Technical Audit of System
and Practice of Rail/Weld
Testing by USFD
 A three day technical audit was recently
conducted in a zone.
 The audit was conducted by a team of
Track Directorate and M&C Directorate of
RDSO (5 members) and Faculties of IRICEN
(4 members).
 Three sets of USFD operator along with
machine and registers were audited in detail.
 Discussed with other operators andADENs in
parallel sessions.
 Important features
of any testing
system are
 Reliability
 Accuracy
 Standard
Procedure
System
Reliable
AccurateStandard
 Any testing system
comprises of
 Man
 Machine
 Method
Method
M/c
Man
 Railway Board circulated a check list vide
No.CT/USFD, Dt.28-10-2014.
 Data Survey- Sample data of two block
section fromTMS was taken for study.
 Details
 Length- 17 km
 Rail section- 52 kg, Roll year- 2003
 Route-B, Annual GMT- 22,Total GMT- 200
 Total reported defects- 34 DFWO, 63 OBS + OBS(W)
 Thus defective rail and weld were identified
 Observation
 Few entries in the selected data were earlier
shown as OBS/OBS(w) but on later date
shown as GR/GW.
 Once reported as GW earlier history is
erased.
 Similar to weld defect history rail defect
history is also needed.
 Information on USFD machine in use e.g.
M/c maintenance log book, probe
replacement, M/c characteristics, setting for
temperature variation etc. are also needed in
TMS.
 While rail testing if OBS(w) is found and the
same is tested for weld and found to be
DFW(O) then two entries are created inTMS.
This may be shown together and counted as
one defect.
 As per Chapter 4 of USFD Manual, the
machine shall be
Maintenance Schedule
Visually inspected Daily
Calibration of M/c Once in a week
Sensitivity setting of M/c Once in 3 days
Checking of the equipment
characteristics
Once in a month
Sensitivity calibration against
temperature variation
Once in a month
 Details of M/c
 Three rail tester M/c were examined.
 Make- M/s Paras Electronics (711D)
 Type- Digital DRT, RDSO approved.
 Two weld tester M/c were examined.
 Make- M/s E E C (DS322AT),
 Type- Digital, RDSO approved.
 Observation
 DRT
• Charging- Not adequate. Charged up to 60%.
• Electronic units- Good.
• Trolley- Good.
• Probe and Shoe- Satisfactory-2, Not good-1.
• Alignment cum Lifting Syst.- Satisfactory.
• Audio Alarm- Sounding.
 Observation
 WeldTester
• Charging-Adequate.
• Electronic units- Good.
• Audio Alarm- Sounding.
 Accessories- All but the following were
available, (however, availability of spares could
not be verified)-
 IIW block- Not calibrated.
 Stepped Gauge- Not available.
 Supply of Spares- (as informed by supervisors)
 Probe- Supply is good.
 Battery- Supply is good.
 Maintenance Practice- Contractual, OK.
 Calibration blocks
 0º normal probe- 60x50x50 mm steel block
 Angular probe- IIW block, as per IS:4904.
 Observation
 Blocks were available but without validation
certification.Validation may be got done from
Engine Development unit of RDSO.
 It was apparent that they were not in use.
However, operators were proficient in doing
calibration.
 Rail
 Rail test piece was available and operators
were proficient in ensuring M/c sensitivity.
 Weld
 Weld test piece was available but not
confirming to Para 8.4.1 and Fig. 20(a).
 However, operators were able to ensure
M/c sensitivity but with difficulty and
unreasonable gain.
 Following seven M/c characteristics are to be
checked as per IS: 12666 - 1988
 For M/c- (i) Linearity of time base ± 1.25%, (ii)
Linearity of amplification ± 3%, (iii) Resolution, (iv)
Maximum penetration power
 For Probe- (v) Probe index ± 1 mm, (vi) Probe
angle ± 1º, (vii) Dead zone- single crystal < 7 mm,
double crystal < 3 mm.
Note: Tolerances for railway are shown here and
are more stringent than IS.
 Observations
 IIW block was the major concern as stated supra.
 The record keeping was sketchy, without specific
values.
 A few operators were able to check all the
characteristics while others were unable to do all the
checks. Some of them were even unable to explain
the procedure orally.
 It is recommended to conduct hands-on workshop to
refresh and sharpen this skill.
 It is recommended that the incharge USFD, PWI shall
relieve other operators for a day, for checking M/c
Characteristics etc. and incharge USFD, PWI shall do
test checking of work done by other operators.
 This is necessary to compensate for loss in
signal strength due to rise in temperature
during day.
 It needs temperature gauging and
adjustment of gain.
 Observation
 This checking is not being given due
importance and records were not being
maintained religiously by majority of the
operators.
 All the operators were proficient in picking
and identifying the rail flaws.
 Some of the operators were finding
difficulties in hand probing including tandem
rig.
 The soft grease couplent was more viscous
and resisting free movement of hand probe.
 Data feeding for savingA-scan is only being
done for IMR defects.
 Reason for not maintaining A-scan appears to
be casual approach under the disguise of time
constraint.
 Time taken:- 7-8 min. for first time.
Subsequent entries:- 2-3 min.
 However, machine key board need to be
more user friendly.
 It is recommended to conduct hands-on
workshop to refresh and enhance proficiency.
 Introduce a system of
Internal Audit based
on the checklist given
by Railway Board.
 Internal Audit-Within
the zone, Divisional in-
charge of USFD team
of one Division shall do
technical audit of other
Division’sTeam.
 Conduct Focused
Workshop of short
duration (2-3 days) to
tackle one or two
issues.
 Give emphasis on
learning by Hands-on
to sharpen the skill.
 Conduct Refresher
Courses frequently.
 Arrange StandardTest
Pieces as per relevant IS
codes and RDSO manuals.
 Give emphasis on Regular
Validation to improve
Accuracy.
 Follow Prescribed Manual
Method to improve
Reliability.
 Timely check of M/c on
nominated days for
Accuracy (one operator to
be relieved by Incharge).
 Test Check by incharge on
nominated days .
Standard
Test Piece-
Accuracy
Regular
Validation-
Accuracy
Prescribed
Manual
Method-
Reliability
Timely
Check of
M/c-
Accuracy
Check by
Incharge -
Reliability
 All data related to USFD
M/c (e.g. log book,
various checking) may
be maintain in TMS.
 TMS may also capture
A-scan related to all
defects and archive it.
 User may able to do
Analysis of growth
patterns w.r.t. other
related parameters.
Technical Audit of Rail/Weld Testing Systems

