MIGRATION PROJECTS – SHAREPOINT
1
CONTENTS
SharePoint Migration...............................................................................................................................................................................................1
Introduction.............................................................................................................................................................................................................1
Tools.......................................................................................................................................................................................................................1
Project: USAmeriBank..............................................................................................................................................................................................2
Migration – SharePoint 2007 to SharePoint 2013................................................................................................................................2
Introduction........................................................................................................................................................................................................2
Requirements.....................................................................................................................................................................................................2
Project: SJHC – Capital Budget Approval Process.....................................................................................................................................3
Custom Migration.................................................................................................................................................................................................3
Introduction........................................................................................................................................................................................................3
Requirements.....................................................................................................................................................................................................4
Project: Just Energy...................................................................................................................................................................................................5
Intranet Migration from SharePoint 2007 to SharePoint 2013......................................................................................................5
Introduction........................................................................................................................................................................................................5
Requirements.....................................................................................................................................................................................................5
Project: Quanex...........................................................................................................................................................................................................6
Redesigning & Re-Migrating to SharePoint 2010 as per best practices..................................................................................6
Introduction........................................................................................................................................................................................................6
Requirements.....................................................................................................................................................................................................6
Project: Palm Beach Country Schools (PBCS)...............................................................................................................................................7
SharePoint 2010 to SharePoint 2013 Migration....................................................................................................................................7
Introduction........................................................................................................................................................................................................7
Requirements.....................................................................................................................................................................................................7
Project: Lee County Electric Cooperative (LCEC)........................................................................................................................................9
TFS Server Migration...........................................................................................................................................................................................9
Introduction........................................................................................................................................................................................................9
Requirements.....................................................................................................................................................................................................9
Project Server Migration................................................................................................................................................................................10
Introduction.....................................................................................................................................................................................................10
Requirements..................................................................................................................................................................................................10
Project: Tamarac......................................................................................................................................................................................................11
2
Exchange Migration..........................................................................................................................................................................................11
Introduction.....................................................................................................................................................................................................11
Requirements..................................................................................................................................................................................................11
1
SHAREPOINT MIGRATION
INTRODUCTION
SharePoint migration decisions have become more complicated due to the rapidly expanding volume of enterprise
content and evolving user needs and expectations. Trends like social media, mobility and cloud computing have
influenced enterprise collaboration and content management, prompting new features in SharePoint 2013 and making
SharePoint Online an appealing option for some workloads.
While companies may find that SharePoint 2010 meets their content management and collaboration needs, some are
considering SharePoint 2013, while others have questions about migrating content from third-party content management
systems to SharePoint environments.
Others are considering SharePoint Online, the cloud-based version of the platform. It can reduce maintenance and
management headaches and ease the experience for remote workers or third-party contractors. But migrating to
SharePoint Online can also break site customizations, so user beware.
No matter the type of migration, concerns about SharePoint architecture, data integrity, governance and performance
remain important. The growing significance of metadata as a way to categorize information and make it more findable
adds another layer of complexity to any SharePoint migration.
TOOLS
We have used the following approaches and tools to migrate:
1. Content Database Migration
- Migration of content database from source to destination.
- This is the most preferred option for migration
2. PowerShell scripts - “stsadm” – Backup – Restore method
- Another automation scripting tool to perform migration
3. ShareGate GUI & ShareGate scripts
- Third-party tool for migration
4. Metalogix GUI & Metalogix scripts
- Third-party tool for migration
2
PROJECT: USAMERIBANK
MIGRATION – SHAREPOINT 2007 TO SHAREPOINT 2013
INTRODUCTION
A leading independent bank serving Florida and Alabama with more than $2 billion in deposits, USAmeriBank is highly
