SlideShare a Scribd company logo
1 of 4
Download to read offline
Ir. AINUL JAMAL
BIN MUSA
PERSONAL DETAILS
ADDRESS
B-7-4 Residensi Hijauan Lumayan,
Taman Naga Mas,
57100 Sri Petaling,
Kuala Kumpur
DATE OF BIRTH
23 November 1985
PHONE
017-699 1236
E-MAIL
ainuljamalmusa@gmail.com
Linked
Ainul Jamal
linkedin.com/in/ainul-jamal-
musa-3bb865198
MARITAL STATUS
Married
LANGUAGES
Bahasa Malaysia
English
CAREER OBJECTIVES
A Professional Engineer, seeking for technical position to
enhance my professional skills and apply my technical
knowledges in the infrastructure industry.
Currently, i was assigned as Senior Engineer for East Coast
Rail Link Project (ECRL). Involving in planning, design, site
supervision work with 11 years experience.
EDUCATION BACKGROUND
Bachelor of Engineering Civil
• Mara University of Technology (UiTM) Shah Alam
• 2006 – 2009
• Majoring in Highway and Transportation Engineering
Diploma of Engineering Civil
• Mara University of Technology (UiTM) Shah Alam
• 2003 – 2006
Sijil Pelajaran Malaysia (SPM)
• Sekolah Menengah Kebangsaan Bukit Saujana P.D
• 2002
COURSES / CONFERENCES ATTENDED
 International Road Federation conferences.2016
 Bentley Systems Aecosim/BIM workshop.2014
 17th ESRI Malaysia User Conference 2013
 Improving The Design And Installation Of Traffic
Barrier Along Major Road in Malaysia Conference
2010
 MXRoad V8i Training and AutoCAD Civil 3d Training
2009
SOFTWARE SKILL
MXRoad V8i SS2
AutoCAD
Sketchup
Misc Project
COMPETENCY
• Registered Professional
Engineer (PE) with BEM
Reg no :(21165)
• Registered Member with IEM
Reg no :(111836)
• CIDB Green Card Holder
ID : W51260720110033
• Expressway Operation Safety
Passport (EOSP) –
No:EOSP009601N
PROFESSIONAL SKILLS / EXPERIENCES
Planning/Management (~2 years)
• Assist on the preparation Concession Agreement (CA), Technical
Appendices (TA) and Project Design Brief.
• Liaising at an appropriate level with clients, stakeholders and
technical disciplines (Geotechnical, Drainage, Utility, and Bridge)
to optimise and develop fully integrated solutions.
• Assist Project Manager on liaising with Authorities such as MHA,
JKR, JPS , local authorities and utility provider.
• Worked closely with 3rd party consultant such as Surveyor, Traffic
Management Consultant, Road Safety Auditor, and Independent
Checking Engineer
• Prepared relevant technical document and report such as DDJR,
Pavement, Local Access Report.
• Participated in Value Management and Value Engineering
workshop.
Engineering Design (~6 years)
• Preparation of designs and drawings in accordance to technical
design standards such as JKR,REAM,MHA and/or AASTHO
• Vast experience in technical design geometric for Mainline
Highway, Interchanges, Intersection and minor road using Mx
Road and AutoCad. Also experience in Pavement, Road Furniture,
Traffic Management Design and Toll Plaza Configuration
• Good understanding on Utility and Relocation requirement such
as underground utility such as SYABAS, GAS Malaysia,
Timedotcom, 13kV and overhead transmission line 13kV, 132kV
and 275kV.
• Assist Quantity Surveyor in Taking off quantities
Site Supervision work (~3 years)
• Assist the Resident Engineer on supervising and monitoring
activity such as Ground Treatment, Earthwork, Drainage,
Pavement and Utility work
• Review construction and utility drawing and to ensure smooth
technical and construction interfacing. Inform design team if any
discrepancies on design and site condition.
• Review of shop drawing, design proposal, work method
statement, material submission and relevant report.
• Recommend workable solutions or introduce mitigation measures
to the problem or issued encounter at site
• Ensure that subordinates or Inspector of works monitor and
