SlideShare a Scribd company logo
1 of 3
Resume: Azhar Ali
Summary
Over the past Seven year of my professional Career, I worked on commercial, industrial,residential
and admistrative buildings. I started my career with AL-Futtaim Carillion UAE(duration 3 years) in 2007 as
Site Engineer on one of their project Emaal(Emirates Aluminum) Abu Dhabi . then I emigrated to Saudi
Arabia joined Saudi Binladen Group ABCD in 2011 (duration 2 years and 6months) as Site Engineer ,
project name C.I.D Buildings in jizan KSA. Then I moved back to pakistan in 2013 and worked with
Guarantee Engineers Pvt Ltd (duration 1 years and 6months) as a Construction Manager, on their project
Emporium Mall lahore Pakistan.I have eperienced in making daily work plan,setting the daily targets to
ensure that set priorities and targets are being achieved to quality, time and safety standards; Established
the schedule of material delivery to the site in accordance with the contractual time schedule and prepare
and maintain the material status report with the procurement department; Inspecting the activities during
the execution of the work and make sure that work is proceeds as per the specification and work
methodology; Prepared the material submittals; Prepared shop drawings for construction; Monitored
compliance of equipment and materials with project specifications and ensure executions are within design
tolerances;Coordinate with the sub-contractor and maintained the record of work done by them;Take off
actual quantities executed at site; have good knowledge of concrete mix design; having a high level of
integrity Versed in quality controlmanagement; Materials; site constructionsupervision and inspections.
Professional Qualification
Qualification Subject Establishment/Country Year
Degree B.Sc Civil Engg. University of Engg. & Tech.
Lahore, Pakistan
2007
Other Qualifications,Memberships,Certification
Professional Engineer, Pakistan Engineering Council
Prima Vera ProjectPlanner P6,Pakistan engineering Congress
Confined Space/ Incident Investigation Training, Al-Futtaim Carillion, 2009
Employment History
Year Company Designation
July 2013-Present Guarantee Engineers Construction Manager/
(1Year and 6months) PvtLtd, Pakistan Material Engineer
Sept. 2011–May 2013 Saudi Binladin Group ABCD Site Engineer
( 2 years and 6months) (P1184)Jizan,KSA
Jan 2011 – Aug. 2011 SKB Construction & Asst. ProjectCoordinator
(8 months) Engg. Lahore, Pakistan
Sept. 2007–Nov.2010 AL Futtaim Carillion Site Engineer
(3 years and 2months) Abu Dhabi UAE
ENGR.AZHAR ALI
(ConstructionManager,Material Engineer,SiteEngineer)
Email ID: aliazhar28@yahoo.com
Cell No.+93223369454
Resume: Azhar Ali
Working Experience
July 2013 – Present
GuaranteeEngineers
Pvt Ltd. LahorePakistan
Project:TheEmporiumMallLahore
ConstructionManager(Jan.2014-Present)
Responsibilities;
 Arranged and order the material and labour at site.
 Setting the daily targets
 Raising the inspection request schedule
 Ordering the concrete at site
 Ensuring that all constructionworks conformto quality controlstandards.
 Taking off actual quantities executed at site
 Maintained the record of the workdone by sub-contractor
 Updating sub-contractorswith latest project information such as revisions to drawings,
specifications and schedule.
Project:TheEmporiumMalllahore
Material Engineer(July2013-Dec2013)
Responsibilities;
 Established the laboratory at site.
 Prepared the mix designs for 6000 Psi ; 4500Psi ; 3000Psi ; 2000Psi ; 1500Psi and 1000Psi
 Compliance of Material as per required standards and specification
 Ensuring that all quality tools and equipment to be used at site are all calibrated and certificates are
intact.
 Arranging field testing after discussion and instruction of all concernpersonnel.
 Making inclusive listing and schedule of all QC testing to be accomplished in the worksite.
 Maintaining records of Test Certificates.
 Maintaining records of Daily cylinder crushing ; gradation of aggregates ; moisture correction of mix
designs and concrete delivered
 Prepared the daily material report and reconciliation of all materials at the end of the month.
 Calibration of batching plants on monthly basis.
 Assured and controlled the quality of concretedelivered at site.
 Maintaining the records of FDT
 Maintaining Stockpiles of aggregates and backfillmaterial at site.
Sept.2011 – May2013
Saudi BinladinGroupABCD(P1184JizanArea)Saudi Arabia
Project:CID Buildings
Site Engineer
Key Responsibilities;
 Monitoring complianceof equipment and materials with project specifications and ensure
executions are within design tolerances;
 Supervising and motivating workgroup employees in their daily performance to ensure that set
priorities and targets are being achieved to quality, time and safety standards;
 Ensuring that all constructionworks conformto quality controlstandards, and where necessary
take action to correctinconsistencies;
 Taking off actual quantities executed at site;
 Establishing the schedule of material delivery to the site in accordancewith the contractual time
schedule and
 prepare and maintain the material status report with the procurement department;
 Updating sub-contractorswith latest project information such as revisions to drawings,
specifications and schedule;
 Implementing practices and procedures to avoid the risk of accidents and injuries.
Resume: Azhar Ali
Jan2011 – Aug. 2011
SKB CONSTRUCTION&ENGINEERING
Project: ShahbazAirBaseJacobabad
Asst. ProjectCoordinator
Key Responsibilities;
 Maintaining drawings and specifications provided by the client to their most up to date revisions
and provide it to the construction team at site
 Prepare contracts and negotiate changes tocontracts with architects, consultants, clients, suppliers,
and subcontractors.
 Prepared the material submittals
 Prepared shop drawings forconstruction
 Prepared the monthly presentation for the ongoing activities
Sept.2007–Nov.2010
AL FUTTAIM CARILLION
Project: EmiratesAluminumEmaal AbuDhabi
Site Engineer
Key Responsibilities;
 Making the daily workplan
 Making the workMethod Statement and Risk Assessment
 Briefing the workMethod Statement and Risk Assessment to general foreman
 Arranging the material at site
 Obtaining required workpermits (Hot workpermit, Excavationand Confined Space permit)
 Inspecting the activities during the execution of the workand make sure that work is proceeds as
per the specification and work methodology
 Raising the inspection request schedule
 Coordinating with the sub contractor
 Arranging the revised set of drawing at site
 Generating the daily progress reports
Personel Information
Passport # NG1795282
Year of birth 1981
Marital Status Married
Nationality Pakistani
Languages
English Read, write and speak fluently
Arabic Speak
Urdu Read, write and speak fluently
Computer Skills and Software Used
MS Word / Excel/ Powerpoint / Outlook
MS ProjectPlanner
Prima Vera ProjectPlanner P6
Autodesk Quantity Take off
Ideal Next Job
Looking forwork immediately at Site.