More Related Content

What's hot

A highly versatile autonomous underwater vehicle
A highly versatile autonomous underwater vehicleA highly versatile autonomous underwater vehicle
A highly versatile autonomous underwater vehicleAlwin Wilken
 
samseer husain CV 15-4-2015
samseer husain CV  15-4-2015samseer husain CV  15-4-2015
samseer husain CV 15-4-2015Samseer Husain
 
CDTC Topic 14
CDTC Topic 14 CDTC Topic 14
CDTC Topic 14 CCCJimenez
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviihydrologyproject001
 
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptIGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptgrssieee
 
Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Sung (Stephen) Kim
 
Ann over
Ann overAnn over
Ann overNASAPMC
 
Ess.robert
Ess.robertEss.robert
Ess.robertNASAPMC
 
Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Sung (Stephen) Kim
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgatedonhhenry
 
Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry
 Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry
Download-manuals-surface water-manual-sw-volume4referencemanualhydrometryhydrologyproject001
 
Technical Paper Presentation- ERC Forum
Technical Paper Presentation- ERC ForumTechnical Paper Presentation- ERC Forum
Technical Paper Presentation- ERC ForumRazmi Marzook
 
Sneak preview - SMM presentation
Sneak preview - SMM presentationSneak preview - SMM presentation
Sneak preview - SMM presentationdkane27
 
Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgatedonhhenry
 
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...Michael LaMarr
 

What's hot (20)

