SlideShare a Scribd company logo
1 of 3
Curriculum Vitae
Name: - Tarek Abd El-Hameed Farag Quantity Surveyor
Personal Information: -
Marital Status : Married
Nationality : Egyptian
Date of Birth : 13, January 1974
Present Address : 108 Zaki Hawass St. Tiaran city Helwaan
Mobile : 01224825029
E-Mail : tareq_35@yahoo.com
Military Service : Exempted
Education : Diploma from Matarya Industrial Institute
(Construction Division Technical office Branch) June 1993 Grade Good
Skills
Computer:
Excellent in (Windows – MS Office (Word-Excel-Power Point) & Auto-Cad.
Languages:
Excellent in Arabic (Mother Lang.) – Very Good in English
Professional Experience
 Present Occupation:- from January 2015 till present
Working with LIVING IN Interiors
Position : - Senior Quantity Surveyor
Duties : -
• Study & prepare new project BOQs (designed by Living in design team) .
• Supervising Project Q.S. engineers.
• Prepare Monthly client invoices. for big projects.
• Prepare all commercial & Cost control reports (V.O. log, payment logs and status, etc…).
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Give a hand in preparing Subcontractors contract ( negotiation – prepare BOQs-
 Last Experience: -
from February 2013 till December 2014
Working with IDRAK (DMG )
Position : - Senior Project Quantity Surveyor
Project
Finishing work for Galleria 40 project (RAYA Plaza Smart office and commercial building (Mall))
Duties : -
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly client invoices.
Page 1 of 3
• Prepare all commercial reports (V.O. log, payment log and status, etc…)
• Study, Analysis & Discuss Variation Orders.
From October 2005 till December 2012
Working with DEPA United Group for Hotel interiors
Position : - Quantity Surveying Section Manager from January 2012 till December 2012
Previous Position : - Senior Project Quantity Surveyor from October 2005 till December 2011
Projects
1- El Nile Hotel (Kempinski) from June 2008 till now (Internal & External Finishing)
Project consists of (220 Guest rooms, Public area (restaurants, Lobbies & Lounges, public toilets, Spa & Gymnasium and
swimming pool), front offices and back of house, at Kornesh El-Nil Garden City
2-Millennium Tiran Resort (Internal & External Finishing) from October 2005 till May 2008
Project consists of (Main building (Lobbies & Lounges), 351 Guest rooms, Children club, 2 staff buildings, 2
swimming pools, utilities buildings & restaurants at Sharm El-Sheikh city).
Duties : -
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Prepare Monthly subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly client invoices.
• Prepare all commercial reports (V.O. log, payment log and status, etc…)
• Study, Analysis & Discuss Variation Orders.
From April 2004 till 30/08/2005
Working with ABB SUSA, Inc
Project : Middle Egypt Project (Fayoum, Beni Suef and Minia Governorates)
The Project specified in improvement and constructing water & waste water Treatment Plants in each Governorate,
and it includes a high variety of work such as:
Constructing Clarifiers, Sedimentations, Oxidation ditches, Screening & Grit Removal, Gravity Thickener, Pump
stations, Drying beds, Chlorination building & Channels, Treated water Reservoirs, Flocculation & Sedimentations
Basins & Pipe Lines (Gravity Sewers & Force Main) .
Position :- Senior Quantity Surveyor
Duties :-
• Prepare All Quantity Surveying for Civil & Architectural Works.
• Check and approved subcontractors invoices (Quantities, activities and prices).
• Prepare Monthly forecast according to the new contract & change orders.
• Study, Analysis & Discuss Variation Orders.
Page 2 of 3
From July 1994 till March 2004
Working with Arabian International Construction Co. (AIC)
Position :- Senior Quantity Surveyor
Duties :-
• Prepare All Quantity Surveying for Civil, Architecture, and Plumping & Electrical Works.
• Prepare, Check & Supervision Structure & Architecture Shop Drawings & As Built Drawings.
• Prepare Client Invoices & Follow up the Employer Correspondence
• Subcontractors (Evaluation, Contracts& Payments).
• Study, Analysis & Discuss Variation Orders.
Projects :-
1. Palma Pyramids Project (Resort at Cairo Alexandria High way Consists of 44 Villa).
2. La Vila Blanche (Residential Building at Alharm St. Giza).
3. Horgede Helton Blaze Hotel ( 5 Star Hotel Consist of 200 room, 30 cabana, health club, staff building,
swimming pools, sewage treatment plant, squash & tines courts & restaurants at Hurgada City ( Red See) .
4. Horgede Obroy Hotel (5 Star Resort, consists of 40 villa, administration & main building, utilities & staff
Buildings & Restaurants at Horgede City Red See).
5. Royal Hills Resort (Residential Resort at 6 October City Consist of 200 Villa, mosque, kindergarten,
swimming pools & water tanks).
6. Sharm El-Sheikh Crown plaza hotel(5 Stars Hotel Consists of 250 room, 25 villas, health club, staff
building, 4 swimming pools, sewage treatment plant, utilities buildings & restaurants at Sharm El-Sheikh
city).
7. Ameron Egypt Factory for CCP (Factory Consists of Steel Structure buildings for production line, batch
plant, utilities building, warehouse building, fitting & joint rings building& concrete, administration
building, social building, boundary walls & Gates at Suez City).
8. Misr Beni Suef Cement Factory (cement factory consists of Steel Structure buildings for production line,
crushers building, & cement storage silos & 3 kilometers of under ground cables’ tunnel).
9. Fiberglass & ceramist Pipes factories (3 factories for fiberglass & ceramist Pipes consist of Steel
Structure buildings for production line, utilities building, warehouse building, fitting, administration
building, social building, boundary walls & Gates at Kattamya industrial city).
10. Al-Ameer Trade Center at Khollose St. Shopra Cairo
11.Wastewater treatment plant Alexandria Egypt. The project includes a high variety of work such as :
Constructing Clarifiers, Sedimentations basin, Screening facility, headwork, Pump stations, Chlorination building &
Channels, administration building, garage buildings & Pipe Lines
Page 3 of 3

