Richards Bay Industrial Development Zone
The African Ports and Harbours Show 2015
Tuesday 30 June 2015
Sandton Convention Centre
ECONOMIC COMPARATIVE ADVANTAGES
Richards Bay
IDZ
Metals
beneficiation
Aluminium
Titanium
Iron ore
Agro-
processing
Pulp,
Horticulture &
meat production
Port optimization
- Containerization, -
Ship building &
repair
- Oil & Gas
Renewable
energy
- Solar
- Fuel cells
- Biomass
ICT
- Techno-parks -
Innovation Hub
2
Existing Land Portfolio
Phase 1A 62Ha
Phase 1F 110Ha
Phase 1D 65Ha
Total 237Ha
3
LIFESTYLE QUALITY
4
50-YEAR MASTER PLANNING
Environmental constraints, Irreplaceable agricultural land,
Topography, Built-up areas, Time-Distance to Port
50-YEAR MASTER PLANNING
ASSESSMENT OUTCOME: OPPORTUNITY
ZONE 4: HIGHEST DEVELOPMENT POTENTIAL
Macro Site 3 Site 4 Site 5 Site 6 Site 7 Site 9 Site 17 Site 1D Site 1E
Total Impact on GDP (million
R per annum)
13,255 23,546 9,602 8,007 16,054 2,904 2,527 919 82
Direct employment
opportunities (number of
employment opportunities)
19,084 34,033 13,507 11,930 62,676 11,131 10,655 2,044 152
Total employment
opportunities (direct, indirect
and induced); (number of
employment opportunities)
62,544 111,152 45,082 38,549 111,002 19,945 18,520 5,242 455
Impact on low-income
households (million R per
annum)
144 255 104 87 184 33 29 11 1
Impact on total household
income (million R per annum)
6,723 11,936 4,868 4,066 8,561 1,547 1,362 521 42
MACRO-ECONOMIC ASSESSMENT OUTCOME:
OPPORTUNITY ZONE 4
IDENTIFIED EXPANSION AREAS
10-YEAR HEADLINE DEVELOPMENT
PROGRAMME
Performance Indicator 2013 -2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022
Phase 1A: Completion of Engineering
Infrastructure
Phase 1F: Completion of Engineering Design
and EIA Approvals
Phase 1F: Completion of Engineering
Infrastructure
Phase 2A: Negotiations with land owners on
the sale of land parcels for expansion &
signing of options agreements
Phase 2A: Submission of application for the
subdivision of Agricultural Land(Act 70 of 70)
Phase 2A: Valuation of properties for
expansion
Phase 2A: Undertake specialist studies to
support EIA applications and EIA
Phase 2A: Submission of PDA Applications
for Development Approval
Phase 2A: Land Acquisition
Phase 2A: Bulk Infrastructure: Water,
Electricity, Sewer, Roads, N2 Interchange
Phase 2A: Internal Infrastructure: Water,
Electricity, Sewer, Roads
WHY RICHARDS BAY?
Comparative advantages – Appeal, resonance & strengths
Developed Economic
Infrastructure
Strong Geo-economic location
Human capital base
Qualified workforce
Environment and lifestyle
Agricultural & Mineral
endowments
• Aesthetic mixed-use urban infrastructure
• Good standard of living for expatriate personnel
• Pleasing Urban-rural integration
• Balanced sustainable development-mix
• Titanium & Aluminium– beneficiation into
component manufacturing AVIATION
• Forestry – timber & pulp development
• Fresh produce – food processing
• Diverse population offering young and trainable
workforce
• Multi-lingual workforce
• Reputable tertiary institutions
• Diverse & well established heavy industrial base
• Purpose-built industrial infrastructure
• Deep-water port & multimodal capability
• Gas, fibre-optics, electrical & logistics network
COMMITTED (SIGNED) INVESTORS
Investor Investment
Value
Number of Jobs Type of Investment Land
Uptake
Nyanza Light Metals R 4,5 billion 300 direct and 800 construction
jobs
Manufacturing of Titanium
dioxide pigment
65 Ha
Oasis Group R 40 million 30 direct jobs and 60 jobs during
