SlideShare a Scribd company logo
1 of 4
Download to read offline
CURRICULUM VITAE
1. N a m e : ASDIAN AKBAR
2. Date of Birth : May 5, 1973 Nationality : Indonesia
3. Address : Komplek Taman Anyelir blok C.2 No.13 Kebon Nanas 15117
4. Phone number : Hp. 08129640236
5. Proposed Position :
6. Expected Salary :
7. Current Company : PT. Adhi Karya (Persero) Tbk7. Current Company : PT. Adhi Karya (Persero) Tbk
Jl. Raya Pasar Minggu Km. 18 Jakarta 12510
8. General Qualifications
8.1 Education :
Education :
University of Indonesia, Jakarta, Civil Engineering, Graduate : 2001
Academy of Technology Sapta Taruna, Jakarta, Civil Engineering, Graduate : 1995.
8.2 Computer Program
- DOS operating system and Basic Language
- Windows : MS Word, MS Excel, MS PowerPoint,
Lotus R5 under windows, etc.
- Microsoft Project
- Drawing : AutoCAD
- Civil :
= Road : Land Desktop Development
= Structure : Mathcad, ETABS (Three Dimensional Analysis of
Building System) V6.12 & Structure Analysis Program (SAP) 2000
Planner 1 of 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
8.3 General Experience
No. Employer Position Description
From-to Month Held of Duties
1 Februari 2014 to 13 PT. Adhi KaryaPlanner Fasilitas Perpindahan Responsible for :
Persero Antarmoda (Stasiun KA) - Land Development
BSH di Integrated - Design alignment
Building - Quantity Calculation
Cengkareng - Surveying
- Report
2 Decmber 2012 to 13 PT. Adhi KaryaPlanner Jakarta Link TransportationResponsible for :
January 2014 Persero DKI Jakartra - Land Development
APMS BSH - Design alignment
Contract Period Project Name
and Location
APMS BSH - Design alignment
ACT PELINDO 2 Surabaya- Quantity Calculation
- Surveying
- Report
3 February 2012 to 10 PT. Adhi KaryaProject Jakarta Outer Ring Road Responsible for :
Nopember 2012 Persero Planning & W 2 North Section 2 - Project Implementation
ImplementationToll Road - Project progress schedule
DKI Jakarta - Design review
- Technical justification
- Maintenance projects
4 January 2011 to 9 PT. Adhi KaryaProject Jalan Layang (Fly Over) Responsible for :
Setember 2011 Persero Planning & Non Tol - Project Implementation
ImplementationDKI Jakarta - Design review
- Technical justification
5 January 2010 to 11 PT. Adhi KaryaChip Design and Build Responsible for :
Nopember 2010 Persero Engineer / - Highway design
Designer - Pavement Design
- Quantity Calculation
- Land Development
- Technical justification
6 March 2008 to 22 PT. Adhi KaryaProject Bogor Ring Road Responsible for :
Jalan Tol Ciawi-
Sukabumi
Seksi 1 & 2: Ciawi -
Cigombong
6 March 2008 to 22 PT. Adhi KaryaProject Bogor Ring Road Responsible for :
December 2009 Persero Planning & Tol Road Section 1 - Project Implementation
Implementation - Project progress schedule
- Design review
- Technical justification
- Maintenance projects
7 January 2007 to 10 PT. Adhi KaryaStaff Monitoring All Project Responsible for :
February 2008 Persero Engineering Construction Division 2 - Project progress schedule
Division at PT. Adhi Karya - Project issues
- Technical justification
- Quantity Review
Planner 2 of 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
No. Employer Position Description
From-to Month Held of Duties
