SlideShare a Scribd company logo
1 of 24
BIM for Manufacturers – Help with the Journey
Product Data Templates and COBie
BIM for Manufacturers and Manufacturing
Presented by
Matt Crunden
Training and BIM Manager
Legrand Electric Ltd
Product Data Templates
Product Data Templates
+ =
Product Data Templates
Product Data Templates
Product Data Templates
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
PDT Steering Group
Product Data Templates
Category eg: Cable Ladder
System or Powertrack System
Manufacturer data eg: Name,
website, link to tech data
Product specification data eg:
dimensions, available finishes
Product Data Templates
Performance data eg:
electrical
Sustainability eg: embodied
carbon, EPD’s
FM eg: O&M schedules
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Questions Plain Language Answers
Product Data Sheets
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Answers
Completed PDT =
Product Data Sheet
(PDS)
HOSTED ON
MANUFACTURER
WEBSITE
FREE TO DOWNLOAD
COMPLETED ONCE
COMPLETED BY ‘RANGE’
Product Data Sheets
PDT’s feed into COBie
PRODUCT INFORMATION
PROJECT INFORMATION
Product Data Sheets / Sets
Project value = £100m
25%
capex
75%
opex
2 years 40 years
COBie & FM
Automating Data Management
(PROJECT STAGE 2)
Product Data Sheets / Sets
Automating Data Management
(PROJECT STAGE 3)
Product Data Sheets / Sets
Automating Data Management
(PROJECT STAGE 4)
STRUCTURED DATA
(PAS 1192-2)
FIXED FORMAT
EASE OF USE
PLATFORM NEUTRAL
GEOGRAPHICALLY NEUTRAL
MULTI DISCIPLINE
MULTI SECTOR
Product Data Sheets / Sets
Product Data Templates
Data Templates
Developing templates to enable
manufacturers to easily provide
consistent and useable information
PDT’s
Examples out for consultation
COOLING COIL
HEATER BATTERY
PLATE HEAT EXCHANGER
RADIANT PANEL
UV STERILISER
TANK
Trade bodies
BIM4M2
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Product Data Templates
Create
• Professional body appoint Originating author
• Liaise with Manufacturers
Technical
Approval
• Refer to Peers
• Liaise with Professional body Technical Committee
Consultation
• Issue for draft use
• Gather feedback and enact where appropriate
Issue
• Final Technical Committee sign off
• Approved for use
Annual
Check
• Gather feedback and Review by Professional body
• Changes approved by Technical Committee
Product Data Templates
IDENTIFY NEED
REFER TO MASTER LIST
IS THERE SOMETHING SIMILAR
GO FOR IT !!!
Product Data Templates
MANUFACTURER
CONTRACTOR
DESIGNER
SPECIFIER
BUYER
FM
Product Data Templates
The Built Environment as part of a Smart, networked world
Product Data Templates (PDTs) and CObie - #BIM4M2help

More Related Content

What's hot

Manufacturing instructions sn200_2010
Manufacturing instructions sn200_2010Manufacturing instructions sn200_2010
Manufacturing instructions sn200_2010
Janez Temnikar
 

What's hot (20)

Introduction to BIM and business case of BIM
Introduction to BIM and business case of BIMIntroduction to BIM and business case of BIM
Introduction to BIM and business case of BIM
 
ECPPM Keynote: don't forget about data consumption
ECPPM Keynote: don't forget about data consumptionECPPM Keynote: don't forget about data consumption
ECPPM Keynote: don't forget about data consumption
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and ProcedureBIM Execution Plan - Bim Process Model Rview and Procedure
BIM Execution Plan - Bim Process Model Rview and Procedure
 
BIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesBIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 Slides
 
Palestra BIM_UNIGRANRIO 2013
Palestra BIM_UNIGRANRIO 2013Palestra BIM_UNIGRANRIO 2013
Palestra BIM_UNIGRANRIO 2013
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
 
Manufacturing instructions sn200_2010
Manufacturing instructions sn200_2010Manufacturing instructions sn200_2010
Manufacturing instructions sn200_2010
 
Ghid proiectare durabilitate beton 2017
Ghid proiectare durabilitate beton 2017Ghid proiectare durabilitate beton 2017
Ghid proiectare durabilitate beton 2017
 
Bim
BimBim
Bim
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
Guide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wpsGuide to understanding welding procedure specification (wps
Guide to understanding welding procedure specification (wps
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
Saliekamā dzelzsbetona ražošanas iespējas Latvijā
Saliekamā dzelzsbetona ražošanas iespējas LatvijāSaliekamā dzelzsbetona ražošanas iespējas Latvijā
Saliekamā dzelzsbetona ražošanas iespējas Latvijā
 
Nevera Siemens KA92NVI25
Nevera Siemens KA92NVI25Nevera Siemens KA92NVI25
Nevera Siemens KA92NVI25
 
Evolution of pdm plm technology & value to the industry
Evolution of pdm   plm technology & value to the industryEvolution of pdm   plm technology & value to the industry
Evolution of pdm plm technology & value to the industry
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
Industry Foundation Classes
Industry Foundation ClassesIndustry Foundation Classes
Industry Foundation Classes
 
How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...How BIM 360 construction document management facilitates building work proces...
How BIM 360 construction document management facilitates building work proces...
 