capitalized to ensure tremendous financial stability and provide the flexibility to offer solutions that are beyond of the
capabilities of rigid regional or national companies. Their current environment was SharePoint 2007. USAmeriBank current
environment was SharePoint 2007. We migrated it to SharePoint 2013.
REQUIREMENTS
We performed a content migration for USAmeriBank from SharePoint 2007 to SharePoint 2013.
Before migration, we performed a health-check on both, their current SharePoint 2007 and their new SharePoint 2013
environment.
We used ShareGate and custom PowerShell scripts for the migration.
The above screenshot is their SharePoint 2007 environment. We migrated it to SharePoint 2013.
3
PROJECT: SJHC – CAPITAL BUDGET APPROVAL PROCESS
CUSTOM MIGRATION
INTRODUCTION
SJHC (South Jersey Hospital Company) is a nonprofit health care organization with four multi-specialty health centers and
a total of more than 60 locations. The network, which traces its roots to 1899, comprises three hospitals, a comprehensive
cancer center, several multi-specialty health centers and a total of more than 100 locations. These include urgent care;
outpatient imaging and rehabilitation; numerous specialty centers, including sleep medicine, cardiac testing, digestive
health and wound care; hospice and home care; and more than 30 primary and specialty physician practices in Gloucester,
Cumberland, Salem and Camden counties. For SJHC, we migrated the custom workflow from SharePoint 2007 to
SharePoint 2013.
4
REQUIREMENTS
SJHC had their intranet developed in SharePoint 2007. So, they wanted to migrate SJHC environment to SharePoint 2010.
Later, when SP 2013, was released, we migrated from SharePoint 2010 to SharePoint 2013.
They had their state-machine workflows, currently in-progress (in SharePoint 2007) and they wanted to have that in the
same state only. Moreover, their content was too huge.
To achieve this, we chose the content-DB migration as the migration approach. The main reason, was to have the custom
workflows migrated, along with their current stage and running instances. So, for 2010 and later, from SharePoint 2010 to
SharePoint 2013, we chose this approach for migration.
5
PROJECT: JUST ENERGY
INTRANET MIGRATION FROM SHAREPOINT 2007 TO SHAREPOINT 2013
INTRODUCTION
Just Energy is a leading provider of natural gas, electricity and green energy. We were established in 1997 and as a publicly
traded company, serve more than 2 million customers across North America. Along with electricity and natural gas supply,
we offer green energy product options and energy efficient programs that let customers support a cleaner environment.
Just Energy stands by its vision to be the gold standard in retail energy delivering stability, value and innovation in every
customer, shareholder, employee and community relationship. Our vision serves as the framework for every aspect of our
business.
REQUIREMENTS
Just Energy wanted their intranet migrated from SharePoint 2007 to SharePoint 2013.
We migrated their intranet portal from SharePoint 2007 to SharePoint 2013. The approach was content database
migration, along with ShareGate and custom PowerShell script.
They also had many custom solutions deployed on their SharePoint 2007 environment. We migrated these custom
solutions also, from SharePoint 2007 to SharePoint 2013, using Visual Studio 2008 and Visual Studio 2013.
6
PROJECT: QUANEX
REDESIGNING & RE-MIGRATING TO SHAREPOINT 2010 AS PER BEST PRACTICES
INTRODUCTION
Headquartered in Houston, Texas, with locations around the world, Quanex Building Products Corporation is an industry-
leading manufacturer of engineered materials and components for building products sold to Original Equipment
Manufacturers (OEMs). We design and produce energy-efficient window and door products, systems and solutions, as well
as kitchen and bathroom cabinet components.
REQUIREMENTS
Quanex had their intranet setup in SharePoint 2010. But, they wanted us to have it done in the approach where the best
practices are maintained.
They had 3 environments – Staging, Dev and Production. Also, they had K2 servers in all the 3 environments. With this,
they had their intranet portal with no proper site structure. We analyzed their current environment and redesigned the
environment. Based on that, we migrated the content.
We migrated the contents using PowerShell “stsadm” backup-restore method. Also, using the same approach, we
migrated K2 servers.
7
PROJECT: PALM BEACH COUNTRY SCHOOLS (PBCS)
SHAREPOINT 2010 TO SHAREPOINT 2013 MIGRATION
INTRODUCTION
The School District of Palm Beach County is the eleventh largest in the nation and the fifth largest in the state of Florida
with 185 schools, serving more than 183,000 students who speak 150 languages and dialects. As the largest employer in
Palm Beach County, the school district has nearly 21,000 employees, including more than 12,000 teachers.
REQUIREMENTS
For PCBS, we performed the migration from SharePoint 2010 to SharePoint 2013.
We had huge database to be migrated. So, we decided to go for content database migration. This migration had many
content DBs and 2 web applications.
They had also used another 3rd
party solutions, and deployed it on their environment. Along with their custom WSPs. We
migrated that too, using Content Database migration approach.
The other solution was their support site.
8
For this, we had performed the content migration, along with some branding issues and performance issues fixed.
9
PROJECT: LEE COUNTY ELECTRIC COOPERATIVE (LCEC)
TFS SERVER MIGRATION
INTRODUCTION
Lee County Electric Cooperative has been serving Southwest Florida’s energy needs since 1940. LCEC was created to
deliver power to cooperative members. The principle on which we were founded – service to local community. LCEC
currently serves nearly 200,000 customers in Lee County and parts of Collier, Hendry, Charlotte, and Broward counties.
REQUIREMENTS
LCEC team was using TFS 2010 to manage all their projects. They want to migrate their TFS server 2010 data to TFS server
2015.
Their architecture had 2 application server and 2 Build Servers for TFS. Each had multiple project collection having the
database sizes to 10 GB each (Server).
We installed and configured the TFS in each of the new servers. Then, after configuration, we perform the Content
database migration for each of the servers so as to get all the data in the same position as that in the current environment.
10
PROJECT SERVER MIGRATION
INTRODUCTION
Lee County Electric Cooperative has been serving Southwest Florida’s energy needs since 1940. LCEC was created to
deliver power to cooperative members. The principle on which we were founded – service to local community. LCEC
currently serves nearly 200,000 customers in Lee County and parts of Collier, Hendry, Charlotte, and Broward counties.
REQUIREMENTS
LCEC also wanted to migrate all the existing projects from Project Server 2010 to Project Server 2013. We have completed
this migration using content database migration and PowerShell scripts.
Their architecture had 3 application servers for Project server. Each had multiple site collections having the database sizes
to 5 GB each (Server).
We configured the Project server Service application in each of the new servers. Then, after configuration, we perform the
content-db migration for each of the servers so as to get all the data in the same position as that in the current
environment.
11
PROJECT: TAMARAC
EXCHANGE MIGRATION
INTRODUCTION
Ideally situated in western Broward County, Tamarac provides access to highways, railways, airports and waterways, and a
wealth of cultural and sports activities. Tamarac covers a 12-square mile area and is home to more than 60,000 residents
and approximately 2,000 businesses. Since its founding in 1963, the median age of the residents continue to grow
younger and they are becoming more culturally diverse; all attracted to the neighborhoods, parks and recreation, and
business opportunities that make Tamarac “The City for Your Life”
REQUIREMENTS
Tamarac was using Exchange 2003 for their inbound and outbound mails.
They wanted a migration to the latest Exchange servers i.e. - Exchange 2013. We performed this migration using a third
party tool - CodeTwo. CodeTwo Exchange Migration enables direct migrations from Exchange 2003 to 2013, at the same
time reducing the amount of time and number of pre-configuration tasks required to complete the job.
12
They also wanted Cross Forest Migration of current Windows Active Directory 2003 to an existing Active Directory 2008
R2. This was a bit of a typical requirement as it was 2003 and that too cross-forest migration from 2003 to 2008 R2. Still,
we used Active Directory Migration Tool 3.2 (ADMT 3.2) to perform this migration. ADMT is a free utility that allows you to
migrate objects (users, computers, groups, etc.) from one Windows Server Active Directory domain/forest to another.

