SlideShare a Scribd company logo
1 of 5
Download to read offline
AHMED EL SAYED SAKR Senior Architect
Over eleven (11) years’ experience in Construction management and Supervision, Project
Coordinator, Architectural designing, Production office, coordination with MEP Consultants,
dealing with all Authorities to assure obtaining the approval, review of workshop drawings and
site supervisions, etc., for various projects including, high rise building, hotels, residential &
commercial multi-storey buildings, Deluxe villa complexes, airports, industrial structures, mosques
& office buildings, etc.
NATIONALITY/AGE
Egyptian/34
MOBILE
00966599912021
MAIL
A.SAKR14@GMAIL.COM
LANGUAGES
Arabic and English (Fluent)
EDUCATION AND PROFESSIONAL QUALIFICATIONS
 B.Sc. in Architecture (2005). -Arab Academy for Science, Technology and Maritime Transport
 RIBA (Royal Institute of British Architects) 2005.
 Member of Egyptian Syndicate of Engineers no. 20/03757.
 Member of Saudi Council of Engineers no.130524.
 PMP (Project management professional) course in Study Coach, UK
EXPERIENCE
 2014 July –Until present, Khatib & ALami company, Makkah, KSA; Assitant Architect -Jabal
Omar Development Project is a unique urban regeneration scheme aimed at providing first class
accommodation and supporting religious, social and commercial facilities and services for the
visitors and residents of the holy city of Makkah Al-Mukarramah. The development will significantly
enhance accommodation and other facilities for the ever-increasing number of pilgrims and
seasonal visitors to Al-Haram. The project consists of 5 phases for 38 hotel towers that will
operated by well-known international 5 & 4 stars hotel. such as Hilton, Double Tree, Sheraton and
Marriott.
Phase III consists of 5 stars hotel ( Hilton) of 44 floors & Double Tree, 4 stars Hotel of 33 floors
and 11 of which are podium floors, where 4 are commercial floors, 3 parking floors, 2 floors of
villas in addition to Ground and Mezzanine where the main entrances of the towers will be. The
estimated budget of Phase III is 3 billion SR and whole project 30 billion SR .
Duties include the following:
1. Review submitted shop drawings against contract drawings and specifications, local codes
and international codes, Reply for ( RFI's) and coordinate with the Residential Engineer and
Assistant Chief Engineer.
2. Attend meeting with the ID representative to finalize all the requirement for the design
drawing and operator requirement.
3. Review the ( ITP's) and the method of statement for the finishes procees work in the site.
4. Attend to Inspection Requests (IR's mock up ) that submitted by the contractor and take
appropriate action in a timely manner.
5. Report any works carried out by contractor found to not be in accordance with approved
drawing and specifications and report to immediate supervisor for appropriate action and
discharge instruction to the contractor
AHMED EL SAYED SAKR Senior Architect
6. Monitor quality of works and assess the safety at site including health and environmental
issues, ensuring the same complies with contracts / QCS specifications, safety and health risk
assessment and environmental mitigating measures respectively on a daily basis
7. Maintain records for daily activities on site including progress photos and ensure they are
readily available for inspection as and when required
8. Prepare Surveillance Report(s) for deficiencies of work found at site that are believed to have
failed or if the contractor is not complying with verbal instructions and subsequently
complete a Non Conformance Report (NCR) if required in view of the development of events
9. Check and ensure effective co-ordination between discipline related works and all other
disciplines
10. Provide technical input and experiences to resolve any discipline related issues on site that
may arise.
11. Monitor the contractor’s (ITP's) and quality plan(s) in regards to discipline related works
12. Ensure site progress information is communicated regularly
13. Coordinate the works to ensure successful hand-over of the project
14. Perform all other duties that may be requested by Resident & Assistant Chief Engineers.
 2013 May – 2014 July, Marwan Bader EL Din Ashour Consulting Office, Jeddah, KSA; Senior
Architectural /Assistant President for the following projects: Jubail Port (Jubail commercial
port), Hotel Building in Jeddah, Renovation and relocated for SABB Branch’s in Yuanbu (RCY),
Jeddah (ASF), Jeddah (TIJ&TDJ) & Makkah Azizyah, Residential Building in Madinna & Makkah
for Bin Laden development company, Ain Al Azizia in Jeddah, Villas in Madinah
Client: Varies
Duties include the following:
- Representative of the company for meeting and dealing with clients.
- Preparing Technical and financial proposal
- Presentations for Clients
- Quality control.
- Supervision of architectural works
- Preparing tender documents
- Coordination with all disciplines.
- Reviewing contractors’ submittals
- Attending progress meeting to update client on project's progress and resolve outstanding
issues
 2012 May – 2013 May , Al Amar Consulting Group S.A, Cairo, Egypt; Senior Site Architectural
Engineer for Westown is Sheikh Zayed’s ground –breaking new city center, westown is being
designed by award-winning Egyptian and international architect with its shops, restaurants,
homes and offices.
Owner & Project Manager : SODIC, Main Contractor El Rwad, Project total Budget: 650,000,000.
Duties include the following:
- Construction supervision of architecture work.
- Reviewing contractors submittals ( Shop drawing, materials, RFI’s ..etc).