Viewers also liked

BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
Clive Walsh
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
niict
 

Viewers also liked (18)

BIM: The Right Level of Content #BIM4M2help
BIM: The Right Level of Content #BIM4M2helpBIM: The Right Level of Content #BIM4M2help
BIM: The Right Level of Content #BIM4M2help
 
BIM - Gaining Competitive Advantage
BIM - Gaining Competitive Advantage   BIM - Gaining Competitive Advantage
BIM - Gaining Competitive Advantage
 
BIM - How to Do it? #BIM4M2help
BIM - How to Do it? #BIM4M2helpBIM - How to Do it? #BIM4M2help
BIM - How to Do it? #BIM4M2help
 
BIM Software and Hosting Options - what package should you use #BIM4M2help
BIM Software and Hosting Options - what package should you use #BIM4M2helpBIM Software and Hosting Options - what package should you use #BIM4M2help
BIM Software and Hosting Options - what package should you use #BIM4M2help
 
Data Templates - #BIM4M2help
Data Templates - #BIM4M2helpData Templates - #BIM4M2help
Data Templates - #BIM4M2help
 
Why Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2helpWhy Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2help
 
BIM - What the Client wants from Manufacturers #BIM4M2help
BIM - What the Client wants from Manufacturers #BIM4M2helpBIM - What the Client wants from Manufacturers #BIM4M2help
BIM - What the Client wants from Manufacturers #BIM4M2help
 
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2helpBIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
 
Client Case Study - Sandwell Council
Client Case Study - Sandwell Council Client Case Study - Sandwell Council
Client Case Study - Sandwell Council
 
BIM - what 2016 means for Manufacturers
BIM - what 2016 means for ManufacturersBIM - what 2016 means for Manufacturers
BIM - what 2016 means for Manufacturers
 
BIM - Contractors and Manufacturers working together
BIM - Contractors and Manufacturers working togetherBIM - Contractors and Manufacturers working together
BIM - Contractors and Manufacturers working together
 
An Introduction to BIM for Manufacturers
An Introduction to BIM for ManufacturersAn Introduction to BIM for Manufacturers
An Introduction to BIM for Manufacturers
 
Architecture presentation 5
Architecture presentation 5Architecture presentation 5
Architecture presentation 5
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
 
BIFM Merseyside Networking Group - BIM & Facilities Management
BIFM Merseyside Networking Group - BIM & Facilities ManagementBIFM Merseyside Networking Group - BIM & Facilities Management
BIFM Merseyside Networking Group - BIM & Facilities Management
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

Similar to Product Data Templates (PDTs) and CObie - #BIM4M2help

Segue Presentation 4.15a.09
Segue Presentation 4.15a.09Segue Presentation 4.15a.09
Segue Presentation 4.15a.09
pfrasso
 
Punith_Resume_Diploma_EC
Punith_Resume_Diploma_ECPunith_Resume_Diploma_EC
Punith_Resume_Diploma_EC
Punith Gowda
 
Aes Corporate Presentation
Aes Corporate PresentationAes Corporate Presentation
Aes Corporate Presentation
carriestalker
 
Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
karthik451
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale
 
LAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities OverviewLAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities Overview
LAI International | The Precision Manufacturing Experts.
 

Similar to Product Data Templates (PDTs) and CObie - #BIM4M2help (20)

Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
 
Segue Presentation 4.15a.09
Segue Presentation 4.15a.09Segue Presentation 4.15a.09
Segue Presentation 4.15a.09
 
Punith_Resume_Diploma_EC
Punith_Resume_Diploma_ECPunith_Resume_Diploma_EC
Punith_Resume_Diploma_EC
 
Aes Corporate Presentation
Aes Corporate PresentationAes Corporate Presentation
Aes Corporate Presentation
 
Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
 
DSS RAJESH
DSS RAJESHDSS RAJESH
DSS RAJESH
 
Popular Systems, Coimbatore, Electrical Components
Popular Systems, Coimbatore, Electrical ComponentsPopular Systems, Coimbatore, Electrical Components
Popular Systems, Coimbatore, Electrical Components
 
Full Material Declarations: Removing Barriers to Environmental Data Reporting
Full Material Declarations: Removing Barriers to Environmental Data ReportingFull Material Declarations: Removing Barriers to Environmental Data Reporting
Full Material Declarations: Removing Barriers to Environmental Data Reporting
 
