SlideShare a Scribd company logo
1 of 20
Roll Handling
Yazid Eideh, David Evans, Ben Johnson, Ben Keach, Dan Richards
Thank You
● Our group would like to thank Spaulding Composites for giving us
the opportunity of working with them at their plant. This opportunity
has bettered us as safety professionals and will help us begin our
careers.
2
Overview
● Scope of Work
● Methods and Findings
● Videos
● Controls/Recommendations
● Questions & Answer Period
● Closing
3
Agenda
● Examined Warehouse
● Thoroughly watched/recorded process
● Determined Possible Solutions
● Followed up with Research
● Chose best Alternative
4
Scope Of Work
● Roll Handling Process
● Ergonomics
● Eliminating Injuries
5
Roll Handling Process
● Rolls must travel from point A to Point B
● Rolls must be maneuvered from horizontal to vertical or
vice versa
● Roll must be held in place while rod is put through the
center of the roll
● Rod with roll on it must be placed onto machine and
locked into place
6
Video of Process
7
Ergonomics
● Eliminate improper lifting
● Incorporate easily usable Machinery
● Prolong the Workers Career
● Avoid unnecessary costs due to Workers Compensation
8
NIOSH Lifting Equation
● Specific Parameters must be met:
○ No twists/turns
○ Load is held 25cm from body
○ Load is held 75cm from the floor
○ Load should not be lifted more than an
additional 25 cm
○ Handles are present allowing for easy
carrying
○ Low frequency of lifts: 1 per 5 minutes per
8 hour shift
9
Methods
● Unsuccessful methods
o PPE
 Use of back belts
 Incorporating handles onto rolls
o Administrative
 Job Rotation
 Different Type of Training
10
Methods
● Successful Methods
o Engineering Controls
 Equipment to Move Rolls
● Lifts
● Rotates
● Holds in Place
● Weighs excess
11
Video of Machine
12
Specs of Machine
● Lifts up to 600 Pounds
● Fits through 30” wide clearance
● Powered by 24 volt rechargeable battery
● Lifts up to 6’ above ground
13
Additional Options
● 12” or 26” Clamp
● Side shifters: Allowing the roll to move 4” side to side
● Clamping Pressure Regulator
● Scales to weigh unused materials
14
Findings
● Lifting without handles exponentially increases difficulty
● With handles, team lifting would still be needed due to
overwhelming weight
● Use of manpower can not eliminate twisting motion as
seen in unloading process
15
Findings
● During transition process:
o Roll is twisted into upright position
o Roll may or may not be located at proper distance
from body and floor
o Depending on where the roll is grabbed, it obeys the
additional height rule
o Handles are not present, making the lift much more
difficult
o Low frequency of lifts per day
16
Machine Disadvantages
● Large cost up front
● Provide training on new equipment to employees
● Wait time for shipping
17
Machine Advantages
● Avoid lower back injuries from lifting/twisting
● Operates faster than employees manually transferring rolls
● Multiple different attachments
● Provides alternative for easier weighing of excess
● Quick payback period from:
o Increased productivity
o Decreased workers comp claims
18
Questions & Answers
19
Closing
● Again, we want to thank Spaulding Composite’s Inc. for
providing us the opportunity of gaining experience and
furthering our knowledge on providing workers with a
safe workplace.
20

More Related Content

What's hot

Ag xri ppt presentation 1
Ag xri ppt presentation 1Ag xri ppt presentation 1
Ag xri ppt presentation 1Don Bogardus
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting OperationsJames McCann
 
Forklift training - refresher course
Forklift training - refresher courseForklift training - refresher course
Forklift training - refresher courseEric Lestock Kay
 
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078oscar gandara
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rulesytcrane
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAAtlantic Training, LLC.
 

What's hot (11)

Ag xri ppt presentation 1
Ag xri ppt presentation 1Ag xri ppt presentation 1
Ag xri ppt presentation 1
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
A Part 6 Lifting Operations
A  Part 6 Lifting OperationsA  Part 6 Lifting Operations
A Part 6 Lifting Operations
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Forklift training - refresher course
Forklift training - refresher courseForklift training - refresher course
Forklift training - refresher course
 
Scaffolding by UWM
Scaffolding by UWMScaffolding by UWM
Scaffolding by UWM
 
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078
Om waltco rgl_rbgl-series_owners_manual_en-us_160225-w_original_85078
 
Cranes ppt
Cranes pptCranes ppt
Cranes ppt
 
Mobile crane safety rules
Mobile crane safety rulesMobile crane safety rules
Mobile crane safety rules
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCA
 

Viewers also liked

Final Version of Paper
Final Version of PaperFinal Version of Paper
Final Version of PaperBen Johnson
 
