1. Curriculum Vitae
Name: - Tarek Abd El-Hameed Farag Quantity Surveyor
Personal Information: -
Marital Status : Married
Nationality : Egyptian
Date of Birth : 13, January 1974
Present Address : 108 Zaki Hawass St. Tiaran city Helwaan
Mobile : 01224825029
E-Mail : tareq_35@yahoo.com
Military Service : Exempted
Education : Diploma from Matarya Industrial Institute
(Construction Division Technical office Branch) June 1993 Grade Good
Skills
Computer:
Excellent in (Windows – MS Office (Word-Excel-Power Point) & Auto-Cad.
Languages:
Excellent in Arabic (Mother Lang.) – Very Good in English
Professional Experience
Present Occupation:- from January 2015 till present
Working with LIVING IN Interiors
Position : - Senior Quantity Surveyor
Duties : -
• Study & prepare new project BOQs (designed by Living in design team) .
• Supervising Project Q.S. engineers.
• Prepare Monthly client invoices. for big projects.
• Prepare all commercial & Cost control reports (V.O. log, payment logs and status, etc…).
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Give a hand in preparing Subcontractors contract ( negotiation – prepare BOQs-
Last Experience: -
from February 2013 till December 2014
Working with IDRAK (DMG )
Position : - Senior Project Quantity Surveyor
Project
Finishing work for Galleria 40 project (RAYA Plaza Smart office and commercial building (Mall))
Duties : -
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly client invoices.
Page 1 of 3
2. • Prepare all commercial reports (V.O. log, payment log and status, etc…)
• Study, Analysis & Discuss Variation Orders.
From October 2005 till December 2012
Working with DEPA United Group for Hotel interiors
Position : - Quantity Surveying Section Manager from January 2012 till December 2012
Previous Position : - Senior Project Quantity Surveyor from October 2005 till December 2011
Projects
1- El Nile Hotel (Kempinski) from June 2008 till now (Internal & External Finishing)
Project consists of (220 Guest rooms, Public area (restaurants, Lobbies & Lounges, public toilets, Spa & Gymnasium and
swimming pool), front offices and back of house, at Kornesh El-Nil Garden City
2-Millennium Tiran Resort (Internal & External Finishing) from October 2005 till May 2008
Project consists of (Main building (Lobbies & Lounges), 351 Guest rooms, Children club, 2 staff buildings, 2
swimming pools, utilities buildings & restaurants at Sharm El-Sheikh city).
Duties : -
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly client invoices.
• Prepare all commercial reports (V.O. log, payment log and status, etc…)
• Study, Analysis & Discuss Variation Orders.
From April 2004 till 30/08/2005
Working with ABB SUSA, Inc
Project : Middle Egypt Project (Fayoum, Beni Suef and Minia Governorates)
The Project specified in improvement and constructing water & waste water Treatment Plants in each Governorate,
and it includes a high variety of work such as:
Constructing Clarifiers, Sedimentations, Oxidation ditches, Screening & Grit Removal, Gravity Thickener, Pump
stations, Drying beds, Chlorination building & Channels, Treated water Reservoirs, Flocculation & Sedimentations
Basins & Pipe Lines (Gravity Sewers & Force Main) .
Position :- Senior Quantity Surveyor
Duties :-
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Check and approved subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly forecast according to the new contract & change orders.
• Study, Analysis & Discuss Variation Orders.
Page 2 of 3
3. From July 1994 till March 2004
Working with Arabian International Construction Co. (AIC)
Position :- Senior Quantity Surveyor
Duties :-
• Prepare All Quantity Surveying for Civil, Architecture, and Plumping & Electrical Works.
• Prepare, Check & Supervision Structure & Architecture Shop Drawings & As Built Drawings.
• Prepare Client Invoices & Follow up the Employer Correspondence
• Subcontractors (Evaluation, Contracts& Payments).
• Study, Analysis & Discuss Variation Orders.
Projects :-
1. Palma Pyramids Project (Resort at Cairo Alexandria High way Consists of 44 Villa).
2. La Vila Blanche (Residential Building at Alharm St. Giza).
3. Horgede Helton Blaze Hotel ( 5 Star Hotel Consist of 200 room, 30 cabana, health club, staff building,
swimming pools, sewage treatment plant, squash & tines courts & restaurants at Hurgada City ( Red See) .
4. Horgede Obroy Hotel (5 Star Resort, consists of 40 villa, administration & main building, utilities & staff
Buildings & Restaurants at Horgede City Red See).
5. Royal Hills Resort (Residential Resort at 6 October City Consist of 200 Villa, mosque, kindergarten,
swimming pools & water tanks).
6. Sharm El-Sheikh Crown plaza hotel(5 Stars Hotel Consists of 250 room, 25 villas, health club, staff
building, 4 swimming pools, sewage treatment plant, utilities buildings & restaurants at Sharm El-Sheikh
city).
7. Ameron Egypt Factory for CCP (Factory Consists of Steel Structure buildings for production line, batch
plant, utilities building, warehouse building, fitting & joint rings building& concrete, administration
building, social building, boundary walls & Gates at Suez City).
8. Misr Beni Suef Cement Factory (cement factory consists of Steel Structure buildings for production line,
crushers building, & cement storage silos & 3 kilometers of under ground cables’ tunnel).
9. Fiberglass & ceramist Pipes factories (3 factories for fiberglass & ceramist Pipes consist of Steel
Structure buildings for production line, utilities building, warehouse building, fitting, administration
building, social building, boundary walls & Gates at Kattamya industrial city).
10. Al-Ameer Trade Center at Khollose St. Shopra Cairo
11.Wastewater treatment plant Alexandria Egypt. The project includes a high variety of work such as :
Constructing Clarifiers, Sedimentations basin, Screening facility, headwork, Pump stations, Chlorination building &
Channels, administration building, garage buildings & Pipe Lines
Page 3 of 3