Presentation by Matt Crundon, Legrand Electric Ltd at the BIM for Manufacturers: Help with the Journey seminar on 28 July 2015
More information at http://bim4m2.co.uk/
Product Data Templates (PDTs) and CObie - #BIM4M2help
1. BIM for Manufacturers – Help with the Journey
Product Data Templates and COBie
BIM for Manufacturers and Manufacturing
Presented by
Matt Crunden
Training and BIM Manager
Legrand Electric Ltd
7. Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
PDT Steering Group
8. Product Data Templates
Category eg: Cable Ladder
System or Powertrack System
Manufacturer data eg: Name,
website, link to tech data
Product specification data eg:
dimensions, available finishes
10. Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Questions Plain Language Answers
11. Product Data Sheets
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Answers
Completed PDT =
Product Data Sheet
(PDS)
HOSTED ON
MANUFACTURER
WEBSITE
FREE TO DOWNLOAD
COMPLETED ONCE
COMPLETED BY ‘RANGE’
17. Automating Data Management
(PROJECT STAGE 4)
STRUCTURED DATA
(PAS 1192-2)
FIXED FORMAT
EASE OF USE
PLATFORM NEUTRAL
GEOGRAPHICALLY NEUTRAL
MULTI DISCIPLINE
MULTI SECTOR
Product Data Sheets / Sets
18. Product Data Templates
Data Templates
Developing templates to enable
manufacturers to easily provide
consistent and useable information
PDT’s
Examples out for consultation
COOLING COIL
HEATER BATTERY
PLATE HEAT EXCHANGER
RADIANT PANEL
UV STERILISER
TANK
Trade bodies
BIM4M2
19. Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
20. Product Data Templates
Create
• Professional body appoint Originating author
• Liaise with Manufacturers
Technical
Approval
• Refer to Peers
• Liaise with Professional body Technical Committee
Consultation
• Issue for draft use
• Gather feedback and enact where appropriate
Issue
• Final Technical Committee sign off
• Approved for use
Annual
Check
• Gather feedback and Review by Professional body
• Changes approved by Technical Committee