construction
Waste oil recycling
1 Ha
Phaka Sangle R 20 million 30 direct jobs and 60 jobs during
construction
Manufacturing of solar
water heaters
1Ha
SPS Manufacturing R 300 million 87 direct jobs and 110
construction jobs
PVC Pipe Manufacturing 3Ha
uMuthi Power R 2 billion 70 direct jobs and 260
construction jobs
Renewable Energy Plant 12Ha
Pro Star Export Paint R16 million 50 direct jobs and 50 construction
jobs
Paint manufacturing 2ha
INVESTMENT VALUE =R6,81B PERMANENT JOBS= 517 CONSTRUCTION JOBS= 1340
BOARD APPROVED INVESTORS
(not yet signed)
Investor Investment
Value
Number of Jobs Type of Investment Land
Uptake
Mthonjeni R 105 million 42 direct jobs and 150
construction jobs
Aluminium beneficiation 2Ha
Eagle Pride Power R1,7 billion 500 direct jobs and 150
construction jobs
Energy storage systems 10ha
INVESTMENT VALUE =R1,8 B PERMANENT JOBS= 542 CONSTRUCTION JOBS= 300
INVESTOR ATTRACTION
Expected to commence operations in 2015/16
Investor Investment
Value
Number of Jobs Type of Investment Timeframe
SPS Manufacturing R 300 million 87 direct jobs
110 construction jobs
PVC Pipe Manufacturing Construction by
May 2015
Pro Star Export Paint R16 million 50 direct jobs
50 construction jobs
Paint manufacturing Construction by
September 2015
RB Energy Services R20 million 20 direct jobs and 25
construction jobs
Logistics
Construction by
December 2015
Phaka Sangle R 20 million 30 direct jobs
60 construction jobs
Manufacturing of solar water
heaters
Construction by
December 2015
16
HIGH IMPACT PROJECTS ON PIPELINE
• RBIDZ in discussion with various parties about installing
>800 MW gas-to-power plants in Richards Bay
• Establishment of Metals Hub at Bayside
• Establishment of at Techno Park RBIDZ site
• RBIDZ in discussion with largest steel manufacturer in China
and ranked 3rd in the world
• Oil and gas pursuits
• Establishment of Agro- processing facility 17
18
DEPARTMENT OF TRADE AND INDUSTRY INCENTIVES
CLUSTER INCENTIVE SCHEME
SEZ SPECIFIC • 15 % Corporate income tax – Income Tax Act
• Building Allowance
• Job Incentive (Applies only to youth outside SEZ)
• VAT Timing benefit in CCA only
• RBIDZ Base Rate R 5,50/m²/month (vacant developed land)
BROADENING
PARTICIPATION
• Black Business Supplier Development
Programme (BBSDP)
• Co-operative Incentive Scheme (CIS)
• Incubator Support Programme (ISP)
COMPETITIVENESS
INVESTMENT
• Sector Specific Assistance Scheme (SSAS)
• Export Marketing & Investment Assistance (EMIA)
• Capital Projects Feasibility Programme (CPFP)
MANUFACTURING
INVESTMENT
• Enterprise Investment Programme (EIP)
• 12i Tax Incentive
• Automotive Incentive Scheme (AIS)
• People-carrier Automotive Investment Scheme (P-AIS)
INFRASTRUCTURE
INVESTMENT
• Critical Infrastructure Programme (CIP)
• IDZs (SEZ)
RENEWABLE ENERGY PROJECTS
19
60 MW biomass Plant
Approved by Board
R2 billion project
Project at Feasibility stage
2 Projects Proposed for
gas to power
Potential to produce in
excess of 800 MW
Both projects at
feasibility stages
R20 million
project
Approved by
Board
Expected
construction this
FY
R1.7 billion project
Approved by Board
Project at Feasibility stage
KEY MARITIME OPPORTUNITY AREAS
20
• Container handling terminal
• Bayside security of tenure – Metals Hub
• Oil & Gas
• Boat building
• Ship building & repairs yard
• Liquefied Natural Gas terminal & pipeline network
• Gas-to-Power facilities
RECENT HIGHLIGHTS
21
• RB Energy Services (Lovemore Bros.) commenced operations in Phase 1A – R 20 million.