More Related Content

What's hot (20)

Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
ahmed-el-shouny2016
ahmed-el-shouny2016ahmed-el-shouny2016
ahmed-el-shouny2016
 
CV Updated 2
CV Updated 2CV Updated 2
CV Updated 2
 
Vinod cv offshore
Vinod cv offshoreVinod cv offshore
Vinod cv offshore
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
wilson cv
wilson cvwilson cv
wilson cv
 
Kaleemullah. cv
Kaleemullah. cvKaleemullah. cv
Kaleemullah. cv
 
Mechanical Engineer Anjum
Mechanical Engineer AnjumMechanical Engineer Anjum
Mechanical Engineer Anjum
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
QA/QC Civil Engineer
QA/QC Civil EngineerQA/QC Civil Engineer
QA/QC Civil Engineer
 
Biodata - 14.06.15
Biodata - 14.06.15Biodata - 14.06.15
Biodata - 14.06.15
 
CV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-CivilCV - Senior QAQC Engineer-Civil
CV - Senior QAQC Engineer-Civil
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Ibrahim alnajar CV
Ibrahim alnajar CVIbrahim alnajar CV
Ibrahim alnajar CV
 
cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
Raguram palnichamy jun 2019
Raguram palnichamy jun 2019Raguram palnichamy jun 2019
Raguram palnichamy jun 2019
 
Mohamed Farid Gomaa
Mohamed Farid Gomaa  Mohamed Farid Gomaa
Mohamed Farid Gomaa
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 

Similar to Azhar civil engr(cv)

Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressedSyed Sirajuddin
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & InspectorMOHAMED RASHEED
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )AdnanAltaf13
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docShahbazAhmad953994
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.Romy george
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)Joedon Cunanan
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302khaled Ghadban
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawarengrijaz727
 