More Related Content

What's hot

SPSHOU - Upgrading and Migrating to SharePoint 2016 like a Pro
SPSHOU - Upgrading and Migrating to SharePoint 2016 like a ProSPSHOU - Upgrading and Migrating to SharePoint 2016 like a Pro
SPSHOU - Upgrading and Migrating to SharePoint 2016 like a ProBrian Culver
 
Security and Compliance with SharePoint and Office 365
Security and Compliance with SharePoint and Office 365Security and Compliance with SharePoint and Office 365
Security and Compliance with SharePoint and Office 365Richard Harbridge
 
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...Chirag Patel
 
Concurrency SharePoint Summit 2015
Concurrency SharePoint Summit 2015Concurrency SharePoint Summit 2015
Concurrency SharePoint Summit 2015Drew Madelung
 
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...Richard Harbridge
 
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?Nikkia Carter
 
Building SharePoint 2016 Hybrid the right way
Building SharePoint 2016 Hybrid the right wayBuilding SharePoint 2016 Hybrid the right way
Building SharePoint 2016 Hybrid the right wayBrian Culver
 
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...Accelerate your journey to the cloud using the Microsoft SharePoint Migration...
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...Vignesh Ganesan I Microsoft MVP
 
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...Chirag Patel
 
Office365 Video - Learn it - Love it - Use it | Collab365
Office365 Video - Learn it - Love it - Use it | Collab365Office365 Video - Learn it - Love it - Use it | Collab365
Office365 Video - Learn it - Love it - Use it | Collab365Drew Madelung
 
Content publishing and communication strategies for office 365
Content publishing and communication strategies for office 365Content publishing and communication strategies for office 365
Content publishing and communication strategies for office 365Maarten Visser
 
Establishing a Collaboration Roadmap
Establishing a Collaboration RoadmapEstablishing a Collaboration Roadmap
Establishing a Collaboration RoadmapDrew Madelung
 
Introduction to SharePoint 2013
Introduction to SharePoint 2013Introduction to SharePoint 2013
Introduction to SharePoint 2013Folio3 Software
 
Guiding a Successful SharePoint Implementation
Guiding a Successful SharePoint ImplementationGuiding a Successful SharePoint Implementation
Guiding a Successful SharePoint ImplementationRandy Williams
 
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection Boundary
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection BoundarySPSNE17 - The Wall: Overcoming SharePoint’s Site Collection Boundary
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection BoundaryJonathan Ralton
 
SharePoint Overview
SharePoint OverviewSharePoint Overview
SharePoint OverviewAmy Phillips
 
IAMCP - Cloud Platform Overview & Partner Opportunities
IAMCP - Cloud Platform Overview & Partner OpportunitiesIAMCP - Cloud Platform Overview & Partner Opportunities
IAMCP - Cloud Platform Overview & Partner OpportunitiesRichard Harbridge
 
Intro to Office 365 Admin
Intro to Office 365 AdminIntro to Office 365 Admin
Intro to Office 365 AdminNikkia Carter
 
Office 365 Groups Deep Dive
Office 365 Groups Deep DiveOffice 365 Groups Deep Dive
Office 365 Groups Deep DiveAndré Vala
 
How to implement SharePoint in your organization
How to implement SharePoint in your organizationHow to implement SharePoint in your organization
How to implement SharePoint in your organizationSPC Adriatics
 

What's hot (20)

SPSHOU - Upgrading and Migrating to SharePoint 2016 like a Pro
SPSHOU - Upgrading and Migrating to SharePoint 2016 like a ProSPSHOU - Upgrading and Migrating to SharePoint 2016 like a Pro
SPSHOU - Upgrading and Migrating to SharePoint 2016 like a Pro
 
Security and Compliance with SharePoint and Office 365
Security and Compliance with SharePoint and Office 365Security and Compliance with SharePoint and Office 365
Security and Compliance with SharePoint and Office 365
 
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...
Supporting third-party access and sharing in Microsoft Teams - Teams Day Onli...
 