• Signed R4.8 billion potential locators to date – includes total investment signed during 2014/15
financial year equating to R 320 million.
• Further projects to the value of ~ R3.5 billion approved by the Board of Directors.
• 66% of the Engineering Infrastructure in Phase 1A completed.
• Created >1700 construction jobs up to 30 March 2015.
• Obtained provincial Cabinet approval for the 50 year Master Plan
• Secured R272 million from the dti via the SEZ Funding Application process.
• Obtained Clean Audit Report.
• Improved to Level 2 BBB-EE Contributor.
• ISO 9001:2008 Accreditation
• Capital Projects spend to date exceeds R250 million
PROPOSED MASORINI STEEL AND IRON
PLANT ( PLANT OVERVIEW)
22
• 5 mtpa plant to be implemented in two phases
- Phase 1: 5mtpa
- Phase 2 2mtpa flat products mainly
• Future plans for coke ovens, Cold Roil Coil and galvanizing
• Integrated plant from raw material to distribution
• Importance of controlling entire value chain to keep costs down
• Investment Value – Estimated at USD 5 Billion (R60 billion) for the steel plant excluding
downstream industrial park
• Up to 3000 ha required for the steel plant and industrial park
Permanent jobs on implementation and temporary jobs during construction
Construction (3 yrs) : 10 000
Operations : 4-5 000
Significant job creation potential
======
TOTAL : 15 000
PROPOSED MASORINI STEEL AND IRON
PLANT ( KEY PRODUCTS)
23
PHASE 1 - Long Products
Hot Rolled Coil (HRC)
Metallic (Galvanised) Coil
(HOG)
Organically
Coated/Pre
painted ( Coil)
PHASE 2- Flat Products
Rod for wire drawing Structural Sections
OPERATION PHAKISA
OIL AND GAS
24
OPERATION PHAKISA
MARINE MANUFACTURE AND REPAIR
25
Australian Marine
Complex
• Constructed by State
• Common user facility
• Floating dock
• Deep water port
• 5 wharves
• 40 ha sealed laydown
and construction area
• 27,600 jobs
• Maritime
• Fabrication
• Technology
Oil & GAS AND SHIPYARDS
26
Mexico Dubai
DubaiIndonesia
OPERATION PHAKISA
MARINE MANUFACTURE AND REPAIR
27
Overview of
Atlântico Sul
Shipyard Brazil
• 162 ha
• 13 ha sheltered area
• 400 x 73 x 12 dry
dock
• 730 m outfitting quay
• 680 m rig building &
repair quay
OIL & GAS AND SHIPYARD
BRICS example
Brazil
• 30, 000 jobs over 2 years for 4 new shipyards to
service oil and gas http://riotimesonline.com/brazil-news/rio-business/new-brazilian-shipyards-to-generate-
30000-jobs/
• Building about 370 ships, including 14 oil rigs
and 28 drill ships
• Similar drilling conditions to South Africa
28
29
SIGNING OF M.O.U
Richards Bay IDZ &
Mfolozi Technical Vocational Education Training
Objectives of M.O.U.
• Collaboration in skills
development synergies
• Partnership in Youth training -
technical & trade programmes
- tradesmen and artisans
• Identify & develop skills set
needed by potential locators
• Optimize growth for eligible
candidates for further training
and/or apprenticeship,
incubation & work placement
• Develop curricula for scarce
skills required by industry
EMPLOYMENT CREATION
30
17 Permanent Jobs (Feb 2015) 1717 Construction Jobs (Feb 2015)
Beneficiation of resources and stimulate economic growth will be the output of the value chain.
Vision
“To be the preferred special economic zone for quality investments whilst delivering value
to our stakeholders.”
Mission
“We utilize the competitive advantage of the Richards Bay area to attract sustainable investments that
stimulate economic growth, job creation, beneficiation of resources and the empowerment of people.”
MISSION & VISION
32
THANK YOU