B-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceB-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceTufail Qadri
 

Similar to Azhar civil engr(cv) (20)

CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.CV of Mohammad Khalid Perwez.
CV of Mohammad Khalid Perwez.
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
Civil Engineer & Inspector
Civil Engineer & InspectorCivil Engineer & Inspector
Civil Engineer & Inspector
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
karthik resume 2016-UAE
karthik resume 2016-UAEkarthik resume 2016-UAE
karthik resume 2016-UAE
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )
 
Akhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).docAkhtar Mahmood - Construction Site Engineer (1).doc
Akhtar Mahmood - Construction Site Engineer (1).doc
 
Updated CV
Updated CVUpdated CV
Updated CV
 
LastNew CV
LastNew CVLastNew CV
LastNew CV
 
Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)Final Updated CV for TG (18.7.2016)
Final Updated CV for TG (18.7.2016)
 
Romy George civil site engineer.
Romy George civil site engineer.Romy George civil site engineer.
Romy George civil site engineer.
 
CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)CV-Joedon Cunanan (latest)
CV-Joedon Cunanan (latest)
 
Vinod cv (1)
Vinod cv (1)Vinod cv (1)
Vinod cv (1)
 
Romell CV_PE
Romell CV_PERomell CV_PE
Romell CV_PE
 
25383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_30225383_KHALED GHADBAN_SITE ENGINEER_302
25383_KHALED GHADBAN_SITE ENGINEER_302
 
Rolando Resume
Rolando ResumeRolando Resume
Rolando Resume
 
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc  civil engineer I did civil engineering from University peshawarengr ijaz 1 qc  civil engineer I did civil engineering from University peshawar
engr ijaz 1 qc civil engineer I did civil engineering from University peshawar
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
B-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experienceB-tech civil with more than 5 years of working experience
B-tech civil with more than 5 years of working experience
 

Azhar civil engr(cv)