More Related Content

What's hot

What's hot (19)

mohammed soliman 4-2014
mohammed soliman 4-2014mohammed soliman 4-2014
mohammed soliman 4-2014
 
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
 
alhabib
alhabibalhabib
alhabib
 
Resume
ResumeResume
Resume
 
resume_BFR
resume_BFRresume_BFR
resume_BFR
 
Abdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwiAbdullah Hamed Rashid Al-madailwi
Abdullah Hamed Rashid Al-madailwi
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
medhat_cv modefided .
medhat_cv modefided .medhat_cv modefided .
medhat_cv modefided .
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copy
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
Jacobs Curriculum Vitae
Jacobs Curriculum VitaeJacobs Curriculum Vitae
Jacobs Curriculum Vitae
 
Mehdi abaeian rev3
Mehdi abaeian rev3Mehdi abaeian rev3
Mehdi abaeian rev3
 
Ahmed Shakshouk
Ahmed ShakshoukAhmed Shakshouk
Ahmed Shakshouk
 
CV Henri Odendaal
CV Henri OdendaalCV Henri Odendaal
CV Henri Odendaal
 
Mina Raafat
Mina RaafatMina Raafat
Mina Raafat
 
HENDRIK WILLEM STAPELBERG cv.01_07 PM,june 16
HENDRIK WILLEM STAPELBERG cv.01_07 PM,june 16HENDRIK WILLEM STAPELBERG cv.01_07 PM,june 16
HENDRIK WILLEM STAPELBERG cv.01_07 PM,june 16
 
Road constructor & developer in noida
Road constructor & developer in noidaRoad constructor & developer in noida
Road constructor & developer in noida
 
basem CV- 07- 03-2016 - Copy
basem CV- 07- 03-2016 - Copybasem CV- 07- 03-2016 - Copy
basem CV- 07- 03-2016 - Copy
 