More Related Content

Similar to Richards Bay Industrial Development Zone

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2HAIDER YOUNIS
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016ravi randham
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationViral Network Inc
 
Dc summit jeddah 2010 george berbari presentation
Dc summit jeddah 2010   george berbari presentationDc summit jeddah 2010   george berbari presentation
Dc summit jeddah 2010 george berbari presentationOliviaModisakeng
 
Streamlining Immigration for Skilled Trades People from Invitation to Employment
Streamlining Immigration for Skilled Trades People from Invitation to EmploymentStreamlining Immigration for Skilled Trades People from Invitation to Employment
Streamlining Immigration for Skilled Trades People from Invitation to EmploymentPetroLMI
 
Scotland the global home of oil and gas
Scotland the global home of oil and gasScotland the global home of oil and gas
Scotland the global home of oil and gasscottishenterprise
 
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...MuthanaJallad
 
AMEC presentation - Lithium Valley - Establishing the case
AMEC presentation - Lithium Valley - Establishing the caseAMEC presentation - Lithium Valley - Establishing the case
AMEC presentation - Lithium Valley - Establishing the caseCameron Edwards 北极熊
 
Archirodon presentation - Career Day AUTH.pptx
Archirodon presentation - Career Day AUTH.pptxArchirodon presentation - Career Day AUTH.pptx
Archirodon presentation - Career Day AUTH.pptxClioLinaraki1
 
Saudi National Water Company Vision & Projects
Saudi National Water Company Vision & ProjectsSaudi National Water Company Vision & Projects
Saudi National Water Company Vision & ProjectsIbrahim Al-Hudhaif
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfTiago Alvarez
 
Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxArchirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxClioLinaraki1
 
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptxLe Hoang Phong
 

Similar to Richards Bay Industrial Development Zone (20)

PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2PQ Presentation(BADC) - Rev2
PQ Presentation(BADC) - Rev2
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016RAVI PEO RESUME OCT 2016
RAVI PEO RESUME OCT 2016
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate Presentation
 
Dc summit jeddah 2010 george berbari presentation
Dc summit jeddah 2010   george berbari presentationDc summit jeddah 2010   george berbari presentation
Dc summit jeddah 2010 george berbari presentation
 
Altima Resources - 2 Pager
Altima Resources - 2 PagerAltima Resources - 2 Pager
Altima Resources - 2 Pager
 
Streamlining Immigration for Skilled Trades People from Invitation to Employment
Streamlining Immigration for Skilled Trades People from Invitation to EmploymentStreamlining Immigration for Skilled Trades People from Invitation to Employment
Streamlining Immigration for Skilled Trades People from Invitation to Employment
 
Scotland the global home of oil and gas
Scotland the global home of oil and gasScotland the global home of oil and gas
Scotland the global home of oil and gas
 
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
dokumen.tips_khalifa-port-industrial-zone-abu-dhabi-ports-company-abu-dhabi-e...
 
