MCCS INTERNATIONAL SERVICES
BEHNAM – NOVEMBER 2016
INTEGRATION OF CMMS, EDMS AND WMS
APPLICABLE FOR ONSHORE & OFFSHORE PROJECTS
MCCS INTERNATIONAL SERVICES SUMMARY
1- Project Engineering Phase
MCCS Multi Disciplines Champions Include:
Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Cost Effect Of Rework In Engineering Phase For Issuance Of New
Revision Documents Is Way More Cheaper Than Rework In Project
Execution Phase
Detailed
Design
Documents
Review
Provision of
Technical
Problems
List with
Related
Attachments
Assistant
in issuance of
New Revision
of Related
Documents
CONSEQUENCE:
TIME SAVING IN
PROJECT
EXECUTION
PHASE
2- Project Procurement Engineering Phase
MCCS Multi Disciplines Champions Include:
Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Cost Effect Of MCCS Champions Support In Procurement
Engineering Phase Is Significantly Less Than Delay Cost In
Project Execution Phase
Material
Requisition
Technical
Documents
Review
(MR Packs)
Provision of Check sheet, Test sheet
And Maintenance Procedure as Per
Each PO NO And Related Tag NO(s),
Under relevant System And
Sub-System. No
CONSEQUENCE:
TIME SAVING IN
PROJECT
EXECUTION
PHASE
3- PROJECT COMMISSIONING ENGINEERING
PHASE (PLANNING)
MCCS Multi Disciplines Team Include:
Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc.
Increasing Of Budget Baseline For High Quality Of Pre-
commissioning, Commissioning & Start-up Will Be
Compensated With Early Production Bonus
Technical Preparation For Execution Phase of
Pre-Commissioning, Commissioning,
Start-Up Assistant And Multi Discipline Maintenance
As per Computerise Maintenance Management
System (CMMS) And Electronic Document Management
System (EDMS) And Warehouse Management
System (WMS)
THIS IS INTEGRATION OF CMMS, EDMS & WMS
AS PER CREATION OF RELATEDMASTER DATABASE
CONSEQUENCE: SAFE
COMMISSIONING AND
START-UP AND EARLY
PRODUCTION
4- PROJECT CONSTRUCTION PHASE
Flange Management (Software Basis):
Flange Management Software Will Be Used For Related Planning.
Also Flange Management Service Is Applicable In Oil &
Gas Facilities During Black Shut Down / Overhaul
Joint Data Management
Manual Bolt Torquing
Hydraulic Bolt Torquing
Hydraulic Bolt Tensioning
Joint Breakout
Auditable Report
Confirming System
Safety & Integrity
as per ISO 9001
CONSEQUENCE:
FAILURE
PREVENTION OF
SYSTEMS DUE TO
LEAKING JOINTS
5- PROJECT PRE-COMM. & COMMISSIONING PHASE
N2 He Leak Testing:
Helium Leak Detection Is Known To Be The Most Accurate Method Of Locating
And Quantifying System Leaks.
Also N2 He Leak Testing Service Is Applicable In Oil & Gas
Facilities During Black Shut Down / Overhaul
Pre-engineering of test packs
and test procedures
Consumables (N2/He gas),
equipment & manpower supply
Pressurisation of systems
Data compilation and handover
to the client
Handover of related
Test Package Dossier
to Company and Main
Contractor with
complete sign off.
CONSEQUENCE:
SAFE START-UP
AND SAFE
OPERATION
INTEGRATION OF CMMS, EDMS & WMS
DEFINITION
CMMS: Computerize Maintenance Management System
EDMS: Electronic Document Management System
WMS: Warehouse Management System
MCCS: Mechanical Completion And Commissioning Services
SEQUENCE OF INTEGRATION
STEP 1: Master Database Creation For Project Permanent
Equipment As Per Following Breakdown:
MASTER DATABASE BREAKDOWN
PURCHASING ORDER NUMBER (PO No. – EACH
DISCIPLINE)
RELEVANT TAG No.(s) OF EACH PO No. AS PER
RELATED SYSTEM & SUB-SYSTEM NUMBER (s)
RELEVANT TECHNICAL DOCUMENTS TO EACH TAG
No.(s) SUCH AS DATASHEET, SPECIFICATION, LIST,
DRAWING, DIAGRAM, MANUAL, PROCEDURE, etc.
RELEVANT TECHNICAL INFORMATION FOR
WAREHOUSE SUCH AS STOCK No., STOCK
CATEGORY, MIN/MAX QTY., CERT No., VENDOR
DATA, SUPPLIER NAME, ESTIMATED PRICE, etc.
STEP 2: Provision Of All Related Technical Documents
And Highperlinks As Per Specified Breakdown
Structure:
Considering the current oil & gas market purchasing a
specialized software such as SAP, Zinator, ICAPS, Easy
Plant, Mainta and so on is not affordable. However,
MCCS Integrated Method is a superior solution for
time saving in project execution phase and increase
the plant reliability in operation & maintenance phase.
OIL & GAS PROJECT LIFE CYCLE
WWW.MCCSINTERNATIONAL.COM
THANK YOU

