3. INTRODUCTION
SUBJECT OF WORK
RELATED WORK
AIM AND OBJECTIVE
PLAN OF RESERCH / METHODOLOGY / PLANNING OF WORK
CHAPTER SCHEME
REFERENCES
SYNOPSIS CONTENT
4. INTRODUCTION
It is the information about Advance Technologies In Building Construction.
The construction industry is rapidly changing. With-changing times, new
processes and the materials are being used.
A lot of research and development is carried out in the construction industry
throughout the globe
Time, economy and utility of space have become the important aspects of
the construction industry.
5. SUBJECT OF WORK
TO PROVE MIVAN CONSTRUCTION TECHNOLOGY
IS BETTER THAN CONVENTIONAL CONSTRUCTION
TECHNOLOGY FOR MASS CONSTRUCTION .
6. RELATED WORK
Infinity tower – Dubai 2008 (73 story ht.300m)
The tower was constructed at a speed of 8 floor per month.
Under construction After construction
7. SRA Township, mahul Mumbai (date of award 2007)
65 no. G+7 story residential building.
8. AIM AND OBJECTIVE
AIM
TO STUDY ABOUT MIVAN CONSTRUCTION TECHNOLOGY.
OBJECTIVE
• TO IMPROVE THE SPEED OF CONSTRUCTION.
• IT INCREASEASES THE SESMIC RESISTANCE OF BUILDING.
• IT INCREASE EFFICIENCY.
• REDUCES COST FOR MASS CONSTRUCTION.
• INCREASEASES QUALITY OF CONSTRUCTION
9. PLAN OF RESERCH / PLAN OF WORK /
METHODOLOGY
TO DESIGN MULTI-STORY BUILDING
10. CHAPTER SCHEME
CHAPTER 1: INTRODUCTION
CHAPTER 2: LITERATURE REVIEW
CHAPTER 3: DESIGN AND DISCRIPTION
CHAPTER 4: RESULT AND DISCUSSION
CHAPTER 5: CONCLUSION RECOMMENDATION AND REFERENCES
11. Future Scope-
This thesis work is restricted to only Mivan formwork and not other type of
aluminum formworks. The future researchers can continue by working over
other type of formworks construction by analyzing activities like brickwork,
plastering, painting and many more. Furthermore interviews of different
people from construction industry can be taken based on questionnaire
prepared and analysis can be done.
12. REFRANCE
• International Journal of Engineering and Technical Research (IJETR) ISSN: 2321-0869,
Volume-3, Issue-6, June 2015
https://www.erpublication.org/admin/vol_issue1/.../IJETR032419.pdf
• MIVAN- (Components, Assembly, Case studies)
- www.mivan.com
• D.M. Wijesekara, “Cost Effective and Speedy Construction for High-Rise Buildings in
SriLanka by Using Aluminium Panel System Formworks”, ACEPS, 2012, pp 238-244.
• Eng. Varma Santosh, Prof. M. R. Apte, “Productivity in building construction”, IOSR
Journal of mechanical and civil eng – Vol 10, Issue 5, 2014, pp 64-71.
• Gary R. Smith, Awad ,S. Hanna, “factors influencing formwork productivity”, Canadian
journal of civil engineering, 1993, pp 144-153.
• James D. Sumway, “A comparative analysis of concrete formwork productivity influence
factors”, Ph.D Thesis, 1992, The Pennsylvania university, pp 20-33.
• Nuzul Azam Haron, Salihuddin Hassim, Mohd. Razali, ABD. kadir and Mohd Saleh Jaafar,
“Conventional and formwork system”, Universiti Teknoki Malaysia, 2005,pp1-11.
• Osama Mosheli, Jaffer Khan, “Analysis of Labour Productivity in Building Construction”,
2010, Vol 10, Issue 3, pp 286-303.