1. Ir. AINUL JAMAL
BIN MUSA
PERSONAL DETAILS
ADDRESS
B-7-4 Residensi Hijauan Lumayan,
Taman Naga Mas,
57100 Sri Petaling,
Kuala Kumpur
DATE OF BIRTH
23 November 1985
PHONE
017-699 1236
E-MAIL
ainuljamalmusa@gmail.com
Linked
Ainul Jamal
linkedin.com/in/ainul-jamal-
musa-3bb865198
MARITAL STATUS
Married
LANGUAGES
Bahasa Malaysia
English
CAREER OBJECTIVES
A Professional Engineer, seeking for technical position to
enhance my professional skills and apply my technical
knowledges in the infrastructure industry.
Currently, i was assigned as Senior Engineer for East Coast
Rail Link Project (ECRL). Involving in planning, design, site
supervision work with 11 years experience.
EDUCATION BACKGROUND
Bachelor of Engineering Civil
• Mara University of Technology (UiTM) Shah Alam
• 2006 – 2009
• Majoring in Highway and Transportation Engineering
Diploma of Engineering Civil
• Mara University of Technology (UiTM) Shah Alam
• 2003 – 2006
Sijil Pelajaran Malaysia (SPM)
• Sekolah Menengah Kebangsaan Bukit Saujana P.D
• 2002
COURSES / CONFERENCES ATTENDED
International Road Federation conferences.2016
Bentley Systems Aecosim/BIM workshop.2014
17th ESRI Malaysia User Conference 2013
Improving The Design And Installation Of Traffic
Barrier Along Major Road in Malaysia Conference
2010
MXRoad V8i Training and AutoCAD Civil 3d Training
2009
2. SOFTWARE SKILL
MXRoad V8i SS2
AutoCAD
Sketchup
Misc Project
COMPETENCY
• Registered Professional
Engineer (PE) with BEM
Reg no :(21165)
• Registered Member with IEM
Reg no :(111836)
• CIDB Green Card Holder
ID : W51260720110033
• Expressway Operation Safety
Passport (EOSP) –
No:EOSP009601N
PROFESSIONAL SKILLS / EXPERIENCES
Planning/Management (~2 years)
• Assist on the preparation Concession Agreement (CA), Technical
Appendices (TA) and Project Design Brief.
• Liaising at an appropriate level with clients, stakeholders and
technical disciplines (Geotechnical, Drainage, Utility, and Bridge)
to optimise and develop fully integrated solutions.
• Assist Project Manager on liaising with Authorities such as MHA,
JKR, JPS , local authorities and utility provider.
• Worked closely with 3rd party consultant such as Surveyor, Traffic
Management Consultant, Road Safety Auditor, and Independent
Checking Engineer
• Prepared relevant technical document and report such as DDJR,
Pavement, Local Access Report.
• Participated in Value Management and Value Engineering
workshop.
Engineering Design (~6 years)
• Preparation of designs and drawings in accordance to technical
design standards such as JKR,REAM,MHA and/or AASTHO
• Vast experience in technical design geometric for Mainline
Highway, Interchanges, Intersection and minor road using Mx
Road and AutoCad. Also experience in Pavement, Road Furniture,
Traffic Management Design and Toll Plaza Configuration
• Good understanding on Utility and Relocation requirement such
as underground utility such as SYABAS, GAS Malaysia,
Timedotcom, 13kV and overhead transmission line 13kV, 132kV
and 275kV.
• Assist Quantity Surveyor in Taking off quantities
Site Supervision work (~3 years)
• Assist the Resident Engineer on supervising and monitoring
activity such as Ground Treatment, Earthwork, Drainage,
Pavement and Utility work
• Review construction and utility drawing and to ensure smooth
technical and construction interfacing. Inform design team if any
discrepancies on design and site condition.
• Review of shop drawing, design proposal, work method
statement, material submission and relevant report.
• Recommend workable solutions or introduce mitigation measures
to the problem or issued encounter at site
• Ensure that subordinates or Inspector of works monitor and
supervise contractor and subcontractor works done complied with
specification, drawing, and contract documents
• Manage and ensure the contractor to implement Health, Safety
and Environment (HSE) requirement during construction activity.