More Related Content

What's hot

Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 dieselpub
 
Applying the energy institute and prci paper gmc
Applying the energy institute and prci paper  gmcApplying the energy institute and prci paper  gmc
Applying the energy institute and prci paper gmcdieselpub
 
BV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCBV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCTran Ngoc Minh
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 enKarel Van Isacker
 
CCOM Final Presentation
CCOM Final PresentationCCOM Final Presentation
CCOM Final PresentationMd Islam
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning WorksCx Associates
 
Hydrology and Water resources software
Hydrology and Water resources softwareHydrology and Water resources software
Hydrology and Water resources softwareHariyali Pujara
 
Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo
Dust Mapping and Control Plan - DMCP by_Deepak Kumar SahooDust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo
Dust Mapping and Control Plan - DMCP by_Deepak Kumar SahooDEEPAK SAHOO
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Daniel Coakley
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobjoseph william
 
Lec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project schedulingLec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project schedulingSyed Hamza
 

What's hot (13)

Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2
 
Applying the energy institute and prci paper gmc
Applying the energy institute and prci paper  gmcApplying the energy institute and prci paper  gmc
Applying the energy institute and prci paper gmc
 
BV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevCBV CTG - Boiler Health Care Service (Plant Care) - RevC
BV CTG - Boiler Health Care Service (Plant Care) - RevC
 
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
VET4SBO Level 2   module 4 - unit 2 - v0.5 enVET4SBO Level 2   module 4 - unit 2 - v0.5 en
VET4SBO Level 2 module 4 - unit 2 - v0.5 en
 
CCOM Final Presentation
CCOM Final PresentationCCOM Final Presentation
CCOM Final Presentation
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning Works
 
Hydrology and Water resources software
Hydrology and Water resources softwareHydrology and Water resources software
Hydrology and Water resources software
 
Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo
Dust Mapping and Control Plan - DMCP by_Deepak Kumar SahooDust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo
Dust Mapping and Control Plan - DMCP by_Deepak Kumar Sahoo
 
Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...Development of Calibrated Operational Models for Real-Time Decision Support a...
Development of Calibrated Operational Models for Real-Time Decision Support a...
 
Project inventory
Project inventoryProject inventory
Project inventory
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Lec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project schedulingLec 9 & 10 chapter 5 project scheduling
Lec 9 & 10 chapter 5 project scheduling
 

Similar to Integration of cmms, edms and wms

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Frank Lemus
 
Engineering
EngineeringEngineering
EngineeringKomalia
 
Engineering
EngineeringEngineering
EngineeringKomalia
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument EngineerKamran Saeed
 
Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfJoshua25806
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revertMike Lewin
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)Vijayakumar Kumar
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1Dave Thompson
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineKsPuri
 
Phil Welker Commissioning
Phil Welker CommissioningPhil Welker Commissioning
Phil Welker Commissioningluigiseta
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 

Similar to Integration of cmms, edms and wms (20)

Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017
 
Engineering
EngineeringEngineering
Engineering
 
Engineering
EngineeringEngineering
Engineering
 
Engineering
EngineeringEngineering
Engineering
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Chapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdfChapter7_ControlLoop-1.pdf
Chapter7_ControlLoop-1.pdf
 
Welding Construction Mngmt_revert
Welding Construction Mngmt_revertWelding Construction Mngmt_revert
Welding Construction Mngmt_revert
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
D david thompson_resume_15_1
D david  thompson_resume_15_1D david  thompson_resume_15_1
D david thompson_resume_15_1
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
instrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbineinstrument engineer shuaibah power plant cems turbine
instrument engineer shuaibah power plant cems turbine
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Phil Welker Commissioning
Phil Welker CommissioningPhil Welker Commissioning
Phil Welker Commissioning
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
MY_CV_1
MY_CV_1MY_CV_1
MY_CV_1
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Integration of cmms, edms and wms