- Attending progress meeting to update on project’s progress.
- Resolve outstanding issues.
- Prepares the weekly progress reports.
- Assist the construction manager in preparing the monthly reports..
 2010Mar -2012May, ECG Engineering Consultants Group S.A., Cairo, Egypt; Extension of Al
Rehab city, Senior Site Architect.
AHMED EL SAYED SAKR Senior Architect
Complete finishes of 750 villa, 250 residential apartment buildings, one mosque and one school
including the infrastructure and landscape works.
Duties include the following:
- Maintains daily diaries of events associated work on site
- Supervises his subordinate staff members in the execution of their responsibilities.
- Monitors, reviews, comments and reports on progress payment, quality control and safety.
- Logs and monitors all contractors' submittals. (Correspondence and shop drawings) to assure
timely response and process change and field orders for reviews by construction manager.
- Prepares necessary draft correspondence for final approval
- Assists as applicable, with pre-tender and pre-construction activities for contracts relative to
his site and provides input for all change orders and claims analysis.
- Hold daily meeting with the contractor's representative.
- Prepares the weekly progress reports.
- Assist the construction manager in preparing the monthly reports..
- Assist in preparing the final acceptance and completion report.
- Reviews and presents the contractors valuations payments for final approval by construction
manager.
- Studies and give comments on the contractor's claims.
 2009 Mar- 2010 Feb Architecture Consultant Group (ACG) Abu Dhabi, UAE, Architect,
Production Office.
Duties include the following :-
- Preparation of detailed working drawings.
- Review of workshop drawings & coordinate.
- Site supervision & quality control.
- Preparation of tender documents & time schedule.
For the following project:-
-Fujrah Mall.
-El Nasser Headquarter building.
-Hodafi Tower II ( Qatar).
 2007 Nov- 2009 Mar : Engineering Consultants Group (ECG) Dubai, UAE, Architect;
Duties include the following :-
- Design projects & presentation for clients.
- Preparation of tender documents .
- Coordination with clients and contractor.
- Site supervision for the following projects;
- Burj Al Alam. Burj el Alam , Dubai , UAE
- Designed by Nikken Sikkei, Japan - Tokyo. The project consists of 108 floors classified as
follows: 5 Basements, 11 Podiums, 70 Office Floors, 21 5-Star Hotel Floors, 12 Hotel
Apartment Floors and 4 Floors High-end Shopping Plaza. Burj Al Alam towers 501m with a
total built-up area of 268 580 sqm, 108-storey building, making it the tallest commercial
tower in the world. The project comprises 27-storey of hotel plus service apartments, 74-
storey office spaces. It has the world's first Roof Top SPA. The tower tapers as it rises
before splaying out with 6 filaments which resemble the opening of a flower's petal; set
within is a multifaceted glazing area which takes the shape of a hexagonal diamondless.
- (10) 132/11kV Substations for DEWA.
AHMED EL SAYED SAKR Senior Architect
- (3) Labor Camp Accommodation (JAM).
 2007 Feb- 2007 Nov: Engineering Consultants Group (ECG) Cairo, Egypt; Junior Architect.
Duties include the following :-
- Preparation of workshop drawings.
- Review of the shop drawings.
- Preparation of tender documents.
- Presentations for the following projects:
- CFC Festival City Cairo (Workshop drawings)
- Mena House (Workshop drawings & Presentation)
- Doha Airport (Workshop drawings)
- Burj Al Alam (Workshop drawings)
 2006 May - 2007 Feb: New Line Group (Contractor), Alexandria, Egypt; Project Coordinator .
Duties include meeting clients; presentation for clients; preparation of workshop drawing; site
supervision; coordination with subcontractor; turn key projects for the following projects:
- Heackt Company – Sadat City
- Part # 1: Office Building
- Part # 2: Extension of Workshop
- Redesigned of Eyvap Factory – Borge El Arab City
- La Quinta Residential Village – El Attima, Cairo – Assistant Designer Architect
- Redesigned of National Bank of Egypt (Ahly Bank) Main Branch Elevations – Cairo
- Designer of Royal Hotel Elevations – El Manchia, Alexandria
- Redesigned of Events Hall (Novotel Hotel) – Cairo Airport
- Redesigned of Piano Hall (Oyoun Sharm Hotel) – Sharm El Sheikh
- Kaiser Loran Residential Building – Alexandria
- Villa of Eng. Khaled Abd El Wahed – Alexandria
- 15 Villas in Marine Turnkey Project with Internal Decoration-Alexandria.
- Residential Apartment in Smouha (Turn Key Project) – Smouha.
 2005 Oct - 2006 May: Seoudy for Planning & Architecture (Consultant) ,Alexandria, Egypt;
Architecture & Planning Designer. Duties include; preparation of workshop drawing; site
supervision; coordination with subcontractor; turn key projects for the following projects:
- Planning of Access Road and Main Entrance of Damanhour City
- Planning of Damanhour City Bus Terminal & Main Market
- Replanning of Damanhour Corniche
- Design and Working Drawing of El Omanlia University.
Training Course
- Effective presentation – ECG center.
- Adobe Photoshop CS2.
- AutoCAD 2001.
Computer Skills
-- OOppeerraattiinngg SSyysstteemmss:: WWiinnddoowwss 9988,, MMEE,, PPrrooffeessssiioonnaall aanndd XXPP..
AHMED EL SAYED SAKR Senior Architect
-- SSuurrffiinngg IInntteerrnneett..
-- MMss OOffffiiccee:: PPoowweerr PPooiinntt,, WWoorrdd,, EExxcceell..
DDrraaffttiinngg PPrrooggrraammss::
- AutoCAD 2000 – 2014.
PPrreesseennttaattiioonn PPrrooggrraammss::
- Adobe Photoshop cs5.
AAnniimmaattiioonn && RReennddeerriinngg PPrrooggrraammss::.
- 3D Max 2012.
End