AMEC presentation Perth - June 2018
AMEC presentation Perth - June 2018AMEC presentation Perth - June 2018
AMEC presentation Perth - June 2018
 
AMEC presentation - Lithium Valley - Establishing the case
AMEC presentation - Lithium Valley - Establishing the caseAMEC presentation - Lithium Valley - Establishing the case
AMEC presentation - Lithium Valley - Establishing the case
 
Archirodon presentation - Career Day AUTH.pptx
Archirodon presentation - Career Day AUTH.pptxArchirodon presentation - Career Day AUTH.pptx
Archirodon presentation - Career Day AUTH.pptx
 
Saudi National Water Company Vision & Projects
Saudi National Water Company Vision & ProjectsSaudi National Water Company Vision & Projects
Saudi National Water Company Vision & Projects
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdf
 
Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptxArchirodon presentation - Job Fair Xanthi 6-7 May.pptx
Archirodon presentation - Job Fair Xanthi 6-7 May.pptx
 
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
565292229-Tenaris-Presentation-Sinopec-Nov-2019-rev2.pptx
 
Egd dec2015
Egd dec2015Egd dec2015
Egd dec2015
 

More from Tristan Wiggill

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfTristan Wiggill
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfTristan Wiggill
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfTristan Wiggill
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfTristan Wiggill
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfTristan Wiggill
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfTristan Wiggill
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfTristan Wiggill
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?Tristan Wiggill
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority updateTristan Wiggill
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South AfricaTristan Wiggill
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Tristan Wiggill
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?Tristan Wiggill
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveTristan Wiggill
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentTristan Wiggill
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengTristan Wiggill
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTristan Wiggill
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel priceTristan Wiggill
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...Tristan Wiggill
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Tristan Wiggill
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Tristan Wiggill
 

More from Tristan Wiggill (20)

Business Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdfBusiness Fleet Africa May 2023.pdf
Business Fleet Africa May 2023.pdf
 
Business Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdfBusiness Fleet Africa April 2023.pdf
Business Fleet Africa April 2023.pdf
 
Business Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdfBusiness Fleet Africa March 2023.pdf
Business Fleet Africa March 2023.pdf
 
Business Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdfBusiness Fleet Africa January 2023.pdf
Business Fleet Africa January 2023.pdf
 
Business Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdfBusiness Fleet Africa December 2022.pdf
Business Fleet Africa December 2022.pdf
 
Business Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdfBusiness Fleet Africa November 2022.pdf
Business Fleet Africa November 2022.pdf
 
Business Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdfBusiness Fleet Africa October 2022.pdf
Business Fleet Africa October 2022.pdf
 
How do we keep Gauteng moving?
How do we keep Gauteng moving?How do we keep Gauteng moving?
How do we keep Gauteng moving?
 
Gauteng Transport Authority update
Gauteng Transport Authority updateGauteng Transport Authority update
Gauteng Transport Authority update
 
Road Funding in South Africa
Road Funding in South AfricaRoad Funding in South Africa
Road Funding in South Africa
 
Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...Self regulation and road funding perspectives from the road transport managem...
Self regulation and road funding perspectives from the road transport managem...
 
Roads: So how do we pay for them?
Roads: So how do we pay for them?Roads: So how do we pay for them?
Roads: So how do we pay for them?
 
Road funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspectiveRoad funding from a freight forwarding and logistics perspective
Road funding from a freight forwarding and logistics perspective
 
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary ExperimentFeedback on DRiVE: Distance-based Road user charge Voluntary Experiment
Feedback on DRiVE: Distance-based Road user charge Voluntary Experiment
 
E-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in GautengE-tolls: The Impact on Development in Gauteng
E-tolls: The Impact on Development in Gauteng
 
Transport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangersTransport and the economy: Understanding the relationship...and the dangers
Transport and the economy: Understanding the relationship...and the dangers
 
Sout Africa's fuel price
Sout Africa's fuel priceSout Africa's fuel price
Sout Africa's fuel price
 
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
The Future of National Roads: The 2030 Roads Plan and a Sustainable Funding M...
 
Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system Beneficiaries of an optimally designed transportation system
Beneficiaries of an optimally designed transportation system
 
Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC Road Funds and Road User Charging in SADC
Road Funds and Road User Charging in SADC
 

Recently uploaded

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 

Recently uploaded (20)

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 

Richards Bay Industrial Development Zone

  • 1. Richards Bay Industrial Development Zone The African Ports and Harbours Show 2015 Tuesday 30 June 2015 Sandton Convention Centre
  • 2. ECONOMIC COMPARATIVE ADVANTAGES Richards Bay IDZ Metals beneficiation Aluminium Titanium Iron ore Agro- processing Pulp, Horticulture & meat production Port optimization - Containerization, - Ship building & repair - Oil & Gas Renewable energy - Solar - Fuel cells - Biomass ICT - Techno-parks - Innovation Hub 2
  • 3. Existing Land Portfolio Phase 1A 62Ha Phase 1F 110Ha Phase 1D 65Ha Total 237Ha 3
  • 5. 50-YEAR MASTER PLANNING Environmental constraints, Irreplaceable agricultural land, Topography, Built-up areas, Time-Distance to Port
  • 6. 50-YEAR MASTER PLANNING ASSESSMENT OUTCOME: OPPORTUNITY ZONE 4: HIGHEST DEVELOPMENT POTENTIAL
  • 7. Macro Site 3 Site 4 Site 5 Site 6 Site 7 Site 9 Site 17 Site 1D Site 1E Total Impact on GDP (million R per annum) 13,255 23,546 9,602 8,007 16,054 2,904 2,527 919 82 Direct employment opportunities (number of employment opportunities) 19,084 34,033 13,507 11,930 62,676 11,131 10,655 2,044 152 Total employment opportunities (direct, indirect and induced); (number of employment opportunities) 62,544 111,152 45,082 38,549 111,002 19,945 18,520 5,242 455 Impact on low-income households (million R per annum) 144 255 104 87 184 33 29 11 1 Impact on total household income (million R per annum) 6,723 11,936 4,868 4,066 8,561 1,547 1,362 521 42 MACRO-ECONOMIC ASSESSMENT OUTCOME: OPPORTUNITY ZONE 4
  • 9. 10-YEAR HEADLINE DEVELOPMENT PROGRAMME Performance Indicator 2013 -2014 2014-2015 2015-2016 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021 2021-2022 Phase 1A: Completion of Engineering Infrastructure Phase 1F: Completion of Engineering Design and EIA Approvals Phase 1F: Completion of Engineering Infrastructure Phase 2A: Negotiations with land owners on the sale of land parcels for expansion & signing of options agreements Phase 2A: Submission of application for the subdivision of Agricultural Land(Act 70 of 70) Phase 2A: Valuation of properties for expansion Phase 2A: Undertake specialist studies to support EIA applications and EIA Phase 2A: Submission of PDA Applications for Development Approval Phase 2A: Land Acquisition Phase 2A: Bulk Infrastructure: Water, Electricity, Sewer, Roads, N2 Interchange Phase 2A: Internal Infrastructure: Water, Electricity, Sewer, Roads
  • 10.
  • 11.
  • 12.
  • 13. WHY RICHARDS BAY? Comparative advantages – Appeal, resonance & strengths Developed Economic Infrastructure Strong Geo-economic location Human capital base Qualified workforce Environment and lifestyle Agricultural & Mineral endowments • Aesthetic mixed-use urban infrastructure • Good standard of living for expatriate personnel • Pleasing Urban-rural integration • Balanced sustainable development-mix • Titanium & Aluminium– beneficiation into component manufacturing AVIATION • Forestry – timber & pulp development • Fresh produce – food processing • Diverse population offering young and trainable workforce • Multi-lingual workforce • Reputable tertiary institutions • Diverse & well established heavy industrial base • Purpose-built industrial infrastructure • Deep-water port & multimodal capability • Gas, fibre-optics, electrical & logistics network