8 March 2006 to 10 PT. Adhi KaryaChip Design and Build Responsible for :
December 2006 Persero Engineer / - Highway design
Designer - Pavement Design
- Quantity Calculation
- Project Implementation
- Technical justification
9 July 2004 to 21 PT. Adhi KaryaChip Design and Build Responsible for :
February 2006 Persero Engineer Cipularang Tol Road - Project Implementation
- Project progress schedule
- Design review
- Made technical justification
- Maintenance projects
10 June 2003 to 14 PT. Dacrea Highway Design and Supervision Responsible for :
Urgent Recovery West
Coast Section CALANG-
MEULABOH
Contract Period Project Name
and Location
10 June 2003 to 14 PT. Dacrea Highway Design and Supervision Responsible for :
July 2004 Mitrayasa Engineer North Coast Road - Review of geometric design
Java Coridor - Project progress schedule
- Provide Tender Document
- Made draft of technical
justification
11 August 1997 to 71 PT. Bina Ass. Highway Project Management Responsible for :
May 2003 Karya Engineer Unit (PMU) for - Project monitoring
Strategic Urban Road - Project progress schedule
Infrastructure Project-1A - Provide Tender Document
(SURIP-1A), Center Java - Made draft of technical
justification for proposed
addendum for PMU's
justification to World Bank
- Evaluation of Project escalation
- Provide Request For Proposal
- Project progress schedule
- Review of geometric design
which recommended from
World Bank
12 January 1997 to 6 PT. Bina Highway The Design for Road Responsible for :
June 1997 Karya Engineer Pedestrian and Road - Provide Tender DocumentJune 1997 Karya Engineer Pedestrian and Road - Provide Tender Document
Entrance 12 Links at - Preparation the quantity
Jakarta. calculation and BOQ
DPU-DKI Jakarta - Design of Road Maintenace
- Preparation of digitizer
mapping to computer
program (AutoCAD).
Planner 3 of 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
No. Employer Position Description
From-to Month Held of Duties
13 May 1996 to 8 PT. Bina Ass. Highway FS & FED Responsible for :
December 1996 Karya Engineer Semarang - Demak - Preparation data survey
Toll Road Project - Input data survey to
computer program EDS
(Engineering Data System)
- Design of Geometric
- Design of spiral of road
used clothoid spiral
- Preparation the quantity
cut and fill calculation.
14 March 1995 to 11 PT. Bina Ass. Highway Technical Assistance Responsible for :
Karya Engineer in Final Engineering - Design of GeometricJanuary-1996
Contract Period Project Name
and Location
Design for - Design of pavement, and
Secondary Road sub structure
Maintenance and - Preparation the quantity of
Traffic Management road improvement
Scheme calculation
JUDP-I (JUPCO - Preparation of standard
Code 1 DB. 23 specification for tender
IBRD Loan 2932 document
IND) DKI - Survey report of road
JAKARTA inventory traffic counting,
roughness, rutting of
surface road with
FWD dynatest 8000
Language(s) And Degree of Proficiency
Speaking Writing
English Good Good
Indonesia Mother tongueIndonesia Mother tongue
Certification
I certify the above to be a true and accurate description of my qualifications, experience
and language proficiency.
Tangerang, April 5, 2015
Asdian Akbar
Planner 4 of 4
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)