supervise contractor and subcontractor works done complied with
specification, drawing, and contract documents
• Manage and ensure the contractor to implement Health, Safety
and Environment (HSE) requirement during construction activity.
• Notify Resident Engineer on non-compliance works done by
contractor and issued NCR or Memo to ensure contractor do
rectification work.
COMPANY / SUPERIOR
Ir. Kenneth Ten Fui Chan
Senior General Manager
Transportation and Highway
Department
HSS Integrated Sdn Bhd
Ir. Lee Soo Sin
Resident Engineer
HSS Integrated Sdn Bhd
Maju Expressway Extension
Putrajaya – Klia (MEXII)
Contact : +60 19 322 9165
WORK EXPERIENCES
HSS Integrated Sdn Bhd
Senior Engineer
• June 2012 – Present
Project Involved
East Coast Rail Link Project (ECRL)
• Estimation Project cost RM 55 bill.
• Consist of 210km Section A, 6 Station, 51 RUB and 4 ROB
• Liason with JKR HQ, JKR Kelantan, JKR Terengganu and Local
Authorities
Maju Expressway Extension Putrajaya – KLIA (MEX II)
• Estimation Project cost RM 1.25 bill.
• Consist of 18km highway, 1 Interchange and Toll Plaza
• Participated in Value Engineering with MHA, JKR, and etc
Seri Kembangan Interchange at MEX
• Project cost Rm 118 mill.
• Consist of 1.8km highway, 1 Interchange, Toll Plaza and Seagull
Intersection
• Opening for public on December 2015
Other Project
• Rapid Pengerang – Package 20A1 Temporary Camp
• Proposed Jalan Duta Traffic Dispersal and Road Widening
ICE Roles
• East Klang Valley Expressway (EKVE)
• Feasibility Study Major Roads Project and Third Link in Penang
HSS Integrated Sdn Bhd
Assistant Resident Engineer (ARE) (Secondment)
• Dec 2016 – Dec 2019
Project Involved
Maju Expressway Extension Putrajaya – KLIA (MEX II)
• Progress to Date – 82%
• Supervising 1 of 2 Section from Ch 24000 – Ch31000 for
Geotechnical, Drainage , Earthwork ,Pavement and Utility work
• Ensure work done at site was carried out with testing and/or
installed by required instrument for monitoring. Review test and
monitoring report.
• Attend Factory Acceptance Test where applicable.
• Assist Designer on preparation Utility Relocation Drawing on
integration with other Road facilities or furniture.
• Liaise with JKR and local authorities on application Permit of Work
and TMP Permit
• Evaluate quantity submitted by Joint Measurement exercise
COMPANY / SUPERIOR
Ir. Francis Maria Soosay
Head of Transportation
Department
Ranhill Bersekutu Sdn Bhd
Ir. Husni Bt Hussain
Head of Highway Department
Iktisas Ingenieurs
Sdn Bhd
WORK EXPERIENCE
Ranhill Bersekutu Sdn Bhd
Highway Engineer
• December 2010 – June 2012
Project Involved
East Coast Economic Region Project (ECER) - Package 2
• Estimation Project cost RM 600 mill.
• FT8 Jambatan Sg. Lakit to Gua Musang (60km)
• Produce Geometric Design including mainline (20.7 km) and 5
interchanges for Package 2A
• Designed Traffic Management Plan (TMP) for 60 km.
Ampang-Kuala Lumpur Elevated Highway Extension(AKLEH)
• Concept and Detailed Design split alignment for upgrading AKLEH
from km4.6 to km6.
• Assist on preparation Land Acquisition Plan (LA) and Borehole
Location for SI
KLCC Mixed Development
• Proposed Design for Exit and Entry Ramps connecting Jalan Binjai
to KLCC Mix Development
Iktisas Ingenieurs Sdn Bhd
Highway Engineer
• Jan 2009 – November 2010
Project Involved
East Coast Economic Region Project (ECER) - Package 3
• Estimation Project cost RM 1.4 bill.
• FT8 from Kg. Relung Kuala Lipis to Gua Musang and Gua Musang
Bypass road 104 km.
• Preliminary Engineering Design for Package 3A, 3B, 3C, 3D, 3F,
3G, 3H & 3J (69km) mainline and 5 interchanges.
• Detailed and Tender drawing for package 3G(12.2km) and 3H
(11.8km)
• Package 3F, 3G and 3H completed and opened to traffic on
December 2015.