  • 1. MCCS INTERNATIONAL SERVICES BEHNAM – NOVEMBER 2016 INTEGRATION OF CMMS, EDMS AND WMS
  • 2. APPLICABLE FOR ONSHORE & OFFSHORE PROJECTS
  • 3. MCCS INTERNATIONAL SERVICES SUMMARY 1- Project Engineering Phase MCCS Multi Disciplines Champions Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc. Cost Effect Of Rework In Engineering Phase For Issuance Of New Revision Documents Is Way More Cheaper Than Rework In Project Execution Phase Detailed Design Documents Review Provision of Technical Problems List with Related Attachments Assistant in issuance of New Revision of Related Documents CONSEQUENCE: TIME SAVING IN PROJECT EXECUTION PHASE
  • 4. 2- Project Procurement Engineering Phase MCCS Multi Disciplines Champions Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc. Cost Effect Of MCCS Champions Support In Procurement Engineering Phase Is Significantly Less Than Delay Cost In Project Execution Phase Material Requisition Technical Documents Review (MR Packs) Provision of Check sheet, Test sheet And Maintenance Procedure as Per Each PO NO And Related Tag NO(s), Under relevant System And Sub-System. No CONSEQUENCE: TIME SAVING IN PROJECT EXECUTION PHASE
  • 5. 3- PROJECT COMMISSIONING ENGINEERING PHASE (PLANNING) MCCS Multi Disciplines Team Include: Electrical, Instrument, Mechanical (Fix-rotary), Piping, etc. Increasing Of Budget Baseline For High Quality Of Pre- commissioning, Commissioning & Start-up Will Be Compensated With Early Production Bonus Technical Preparation For Execution Phase of Pre-Commissioning, Commissioning, Start-Up Assistant And Multi Discipline Maintenance As per Computerise Maintenance Management System (CMMS) And Electronic Document Management System (EDMS) And Warehouse Management System (WMS) THIS IS INTEGRATION OF CMMS, EDMS & WMS AS PER CREATION OF RELATEDMASTER DATABASE CONSEQUENCE: SAFE COMMISSIONING AND START-UP AND EARLY PRODUCTION
  • 6. 4- PROJECT CONSTRUCTION PHASE Flange Management (Software Basis): Flange Management Software Will Be Used For Related Planning. Also Flange Management Service Is Applicable In Oil & Gas Facilities During Black Shut Down / Overhaul Joint Data Management Manual Bolt Torquing Hydraulic Bolt Torquing Hydraulic Bolt Tensioning Joint Breakout Auditable Report Confirming System Safety & Integrity as per ISO 9001 CONSEQUENCE: FAILURE PREVENTION OF SYSTEMS DUE TO LEAKING JOINTS
  • 7. 5- PROJECT PRE-COMM. & COMMISSIONING PHASE N2 He Leak Testing: Helium Leak Detection Is Known To Be The Most Accurate Method Of Locating And Quantifying System Leaks. Also N2 He Leak Testing Service Is Applicable In Oil & Gas Facilities During Black Shut Down / Overhaul Pre-engineering of test packs and test procedures Consumables (N2/He gas), equipment & manpower supply Pressurisation of systems Data compilation and handover to the client Handover of related Test Package Dossier to Company and Main Contractor with complete sign off. CONSEQUENCE: SAFE START-UP AND SAFE OPERATION
  • 8. INTEGRATION OF CMMS, EDMS & WMS DEFINITION CMMS: Computerize Maintenance Management System EDMS: Electronic Document Management System WMS: Warehouse Management System MCCS: Mechanical Completion And Commissioning Services SEQUENCE OF INTEGRATION STEP 1: Master Database Creation For Project Permanent Equipment As Per Following Breakdown:
  • 9. MASTER DATABASE BREAKDOWN PURCHASING ORDER NUMBER (PO No. – EACH DISCIPLINE) RELEVANT TAG No.(s) OF EACH PO No. AS PER RELATED SYSTEM & SUB-SYSTEM NUMBER (s) RELEVANT TECHNICAL DOCUMENTS TO EACH TAG No.(s) SUCH AS DATASHEET, SPECIFICATION, LIST, DRAWING, DIAGRAM, MANUAL, PROCEDURE, etc. RELEVANT TECHNICAL INFORMATION FOR WAREHOUSE SUCH AS STOCK No., STOCK CATEGORY, MIN/MAX QTY., CERT No., VENDOR DATA, SUPPLIER NAME, ESTIMATED PRICE, etc.
  • 10. STEP 2: Provision Of All Related Technical Documents And Highperlinks As Per Specified Breakdown Structure: Considering the current oil & gas market purchasing a specialized software such as SAP, Zinator, ICAPS, Easy Plant, Mainta and so on is not affordable. However, MCCS Integrated Method is a superior solution for time saving in project execution phase and increase the plant reliability in operation & maintenance phase.
  • 11. OIL & GAS PROJECT LIFE CYCLE