Pendidikan Dasar dan Terapan KSE Juwiter
Pendidikan Dasar dan Terapan KSE JuwiterPendidikan Dasar dan Terapan KSE Juwiter
Pendidikan Dasar dan Terapan KSE JuwiterEmzet Juwitour
 
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...Emzet Juwitour
 
Juwiter SMPN 1 Sukamulia Lombok Timur
Juwiter SMPN 1 Sukamulia Lombok TimurJuwiter SMPN 1 Sukamulia Lombok Timur
Juwiter SMPN 1 Sukamulia Lombok TimurEmzet Juwitour
 
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok Timur
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok TimurJuwiter : Tabloid Infokes Dinas Kesehatan Lombok Timur
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok TimurEmzet Juwitour
 
Media Informasi dan Promosi Kesehatan
Media Informasi dan Promosi Kesehatan Media Informasi dan Promosi Kesehatan
Media Informasi dan Promosi Kesehatan Emzet Juwitour
 
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013Emzet Juwitour
 
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016Emzet Juwitour
 
Buletin Juwiter SMPN 1 Suralaga
Buletin Juwiter SMPN 1 SuralagaBuletin Juwiter SMPN 1 Suralaga
Buletin Juwiter SMPN 1 SuralagaEmzet Juwitour
 

Viewers also liked (11)

Krishna_Alimili
Krishna_AlimiliKrishna_Alimili
Krishna_Alimili
 
2559 project -1 (1)
2559 project -1 (1)2559 project -1 (1)
2559 project -1 (1)
 
Final Version of Paper
Final Version of PaperFinal Version of Paper
Final Version of Paper
 
Pendidikan Dasar dan Terapan KSE Juwiter
Pendidikan Dasar dan Terapan KSE JuwiterPendidikan Dasar dan Terapan KSE Juwiter
Pendidikan Dasar dan Terapan KSE Juwiter
 
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...
Potret bintang rinjani (desa) kaper : haerul warisin wabup asrul sani kadis n...
 
Juwiter SMPN 1 Sukamulia Lombok Timur
Juwiter SMPN 1 Sukamulia Lombok TimurJuwiter SMPN 1 Sukamulia Lombok Timur
Juwiter SMPN 1 Sukamulia Lombok Timur
 
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok Timur
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok TimurJuwiter : Tabloid Infokes Dinas Kesehatan Lombok Timur
Juwiter : Tabloid Infokes Dinas Kesehatan Lombok Timur
 
Media Informasi dan Promosi Kesehatan
Media Informasi dan Promosi Kesehatan Media Informasi dan Promosi Kesehatan
Media Informasi dan Promosi Kesehatan
 
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013
Peraturan Menteri Lingkungan Hidup Nomor 5 Tahun 2013
 
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016
Tabloid Infokes Dinas Kesehatan Lombok Timur, Edisi Maret 2016
 
Buletin Juwiter SMPN 1 Suralaga
Buletin Juwiter SMPN 1 SuralagaBuletin Juwiter SMPN 1 Suralaga
Buletin Juwiter SMPN 1 Suralaga
 

Similar to Capstone Final Presentation

Forklift Training General
Forklift Training GeneralForklift Training General
Forklift Training GeneralkhaleejCenter
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLift Events
 
Lifting and Rigging Training Slides.pdf
Lifting and Rigging Training Slides.pdfLifting and Rigging Training Slides.pdf
Lifting and Rigging Training Slides.pdfJahirKhan39
 
Presentation Tyre LH
Presentation Tyre LHPresentation Tyre LH
Presentation Tyre LHRedza Amin
 
25_SGW-_Lifting_Techniques (Importance).pptx
25_SGW-_Lifting_Techniques (Importance).pptx25_SGW-_Lifting_Techniques (Importance).pptx
25_SGW-_Lifting_Techniques (Importance).pptxsafetygoodwe
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...AhmedAliKhan38
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid LoaderStarkParks
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile CranesMihajlo Stupar
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekRoseGaming1
 
www.ventracaus.com.au
www.ventracaus.com.auwww.ventracaus.com.au
www.ventracaus.com.auGhazanfar Ali
 
Manual handling battery lifting.pptx
Manual handling   battery lifting.pptxManual handling   battery lifting.pptx
Manual handling battery lifting.pptxSomadevan Sutharsanan
 

Similar to Capstone Final Presentation (20)

Forklift Training General
Forklift Training GeneralForklift Training General
Forklift Training General
 
IE 420 Presentation
IE 420 PresentationIE 420 Presentation
IE 420 Presentation
 
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
PowerLogistics Asia 2014 - Lifting & Hoisting - Best Practices – P V N Chandr...
 