CV-Ahmed hegazy -2015
CV-Ahmed hegazy -2015CV-Ahmed hegazy -2015
CV-Ahmed hegazy -2015
 

Viewers also liked

Bruce wells main stage - 2013
Bruce wells   main stage - 2013Bruce wells   main stage - 2013
Bruce wells main stage - 2013Ray Poynter
 
Envision Your Future, Empower Your Life
Envision Your Future, Empower Your LifeEnvision Your Future, Empower Your Life
Envision Your Future, Empower Your LifeGilly2123
 
Miami-Dade Water and Sewer Department Capital Improvement Overview
Miami-Dade Water and Sewer Department Capital Improvement OverviewMiami-Dade Water and Sewer Department Capital Improvement Overview
Miami-Dade Water and Sewer Department Capital Improvement Overviewfloridawaterdaily
 
30 de enero secundaria
30 de enero secundaria30 de enero secundaria
30 de enero secundariaColegioazorin
 
Politicas de evaluacion
Politicas de evaluacionPoliticas de evaluacion
Politicas de evaluacionMarielld
 
Infopathin perilliset 20.5.2015
Infopathin perilliset 20.5.2015Infopathin perilliset 20.5.2015
Infopathin perilliset 20.5.2015Affecto
 
Final Performance Statistics.PDF
Final Performance Statistics.PDFFinal Performance Statistics.PDF
Final Performance Statistics.PDFEunice Fei Jin Shi
 
Smu mba sem 3 pm winter 2015 assignments
Smu mba sem 3 pm winter 2015 assignmentsSmu mba sem 3 pm winter 2015 assignments
Smu mba sem 3 pm winter 2015 assignmentssolved_assignments
 
Disaster risk management_final project_Grace P Sapuay
Disaster risk management_final project_Grace P SapuayDisaster risk management_final project_Grace P Sapuay
Disaster risk management_final project_Grace P SapuayGrace Sapuay, EnP
 
εγκωμιο»
εγκωμιο»εγκωμιο»
εγκωμιο»4lykeiotrip
 
Resortes - Cesar Uribe
Resortes - Cesar UribeResortes - Cesar Uribe
Resortes - Cesar UribeCesar Uribe
 

Viewers also liked (16)

Bruce wells main stage - 2013
Bruce wells   main stage - 2013Bruce wells   main stage - 2013
Bruce wells main stage - 2013
 
Envision Your Future, Empower Your Life
Envision Your Future, Empower Your LifeEnvision Your Future, Empower Your Life
Envision Your Future, Empower Your Life
 
Miami-Dade Water and Sewer Department Capital Improvement Overview
Miami-Dade Water and Sewer Department Capital Improvement OverviewMiami-Dade Water and Sewer Department Capital Improvement Overview
Miami-Dade Water and Sewer Department Capital Improvement Overview
 
Psalty And Hillsong Kids
Psalty And Hillsong KidsPsalty And Hillsong Kids
Psalty And Hillsong Kids
 
30 de enero secundaria
30 de enero secundaria30 de enero secundaria
30 de enero secundaria
 
Politicas de evaluacion
Politicas de evaluacionPoliticas de evaluacion
Politicas de evaluacion
 
Infopathin perilliset 20.5.2015
Infopathin perilliset 20.5.2015Infopathin perilliset 20.5.2015
Infopathin perilliset 20.5.2015
 
Examen visual aplicado a las uniones soldadas (09/15)
Examen visual aplicado a las uniones soldadas (09/15)Examen visual aplicado a las uniones soldadas (09/15)
Examen visual aplicado a las uniones soldadas (09/15)
 
Adulteration
AdulterationAdulteration
Adulteration
 
Final Performance Statistics.PDF
Final Performance Statistics.PDFFinal Performance Statistics.PDF
Final Performance Statistics.PDF
 
Smu mba sem 3 pm winter 2015 assignments
Smu mba sem 3 pm winter 2015 assignmentsSmu mba sem 3 pm winter 2015 assignments
Smu mba sem 3 pm winter 2015 assignments
 