Concurrency SharePoint Summit 2015
Concurrency SharePoint Summit 2015Concurrency SharePoint Summit 2015
Concurrency SharePoint Summit 2015
 
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...
Strategy & Success: Practical Tools & Techniques For The Strategist, Architec...
 
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?
SharePoint vs Microsoft Teams vs Office 365 Groups: What Should I Use When?
 
Building SharePoint 2016 Hybrid the right way
Building SharePoint 2016 Hybrid the right wayBuilding SharePoint 2016 Hybrid the right way
Building SharePoint 2016 Hybrid the right way
 
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...Accelerate your journey to the cloud using the Microsoft SharePoint Migration...
Accelerate your journey to the cloud using the Microsoft SharePoint Migration...
 
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...
Understanding Security and Compliance in Microsoft Teams - M365 Saturday Bang...
 
Office365 Video - Learn it - Love it - Use it | Collab365
Office365 Video - Learn it - Love it - Use it | Collab365Office365 Video - Learn it - Love it - Use it | Collab365
Office365 Video - Learn it - Love it - Use it | Collab365
 
Content publishing and communication strategies for office 365
Content publishing and communication strategies for office 365Content publishing and communication strategies for office 365
Content publishing and communication strategies for office 365
 
Establishing a Collaboration Roadmap
Establishing a Collaboration RoadmapEstablishing a Collaboration Roadmap
Establishing a Collaboration Roadmap
 
Introduction to SharePoint 2013
Introduction to SharePoint 2013Introduction to SharePoint 2013
Introduction to SharePoint 2013
 
Guiding a Successful SharePoint Implementation
Guiding a Successful SharePoint ImplementationGuiding a Successful SharePoint Implementation
Guiding a Successful SharePoint Implementation
 
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection Boundary
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection BoundarySPSNE17 - The Wall: Overcoming SharePoint’s Site Collection Boundary
SPSNE17 - The Wall: Overcoming SharePoint’s Site Collection Boundary
 
SharePoint Overview
SharePoint OverviewSharePoint Overview
SharePoint Overview
 
IAMCP - Cloud Platform Overview & Partner Opportunities
IAMCP - Cloud Platform Overview & Partner OpportunitiesIAMCP - Cloud Platform Overview & Partner Opportunities
IAMCP - Cloud Platform Overview & Partner Opportunities
 
Intro to Office 365 Admin
Intro to Office 365 AdminIntro to Office 365 Admin
Intro to Office 365 Admin
 
Office 365 Groups Deep Dive
Office 365 Groups Deep DiveOffice 365 Groups Deep Dive
Office 365 Groups Deep Dive
 
How to implement SharePoint in your organization
How to implement SharePoint in your organizationHow to implement SharePoint in your organization
How to implement SharePoint in your organization
 

Viewers also liked

Building contextual experiences with the Office Graph
Building contextual experiences with the Office GraphBuilding contextual experiences with the Office Graph
Building contextual experiences with the Office GraphWaldek Mastykarz
 
Fascinating final
Fascinating  finalFascinating  final
Fascinating finalfndali
 
Recyle the E-waste-T
Recyle the E-waste-TRecyle the E-waste-T
Recyle the E-waste-Talind tiwari
 
Christopher_Bates_FW16_Menswear_Lookbook
Christopher_Bates_FW16_Menswear_LookbookChristopher_Bates_FW16_Menswear_Lookbook
Christopher_Bates_FW16_Menswear_LookbookChristopher Bates
 
Coking coal merger and acquisition (M&A) trends
Coking coal merger and acquisition (M&A) trendsCoking coal merger and acquisition (M&A) trends
Coking coal merger and acquisition (M&A) trendsSmithers Apex
 
Концепция по организации обращения с фармацевтическими отходами в республике ...
Концепция по организации обращения с фармацевтическими отходами в республике ...Концепция по организации обращения с фармацевтическими отходами в республике ...
Концепция по организации обращения с фармацевтическими отходами в республике ...cesbelarus
 
NextGen Portal for Your Organization
NextGen Portal for Your OrganizationNextGen Portal for Your Organization
NextGen Portal for Your OrganizationWaldek Mastykarz
 
Technology and information literacy
Technology and information literacyTechnology and information literacy
Technology and information literacyRey-an Baricanosa
 
Construisez votre intranet avec microsoft office 365 sans code a os canadia...
Construisez votre intranet avec microsoft office 365 sans code   a os canadia...Construisez votre intranet avec microsoft office 365 sans code   a os canadia...
Construisez votre intranet avec microsoft office 365 sans code a os canadia...Samuel Lévesque
 
Must have tools for SharePoint
Must have tools for SharePointMust have tools for SharePoint
Must have tools for SharePointAlistair Pugin
 
Музейная история
Музейная историяМузейная история
Музейная историяKit Keren
 
Project managementprocess.ppt
Project managementprocess.pptProject managementprocess.ppt
Project managementprocess.pptJay Shah
 

Viewers also liked (15)

Building contextual experiences with the Office Graph
Building contextual experiences with the Office GraphBuilding contextual experiences with the Office Graph
Building contextual experiences with the Office Graph
 
Fascinating final
Fascinating  finalFascinating  final
Fascinating final
 
Recyle the E-waste-T
Recyle the E-waste-TRecyle the E-waste-T
Recyle the E-waste-T
 