More Related Content

What's hot

A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia
 
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSAMARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSAMarwan Fawzy Ahmed
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabilyTasamim Online
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليTasamim Online
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 finalHaytham Taalab
 
Khaled Essam portfolio
Khaled Essam portfolioKhaled Essam portfolio
Khaled Essam portfolioKhaled Essam
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
Resume.Sherif
Resume.SherifResume.Sherif
Resume.Sherifsherif63
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolioKhaled Essam
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalAhmed Yehia
 

What's hot (20)

A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSAMARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
MARWAN_FARRAG_ARCHITECT_SITE ENGINEER_CV_KSA
 
haitham cv
haitham cvhaitham cv
haitham cv
 
CV MZ
CV MZCV MZ
CV MZ
 
Architect mohamed el-tarabily
Architect mohamed el-tarabilyArchitect mohamed el-tarabily
Architect mohamed el-tarabily
 
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيليPortfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
Portfolio of Architect Mohamed ElTarabily معمارى محمد الطرابيلي
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
Khaled Essam portfolio
Khaled Essam portfolioKhaled Essam portfolio
Khaled Essam portfolio
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
Wael CV Latest1
Wael CV Latest1Wael CV Latest1
Wael CV Latest1
 
C V -
C V -C V -
C V -
 
zk resume
zk resumezk resume
zk resume
 
Resume.Sherif
Resume.SherifResume.Sherif
Resume.Sherif
 
Khaled essam portfolio
Khaled essam portfolioKhaled essam portfolio
Khaled essam portfolio
 
John CV
John CVJohn CV
John CV
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 Final
 

Similar to AHMED SAKR 2016

Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVnancy nader
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 
1-Ahmed Amin's C.V
1-Ahmed Amin's C.V1-Ahmed Amin's C.V
1-Ahmed Amin's C.VAhmed Amin
 
NOHA ALI MAHMOUD EL KORDY CV
NOHA ALI  MAHMOUD EL KORDY CVNOHA ALI  MAHMOUD EL KORDY CV
NOHA ALI MAHMOUD EL KORDY CVnoha kordy
 
Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled Sedky
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHMusa Elsheikh
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Albitar
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00Muhammad Al-hanbali
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016Romany Fayez
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1AHMED RAAI
 

Similar to AHMED SAKR 2016 (20)

Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CV
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
1-Ahmed Amin's C.V
1-Ahmed Amin's C.V1-Ahmed Amin's C.V
1-Ahmed Amin's C.V
 
NOHA ALI MAHMOUD EL KORDY CV
NOHA ALI  MAHMOUD EL KORDY CVNOHA ALI  MAHMOUD EL KORDY CV
NOHA ALI MAHMOUD EL KORDY CV
 
Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv
 
CV2
CV2CV2
CV2
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
 
Updated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKHUpdated CV of MUSA ELSHEIKH
Updated CV of MUSA ELSHEIKH
 
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
Majdi Murjan (Sr.Civil Engineer, LEED Green Associate) C.V.
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
CV 2015
CV   2015CV   2015
CV 2015
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
 