More Related Content

What's hot (10)

Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
cv Syukur Anton Nugroho
cv  Syukur Anton Nugrohocv  Syukur Anton Nugroho
cv Syukur Anton Nugroho
 
Resume
ResumeResume
Resume
 
ALEX CV.
ALEX CV.ALEX CV.
ALEX CV.
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
CV Achmad Zaelani
CV Achmad ZaelaniCV Achmad Zaelani
CV Achmad Zaelani
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
Resume amjad zahir municipal technologist-2017
Resume amjad zahir municipal technologist-2017Resume amjad zahir municipal technologist-2017
Resume amjad zahir municipal technologist-2017
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
CV - 16032016
CV - 16032016CV - 16032016
CV - 16032016
 

Similar to CV Asdian-2015 (English) (20)

Dennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 MarchDennis Albarracin CV 2016 March
Dennis Albarracin CV 2016 March
 
CV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design EngineerCV _Abdullah_Highway Design Engineer
CV _Abdullah_Highway Design Engineer
 
cv wuryanto
cv wuryantocv wuryanto
cv wuryanto
 
CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016CV_Lengkap-Ucu_Muchtarom-2016
CV_Lengkap-Ucu_Muchtarom-2016
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
CV_REZA_2016
CV_REZA_2016CV_REZA_2016
CV_REZA_2016
 
CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)CV_REZA-English_-_2 (1)
CV_REZA-English_-_2 (1)
 
CV (1).doc
CV (1).docCV (1).doc
CV (1).doc
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16CV_Bavanam Veenadhari_July_16
CV_Bavanam Veenadhari_July_16
 
CV-Thowfeek
CV-ThowfeekCV-Thowfeek
CV-Thowfeek
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
CV_SATYA PRAKASH
CV_SATYA PRAKASHCV_SATYA PRAKASH
CV_SATYA PRAKASH
 
NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)NIZAM ENTERPRISE profile (1)
NIZAM ENTERPRISE profile (1)
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
Ravi_Shenker2014
Ravi_Shenker2014Ravi_Shenker2014
Ravi_Shenker2014
 
CV_DPComplete151014
CV_DPComplete151014CV_DPComplete151014
CV_DPComplete151014
 

CV Asdian-2015 (English)

