B-tech civil with more than 5 years of working experience
Azhar civil engr(cv)
1. Resume: Azhar Ali
Summary
Over the past Seven year of my professional Career, I worked on commercial, industrial,residential
and admistrative buildings. I started my career with AL-Futtaim Carillion UAE(duration 3 years) in 2007 as
Site Engineer on one of their project Emaal(Emirates Aluminum) Abu Dhabi . then I emigrated to Saudi
Arabia joined Saudi Binladen Group ABCD in 2011 (duration 2 years and 6months) as Site Engineer ,
project name C.I.D Buildings in jizan KSA. Then I moved back to pakistan in 2013 and worked with
Guarantee Engineers Pvt Ltd (duration 1 years and 6months) as a Construction Manager, on their project
Emporium Mall lahore Pakistan.I have eperienced in making daily work plan,setting the daily targets to
ensure that set priorities and targets are being achieved to quality, time and safety standards; Established
the schedule of material delivery to the site in accordance with the contractual time schedule and prepare
and maintain the material status report with the procurement department; Inspecting the activities during
the execution of the work and make sure that work is proceeds as per the specification and work
methodology; Prepared the material submittals; Prepared shop drawings for construction; Monitored
compliance of equipment and materials with project specifications and ensure executions are within design
tolerances;Coordinate with the sub-contractor and maintained the record of work done by them;Take off
actual quantities executed at site; have good knowledge of concrete mix design; having a high level of
integrity Versed in quality controlmanagement; Materials; site constructionsupervision and inspections.
Professional Qualification
Qualification Subject Establishment/Country Year
Degree B.Sc Civil Engg. University of Engg. & Tech.
Lahore, Pakistan
2007
Other Qualifications,Memberships,Certification
Professional Engineer, Pakistan Engineering Council
Prima Vera ProjectPlanner P6,Pakistan engineering Congress
Confined Space/ Incident Investigation Training, Al-Futtaim Carillion, 2009
Employment History
Year Company Designation
July 2013-Present Guarantee Engineers Construction Manager/
(1Year and 6months) PvtLtd, Pakistan Material Engineer
Sept. 2011–May 2013 Saudi Binladin Group ABCD Site Engineer
( 2 years and 6months) (P1184)Jizan,KSA
Jan 2011 – Aug. 2011 SKB Construction & Asst. ProjectCoordinator
(8 months) Engg. Lahore, Pakistan
Sept. 2007–Nov.2010 AL Futtaim Carillion Site Engineer
(3 years and 2months) Abu Dhabi UAE
ENGR.AZHAR ALI
(ConstructionManager,Material Engineer,SiteEngineer)
Email ID: aliazhar28@yahoo.com
Cell No.+93223369454
2. Resume: Azhar Ali
Working Experience
July 2013 – Present
GuaranteeEngineers
Pvt Ltd. LahorePakistan
Project:TheEmporiumMallLahore
ConstructionManager(Jan.2014-Present)
Responsibilities;
Arranged and order the material and labour at site.
Setting the daily targets
Raising the inspection request schedule
Ordering the concrete at site
Ensuring that all constructionworks conformto quality controlstandards.
Taking off actual quantities executed at site
Maintained the record of the workdone by sub-contractor
Updating sub-contractorswith latest project information such as revisions to drawings,
specifications and schedule.
Project:TheEmporiumMalllahore
Material Engineer(July2013-Dec2013)
Responsibilities;
Established the laboratory at site.
Prepared the mix designs for 6000 Psi ; 4500Psi ; 3000Psi ; 2000Psi ; 1500Psi and 1000Psi
Compliance of Material as per required standards and specification
Ensuring that all quality tools and equipment to be used at site are all calibrated and certificates are
intact.
Arranging field testing after discussion and instruction of all concernpersonnel.
Making inclusive listing and schedule of all QC testing to be accomplished in the worksite.
Maintaining records of Test Certificates.
Maintaining records of Daily cylinder crushing ; gradation of aggregates ; moisture correction of mix
designs and concrete delivered
Prepared the daily material report and reconciliation of all materials at the end of the month.
Calibration of batching plants on monthly basis.
Assured and controlled the quality of concretedelivered at site.
Maintaining the records of FDT
Maintaining Stockpiles of aggregates and backfillmaterial at site.
Sept.2011 – May2013
Saudi BinladinGroupABCD(P1184JizanArea)Saudi Arabia
Project:CID Buildings
Site Engineer
Key Responsibilities;
Monitoring complianceof equipment and materials with project specifications and ensure
executions are within design tolerances;
Supervising and motivating workgroup employees in their daily performance to ensure that set
priorities and targets are being achieved to quality, time and safety standards;
Ensuring that all constructionworks conformto quality controlstandards, and where necessary
take action to correctinconsistencies;
Taking off actual quantities executed at site;
Establishing the schedule of material delivery to the site in accordancewith the contractual time
schedule and
prepare and maintain the material status report with the procurement department;
Updating sub-contractorswith latest project information such as revisions to drawings,
specifications and schedule;
Implementing practices and procedures to avoid the risk of accidents and injuries.
3. Resume: Azhar Ali
Jan2011 – Aug. 2011
SKB CONSTRUCTION&ENGINEERING
Project: ShahbazAirBaseJacobabad
Asst. ProjectCoordinator
Key Responsibilities;
Maintaining drawings and specifications provided by the client to their most up to date revisions
and provide it to the construction team at site
Prepare contracts and negotiate changes tocontracts with architects, consultants, clients, suppliers,
and subcontractors.
Prepared the material submittals
Prepared shop drawings forconstruction
Prepared the monthly presentation for the ongoing activities
Sept.2007–Nov.2010
AL FUTTAIM CARILLION
Project: EmiratesAluminumEmaal AbuDhabi
Site Engineer
Key Responsibilities;
Making the daily workplan
Making the workMethod Statement and Risk Assessment
Briefing the workMethod Statement and Risk Assessment to general foreman
Arranging the material at site
Obtaining required workpermits (Hot workpermit, Excavationand Confined Space permit)
Inspecting the activities during the execution of the workand make sure that work is proceeds as
per the specification and work methodology
Raising the inspection request schedule
Coordinating with the sub contractor
Arranging the revised set of drawing at site
Generating the daily progress reports
Personel Information
Passport # NG1795282
Year of birth 1981
Marital Status Married
Nationality Pakistani
Languages
English Read, write and speak fluently
Arabic Speak
Urdu Read, write and speak fluently
Computer Skills and Software Used
MS Word / Excel/ Powerpoint / Outlook
MS ProjectPlanner
Prima Vera ProjectPlanner P6
Autodesk Quantity Take off
Ideal Next Job
Looking forwork immediately at Site.