More Related Content

What's hot

What's hot (20)

06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 
CV - Hassan Ssentamu
CV - Hassan SsentamuCV - Hassan Ssentamu
CV - Hassan Ssentamu
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 
CV
CVCV
CV
 
Behlol Cv (2)
Behlol Cv (2)Behlol Cv (2)
Behlol Cv (2)
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Mangla ram
Mangla ramMangla ram
Mangla ram
 
WB 04-2016 Schonken Mark
WB 04-2016 Schonken MarkWB 04-2016 Schonken Mark
WB 04-2016 Schonken Mark
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
CV-FEB2016
CV-FEB2016CV-FEB2016
CV-FEB2016
 
McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015McCormick DA - WSP CV - Feb 2015
McCormick DA - WSP CV - Feb 2015
 
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Masoud rahimzadeh cv
Masoud rahimzadeh cvMasoud rahimzadeh cv
Masoud rahimzadeh cv
 
Mudasar Resume-
Mudasar Resume-Mudasar Resume-
Mudasar Resume-
 
Anjana Satharanga-Surveyor
Anjana Satharanga-SurveyorAnjana Satharanga-Surveyor
Anjana Satharanga-Surveyor
 
AFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEAFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAE
 
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel EngineerCV_Nguyen Van Khoa_Bridge&Tunnel Engineer
CV_Nguyen Van Khoa_Bridge&Tunnel Engineer
 
JMP Development Planning
JMP Development PlanningJMP Development Planning
JMP Development Planning
 

Similar to Cv Ir. Ainul Jamal bin Musa - 2020

Similar to Cv Ir. Ainul Jamal bin Musa - 2020 (20)

cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
Presentation slide
Presentation slidePresentation slide
Presentation slide
 
Saud CV
Saud CVSaud CV
Saud CV
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
Anand ponnaiah
Anand ponnaiahAnand ponnaiah
Anand ponnaiah
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.
 
Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921Brian Parkinson_CV_20140921
Brian Parkinson_CV_20140921
 
resume.b
resume.bresume.b
resume.b
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
Hesham CV - Senior Road Eng 2023.pdf
Hesham CV - Senior Road Eng  2023.pdfHesham CV - Senior Road Eng  2023.pdf
Hesham CV - Senior Road Eng 2023.pdf
 
Resume Bharadwaj
Resume Bharadwaj Resume Bharadwaj
Resume Bharadwaj
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)My saifullizan cv 2015 latest march 15 (1)
My saifullizan cv 2015 latest march 15 (1)
 
Resume
ResumeResume
Resume
 
CV ref
CV refCV ref
CV ref
 

Recently uploaded

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 

Recently uploaded (20)

Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 

Cv Ir. Ainul Jamal bin Musa - 2020

  • 1. Ir. AINUL JAMAL BIN MUSA PERSONAL DETAILS ADDRESS B-7-4 Residensi Hijauan Lumayan, Taman Naga Mas, 57100 Sri Petaling, Kuala Kumpur DATE OF BIRTH 23 November 1985 PHONE 017-699 1236 E-MAIL ainuljamalmusa@gmail.com Linked Ainul Jamal linkedin.com/in/ainul-jamal- musa-3bb865198 MARITAL STATUS Married LANGUAGES Bahasa Malaysia English CAREER OBJECTIVES A Professional Engineer, seeking for technical position to enhance my professional skills and apply my technical knowledges in the infrastructure industry. Currently, i was assigned as Senior Engineer for East Coast Rail Link Project (ECRL). Involving in planning, design, site supervision work with 11 years experience. EDUCATION BACKGROUND Bachelor of Engineering Civil • Mara University of Technology (UiTM) Shah Alam • 2006 – 2009 • Majoring in Highway and Transportation Engineering Diploma of Engineering Civil • Mara University of Technology (UiTM) Shah Alam • 2003 – 2006 Sijil Pelajaran Malaysia (SPM) • Sekolah Menengah Kebangsaan Bukit Saujana P.D • 2002 COURSES / CONFERENCES ATTENDED  International Road Federation conferences.2016  Bentley Systems Aecosim/BIM workshop.2014  17th ESRI Malaysia User Conference 2013  Improving The Design And Installation Of Traffic Barrier Along Major Road in Malaysia Conference 2010  MXRoad V8i Training and AutoCAD Civil 3d Training 2009
  • 2. SOFTWARE SKILL MXRoad V8i SS2 AutoCAD Sketchup Misc Project COMPETENCY • Registered Professional Engineer (PE) with BEM Reg no :(21165) • Registered Member with IEM Reg no :(111836) • CIDB Green Card Holder ID : W51260720110033 • Expressway Operation Safety Passport (EOSP) – No:EOSP009601N PROFESSIONAL SKILLS / EXPERIENCES Planning/Management (~2 years) • Assist on the preparation Concession Agreement (CA), Technical Appendices (TA) and Project Design Brief. • Liaising at an appropriate level with clients, stakeholders and technical disciplines (Geotechnical, Drainage, Utility, and Bridge) to optimise and develop fully integrated solutions. • Assist Project Manager on liaising with Authorities such as MHA, JKR, JPS , local authorities and utility provider. • Worked closely with 3rd party consultant such as Surveyor, Traffic Management Consultant, Road Safety Auditor, and Independent Checking Engineer • Prepared relevant technical document and report such as DDJR, Pavement, Local Access Report. • Participated in Value Management and Value Engineering workshop. Engineering Design (~6 years) • Preparation of designs and drawings in accordance to technical design standards such as JKR,REAM,MHA and/or AASTHO • Vast experience in technical design geometric for Mainline Highway, Interchanges, Intersection and minor road using Mx Road and AutoCad. Also experience in Pavement, Road Furniture, Traffic Management Design and Toll Plaza Configuration • Good understanding on Utility and Relocation requirement such as underground utility such as SYABAS, GAS Malaysia, Timedotcom, 13kV and overhead transmission line 13kV, 132kV and 275kV. • Assist Quantity Surveyor in Taking off quantities Site Supervision work (~3 years) • Assist the Resident Engineer on supervising and monitoring activity such as Ground Treatment, Earthwork, Drainage, Pavement and Utility work • Review construction and utility drawing and to ensure smooth technical and construction interfacing. Inform design team if any discrepancies on design and site condition. • Review of shop drawing, design proposal, work method statement, material submission and relevant report. • Recommend workable solutions or introduce mitigation measures to the problem or issued encounter at site • Ensure that subordinates or Inspector of works monitor and supervise contractor and subcontractor works done complied with specification, drawing, and contract documents • Manage and ensure the contractor to implement Health, Safety and Environment (HSE) requirement during construction activity. • Notify Resident Engineer on non-compliance works done by contractor and issued NCR or Memo to ensure contractor do rectification work.
  • 3. COMPANY / SUPERIOR Ir. Kenneth Ten Fui Chan Senior General Manager Transportation and Highway Department HSS Integrated Sdn Bhd Ir. Lee Soo Sin Resident Engineer HSS Integrated Sdn Bhd Maju Expressway Extension Putrajaya – Klia (MEXII) Contact : +60 19 322 9165 WORK EXPERIENCES HSS Integrated Sdn Bhd Senior Engineer • June 2012 – Present Project Involved East Coast Rail Link Project (ECRL) • Estimation Project cost RM 55 bill. • Consist of 210km Section A, 6 Station, 51 RUB and 4 ROB • Liason with JKR HQ, JKR Kelantan, JKR Terengganu and Local Authorities Maju Expressway Extension Putrajaya – KLIA (MEX II) • Estimation Project cost RM 1.25 bill. • Consist of 18km highway, 1 Interchange and Toll Plaza • Participated in Value Engineering with MHA, JKR, and etc Seri Kembangan Interchange at MEX • Project cost Rm 118 mill. • Consist of 1.8km highway, 1 Interchange, Toll Plaza and Seagull Intersection • Opening for public on December 2015 Other Project • Rapid Pengerang – Package 20A1 Temporary Camp • Proposed Jalan Duta Traffic Dispersal and Road Widening ICE Roles • East Klang Valley Expressway (EKVE) • Feasibility Study Major Roads Project and Third Link in Penang HSS Integrated Sdn Bhd Assistant Resident Engineer (ARE) (Secondment) • Dec 2016 – Dec 2019 Project Involved Maju Expressway Extension Putrajaya – KLIA (MEX II) • Progress to Date – 82% • Supervising 1 of 2 Section from Ch 24000 – Ch31000 for Geotechnical, Drainage , Earthwork ,Pavement and Utility work • Ensure work done at site was carried out with testing and/or installed by required instrument for monitoring. Review test and monitoring report. • Attend Factory Acceptance Test where applicable. • Assist Designer on preparation Utility Relocation Drawing on integration with other Road facilities or furniture. • Liaise with JKR and local authorities on application Permit of Work and TMP Permit • Evaluate quantity submitted by Joint Measurement exercise
  • 4. COMPANY / SUPERIOR Ir. Francis Maria Soosay Head of Transportation Department Ranhill Bersekutu Sdn Bhd Ir. Husni Bt Hussain Head of Highway Department Iktisas Ingenieurs Sdn Bhd WORK EXPERIENCE Ranhill Bersekutu Sdn Bhd Highway Engineer • December 2010 – June 2012 Project Involved East Coast Economic Region Project (ECER) - Package 2 • Estimation Project cost RM 600 mill. • FT8 Jambatan Sg. Lakit to Gua Musang (60km) • Produce Geometric Design including mainline (20.7 km) and 5 interchanges for Package 2A • Designed Traffic Management Plan (TMP) for 60 km. Ampang-Kuala Lumpur Elevated Highway Extension(AKLEH) • Concept and Detailed Design split alignment for upgrading AKLEH from km4.6 to km6. • Assist on preparation Land Acquisition Plan (LA) and Borehole Location for SI KLCC Mixed Development • Proposed Design for Exit and Entry Ramps connecting Jalan Binjai to KLCC Mix Development Iktisas Ingenieurs Sdn Bhd Highway Engineer • Jan 2009 – November 2010 Project Involved East Coast Economic Region Project (ECER) - Package 3 • Estimation Project cost RM 1.4 bill. • FT8 from Kg. Relung Kuala Lipis to Gua Musang and Gua Musang Bypass road 104 km. • Preliminary Engineering Design for Package 3A, 3B, 3C, 3D, 3F, 3G, 3H & 3J (69km) mainline and 5 interchanges. • Detailed and Tender drawing for package 3G(12.2km) and 3H (11.8km) • Package 3F, 3G and 3H completed and opened to traffic on December 2015.