1. ob No / Career Profile /November 07
Curriculum Vitae
Wuryanto career spans over than 1
Road & Bridge Design Project
Drawings and Processing Data
Career Highlights
March 2011 – October 2011
LDD Drafter
Yachiyo Engineering Co., Ltd
Aceh Reconstruction Project
Project Experience:
Design of Provincial Road in Aceh, scope of work is drawing Basemap, Alignment
Layout, , Plan and Profile, Cross Section, Plan and Pr
January 2011 – March 2011
LDD Drafter
PT. Wiratman
Sarowako Bahodopi Road
Project Experience:
Assigned to INCO
Design of road in Sarowako, south Sulawesi, scope of work is drawing Alignment
Layout and Plan Profile Drainage
October 2010 – December
LDD Drafter
PT. Yodya Karya
Pekerjaan Desain Penambahan Lajur Ruas Tomang
Tangerang Barat Jalur A dan Jalur B Pada Jalan Tol
Jakarta - Tangerang
Project Experience:
Assigned to PT. Jasa Marga
Design of Toll road from Tomang
Layout, Basemap, Plan and Profile
ob No / Career Profile /November 07
career spans over than 15 years of work experience Drafter / Designer
Road & Bridge Design Project related to the Highway, Structure, Traffic, Drainage
Processing Data Survey of Topography.
October 2011
Yachiyo Engineering Co., Ltd
Aceh Reconstruction Project
Design of Provincial Road in Aceh, scope of work is drawing Basemap, Alignment
Layout, , Plan and Profile, Cross Section, Plan and Profile Drainage Drawings
March 2011
Bahodopi Road Project
Design of road in Sarowako, south Sulawesi, scope of work is drawing Alignment
Layout and Plan Profile Drainage drawings.
December 2010
Pekerjaan Desain Penambahan Lajur Ruas Tomang –
Tangerang Barat Jalur A dan Jalur B Pada Jalan Tol
Tangerang
Jasa Marga
Tomang to Tangerang, scope of work is drawing Alignment
rofile, Cross Section.
Page 1 of 6
in
, Traffic, Drainage
Design of road in Sarowako, south Sulawesi, scope of work is drawing Alignment
–
Tangerang Barat Jalur A dan Jalur B Pada Jalan Tol
Roles
Drafter / Designer
Qualifications
High School Graduated
1990, SMA Negeri 1 Boyolali
Market Sectors
Highway, Structure, Traffic,
Drainage, Irrigation Drawings
SiteExperience
Indonesia.
Relevant Training
English , Msoffice, Autocad
2D + 3D, Addcad, Softdesk ,
AutoCAD Civil 3D Land
Desktop Companion 2009,
12D ,
Microstation V8
Address
Komplek Bukit Kencana
Blok AN 23, Rt 03 / 019
Jati Rahayu, Pondok Melati,
Bekasi, West Java Indonesia
Post Code : 17414
Hp : +6281398690135
Telp : +62218483858
e-mail :
wuryanto_fatka@yahoo.co.id
2. ob No / Career Profile /November 07 Page 2 of 6
February 2009 – August 2010
LDD Drafter
PT. Wiratman
Rencana Tehnik Akhir Pelebaran atau Penambahan
Lajur Jalan Tol Tangerang - Merak
Project Experience:
Assigned to PT. Marga Mandalasakti
Design of Toll road from tangerang to merak, scope of work is drawing Alignment
Layout, Basemap, Plan and Profile.
March 2008 – February 2009
Sr. Road Designer
Secondment PT. Wiratman to PT. KBR Engineer
Indonesia
Project Experience:
Assigned to G & I Asia Pacific Project
Mains Road Overbridge QLD : Revise drawings
Hamilton Road : Revise drawings
Coal Connect Project : Drawings Plan of Intersection Railway Crossing of Sunwater
Easement.
Preliminary Design of BHP Haul Road/earthwork design: Drawings of Plan, Long
Section, Cross Section, Detail Of Drainage Teluk Timbau Port.
Project Experience :
December 2007 – March 2008
Autocad/land Desktop Drafter
Pacific Consultant International (PCI)
Mass Railway Transit Project
Design of railway from Lebak Bulus – Monas, Monas – Station Kota Flyover and Tunnel
Project
Wuryanto was Responsibility at Plan & profile, Typical Cross Section, Detail Drawings.
September 2007 – December 2007
Autocad/land Desktop Drafter
PT. Delta Tama Waja (DTW)
Survey Condition, Elevated/installed Bridge Technical Design in
Metropolitan and Large Cities (Jabodetabek)
Design of Bridge in Jakarta, Bogor, Depok, Tangerang, Bekasi (Jabodetabek), scope of
work as widening, elevated, re-install and relocations over bridge and Box culvert
Wuryanto was involved in Highway, Structure Drawings works. Wuryanto roles in this
project is design Drafter Plan & Profile, Cross Section and Detail of Structure Bridge of
Drawings.
3. ob No / Career Profile /November 07 Page 3 of 6
April 2007 – July 2007
Autocad/land Desktop Drafter
Mitra Pacific Consultant International (MCI)
Cikampek-Palimanan Detail Engineering Design Project
Wuryanto was responsibility at Drainage Drawings involved drainage network at design
Tollway, sewer line, inlet & outlet, plan & profile, cross section, and Detail ditch.