Portfolio 1 b-klasu
Portfolio 1 b-klasuPortfolio 1 b-klasu
Portfolio 1 b-klasu
 
Christopher_Bates_FW16_Menswear_Lookbook
Christopher_Bates_FW16_Menswear_LookbookChristopher_Bates_FW16_Menswear_Lookbook
Christopher_Bates_FW16_Menswear_Lookbook
 
Resume
ResumeResume
Resume
 
Coking coal merger and acquisition (M&A) trends
Coking coal merger and acquisition (M&A) trendsCoking coal merger and acquisition (M&A) trends
Coking coal merger and acquisition (M&A) trends
 
Концепция по организации обращения с фармацевтическими отходами в республике ...
Концепция по организации обращения с фармацевтическими отходами в республике ...Концепция по организации обращения с фармацевтическими отходами в республике ...
Концепция по организации обращения с фармацевтическими отходами в республике ...
 
NextGen Portal for Your Organization
NextGen Portal for Your OrganizationNextGen Portal for Your Organization
NextGen Portal for Your Organization
 
Technology and information literacy
Technology and information literacyTechnology and information literacy
Technology and information literacy
 
EVOLVE'15 | Enhance | Rene Ugarte | AEM Quality Assurance
EVOLVE'15 | Enhance | Rene Ugarte | AEM Quality AssuranceEVOLVE'15 | Enhance | Rene Ugarte | AEM Quality Assurance
EVOLVE'15 | Enhance | Rene Ugarte | AEM Quality Assurance
 
Construisez votre intranet avec microsoft office 365 sans code a os canadia...
Construisez votre intranet avec microsoft office 365 sans code   a os canadia...Construisez votre intranet avec microsoft office 365 sans code   a os canadia...
Construisez votre intranet avec microsoft office 365 sans code a os canadia...
 
Must have tools for SharePoint
Must have tools for SharePointMust have tools for SharePoint
Must have tools for SharePoint
 
Музейная история
Музейная историяМузейная история
Музейная история
 
Project managementprocess.ppt
Project managementprocess.pptProject managementprocess.ppt
Project managementprocess.ppt
 

Similar to SharePoint Migration projects - Show Case Document

Firstlook of share point 2019
Firstlook of share point 2019Firstlook of share point 2019
Firstlook of share point 2019Hussain Naqvi
 
Share Upgrading and Migrating to SharePoint 2016 Like a Pro
Share Upgrading and Migrating to SharePoint 2016 Like a ProShare Upgrading and Migrating to SharePoint 2016 Like a Pro
Share Upgrading and Migrating to SharePoint 2016 Like a ProBrian Culver
 
Metalogix content matrix alternative | Saketa Migrator
Metalogix content matrix alternative | Saketa Migrator Metalogix content matrix alternative | Saketa Migrator
Metalogix content matrix alternative | Saketa Migrator Rajesh Kumar A
 
SharePoint Migration Preparation
SharePoint Migration PreparationSharePoint Migration Preparation
SharePoint Migration PreparationSysKit Ltd
 
Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16MILL5
 
Accelerate Report Migrations from Cognos Power BI & Tableau
Accelerate Report Migrations from Cognos Power BI & TableauAccelerate Report Migrations from Cognos Power BI & Tableau
Accelerate Report Migrations from Cognos Power BI & TableauSenturus
 
Houston TechFest 2017- Migrate and Upgrade to 2016 Succesfully
Houston TechFest 2017- Migrate and Upgrade to 2016 SuccesfullyHouston TechFest 2017- Migrate and Upgrade to 2016 Succesfully
Houston TechFest 2017- Migrate and Upgrade to 2016 SuccesfullyBrian Culver
 
Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16MILL5
 
SharePoint Project Potfolio- Trimantra
SharePoint Project Potfolio- TrimantraSharePoint Project Potfolio- Trimantra
SharePoint Project Potfolio- TrimantraMihir G.
 
What Makes Migrating to the Cloud Different Than On-Premises
What Makes Migrating to the Cloud Different Than On-PremisesWhat Makes Migrating to the Cloud Different Than On-Premises
What Makes Migrating to the Cloud Different Than On-PremisesChristian Buckley
 
PROJECT FAST INVENTORY Delivere.docx
PROJECT FAST INVENTORY  Delivere.docxPROJECT FAST INVENTORY  Delivere.docx
PROJECT FAST INVENTORY Delivere.docxwoodruffeloisa
 
Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Steve Xu
 
Deployment guide for share point 2013
Deployment guide for share point 2013Deployment guide for share point 2013
Deployment guide for share point 2013Vinh Nguyen
 
Running Data Platforms Like Products
Running Data Platforms Like ProductsRunning Data Platforms Like Products
Running Data Platforms Like ProductsVMware Tanzu
 
Deployment guide for Microsoft SharePoint 2013
Deployment guide for Microsoft SharePoint 2013Deployment guide for Microsoft SharePoint 2013
Deployment guide for Microsoft SharePoint 2013Vinh Nguyen
 
Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Heo Gòm
 

Similar to SharePoint Migration projects - Show Case Document (20)

SharePoint Migration Guide
SharePoint Migration GuideSharePoint Migration Guide
SharePoint Migration Guide
 
Firstlook of share point 2019
Firstlook of share point 2019Firstlook of share point 2019
Firstlook of share point 2019
 