  • 14. COMMITTED (SIGNED) INVESTORS Investor Investment Value Number of Jobs Type of Investment Land Uptake Nyanza Light Metals R 4,5 billion 300 direct and 800 construction jobs Manufacturing of Titanium dioxide pigment 65 Ha Oasis Group R 40 million 30 direct jobs and 60 jobs during construction Waste oil recycling 1 Ha Phaka Sangle R 20 million 30 direct jobs and 60 jobs during construction Manufacturing of solar water heaters 1Ha SPS Manufacturing R 300 million 87 direct jobs and 110 construction jobs PVC Pipe Manufacturing 3Ha uMuthi Power R 2 billion 70 direct jobs and 260 construction jobs Renewable Energy Plant 12Ha Pro Star Export Paint R16 million 50 direct jobs and 50 construction jobs Paint manufacturing 2ha INVESTMENT VALUE =R6,81B PERMANENT JOBS= 517 CONSTRUCTION JOBS= 1340
  • 15. BOARD APPROVED INVESTORS (not yet signed) Investor Investment Value Number of Jobs Type of Investment Land Uptake Mthonjeni R 105 million 42 direct jobs and 150 construction jobs Aluminium beneficiation 2Ha Eagle Pride Power R1,7 billion 500 direct jobs and 150 construction jobs Energy storage systems 10ha INVESTMENT VALUE =R1,8 B PERMANENT JOBS= 542 CONSTRUCTION JOBS= 300
  • 16. INVESTOR ATTRACTION Expected to commence operations in 2015/16 Investor Investment Value Number of Jobs Type of Investment Timeframe SPS Manufacturing R 300 million 87 direct jobs 110 construction jobs PVC Pipe Manufacturing Construction by May 2015 Pro Star Export Paint R16 million 50 direct jobs 50 construction jobs Paint manufacturing Construction by September 2015 RB Energy Services R20 million 20 direct jobs and 25 construction jobs Logistics Construction by December 2015 Phaka Sangle R 20 million 30 direct jobs 60 construction jobs Manufacturing of solar water heaters Construction by December 2015 16
  • 17. HIGH IMPACT PROJECTS ON PIPELINE • RBIDZ in discussion with various parties about installing >800 MW gas-to-power plants in Richards Bay • Establishment of Metals Hub at Bayside • Establishment of at Techno Park RBIDZ site • RBIDZ in discussion with largest steel manufacturer in China and ranked 3rd in the world • Oil and gas pursuits • Establishment of Agro- processing facility 17
  • 18. 18 DEPARTMENT OF TRADE AND INDUSTRY INCENTIVES CLUSTER INCENTIVE SCHEME SEZ SPECIFIC • 15 % Corporate income tax – Income Tax Act • Building Allowance • Job Incentive (Applies only to youth outside SEZ) • VAT Timing benefit in CCA only • RBIDZ Base Rate R 5,50/m²/month (vacant developed land) BROADENING PARTICIPATION • Black Business Supplier Development Programme (BBSDP) • Co-operative Incentive Scheme (CIS) • Incubator Support Programme (ISP) COMPETITIVENESS INVESTMENT • Sector Specific Assistance Scheme (SSAS) • Export Marketing & Investment Assistance (EMIA) • Capital Projects Feasibility Programme (CPFP) MANUFACTURING INVESTMENT • Enterprise Investment Programme (EIP) • 12i Tax Incentive • Automotive Incentive Scheme (AIS) • People-carrier Automotive Investment Scheme (P-AIS) INFRASTRUCTURE INVESTMENT • Critical Infrastructure Programme (CIP) • IDZs (SEZ)
  • 19. RENEWABLE ENERGY PROJECTS 19 60 MW biomass Plant Approved by Board R2 billion project Project at Feasibility stage 2 Projects Proposed for gas to power Potential to produce in excess of 800 MW Both projects at feasibility stages R20 million project Approved by Board Expected construction this FY R1.7 billion project Approved by Board Project at Feasibility stage
  • 20. KEY MARITIME OPPORTUNITY AREAS 20 • Container handling terminal • Bayside security of tenure – Metals Hub • Oil & Gas • Boat building • Ship building & repairs yard • Liquefied Natural Gas terminal & pipeline network • Gas-to-Power facilities