• Notify Resident Engineer on non-compliance works done by
contractor and issued NCR or Memo to ensure contractor do
rectification work.
3. COMPANY / SUPERIOR
Ir. Kenneth Ten Fui Chan
Senior General Manager
Transportation and Highway
Department
HSS Integrated Sdn Bhd
Ir. Lee Soo Sin
Resident Engineer
HSS Integrated Sdn Bhd
Maju Expressway Extension
Putrajaya – Klia (MEXII)
Contact : +60 19 322 9165
WORK EXPERIENCES
HSS Integrated Sdn Bhd
Senior Engineer
• June 2012 – Present
Project Involved
East Coast Rail Link Project (ECRL)
• Estimation Project cost RM 55 bill.
• Consist of 210km Section A, 6 Station, 51 RUB and 4 ROB
• Liason with JKR HQ, JKR Kelantan, JKR Terengganu and Local
Authorities
Maju Expressway Extension Putrajaya – KLIA (MEX II)
• Estimation Project cost RM 1.25 bill.
• Consist of 18km highway, 1 Interchange and Toll Plaza
• Participated in Value Engineering with MHA, JKR, and etc
Seri Kembangan Interchange at MEX
• Project cost Rm 118 mill.
• Consist of 1.8km highway, 1 Interchange, Toll Plaza and Seagull
Intersection
• Opening for public on December 2015
Other Project
• Rapid Pengerang – Package 20A1 Temporary Camp
• Proposed Jalan Duta Traffic Dispersal and Road Widening
ICE Roles
• East Klang Valley Expressway (EKVE)
• Feasibility Study Major Roads Project and Third Link in Penang
HSS Integrated Sdn Bhd
Assistant Resident Engineer (ARE) (Secondment)
• Dec 2016 – Dec 2019
Project Involved
Maju Expressway Extension Putrajaya – KLIA (MEX II)
• Progress to Date – 82%
• Supervising 1 of 2 Section from Ch 24000 – Ch31000 for
Geotechnical, Drainage , Earthwork ,Pavement and Utility work
• Ensure work done at site was carried out with testing and/or
installed by required instrument for monitoring. Review test and
monitoring report.
• Attend Factory Acceptance Test where applicable.
• Assist Designer on preparation Utility Relocation Drawing on
integration with other Road facilities or furniture.
• Liaise with JKR and local authorities on application Permit of Work
and TMP Permit
• Evaluate quantity submitted by Joint Measurement exercise
4. COMPANY / SUPERIOR
Ir. Francis Maria Soosay
Head of Transportation
Department
Ranhill Bersekutu Sdn Bhd
Ir. Husni Bt Hussain
Head of Highway Department
Iktisas Ingenieurs
Sdn Bhd
WORK EXPERIENCE
Ranhill Bersekutu Sdn Bhd
Highway Engineer
• December 2010 – June 2012
Project Involved
East Coast Economic Region Project (ECER) - Package 2
• Estimation Project cost RM 600 mill.
• FT8 Jambatan Sg. Lakit to Gua Musang (60km)
• Produce Geometric Design including mainline (20.7 km) and 5
interchanges for Package 2A
• Designed Traffic Management Plan (TMP) for 60 km.
Ampang-Kuala Lumpur Elevated Highway Extension(AKLEH)
• Concept and Detailed Design split alignment for upgrading AKLEH
from km4.6 to km6.
• Assist on preparation Land Acquisition Plan (LA) and Borehole
Location for SI
KLCC Mixed Development
• Proposed Design for Exit and Entry Ramps connecting Jalan Binjai
to KLCC Mix Development
Iktisas Ingenieurs Sdn Bhd
Highway Engineer
• Jan 2009 – November 2010
Project Involved
East Coast Economic Region Project (ECER) - Package 3
• Estimation Project cost RM 1.4 bill.
• FT8 from Kg. Relung Kuala Lipis to Gua Musang and Gua Musang
Bypass road 104 km.
• Preliminary Engineering Design for Package 3A, 3B, 3C, 3D, 3F,
3G, 3H & 3J (69km) mainline and 5 interchanges.
• Detailed and Tender drawing for package 3G(12.2km) and 3H
(11.8km)
• Package 3F, 3G and 3H completed and opened to traffic on
December 2015.