26.10.2012, NEWSWIRE, Issue 245
26.10.2012, NEWSWIRE, Issue 24526.10.2012, NEWSWIRE, Issue 245
26.10.2012, NEWSWIRE, Issue 245
 
Disaster risk management_final project_Grace P Sapuay
Disaster risk management_final project_Grace P SapuayDisaster risk management_final project_Grace P Sapuay
Disaster risk management_final project_Grace P Sapuay
 
εγκωμιο»
εγκωμιο»εγκωμιο»
εγκωμιο»
 
Resortes - Cesar Uribe
Resortes - Cesar UribeResortes - Cesar Uribe
Resortes - Cesar Uribe
 
Intellectual Property
Intellectual PropertyIntellectual Property
Intellectual Property
 

Similar to Tarek C.V (20)

Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
CV Eng Yasser Zeinhom Mohamed A
CV Eng  Yasser Zeinhom Mohamed ACV Eng  Yasser Zeinhom Mohamed A
CV Eng Yasser Zeinhom Mohamed A
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
CV Sheren
CV SherenCV Sheren
CV Sheren
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
CV
CVCV
CV
 
hosam cv english 1
hosam cv english 1hosam cv english 1
hosam cv english 1
 
CV june-2016
CV june-2016CV june-2016
CV june-2016
 
Resume
ResumeResume
Resume
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
M Sahar CV-Updated
M Sahar CV-UpdatedM Sahar CV-Updated
M Sahar CV-Updated
 
M.Salamony's_updated 2016
M.Salamony's_updated 2016M.Salamony's_updated 2016
M.Salamony's_updated 2016
 