Share Upgrading and Migrating to SharePoint 2016 Like a Pro
Share Upgrading and Migrating to SharePoint 2016 Like a ProShare Upgrading and Migrating to SharePoint 2016 Like a Pro
Share Upgrading and Migrating to SharePoint 2016 Like a Pro
 
Metalogix content matrix alternative | Saketa Migrator
Metalogix content matrix alternative | Saketa Migrator Metalogix content matrix alternative | Saketa Migrator
Metalogix content matrix alternative | Saketa Migrator
 
SharePoint Migration Preparation
SharePoint Migration PreparationSharePoint Migration Preparation
SharePoint Migration Preparation
 
SAP BODS 4.2
SAP BODS 4.2 SAP BODS 4.2
SAP BODS 4.2
 
Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16
 
Accelerate Report Migrations from Cognos Power BI & Tableau
Accelerate Report Migrations from Cognos Power BI & TableauAccelerate Report Migrations from Cognos Power BI & Tableau
Accelerate Report Migrations from Cognos Power BI & Tableau
 
Houston TechFest 2017- Migrate and Upgrade to 2016 Succesfully
Houston TechFest 2017- Migrate and Upgrade to 2016 SuccesfullyHouston TechFest 2017- Migrate and Upgrade to 2016 Succesfully
Houston TechFest 2017- Migrate and Upgrade to 2016 Succesfully
 
Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16Sql server bi poweredby pw_v16
Sql server bi poweredby pw_v16
 
SharePoint Project Potfolio- Trimantra
SharePoint Project Potfolio- TrimantraSharePoint Project Potfolio- Trimantra
SharePoint Project Potfolio- Trimantra
 
What Makes Migrating to the Cloud Different Than On-Premises
What Makes Migrating to the Cloud Different Than On-PremisesWhat Makes Migrating to the Cloud Different Than On-Premises
What Makes Migrating to the Cloud Different Than On-Premises
 
PROJECT FAST INVENTORY Delivere.docx
PROJECT FAST INVENTORY  Delivere.docxPROJECT FAST INVENTORY  Delivere.docx
PROJECT FAST INVENTORY Delivere.docx
 
Final Project
Final ProjectFinal Project
Final Project
 
Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Deployment guide-for-share point-2013
Deployment guide-for-share point-2013
 
Deployment guide for share point 2013
Deployment guide for share point 2013Deployment guide for share point 2013
Deployment guide for share point 2013
 
Running Data Platforms Like Products
Running Data Platforms Like ProductsRunning Data Platforms Like Products
Running Data Platforms Like Products
 
Operations hub implementation 25.01.22
Operations hub implementation 25.01.22Operations hub implementation 25.01.22
Operations hub implementation 25.01.22
 
Deployment guide for Microsoft SharePoint 2013
Deployment guide for Microsoft SharePoint 2013Deployment guide for Microsoft SharePoint 2013
Deployment guide for Microsoft SharePoint 2013
 
Deployment guide-for-share point-2013
Deployment guide-for-share point-2013Deployment guide-for-share point-2013
Deployment guide-for-share point-2013
 

Recently uploaded

办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number SystemsJheuzeDellosa
 
XpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsXpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsMehedi Hasan Shohan
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfjoe51371421
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Unit 1.1 Excite Part 1, class 9, cbse...
Unit 1.1 Excite Part 1, class 9, cbse...Unit 1.1 Excite Part 1, class 9, cbse...
Unit 1.1 Excite Part 1, class 9, cbse...aditisharan08
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
buds n tech IT solutions
buds n  tech IT                solutionsbuds n  tech IT                solutions
buds n tech IT solutionsmonugehlot87
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?Watsoo Telematics
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfPower Karaoke
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - InfographicHr365.us smith
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureDinusha Kumarasiri
 

Recently uploaded (20)

办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number Systems
 
XpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsXpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software Solutions
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdf
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Unit 1.1 Excite Part 1, class 9, cbse...
Unit 1.1 Excite Part 1, class 9, cbse...Unit 1.1 Excite Part 1, class 9, cbse...
Unit 1.1 Excite Part 1, class 9, cbse...
 
chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
buds n tech IT solutions
buds n  tech IT                solutionsbuds n  tech IT                solutions
buds n tech IT solutions
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
 
Asset Management Software - Infographic
Asset Management Software - InfographicAsset Management Software - Infographic
Asset Management Software - Infographic
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with Azure
 