  • 1. CURRICULUM VITAE 1. N a m e : ASDIAN AKBAR 2. Date of Birth : May 5, 1973 Nationality : Indonesia 3. Address : Komplek Taman Anyelir blok C.2 No.13 Kebon Nanas 15117 4. Phone number : Hp. 08129640236 5. Proposed Position : 6. Expected Salary : 7. Current Company : PT. Adhi Karya (Persero) Tbk7. Current Company : PT. Adhi Karya (Persero) Tbk Jl. Raya Pasar Minggu Km. 18 Jakarta 12510 8. General Qualifications 8.1 Education : Education : University of Indonesia, Jakarta, Civil Engineering, Graduate : 2001 Academy of Technology Sapta Taruna, Jakarta, Civil Engineering, Graduate : 1995. 8.2 Computer Program - DOS operating system and Basic Language - Windows : MS Word, MS Excel, MS PowerPoint, Lotus R5 under windows, etc. - Microsoft Project - Drawing : AutoCAD - Civil : = Road : Land Desktop Development = Structure : Mathcad, ETABS (Three Dimensional Analysis of Building System) V6.12 & Structure Analysis Program (SAP) 2000 Planner 1 of 4 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
  • 2. 8.3 General Experience No. Employer Position Description From-to Month Held of Duties 1 Februari 2014 to 13 PT. Adhi KaryaPlanner Fasilitas Perpindahan Responsible for : Persero Antarmoda (Stasiun KA) - Land Development BSH di Integrated - Design alignment Building - Quantity Calculation Cengkareng - Surveying - Report 2 Decmber 2012 to 13 PT. Adhi KaryaPlanner Jakarta Link TransportationResponsible for : January 2014 Persero DKI Jakartra - Land Development APMS BSH - Design alignment Contract Period Project Name and Location APMS BSH - Design alignment ACT PELINDO 2 Surabaya- Quantity Calculation - Surveying - Report 3 February 2012 to 10 PT. Adhi KaryaProject Jakarta Outer Ring Road Responsible for : Nopember 2012 Persero Planning & W 2 North Section 2 - Project Implementation ImplementationToll Road - Project progress schedule DKI Jakarta - Design review - Technical justification - Maintenance projects 4 January 2011 to 9 PT. Adhi KaryaProject Jalan Layang (Fly Over) Responsible for : Setember 2011 Persero Planning & Non Tol - Project Implementation ImplementationDKI Jakarta - Design review - Technical justification 5 January 2010 to 11 PT. Adhi KaryaChip Design and Build Responsible for : Nopember 2010 Persero Engineer / - Highway design Designer - Pavement Design - Quantity Calculation - Land Development - Technical justification 6 March 2008 to 22 PT. Adhi KaryaProject Bogor Ring Road Responsible for : Jalan Tol Ciawi- Sukabumi Seksi 1 & 2: Ciawi - Cigombong 6 March 2008 to 22 PT. Adhi KaryaProject Bogor Ring Road Responsible for : December 2009 Persero Planning & Tol Road Section 1 - Project Implementation Implementation - Project progress schedule - Design review - Technical justification - Maintenance projects 7 January 2007 to 10 PT. Adhi KaryaStaff Monitoring All Project Responsible for : February 2008 Persero Engineering Construction Division 2 - Project progress schedule Division at PT. Adhi Karya - Project issues - Technical justification - Quantity Review Planner 2 of 4 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
  • 3. No. Employer Position Description From-to Month Held of Duties 8 March 2006 to 10 PT. Adhi KaryaChip Design and Build Responsible for : December 2006 Persero Engineer / - Highway design Designer - Pavement Design - Quantity Calculation - Project Implementation - Technical justification 9 July 2004 to 21 PT. Adhi KaryaChip Design and Build Responsible for : February 2006 Persero Engineer Cipularang Tol Road - Project Implementation - Project progress schedule - Design review - Made technical justification - Maintenance projects 10 June 2003 to 14 PT. Dacrea Highway Design and Supervision Responsible for : Urgent Recovery West Coast Section CALANG- MEULABOH Contract Period Project Name and Location 10 June 2003 to 14 PT. Dacrea Highway Design and Supervision Responsible for : July 2004 Mitrayasa Engineer North Coast Road - Review of geometric design Java Coridor - Project progress schedule - Provide Tender Document - Made draft of technical justification 11 August 1997 to 71 PT. Bina Ass. Highway Project Management Responsible for : May 2003 Karya Engineer Unit (PMU) for - Project monitoring Strategic Urban Road - Project progress schedule Infrastructure Project-1A - Provide Tender Document (SURIP-1A), Center Java - Made draft of technical justification for proposed addendum for PMU's justification to World Bank - Evaluation of Project escalation - Provide Request For Proposal - Project progress schedule - Review of geometric design which recommended from World Bank 12 January 1997 to 6 PT. Bina Highway The Design for Road Responsible for : June 1997 Karya Engineer Pedestrian and Road - Provide Tender DocumentJune 1997 Karya Engineer Pedestrian and Road - Provide Tender Document Entrance 12 Links at - Preparation the quantity Jakarta. calculation and BOQ DPU-DKI Jakarta - Design of Road Maintenace - Preparation of digitizer mapping to computer program (AutoCAD). Planner 3 of 4 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
  • 4. No. Employer Position Description From-to Month Held of Duties 13 May 1996 to 8 PT. Bina Ass. Highway FS & FED Responsible for : December 1996 Karya Engineer Semarang - Demak - Preparation data survey Toll Road Project - Input data survey to computer program EDS (Engineering Data System) - Design of Geometric - Design of spiral of road used clothoid spiral - Preparation the quantity cut and fill calculation. 14 March 1995 to 11 PT. Bina Ass. Highway Technical Assistance Responsible for : Karya Engineer in Final Engineering - Design of GeometricJanuary-1996 Contract Period Project Name and Location Design for - Design of pavement, and Secondary Road sub structure Maintenance and - Preparation the quantity of Traffic Management road improvement Scheme calculation JUDP-I (JUPCO - Preparation of standard Code 1 DB. 23 specification for tender IBRD Loan 2932 document IND) DKI - Survey report of road JAKARTA inventory traffic counting, roughness, rutting of surface road with FWD dynatest 8000 Language(s) And Degree of Proficiency Speaking Writing English Good Good Indonesia Mother tongueIndonesia Mother tongue Certification I certify the above to be a true and accurate description of my qualifications, experience and language proficiency. Tangerang, April 5, 2015 Asdian Akbar Planner 4 of 4 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)