  • 1. Resume: Azhar Ali Summary Over the past Seven year of my professional Career, I worked on commercial, industrial,residential and admistrative buildings. I started my career with AL-Futtaim Carillion UAE(duration 3 years) in 2007 as Site Engineer on one of their project Emaal(Emirates Aluminum) Abu Dhabi . then I emigrated to Saudi Arabia joined Saudi Binladen Group ABCD in 2011 (duration 2 years and 6months) as Site Engineer , project name C.I.D Buildings in jizan KSA. Then I moved back to pakistan in 2013 and worked with Guarantee Engineers Pvt Ltd (duration 1 years and 6months) as a Construction Manager, on their project Emporium Mall lahore Pakistan.I have eperienced in making daily work plan,setting the daily targets to ensure that set priorities and targets are being achieved to quality, time and safety standards; Established the schedule of material delivery to the site in accordance with the contractual time schedule and prepare and maintain the material status report with the procurement department; Inspecting the activities during the execution of the work and make sure that work is proceeds as per the specification and work methodology; Prepared the material submittals; Prepared shop drawings for construction; Monitored compliance of equipment and materials with project specifications and ensure executions are within design tolerances;Coordinate with the sub-contractor and maintained the record of work done by them;Take off actual quantities executed at site; have good knowledge of concrete mix design; having a high level of integrity Versed in quality controlmanagement; Materials; site constructionsupervision and inspections. Professional Qualification Qualification Subject Establishment/Country Year Degree B.Sc Civil Engg. University of Engg. & Tech. Lahore, Pakistan 2007 Other Qualifications,Memberships,Certification Professional Engineer, Pakistan Engineering Council Prima Vera ProjectPlanner P6,Pakistan engineering Congress Confined Space/ Incident Investigation Training, Al-Futtaim Carillion, 2009 Employment History Year Company Designation July 2013-Present Guarantee Engineers Construction Manager/ (1Year and 6months) PvtLtd, Pakistan Material Engineer Sept. 2011–May 2013 Saudi Binladin Group ABCD Site Engineer ( 2 years and 6months) (P1184)Jizan,KSA Jan 2011 – Aug. 2011 SKB Construction & Asst. ProjectCoordinator (8 months) Engg. Lahore, Pakistan Sept. 2007–Nov.2010 AL Futtaim Carillion Site Engineer (3 years and 2months) Abu Dhabi UAE ENGR.AZHAR ALI (ConstructionManager,Material Engineer,SiteEngineer) Email ID: aliazhar28@yahoo.com Cell No.+93223369454
  • 2. Resume: Azhar Ali Working Experience July 2013 – Present GuaranteeEngineers Pvt Ltd. LahorePakistan Project:TheEmporiumMallLahore ConstructionManager(Jan.2014-Present) Responsibilities;  Arranged and order the material and labour at site.  Setting the daily targets  Raising the inspection request schedule  Ordering the concrete at site  Ensuring that all constructionworks conformto quality controlstandards.  Taking off actual quantities executed at site  Maintained the record of the workdone by sub-contractor  Updating sub-contractorswith latest project information such as revisions to drawings, specifications and schedule. Project:TheEmporiumMalllahore Material Engineer(July2013-Dec2013) Responsibilities;  Established the laboratory at site.  Prepared the mix designs for 6000 Psi ; 4500Psi ; 3000Psi ; 2000Psi ; 1500Psi and 1000Psi  Compliance of Material as per required standards and specification  Ensuring that all quality tools and equipment to be used at site are all calibrated and certificates are intact.  Arranging field testing after discussion and instruction of all concernpersonnel.  Making inclusive listing and schedule of all QC testing to be accomplished in the worksite.  Maintaining records of Test Certificates.  Maintaining records of Daily cylinder crushing ; gradation of aggregates ; moisture correction of mix designs and concrete delivered  Prepared the daily material report and reconciliation of all materials at the end of the month.  Calibration of batching plants on monthly basis.  Assured and controlled the quality of concretedelivered at site.  Maintaining the records of FDT  Maintaining Stockpiles of aggregates and backfillmaterial at site. Sept.2011 – May2013 Saudi BinladinGroupABCD(P1184JizanArea)Saudi Arabia Project:CID Buildings Site Engineer Key Responsibilities;  Monitoring complianceof equipment and materials with project specifications and ensure executions are within design tolerances;  Supervising and motivating workgroup employees in their daily performance to ensure that set priorities and targets are being achieved to quality, time and safety standards;  Ensuring that all constructionworks conformto quality controlstandards, and where necessary take action to correctinconsistencies;  Taking off actual quantities executed at site;  Establishing the schedule of material delivery to the site in accordancewith the contractual time schedule and  prepare and maintain the material status report with the procurement department;  Updating sub-contractorswith latest project information such as revisions to drawings, specifications and schedule;  Implementing practices and procedures to avoid the risk of accidents and injuries.
  • 3. Resume: Azhar Ali Jan2011 – Aug. 2011 SKB CONSTRUCTION&ENGINEERING Project: ShahbazAirBaseJacobabad Asst. ProjectCoordinator Key Responsibilities;  Maintaining drawings and specifications provided by the client to their most up to date revisions and provide it to the construction team at site  Prepare contracts and negotiate changes tocontracts with architects, consultants, clients, suppliers, and subcontractors.  Prepared the material submittals  Prepared shop drawings forconstruction  Prepared the monthly presentation for the ongoing activities Sept.2007–Nov.2010 AL FUTTAIM CARILLION Project: EmiratesAluminumEmaal AbuDhabi Site Engineer Key Responsibilities;  Making the daily workplan  Making the workMethod Statement and Risk Assessment  Briefing the workMethod Statement and Risk Assessment to general foreman  Arranging the material at site  Obtaining required workpermits (Hot workpermit, Excavationand Confined Space permit)  Inspecting the activities during the execution of the workand make sure that work is proceeds as per the specification and work methodology  Raising the inspection request schedule  Coordinating with the sub contractor  Arranging the revised set of drawing at site  Generating the daily progress reports Personel Information Passport # NG1795282 Year of birth 1981 Marital Status Married Nationality Pakistani Languages English Read, write and speak fluently Arabic Speak Urdu Read, write and speak fluently Computer Skills and Software Used MS Word / Excel/ Powerpoint / Outlook MS ProjectPlanner Prima Vera ProjectPlanner P6 Autodesk Quantity Take off Ideal Next Job Looking forwork immediately at Site.