March 2006 – February 2007
Autocad Drafter
Nippon Koei International
Participatory Irrigation Rehabilitation Improvement
Management Project (PIRIMP)
Wuryanto was responsibility at Irrigation Drawings involved plan & profile, cross
section, and Detail structure drawings.
April 2005 – January 2006
Autocad/land Desktop Drafter
CV. Era Teknik
Technical Design Road Kebinamargaan Kab. Bekasi
Wuryanto was responsibility at highway drawings involved Plan & Profile, Cross section
drawings.
November 2004 – February 2005
Softdesk/land Desktop Drafter
Department of Public works Jati Baru
Basic Design Busway on DKI Project
Wuryanto was responsibility at Highway drawings involved Plan & Profile, Cross
Section, and Typical Cross Section drawings of Ciledug-Blok M, Cililitan-Grogol,
Kebayoran Lama-lebak Bulus, Kalimalang-Blok M, Kp. Melayu-Kp. Rambutan, Kp.
Melayu-Pulo Gebang, Kp. Melayu-Ancol, Manggarai Ps. Minggu, Pulo-gebang-HI,
Tanah Abang-Senayan, Warung Jati-Dukuh Atas.
November 2004 – December 2004
Softdesk/land Desktop Drafter
PT. PP (Persero)
Jakarta Outer Ring Road Section-E2 (JORR E-2)
Wuryanto was responsibility at Highway drawings involved Plan & Profile, Cross
Section, and Structure detail drawings of Ramp.
August 2004 – Oktober 2004
Softdesk/land Desktop Drafter
PT. Hutama Karya (Persero)
Urban Arterial Road Improvement in Metropolitan and Large
Cities Project (UARI)
Wuryanto was responsibility at Structure drawings involved Plan & Profile, Cross
Section, and Structure detail drawings of Pramuka Flyover.
4. ob No / Career Profile /November 07 Page 4 of 6
August 2003 – July 2004
Softdesk/land Desktop Drafter
Ssyangyong co.ltd.
Sumatera East Coast Highway Project
Wuryanto was responsibility at Highway drawings involved plan & profile, cross section
of Way Jepara-Way Seputih Banyak.
May 2003 – August 2003
Autocad/Softdesk Drafter
Pacific Consultant International (PCI)
Heavy Load Project
Wuryanto was responsibility at Highway drawings involved plan & profile, cross section.
April 2002 – March 2003
Autocad/Softdesk Drafter
PT. Bina Karya (Persero)
Padalarang-Cikampek Review Design Project
Wuryanto was responsibility at Structure, Drainage drawings involved Plan & Profile,
Cross Section of Overpass, Underpass, Box Culvert, and Cimeta Bridge Drawings.
February 2002 – June 2002
Autocad/land Desktop Drafter
CV. Eka Cipta Kreasi
Tangerang Road Improvement Project
Wuryanto was responsiboadility at Highway drawings involved Plan & Profile, Cross
Section of Widening MH. Thamrin and New Design Road of AMD Drawings Project
July 2001 – November 2001
Autocad/land Desktop Drafter
Samneung
Hospital Waste Water Treatment Project (HWWTP)
Wuryanto was responsiboadility at Mechannical, Drainage drawings involved plan &
profile of Drainage Network, cross section, Structure, Mechannical Drawings.
February 2001 – June 2001
Autocad/land Desktop Drafter
CV. Eka Cipta Kreasi
Tangerang Road Improvement Project
Wuryanto was responsibility at Highway drawings involved plan & profile, cross section.
November 1998 – Oktober 1999
Autocad / Softdesk Drafter
PT. Wahana Mitra Amerta
Urban Arterial Road Improvement in Metropolitan and Large
Cities Project (UARI)
Wuryanto was responsibility at Structure drawings involved Plan & Profile, Cross
Section, and Structure detail drawings of Tanjung Barat, Suprapto, Cikokol Flyover.
5. ob No / Career Profile /November 07 Page 5 of 6
February 1998 – June 1998
Autocad Drafter
Mitra Pacific Consultant International (MCI)
Waru-Wonokromo-Tj. Perak Toll Road Design Project
Wuryanto was responsiboadility at Traffic, Detail drawings.
February 1997 – December 1997
Autocad / Adcadd Drafter
PT. Bina Karya (Persero)
Pedestrian DKI Jakarta Road Design Project
Wuryanto was responsibility at Landscape, Structure drawings involved Plan & Cross
Section, and Structure detail drawings.
July 1996 – January 1997
Autocad Drafter
PT. Citaconas
Aromatics Plan Tuban Petrochemical
Wuryanto was responsibility at Steel Structure drawings involved Plan & Cross Section,
and Structure detail drawings.
April 1996 – June 1996
Autocad Drafter
PT. Bina Karya (Persero)
Feasibility Study on Cirebon-Batang Toll Road Project
Wuryanto was responsibility at highway, Structure, drawings involved Plan & Profile,
Cross Section, and Structure drawings.
April 1995 – March 1996
Operator Computer
PT. Bina Karya (Persero)
Semarang Section-C Technical Review Design Toll Road
Project
Wuryanto was responsibility at report project and helped simple Drawings