A highly versatile autonomous underwater vehicle
A highly versatile autonomous underwater vehicleA highly versatile autonomous underwater vehicle
A highly versatile autonomous underwater vehicle
 
samseer husain CV 15-4-2015
samseer husain CV  15-4-2015samseer husain CV  15-4-2015
samseer husain CV 15-4-2015
 
CDTC Topic 14
CDTC Topic 14 CDTC Topic 14
CDTC Topic 14
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).pptIGARSS 2011 - RCM, The Making of (AC) (Short).ppt
IGARSS 2011 - RCM, The Making of (AC) (Short).ppt
 
Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.
 
Ann over
Ann overAnn over
Ann over
 
Ess.robert
Ess.robertEss.robert
Ess.robert
 
Fleet ride systems pts rega training brief (updated 31 jan 12)
Fleet ride systems pts rega training brief (updated 31 jan 12)Fleet ride systems pts rega training brief (updated 31 jan 12)
Fleet ride systems pts rega training brief (updated 31 jan 12)
 
Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.Critical Design Review Presentation for Project A.R.E.S.
Critical Design Review Presentation for Project A.R.E.S.
 
Pers3 leadership brief
Pers3 leadership briefPers3 leadership brief
Pers3 leadership brief
 
Career Waypoint USER Guide 2013 June 4
Career Waypoint USER Guide 2013 June 4Career Waypoint USER Guide 2013 June 4
Career Waypoint USER Guide 2013 June 4
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgate
 
Remote geosteering presentation
Remote geosteering presentationRemote geosteering presentation
Remote geosteering presentation
 
Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry
 Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry
Download-manuals-surface water-manual-sw-volume4referencemanualhydrometry
 
Career Waypoint nc school house brief 2013
Career Waypoint nc school house brief 2013Career Waypoint nc school house brief 2013
Career Waypoint nc school house brief 2013
 
Technical Paper Presentation- ERC Forum
Technical Paper Presentation- ERC ForumTechnical Paper Presentation- ERC Forum
Technical Paper Presentation- ERC Forum
 
Sneak preview - SMM presentation
Sneak preview - SMM presentationSneak preview - SMM presentation
Sneak preview - SMM presentation
 
Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgate
 
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...Enhancing Pilot Ability to Perform Continuous Descent Approach with  Descript...
Enhancing Pilot Ability to Perform Continuous Descent Approach with Descript...
 

Similar to Technical Audit of Rail/Weld Testing Systems

Planning track maintenance.ppt
Planning track maintenance.pptPlanning track maintenance.ppt
Planning track maintenance.pptAfendiAriff
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviiihydrologyproject001
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1mahesh savita
 
SCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionSCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionBrett Payton
 
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal ho
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal hoPavement Management, PMS, Asset Management, Road Maintenance planningfinal ho
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal hoHamid62
 
Guidelines on monitoring of online water water / effluent quality monitoring ...
Guidelines on monitoring of online water water / effluent quality monitoring ...Guidelines on monitoring of online water water / effluent quality monitoring ...
Guidelines on monitoring of online water water / effluent quality monitoring ...PremVerma95
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.S P Singh
 
Direct Assessment ECDA Program Development
Direct Assessment ECDA Program DevelopmentDirect Assessment ECDA Program Development
Direct Assessment ECDA Program DevelopmentMTS Webmaster
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxflorriezhamphrey3065
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
PAUT PRESENTATION.pptx
PAUT PRESENTATION.pptxPAUT PRESENTATION.pptx
PAUT PRESENTATION.pptxEndLab
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfAbdulSalamSagir1
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Ryosuke Ichikari
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Ryosuke Ichikari
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018Ryosuke Ichikari
 

Similar to Technical Audit of Rail/Weld Testing Systems (20)

Planning track maintenance.ppt
Planning track maintenance.pptPlanning track maintenance.ppt
Planning track maintenance.ppt
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviii
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
External Corrosion Direct Assessment (ECDA)
External Corrosion Direct Assessment (ECDA) External Corrosion Direct Assessment (ECDA)
External Corrosion Direct Assessment (ECDA)
 
SCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionSCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity Solution
 
C012231827
C012231827C012231827
C012231827
 
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal ho
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal hoPavement Management, PMS, Asset Management, Road Maintenance planningfinal ho
Pavement Management, PMS, Asset Management, Road Maintenance planningfinal ho
 
Guidelines on monitoring of online water water / effluent quality monitoring ...
Guidelines on monitoring of online water water / effluent quality monitoring ...Guidelines on monitoring of online water water / effluent quality monitoring ...
Guidelines on monitoring of online water water / effluent quality monitoring ...
 
Ml101610106
Ml101610106Ml101610106
Ml101610106
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.
 
Direct Assessment ECDA Program Development
Direct Assessment ECDA Program DevelopmentDirect Assessment ECDA Program Development
Direct Assessment ECDA Program Development
 
Student Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docxStudent Declaration on Submission I confirm that all the work in.docx
Student Declaration on Submission I confirm that all the work in.docx
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
PAUT PRESENTATION.pptx
PAUT PRESENTATION.pptxPAUT PRESENTATION.pptx
PAUT PRESENTATION.pptx
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018 Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018
 
City & guilds 2392
City & guilds 2392City & guilds 2392
City & guilds 2392
 
Presentation for IRC
Presentation for IRCPresentation for IRC
Presentation for IRC
 
Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018Announcement of Results of xDR Challenge 2018
Announcement of Results of xDR Challenge 2018
 

Recently uploaded

New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraDeakin University
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 

Recently uploaded (20)

New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Artificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning eraArtificial intelligence in the post-deep learning era
Artificial intelligence in the post-deep learning era
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 