Advanced technical services unipower power point 101018
Advanced technical services unipower power point 101018Advanced technical services unipower power point 101018
Advanced technical services unipower power point 101018
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Assessing Performance In Energy Sector PowerPoint Presentation Slides
Assessing Performance In Energy Sector PowerPoint Presentation SlidesAssessing Performance In Energy Sector PowerPoint Presentation Slides
Assessing Performance In Energy Sector PowerPoint Presentation Slides
 
LAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities OverviewLAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities Overview
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 
Spec 2300 Common and Unique Design Features
Spec 2300 Common and Unique Design FeaturesSpec 2300 Common and Unique Design Features
Spec 2300 Common and Unique Design Features
 
Performance Measurement In Energy Sector PowerPoint Presentation Slides
Performance Measurement In Energy Sector PowerPoint Presentation SlidesPerformance Measurement In Energy Sector PowerPoint Presentation Slides
Performance Measurement In Energy Sector PowerPoint Presentation Slides
 
Emcs
EmcsEmcs
Emcs
 
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness ManufacturerOEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
 
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilities
 
Mazda Star Barcelona
Mazda Star BarcelonaMazda Star Barcelona
Mazda Star Barcelona
 

Recently uploaded

9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
delhimodel235
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
asmaqueen5
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
asmaqueen5
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
asmaqueen5
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
delhimodel235
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
asmaqueen5
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
delhimodel235
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
soniya singh
 

Recently uploaded (20)

9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 7 Delhi (Call Girls) Delhi
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Huda City Centre (Gurgaon)
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road Bengaluru
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
 
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time TogetherShapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
Shapoorji Pallonji Joyville Vista Pune | Spend Your Family Time Together
 
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCRCall Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
Call Girls in Karkardooma Delhi +91 84487779280}Woman Seeking Man in Delhi NCR
 
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...Call Girls In Seelampur  Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
Call Girls In Seelampur Delhi ↬8447779280}Seelampur Escorts Service In Delhi...
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
 
2k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 92055419142k Shot Call girls Karol Bagh Delhi 9205541914
2k Shot Call girls Karol Bagh Delhi 9205541914
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property Broadcast
 
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
Call Girls In Krishna Nagar Delhi (Escort)↫8447779280↬@SHOT 1500- NIGHT 5500→...
 
2k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 92055419142k Shot Call girls Aiims Delhi 9205541914
2k Shot Call girls Aiims Delhi 9205541914
 
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, NoidaM3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
 
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 2 Delhi (Call Girls) Delhi
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 

Product Data Templates (PDTs) and CObie - #BIM4M2help

  • 1. BIM for Manufacturers – Help with the Journey Product Data Templates and COBie BIM for Manufacturers and Manufacturing Presented by Matt Crunden Training and BIM Manager Legrand Electric Ltd
  • 7. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description PDT Steering Group
  • 8. Product Data Templates Category eg: Cable Ladder System or Powertrack System Manufacturer data eg: Name, website, link to tech data Product specification data eg: dimensions, available finishes
  • 9. Product Data Templates Performance data eg: electrical Sustainability eg: embodied carbon, EPD’s FM eg: O&M schedules
  • 10. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Plain Language Questions Plain Language Answers
  • 11. Product Data Sheets Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Plain Language Answers Completed PDT = Product Data Sheet (PDS) HOSTED ON MANUFACTURER WEBSITE FREE TO DOWNLOAD COMPLETED ONCE COMPLETED BY ‘RANGE’
  • 13. PDT’s feed into COBie PRODUCT INFORMATION PROJECT INFORMATION Product Data Sheets / Sets
  • 14. Project value = £100m 25% capex 75% opex 2 years 40 years COBie & FM
  • 15. Automating Data Management (PROJECT STAGE 2) Product Data Sheets / Sets
  • 16. Automating Data Management (PROJECT STAGE 3) Product Data Sheets / Sets
  • 17. Automating Data Management (PROJECT STAGE 4) STRUCTURED DATA (PAS 1192-2) FIXED FORMAT EASE OF USE PLATFORM NEUTRAL GEOGRAPHICALLY NEUTRAL MULTI DISCIPLINE MULTI SECTOR Product Data Sheets / Sets
  • 18. Product Data Templates Data Templates Developing templates to enable manufacturers to easily provide consistent and useable information PDT’s Examples out for consultation COOLING COIL HEATER BATTERY PLATE HEAT EXCHANGER RADIANT PANEL UV STERILISER TANK Trade bodies BIM4M2
  • 19. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description
  • 20. Product Data Templates Create • Professional body appoint Originating author • Liaise with Manufacturers Technical Approval • Refer to Peers • Liaise with Professional body Technical Committee Consultation • Issue for draft use • Gather feedback and enact where appropriate Issue • Final Technical Committee sign off • Approved for use Annual Check • Gather feedback and Review by Professional body • Changes approved by Technical Committee
  • 21. Product Data Templates IDENTIFY NEED REFER TO MASTER LIST IS THERE SOMETHING SIMILAR GO FOR IT !!!
  • 23. Product Data Templates The Built Environment as part of a Smart, networked world