SharePoint Migration projects - Show Case Document

  • 2. 1 CONTENTS SharePoint Migration...............................................................................................................................................................................................1 Introduction.............................................................................................................................................................................................................1 Tools.......................................................................................................................................................................................................................1 Project: USAmeriBank..............................................................................................................................................................................................2 Migration – SharePoint 2007 to SharePoint 2013................................................................................................................................2 Introduction........................................................................................................................................................................................................2 Requirements.....................................................................................................................................................................................................2 Project: SJHC – Capital Budget Approval Process.....................................................................................................................................3 Custom Migration.................................................................................................................................................................................................3 Introduction........................................................................................................................................................................................................3 Requirements.....................................................................................................................................................................................................4 Project: Just Energy...................................................................................................................................................................................................5 Intranet Migration from SharePoint 2007 to SharePoint 2013......................................................................................................5 Introduction........................................................................................................................................................................................................5 Requirements.....................................................................................................................................................................................................5 Project: Quanex...........................................................................................................................................................................................................6 Redesigning & Re-Migrating to SharePoint 2010 as per best practices..................................................................................6 Introduction........................................................................................................................................................................................................6 Requirements.....................................................................................................................................................................................................6 Project: Palm Beach Country Schools (PBCS)...............................................................................................................................................7 SharePoint 2010 to SharePoint 2013 Migration....................................................................................................................................7 Introduction........................................................................................................................................................................................................7 Requirements.....................................................................................................................................................................................................7 Project: Lee County Electric Cooperative (LCEC)........................................................................................................................................9 TFS Server Migration...........................................................................................................................................................................................9 Introduction........................................................................................................................................................................................................9 Requirements.....................................................................................................................................................................................................9 Project Server Migration................................................................................................................................................................................10 Introduction.....................................................................................................................................................................................................10 Requirements..................................................................................................................................................................................................10 Project: Tamarac......................................................................................................................................................................................................11
  • 4. 1 SHAREPOINT MIGRATION INTRODUCTION SharePoint migration decisions have become more complicated due to the rapidly expanding volume of enterprise content and evolving user needs and expectations. Trends like social media, mobility and cloud computing have influenced enterprise collaboration and content management, prompting new features in SharePoint 2013 and making SharePoint Online an appealing option for some workloads. While companies may find that SharePoint 2010 meets their content management and collaboration needs, some are considering SharePoint 2013, while others have questions about migrating content from third-party content management systems to SharePoint environments. Others are considering SharePoint Online, the cloud-based version of the platform. It can reduce maintenance and management headaches and ease the experience for remote workers or third-party contractors. But migrating to SharePoint Online can also break site customizations, so user beware. No matter the type of migration, concerns about SharePoint architecture, data integrity, governance and performance remain important. The growing significance of metadata as a way to categorize information and make it more findable adds another layer of complexity to any SharePoint migration. TOOLS We have used the following approaches and tools to migrate: 1. Content Database Migration - Migration of content database from source to destination. - This is the most preferred option for migration 2. PowerShell scripts - “stsadm” – Backup – Restore method - Another automation scripting tool to perform migration 3. ShareGate GUI & ShareGate scripts - Third-party tool for migration 4. Metalogix GUI & Metalogix scripts - Third-party tool for migration
  • 5. 2 PROJECT: USAMERIBANK MIGRATION – SHAREPOINT 2007 TO SHAREPOINT 2013 INTRODUCTION A leading independent bank serving Florida and Alabama with more than $2 billion in deposits, USAmeriBank is highly capitalized to ensure tremendous financial stability and provide the flexibility to offer solutions that are beyond of the capabilities of rigid regional or national companies. Their current environment was SharePoint 2007. USAmeriBank current environment was SharePoint 2007. We migrated it to SharePoint 2013. REQUIREMENTS We performed a content migration for USAmeriBank from SharePoint 2007 to SharePoint 2013. Before migration, we performed a health-check on both, their current SharePoint 2007 and their new SharePoint 2013 environment. We used ShareGate and custom PowerShell scripts for the migration. The above screenshot is their SharePoint 2007 environment. We migrated it to SharePoint 2013.
