The document provides a graphical professional resume of Rahmat Hidayat, outlining his work experience from 1996-2012 in project planning, scheduling, and control roles for various oil, gas, and petrochemical projects in Indonesia, Malaysia, Australia, Qatar, and Japan. It details his roles and responsibilities on specific projects such as the Senoro Gas Development Project in Indonesia and the 3,500 MTPD Ammonia Urea PKT-5 project in Indonesia. The resume highlights his expertise in areas such as project scheduling, risk management, maintenance planning, and portfolio management.
Top profile Call Girls In daman [ 7014168258 ] Call Me For Genuine Models We ...
My Professional Graphical CV
1. Graphical Professional Resume of
Rahmat Hidayat
hidymat@gmail.com +62-82126152075
Updated as of November 2018
rahmat-hidayat-7453b4174 rahmat.hidayat.5680@Hidymat @hidymat
2. Senoro Gas Development Project (2x155 MMScfd), Indonesia
My Role #1: Senior Project Planning & Controller (2015 – 2017)
My Role #2: Maintenance Planning & TAR Supervisor (2016)
Central Processing Plant (CPP) Commissioned
Flare
Rigging Works
Main Control Room
it’s me
it’s me
Piping Works
Jetty Head & Loading Arms Commissioned
1
3. Senoro Gas Development Project (2x155 MMScfd), Indonesia
My Role #1: Senior Project Planning & Controller (2015 – 2017)
My Role #2: Maintenance Planning & TAR Supervisor (2016)
Main Roles as Client:
I. During Project Construction Stage :
1. Supervising Main Contractor i.e. Tripatra EC and Samsung Consortium
2. Expediting Project Schedule to achieve planed milestones
3. Reviewing Turn Over Package Completion
4. Verifying Contractor’s claims
5. Preparing Schedule EOT& Cost CO to Regulator Body (SKK Migas)
II. During Plant Operation Stage :
1. Managing preventive and corrective maintenances
2. Studying and Planning for Yearly Turn-Around (TAR)
2
4. Senoro Gas Development Project (2x155 MMScfd), Indonesia
My Role #1: Senior Project Planning & Controller (2015 – 2017)
My Role #2: Maintenance Planning & TAR Supervisor (2016)
Primavera P6 Master Schedule
Area Density Calculation
Cost Impact Analysis
Manpower Loading Analysis
Monte Carlo -
PERT Schedule Risk
Project Progress
3
5. Senoro Gas Development Project (2x155 MMScfd), Indonesia
My Role #1: Senior Project Planning & Controller (2015 – 2017)
My Role #2: Maintenance Planning & TAR Supervisor (2016)
Plant Maintenance
Preventive Corrective
T A R
Infras Maintenance Rotating Eqp. Maintenance
Metering Callibration
Condition
Monitoring
Lube Oil Analysis
Partial Discharge
Mechanical Seal
Spare Parts, Tools, Consumables
TAR Schedule
Procurement
SAP PM
Turn Around
4
6. 3,500 MTPD Ammonia Urea PKT-5
Pupuk Kaltim Indonesia
Projects Portfolio Management & Control
My Role #1: Corporate Planning & Control Manager (2013-2014)
My Role #2: General Manager of Project Control Division (2012-2013)
My Role #3: Business Ethic Committee (2012-2013)
My Role #4: Senior Risk Management Officer (2011-2012)
Toyo Global Leader Training, Chiba, Japan 2012
IKPT – Toyo’s General Managers
1) Master Schedule Review 2) Risk Assessment 3) EVM Review (Budget (PV), Actual Cost
(AC), Progress (EV), EAC) 4) Recovery & Mitigation 5)PDCA (Plan, Do, Check, Action)
PPGJ Gas Processing , 70 MMSCFD
Pertamina EP, Indonesia
2,750 MTPD Ammonia Urea P2B
Pupuk Pusri, Indonesia
it’s me
5
7. Projects Portfolio Management & Control
My Role #1: Corporate Planning & Control Manager (2013-2014)
My Role #2: General Manager of Project Control Division (2012-2013)
My Role #3: Business Ethic Committee (2012-2013)
My Role #4: Senior Risk Management Officer (2011-2012)
Risk Assessment
Project Financial Performance Review
Coal Boiler 2x220 MTPH
Pupuk Kaltim, Indonesia
6
8. Collie Urea Coal Gasification
Project Development, PERTH - WA
My Role : Owner Team – Planning & Scheduling Engineer (2009-2011)
Collie WA Existing Ammonia Plant
Utility Flow Diagram
Overall Plot Plan
it’s me
7
9. Qatar 3LLNG Projects
Chiyoda Corporation, YOKOHAMA - JAPAN
My Role : Senior Scheduler & Cost Coordinator (2007-2008)
Construction Area
Density
Construction Work Sequence
Piping Work Study Manpower Loading
8
10. Malaysia MLNG
MW Kellogg & JGC, Bintulu - Malaysia
My Role : Field Scheduling Support Engineer (2003)
SPR P3 - 3D Schedule
9
11. EPC Projects (1996 – 2012)
My Roles : Project Planning & Scheduling Engineer, Proposal Services Engineer,
Field Project Control Coordinator
Merbau Gas Processing Plant 68 MMScfd
Sumatera, Indonesia 2005
175 KM 32” Cross Country Pipeline
Sumatera, Indonesia 2004
Kujang 1B Ammonia Urea 1750 MTPD
Cikampek, Indonesia 2003 CGS10 Crude Oil Gathering Station
Duri, Indonesia 2000
10