Technical Audit of Rail/Weld Testing Systems

  • 1. Technical Audit of System and Practice of Rail/Weld Testing by USFD
  • 2.  A three day technical audit was recently conducted in a zone.  The audit was conducted by a team of Track Directorate and M&C Directorate of RDSO (5 members) and Faculties of IRICEN (4 members).  Three sets of USFD operator along with machine and registers were audited in detail.  Discussed with other operators andADENs in parallel sessions.
  • 3.  Important features of any testing system are  Reliability  Accuracy  Standard Procedure System Reliable AccurateStandard
  • 4.  Any testing system comprises of  Man  Machine  Method Method M/c Man
  • 5.  Railway Board circulated a check list vide No.CT/USFD, Dt.28-10-2014.  Data Survey- Sample data of two block section fromTMS was taken for study.  Details  Length- 17 km  Rail section- 52 kg, Roll year- 2003  Route-B, Annual GMT- 22,Total GMT- 200  Total reported defects- 34 DFWO, 63 OBS + OBS(W)
  • 6.  Thus defective rail and weld were identified  Observation  Few entries in the selected data were earlier shown as OBS/OBS(w) but on later date shown as GR/GW.  Once reported as GW earlier history is erased.  Similar to weld defect history rail defect history is also needed.
  • 7.  Information on USFD machine in use e.g. M/c maintenance log book, probe replacement, M/c characteristics, setting for temperature variation etc. are also needed in TMS.  While rail testing if OBS(w) is found and the same is tested for weld and found to be DFW(O) then two entries are created inTMS. This may be shown together and counted as one defect.
  • 8.  As per Chapter 4 of USFD Manual, the machine shall be Maintenance Schedule Visually inspected Daily Calibration of M/c Once in a week Sensitivity setting of M/c Once in 3 days Checking of the equipment characteristics Once in a month Sensitivity calibration against temperature variation Once in a month
  • 9.  Details of M/c  Three rail tester M/c were examined.  Make- M/s Paras Electronics (711D)  Type- Digital DRT, RDSO approved.  Two weld tester M/c were examined.  Make- M/s E E C (DS322AT),  Type- Digital, RDSO approved.
  • 10.  Observation  DRT • Charging- Not adequate. Charged up to 60%. • Electronic units- Good. • Trolley- Good. • Probe and Shoe- Satisfactory-2, Not good-1. • Alignment cum Lifting Syst.- Satisfactory. • Audio Alarm- Sounding.
  • 11.  Observation  WeldTester • Charging-Adequate. • Electronic units- Good. • Audio Alarm- Sounding.
  • 12.  Accessories- All but the following were available, (however, availability of spares could not be verified)-  IIW block- Not calibrated.  Stepped Gauge- Not available.  Supply of Spares- (as informed by supervisors)  Probe- Supply is good.  Battery- Supply is good.  Maintenance Practice- Contractual, OK.
  • 13.  Calibration blocks  0º normal probe- 60x50x50 mm steel block  Angular probe- IIW block, as per IS:4904.  Observation  Blocks were available but without validation certification.Validation may be got done from Engine Development unit of RDSO.  It was apparent that they were not in use. However, operators were proficient in doing calibration.
  • 14.  Rail  Rail test piece was available and operators were proficient in ensuring M/c sensitivity.  Weld  Weld test piece was available but not confirming to Para 8.4.1 and Fig. 20(a).  However, operators were able to ensure M/c sensitivity but with difficulty and unreasonable gain.
  • 15.  Following seven M/c characteristics are to be checked as per IS: 12666 - 1988  For M/c- (i) Linearity of time base ± 1.25%, (ii) Linearity of amplification ± 3%, (iii) Resolution, (iv) Maximum penetration power  For Probe- (v) Probe index ± 1 mm, (vi) Probe angle ± 1º, (vii) Dead zone- single crystal < 7 mm, double crystal < 3 mm. Note: Tolerances for railway are shown here and are more stringent than IS.
  • 16.  Observations  IIW block was the major concern as stated supra.  The record keeping was sketchy, without specific values.  A few operators were able to check all the characteristics while others were unable to do all the checks. Some of them were even unable to explain the procedure orally.  It is recommended to conduct hands-on workshop to refresh and sharpen this skill.  It is recommended that the incharge USFD, PWI shall relieve other operators for a day, for checking M/c Characteristics etc. and incharge USFD, PWI shall do test checking of work done by other operators.
  • 17.  This is necessary to compensate for loss in signal strength due to rise in temperature during day.  It needs temperature gauging and adjustment of gain.  Observation  This checking is not being given due importance and records were not being maintained religiously by majority of the operators.
  • 18.  All the operators were proficient in picking and identifying the rail flaws.  Some of the operators were finding difficulties in hand probing including tandem rig.  The soft grease couplent was more viscous and resisting free movement of hand probe.  Data feeding for savingA-scan is only being done for IMR defects.
  • 19.  Reason for not maintaining A-scan appears to be casual approach under the disguise of time constraint.  Time taken:- 7-8 min. for first time. Subsequent entries:- 2-3 min.  However, machine key board need to be more user friendly.  It is recommended to conduct hands-on workshop to refresh and enhance proficiency.
  • 20.  Introduce a system of Internal Audit based on the checklist given by Railway Board.  Internal Audit-Within the zone, Divisional in- charge of USFD team of one Division shall do technical audit of other Division’sTeam.
  • 21.  Conduct Focused Workshop of short duration (2-3 days) to tackle one or two issues.  Give emphasis on learning by Hands-on to sharpen the skill.  Conduct Refresher Courses frequently.
  • 22.  Arrange StandardTest Pieces as per relevant IS codes and RDSO manuals.  Give emphasis on Regular Validation to improve Accuracy.  Follow Prescribed Manual Method to improve Reliability.  Timely check of M/c on nominated days for Accuracy (one operator to be relieved by Incharge).  Test Check by incharge on nominated days . Standard Test Piece- Accuracy Regular Validation- Accuracy Prescribed Manual Method- Reliability Timely Check of M/c- Accuracy Check by Incharge - Reliability
  • 23.  All data related to USFD M/c (e.g. log book, various checking) may be maintain in TMS.  TMS may also capture A-scan related to all defects and archive it.  User may able to do Analysis of growth patterns w.r.t. other related parameters.