  • 6. 3 PROJECT: SJHC – CAPITAL BUDGET APPROVAL PROCESS CUSTOM MIGRATION INTRODUCTION SJHC (South Jersey Hospital Company) is a nonprofit health care organization with four multi-specialty health centers and a total of more than 60 locations. The network, which traces its roots to 1899, comprises three hospitals, a comprehensive cancer center, several multi-specialty health centers and a total of more than 100 locations. These include urgent care; outpatient imaging and rehabilitation; numerous specialty centers, including sleep medicine, cardiac testing, digestive health and wound care; hospice and home care; and more than 30 primary and specialty physician practices in Gloucester, Cumberland, Salem and Camden counties. For SJHC, we migrated the custom workflow from SharePoint 2007 to SharePoint 2013.
  • 7. 4 REQUIREMENTS SJHC had their intranet developed in SharePoint 2007. So, they wanted to migrate SJHC environment to SharePoint 2010. Later, when SP 2013, was released, we migrated from SharePoint 2010 to SharePoint 2013. They had their state-machine workflows, currently in-progress (in SharePoint 2007) and they wanted to have that in the same state only. Moreover, their content was too huge. To achieve this, we chose the content-DB migration as the migration approach. The main reason, was to have the custom workflows migrated, along with their current stage and running instances. So, for 2010 and later, from SharePoint 2010 to SharePoint 2013, we chose this approach for migration.
  • 8. 5 PROJECT: JUST ENERGY INTRANET MIGRATION FROM SHAREPOINT 2007 TO SHAREPOINT 2013 INTRODUCTION Just Energy is a leading provider of natural gas, electricity and green energy. We were established in 1997 and as a publicly traded company, serve more than 2 million customers across North America. Along with electricity and natural gas supply, we offer green energy product options and energy efficient programs that let customers support a cleaner environment. Just Energy stands by its vision to be the gold standard in retail energy delivering stability, value and innovation in every customer, shareholder, employee and community relationship. Our vision serves as the framework for every aspect of our business. REQUIREMENTS Just Energy wanted their intranet migrated from SharePoint 2007 to SharePoint 2013. We migrated their intranet portal from SharePoint 2007 to SharePoint 2013. The approach was content database migration, along with ShareGate and custom PowerShell script. They also had many custom solutions deployed on their SharePoint 2007 environment. We migrated these custom solutions also, from SharePoint 2007 to SharePoint 2013, using Visual Studio 2008 and Visual Studio 2013.
  • 9. 6 PROJECT: QUANEX REDESIGNING & RE-MIGRATING TO SHAREPOINT 2010 AS PER BEST PRACTICES INTRODUCTION Headquartered in Houston, Texas, with locations around the world, Quanex Building Products Corporation is an industry- leading manufacturer of engineered materials and components for building products sold to Original Equipment Manufacturers (OEMs). We design and produce energy-efficient window and door products, systems and solutions, as well as kitchen and bathroom cabinet components. REQUIREMENTS Quanex had their intranet setup in SharePoint 2010. But, they wanted us to have it done in the approach where the best practices are maintained. They had 3 environments – Staging, Dev and Production. Also, they had K2 servers in all the 3 environments. With this, they had their intranet portal with no proper site structure. We analyzed their current environment and redesigned the environment. Based on that, we migrated the content. We migrated the contents using PowerShell “stsadm” backup-restore method. Also, using the same approach, we migrated K2 servers.
  • 10. 7 PROJECT: PALM BEACH COUNTRY SCHOOLS (PBCS) SHAREPOINT 2010 TO SHAREPOINT 2013 MIGRATION INTRODUCTION The School District of Palm Beach County is the eleventh largest in the nation and the fifth largest in the state of Florida with 185 schools, serving more than 183,000 students who speak 150 languages and dialects. As the largest employer in Palm Beach County, the school district has nearly 21,000 employees, including more than 12,000 teachers. REQUIREMENTS For PCBS, we performed the migration from SharePoint 2010 to SharePoint 2013. We had huge database to be migrated. So, we decided to go for content database migration. This migration had many content DBs and 2 web applications. They had also used another 3rd party solutions, and deployed it on their environment. Along with their custom WSPs. We migrated that too, using Content Database migration approach. The other solution was their support site.
  • 11. 8 For this, we had performed the content migration, along with some branding issues and performance issues fixed.
  • 12. 9 PROJECT: LEE COUNTY ELECTRIC COOPERATIVE (LCEC) TFS SERVER MIGRATION INTRODUCTION Lee County Electric Cooperative has been serving Southwest Florida’s energy needs since 1940. LCEC was created to deliver power to cooperative members. The principle on which we were founded – service to local community. LCEC currently serves nearly 200,000 customers in Lee County and parts of Collier, Hendry, Charlotte, and Broward counties. REQUIREMENTS LCEC team was using TFS 2010 to manage all their projects. They want to migrate their TFS server 2010 data to TFS server 2015. Their architecture had 2 application server and 2 Build Servers for TFS. Each had multiple project collection having the database sizes to 10 GB each (Server). We installed and configured the TFS in each of the new servers. Then, after configuration, we perform the Content database migration for each of the servers so as to get all the data in the same position as that in the current environment.
  • 13. 10 PROJECT SERVER MIGRATION INTRODUCTION Lee County Electric Cooperative has been serving Southwest Florida’s energy needs since 1940. LCEC was created to deliver power to cooperative members. The principle on which we were founded – service to local community. LCEC currently serves nearly 200,000 customers in Lee County and parts of Collier, Hendry, Charlotte, and Broward counties. REQUIREMENTS LCEC also wanted to migrate all the existing projects from Project Server 2010 to Project Server 2013. We have completed this migration using content database migration and PowerShell scripts. Their architecture had 3 application servers for Project server. Each had multiple site collections having the database sizes to 5 GB each (Server). We configured the Project server Service application in each of the new servers. Then, after configuration, we perform the content-db migration for each of the servers so as to get all the data in the same position as that in the current environment.
  • 14. 11 PROJECT: TAMARAC EXCHANGE MIGRATION INTRODUCTION Ideally situated in western Broward County, Tamarac provides access to highways, railways, airports and waterways, and a wealth of cultural and sports activities. Tamarac covers a 12-square mile area and is home to more than 60,000 residents and approximately 2,000 businesses. Since its founding in 1963, the median age of the residents continue to grow younger and they are becoming more culturally diverse; all attracted to the neighborhoods, parks and recreation, and business opportunities that make Tamarac “The City for Your Life” REQUIREMENTS Tamarac was using Exchange 2003 for their inbound and outbound mails. They wanted a migration to the latest Exchange servers i.e. - Exchange 2013. We performed this migration using a third party tool - CodeTwo. CodeTwo Exchange Migration enables direct migrations from Exchange 2003 to 2013, at the same time reducing the amount of time and number of pre-configuration tasks required to complete the job.
  • 15. 12 They also wanted Cross Forest Migration of current Windows Active Directory 2003 to an existing Active Directory 2008 R2. This was a bit of a typical requirement as it was 2003 and that too cross-forest migration from 2003 to 2008 R2. Still, we used Active Directory Migration Tool 3.2 (ADMT 3.2) to perform this migration. ADMT is a free utility that allows you to migrate objects (users, computers, groups, etc.) from one Windows Server Active Directory domain/forest to another.