Mohaideen CV
Mohaideen CVMohaideen CV
Mohaideen CV
 
CV MZ
CV MZCV MZ
CV MZ
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 

Tarek C.V

  • 1. Curriculum Vitae Name: - Tarek Abd El-Hameed Farag Quantity Surveyor Personal Information: - Marital Status : Married Nationality : Egyptian Date of Birth : 13, January 1974 Present Address : 108 Zaki Hawass St. Tiaran city Helwaan Mobile : 01224825029 E-Mail : tareq_35@yahoo.com Military Service : Exempted Education : Diploma from Matarya Industrial Institute (Construction Division Technical office Branch) June 1993 Grade Good Skills Computer: Excellent in (Windows – MS Office (Word-Excel-Power Point) & Auto-Cad. Languages: Excellent in Arabic (Mother Lang.) – Very Good in English Professional Experience  Present Occupation:- from January 2015 till present Working with LIVING IN Interiors Position : - Senior Quantity Surveyor Duties : - • Study & prepare new project BOQs (designed by Living in design team) . • Supervising Project Q.S. engineers. • Prepare Monthly client invoices. for big projects. • Prepare all commercial & Cost control reports (V.O. log, payment logs and status, etc…). • Prepare Monthly subcontractors invoices (Quantities, activities and prices). • Give a hand in preparing Subcontractors contract ( negotiation – prepare BOQs-  Last Experience: - from February 2013 till December 2014 Working with IDRAK (DMG ) Position : - Senior Project Quantity Surveyor Project Finishing work for Galleria 40 project (RAYA Plaza Smart office and commercial building (Mall)) Duties : - • Prepare All Quantity Surveying for Civil & Architectural Works. • Prepare Monthly subcontractors invoices (Quantities, activities and prices). • Prepare Monthly client invoices. Page 1 of 3
  • 2. • Prepare all commercial reports (V.O. log, payment log and status, etc…) • Study, Analysis & Discuss Variation Orders. From October 2005 till December 2012 Working with DEPA United Group for Hotel interiors Position : - Quantity Surveying Section Manager from January 2012 till December 2012 Previous Position : - Senior Project Quantity Surveyor from October 2005 till December 2011 Projects 1- El Nile Hotel (Kempinski) from June 2008 till now (Internal & External Finishing) Project consists of (220 Guest rooms, Public area (restaurants, Lobbies & Lounges, public toilets, Spa & Gymnasium and swimming pool), front offices and back of house, at Kornesh El-Nil Garden City 2-Millennium Tiran Resort (Internal & External Finishing) from October 2005 till May 2008 Project consists of (Main building (Lobbies & Lounges), 351 Guest rooms, Children club, 2 staff buildings, 2 swimming pools, utilities buildings & restaurants at Sharm El-Sheikh city). Duties : - • Prepare All Quantity Surveying for Civil & Architectural Works. • Prepare Monthly subcontractors invoices (Quantities, activities and prices). • Prepare Monthly client invoices. • Prepare all commercial reports (V.O. log, payment log and status, etc…) • Study, Analysis & Discuss Variation Orders. From April 2004 till 30/08/2005 Working with ABB SUSA, Inc Project : Middle Egypt Project (Fayoum, Beni Suef and Minia Governorates) The Project specified in improvement and constructing water & waste water Treatment Plants in each Governorate, and it includes a high variety of work such as: Constructing Clarifiers, Sedimentations, Oxidation ditches, Screening & Grit Removal, Gravity Thickener, Pump stations, Drying beds, Chlorination building & Channels, Treated water Reservoirs, Flocculation & Sedimentations Basins & Pipe Lines (Gravity Sewers & Force Main) . Position :- Senior Quantity Surveyor Duties :- • Prepare All Quantity Surveying for Civil & Architectural Works. • Check and approved subcontractors invoices (Quantities, activities and prices). • Prepare Monthly forecast according to the new contract & change orders. • Study, Analysis & Discuss Variation Orders. Page 2 of 3
  • 3. From July 1994 till March 2004 Working with Arabian International Construction Co. (AIC) Position :- Senior Quantity Surveyor Duties :- • Prepare All Quantity Surveying for Civil, Architecture, and Plumping & Electrical Works. • Prepare, Check & Supervision Structure & Architecture Shop Drawings & As Built Drawings. • Prepare Client Invoices & Follow up the Employer Correspondence • Subcontractors (Evaluation, Contracts& Payments). • Study, Analysis & Discuss Variation Orders. Projects :- 1. Palma Pyramids Project (Resort at Cairo Alexandria High way Consists of 44 Villa). 2. La Vila Blanche (Residential Building at Alharm St. Giza). 3. Horgede Helton Blaze Hotel ( 5 Star Hotel Consist of 200 room, 30 cabana, health club, staff building, swimming pools, sewage treatment plant, squash & tines courts & restaurants at Hurgada City ( Red See) . 4. Horgede Obroy Hotel (5 Star Resort, consists of 40 villa, administration & main building, utilities & staff Buildings & Restaurants at Horgede City Red See). 5. Royal Hills Resort (Residential Resort at 6 October City Consist of 200 Villa, mosque, kindergarten, swimming pools & water tanks). 6. Sharm El-Sheikh Crown plaza hotel(5 Stars Hotel Consists of 250 room, 25 villas, health club, staff building, 4 swimming pools, sewage treatment plant, utilities buildings & restaurants at Sharm El-Sheikh city). 7. Ameron Egypt Factory for CCP (Factory Consists of Steel Structure buildings for production line, batch plant, utilities building, warehouse building, fitting & joint rings building& concrete, administration building, social building, boundary walls & Gates at Suez City). 8. Misr Beni Suef Cement Factory (cement factory consists of Steel Structure buildings for production line, crushers building, & cement storage silos & 3 kilometers of under ground cables’ tunnel). 9. Fiberglass & ceramist Pipes factories (3 factories for fiberglass & ceramist Pipes consist of Steel Structure buildings for production line, utilities building, warehouse building, fitting, administration building, social building, boundary walls & Gates at Kattamya industrial city). 10. Al-Ameer Trade Center at Khollose St. Shopra Cairo 11.Wastewater treatment plant Alexandria Egypt. The project includes a high variety of work such as : Constructing Clarifiers, Sedimentations basin, Screening facility, headwork, Pump stations, Chlorination building & Channels, administration building, garage buildings & Pipe Lines Page 3 of 3