Lifting and Rigging Training Slides.pdf
Lifting and Rigging Training Slides.pdfLifting and Rigging Training Slides.pdf
Lifting and Rigging Training Slides.pdf
 
Presentation Tyre LH
Presentation Tyre LHPresentation Tyre LH
Presentation Tyre LH
 
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
PA PIPE WORK 14 inch spool TH11177-06-PI-10-004-5
 
25_SGW-_Lifting_Techniques (Importance).pptx
25_SGW-_Lifting_Techniques (Importance).pptx25_SGW-_Lifting_Techniques (Importance).pptx
25_SGW-_Lifting_Techniques (Importance).pptx
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Manual handling - Battery lifting.
Manual handling -  Battery lifting.Manual handling -  Battery lifting.
Manual handling - Battery lifting.
 
Equipment Operation, Skid Loader
Equipment Operation, Skid LoaderEquipment Operation, Skid Loader
Equipment Operation, Skid Loader
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Road safety ppt
Road safety pptRoad safety ppt
Road safety ppt
 
Safety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhekSafety engineering module 6 shskwn ejekdndhek
Safety engineering module 6 shskwn ejekdndhek
 
www.ventracaus.com.au
www.ventracaus.com.auwww.ventracaus.com.au
www.ventracaus.com.au
 
ADO-A Chapter 07
ADO-A Chapter 07ADO-A Chapter 07
ADO-A Chapter 07
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
Manual handling battery lifting.pptx
Manual handling   battery lifting.pptxManual handling   battery lifting.pptx
Manual handling battery lifting.pptx
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 

Capstone Final Presentation

  • 1. Roll Handling Yazid Eideh, David Evans, Ben Johnson, Ben Keach, Dan Richards
  • 2. Thank You ● Our group would like to thank Spaulding Composites for giving us the opportunity of working with them at their plant. This opportunity has bettered us as safety professionals and will help us begin our careers. 2
  • 3. Overview ● Scope of Work ● Methods and Findings ● Videos ● Controls/Recommendations ● Questions & Answer Period ● Closing 3
  • 4. Agenda ● Examined Warehouse ● Thoroughly watched/recorded process ● Determined Possible Solutions ● Followed up with Research ● Chose best Alternative 4
  • 5. Scope Of Work ● Roll Handling Process ● Ergonomics ● Eliminating Injuries 5
  • 6. Roll Handling Process ● Rolls must travel from point A to Point B ● Rolls must be maneuvered from horizontal to vertical or vice versa ● Roll must be held in place while rod is put through the center of the roll ● Rod with roll on it must be placed onto machine and locked into place 6
  • 8. Ergonomics ● Eliminate improper lifting ● Incorporate easily usable Machinery ● Prolong the Workers Career ● Avoid unnecessary costs due to Workers Compensation 8
  • 9. NIOSH Lifting Equation ● Specific Parameters must be met: ○ No twists/turns ○ Load is held 25cm from body ○ Load is held 75cm from the floor ○ Load should not be lifted more than an additional 25 cm ○ Handles are present allowing for easy carrying ○ Low frequency of lifts: 1 per 5 minutes per 8 hour shift 9
  • 10. Methods ● Unsuccessful methods o PPE  Use of back belts  Incorporating handles onto rolls o Administrative  Job Rotation  Different Type of Training 10
  • 11. Methods ● Successful Methods o Engineering Controls  Equipment to Move Rolls ● Lifts ● Rotates ● Holds in Place ● Weighs excess 11
  • 13. Specs of Machine ● Lifts up to 600 Pounds ● Fits through 30” wide clearance ● Powered by 24 volt rechargeable battery ● Lifts up to 6’ above ground 13
  • 14. Additional Options ● 12” or 26” Clamp ● Side shifters: Allowing the roll to move 4” side to side ● Clamping Pressure Regulator ● Scales to weigh unused materials 14
  • 15. Findings ● Lifting without handles exponentially increases difficulty ● With handles, team lifting would still be needed due to overwhelming weight ● Use of manpower can not eliminate twisting motion as seen in unloading process 15
  • 16. Findings ● During transition process: o Roll is twisted into upright position o Roll may or may not be located at proper distance from body and floor o Depending on where the roll is grabbed, it obeys the additional height rule o Handles are not present, making the lift much more difficult o Low frequency of lifts per day 16
  • 17. Machine Disadvantages ● Large cost up front ● Provide training on new equipment to employees ● Wait time for shipping 17
  • 18. Machine Advantages ● Avoid lower back injuries from lifting/twisting ● Operates faster than employees manually transferring rolls ● Multiple different attachments ● Provides alternative for easier weighing of excess ● Quick payback period from: o Increased productivity o Decreased workers comp claims 18
  • 20. Closing ● Again, we want to thank Spaulding Composite’s Inc. for providing us the opportunity of gaining experience and furthering our knowledge on providing workers with a safe workplace. 20