  • 21. RECENT HIGHLIGHTS 21 • RB Energy Services (Lovemore Bros.) commenced operations in Phase 1A – R 20 million. • Signed R4.8 billion potential locators to date – includes total investment signed during 2014/15 financial year equating to R 320 million. • Further projects to the value of ~ R3.5 billion approved by the Board of Directors. • 66% of the Engineering Infrastructure in Phase 1A completed. • Created >1700 construction jobs up to 30 March 2015. • Obtained provincial Cabinet approval for the 50 year Master Plan • Secured R272 million from the dti via the SEZ Funding Application process. • Obtained Clean Audit Report. • Improved to Level 2 BBB-EE Contributor. • ISO 9001:2008 Accreditation • Capital Projects spend to date exceeds R250 million
  • 22. PROPOSED MASORINI STEEL AND IRON PLANT ( PLANT OVERVIEW) 22 • 5 mtpa plant to be implemented in two phases - Phase 1: 5mtpa - Phase 2 2mtpa flat products mainly • Future plans for coke ovens, Cold Roil Coil and galvanizing • Integrated plant from raw material to distribution • Importance of controlling entire value chain to keep costs down • Investment Value – Estimated at USD 5 Billion (R60 billion) for the steel plant excluding downstream industrial park • Up to 3000 ha required for the steel plant and industrial park Permanent jobs on implementation and temporary jobs during construction Construction (3 yrs) : 10 000 Operations : 4-5 000 Significant job creation potential ====== TOTAL : 15 000
  • 23. PROPOSED MASORINI STEEL AND IRON PLANT ( KEY PRODUCTS) 23 PHASE 1 - Long Products Hot Rolled Coil (HRC) Metallic (Galvanised) Coil (HOG) Organically Coated/Pre painted ( Coil) PHASE 2- Flat Products Rod for wire drawing Structural Sections
  • 25. OPERATION PHAKISA MARINE MANUFACTURE AND REPAIR 25 Australian Marine Complex • Constructed by State • Common user facility • Floating dock • Deep water port • 5 wharves • 40 ha sealed laydown and construction area • 27,600 jobs • Maritime • Fabrication • Technology
  • 26. Oil & GAS AND SHIPYARDS 26 Mexico Dubai DubaiIndonesia
  • 27. OPERATION PHAKISA MARINE MANUFACTURE AND REPAIR 27 Overview of Atlântico Sul Shipyard Brazil • 162 ha • 13 ha sheltered area • 400 x 73 x 12 dry dock • 730 m outfitting quay • 680 m rig building & repair quay
  • 28. OIL & GAS AND SHIPYARD BRICS example Brazil • 30, 000 jobs over 2 years for 4 new shipyards to service oil and gas http://riotimesonline.com/brazil-news/rio-business/new-brazilian-shipyards-to-generate- 30000-jobs/ • Building about 370 ships, including 14 oil rigs and 28 drill ships • Similar drilling conditions to South Africa 28
  • 29. 29 SIGNING OF M.O.U Richards Bay IDZ & Mfolozi Technical Vocational Education Training Objectives of M.O.U. • Collaboration in skills development synergies • Partnership in Youth training - technical & trade programmes - tradesmen and artisans • Identify & develop skills set needed by potential locators • Optimize growth for eligible candidates for further training and/or apprenticeship, incubation & work placement • Develop curricula for scarce skills required by industry
  • 30. EMPLOYMENT CREATION 30 17 Permanent Jobs (Feb 2015) 1717 Construction Jobs (Feb 2015)
  • 31. Beneficiation of resources and stimulate economic growth will be the output of the value chain. Vision “To be the preferred special economic zone for quality investments whilst delivering value to our stakeholders.” Mission “We utilize the competitive advantage of the Richards Bay area to attract sustainable investments that stimulate economic growth, job creation, beneficiation of resources and the empowerment of people.” MISSION & VISION