1.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
SUMMARY
Has about nine (9) years experience as draftman in Process and Piping engineering drawing in
saveral oil and gas, petrochemical Project, onshore Troughout of Indonesia has performed the
Process and Piping drawings Work using relevant applicable codes, standards and regulations.
Name
Birthplace/ Date of Birth
Nationality
Sex
Religion
Marital Status
Address
Mobile Phone
Email
: Syukur Anton Nugroho
: Cilacap, March 31, 1982
: Indonesian
: Male
: Moslem
: Married
: Jl. Tidar No. 273 RT 05 / 06 Cilacap, Jawa Tengah
: 081386704722 / 081808793356
: nike_anton@yahoo.com
EXPERIENCE
January 2013 – Present
PT. Meindo Elang Indah
Project : Salamander Project
GG New Field Development Project
KL Gas Lift Project
Bangka Top site
Position : Drafter Process
Responsibilities :
Prepared and Revised piping Instrument Diagram
Prepare and resived Process safety diagram
Prepare and resived Process flow Diagram
Prepare and resiverd safety layout
2.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
March 2012 – December 2012
PT. TRIPATRA Engineering Consortiums PT. Samsung Engineering
Client : MCL (Mobile Cepu Limited)
Project : Banyu Urip Project (EPC-1)
Position : Drafter Piping
Responsibilities :
Piping Info Loading Data for Sub Pipe Rack
September 2011 – Febuary 2012
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Hoou P&ID update SS and GS area
Position : Microstations Drafsman
responsibilities :
Prepared and Revised piping Instrument Diagram
January 2011 – September 2011
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Rangtau Bais GS Upgrade Detail Engineering Design
Position : Microstations Drafsman process & Piping
responsibilities :
Draft P & ID Drawing
Draft Piping Plan Section
Draft isometric drawing
Draft Detail Drawing
Draft of Material Take Off
3.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Bekasap Water Management Project
Position : Microstations Drafsman process & piping
responsibilities :
Draft P & ID Drawing
Draft Piping Plan Section
Draft isometric drawing
Draft Detail Drawing
Draft of Material Take Off
Febuary 2010 – January 2011
PT. TRIPATRA engineering & contrustors
Client : PT. PERTAMINA PHE ONWJ
Project : BP Rehabilitation Project #1
Position : Piping Drafter
responsibilities :
Revise Pipe Support Drawing
Revise Isometric Drawing
Revise Pipe Support Drawing
PT. TRIPATRA engineering & contrustors
Client : PT. PERTAMINA PHE ONWJ
Project : BP Rehabilitation Project
Position : Process & Piping Drafter
responsibilities :
Draft P & ID Drawing
Draft Isometric Drawing
Draft for Material Take off
Revise Isometric Drawing
Revise Pipe Support Drawing
4.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
March 2009 – January 2010
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Bekasap Water Management Project
Position : Microstations Drafsman process & piping
responsibilities :
Draft P & ID Drawing
Draft Piping Plan Section
Draft Detail drawing
Draft isometric drawing
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Bangko Flare System Project
Position : Microstations Drafsman process & Piping
responsibilities :
Draft P & ID Drawing
Draft Piping Plan Section
Draft Detail drawing
PT. TRIPATRA engineering & contrustors
Client : PT. Chevron Pacific Indonesia
Project : Kota Batak Project
Position : Microstations Drafsman process & piping
responsibilities :
Draft P & ID Drawing
Draft Piping Plan Section
Draft Detail drawing
Draft isometric drawing
5.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
August 2008 – Febuary 2009
PT. TRIPATRA engineering & contrustors
Client : PT. BP WEST JAVA Ltd
Project : BP Engineering Blanket Service West Java Indonesia Position
Position : Microstations Drafsman process & piping
responsibilities :
Draft Revise P & ID Drawing
Draft Revise PFD Drawing
Draft Revise Piping Plan & Revise isometric drawing
January2007 – October 2007
PT. Meta Epsi
Client : PT. PERTAMINA UP IV CILACAP
Project : PEMBANGUNAN UNIT BILER KAPASITAS 110T/J
Position : Process & Piping Drafsman
responsibilities :
Draft P & ID Drawing
Draft Isometric Drawing
Draft for Material Take off
Revise Isometric Drawing
Revise Pipe Support Drawing
Education
2000-2001 ~ Diploma 1 Management And Analist Computer of IMKI PRIMA in Cilacap Jawa Tengah.
1997-2000 ~ Technical High School , Dr. SOETOMO in Cilacap Jawa Tengah.
1994-1997 ~ Junior High School, Islam Al ‐ Irsyad in Cilacap Jawa Tengah.
1988-1994 ~ Elementary School, NEGERI 05, SIDANEGARA in Cilacap Jawa Tengah.
Registrations/Affiliations
Publications/Presentations
-
6.
Syukur Anton Nugroho
Drafter Process & Piping
Resume
Specific Technical Expertise/Specialist Courses
YPST Drafting Course
- Microstation, In House Training at PT. TRIPATRA Engineering