04-2016
04-201604-2016
04-2016
 
WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2WAEL_CURRICULUM_VITAE-2
WAEL_CURRICULUM_VITAE-2
 
Romany resume 2016
Romany resume 2016Romany resume 2016
Romany resume 2016
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 

AHMED SAKR 2016

  • 1. AHMED EL SAYED SAKR Senior Architect Over eleven (11) years’ experience in Construction management and Supervision, Project Coordinator, Architectural designing, Production office, coordination with MEP Consultants, dealing with all Authorities to assure obtaining the approval, review of workshop drawings and site supervisions, etc., for various projects including, high rise building, hotels, residential & commercial multi-storey buildings, Deluxe villa complexes, airports, industrial structures, mosques & office buildings, etc. NATIONALITY/AGE Egyptian/34 MOBILE 00966599912021 MAIL A.SAKR14@GMAIL.COM LANGUAGES Arabic and English (Fluent) EDUCATION AND PROFESSIONAL QUALIFICATIONS  B.Sc. in Architecture (2005). -Arab Academy for Science, Technology and Maritime Transport  RIBA (Royal Institute of British Architects) 2005.  Member of Egyptian Syndicate of Engineers no. 20/03757.  Member of Saudi Council of Engineers no.130524.  PMP (Project management professional) course in Study Coach, UK EXPERIENCE  2014 July –Until present, Khatib & ALami company, Makkah, KSA; Assitant Architect -Jabal Omar Development Project is a unique urban regeneration scheme aimed at providing first class accommodation and supporting religious, social and commercial facilities and services for the visitors and residents of the holy city of Makkah Al-Mukarramah. The development will significantly enhance accommodation and other facilities for the ever-increasing number of pilgrims and seasonal visitors to Al-Haram. The project consists of 5 phases for 38 hotel towers that will operated by well-known international 5 & 4 stars hotel. such as Hilton, Double Tree, Sheraton and Marriott. Phase III consists of 5 stars hotel ( Hilton) of 44 floors & Double Tree, 4 stars Hotel of 33 floors and 11 of which are podium floors, where 4 are commercial floors, 3 parking floors, 2 floors of villas in addition to Ground and Mezzanine where the main entrances of the towers will be. The estimated budget of Phase III is 3 billion SR and whole project 30 billion SR . Duties include the following: 1. Review submitted shop drawings against contract drawings and specifications, local codes and international codes, Reply for ( RFI's) and coordinate with the Residential Engineer and Assistant Chief Engineer. 2. Attend meeting with the ID representative to finalize all the requirement for the design drawing and operator requirement. 3. Review the ( ITP's) and the method of statement for the finishes procees work in the site. 4. Attend to Inspection Requests (IR's mock up ) that submitted by the contractor and take appropriate action in a timely manner. 5. Report any works carried out by contractor found to not be in accordance with approved drawing and specifications and report to immediate supervisor for appropriate action and discharge instruction to the contractor
  • 2. AHMED EL SAYED SAKR Senior Architect 6. Monitor quality of works and assess the safety at site including health and environmental issues, ensuring the same complies with contracts / QCS specifications, safety and health risk assessment and environmental mitigating measures respectively on a daily basis 7. Maintain records for daily activities on site including progress photos and ensure they are readily available for inspection as and when required 8. Prepare Surveillance Report(s) for deficiencies of work found at site that are believed to have failed or if the contractor is not complying with verbal instructions and subsequently complete a Non Conformance Report (NCR) if required in view of the development of events 9. Check and ensure effective co-ordination between discipline related works and all other disciplines 10. Provide technical input and experiences to resolve any discipline related issues on site that may arise. 11. Monitor the contractor’s (ITP's) and quality plan(s) in regards to discipline related works 12. Ensure site progress information is communicated regularly 13. Coordinate the works to ensure successful hand-over of the project 14. Perform all other duties that may be requested by Resident & Assistant Chief Engineers.  2013 May – 2014 July, Marwan Bader EL Din Ashour Consulting Office, Jeddah, KSA; Senior Architectural /Assistant President for the following projects: Jubail Port (Jubail commercial port), Hotel Building in Jeddah, Renovation and relocated for SABB Branch’s in Yuanbu (RCY), Jeddah (ASF), Jeddah (TIJ&TDJ) & Makkah Azizyah, Residential Building in Madinna & Makkah for Bin Laden development company, Ain Al Azizia in Jeddah, Villas in Madinah Client: Varies Duties include the following: - Representative of the company for meeting and dealing with clients. - Preparing Technical and financial proposal - Presentations for Clients - Quality control. - Supervision of architectural works - Preparing tender documents - Coordination with all disciplines. - Reviewing contractors’ submittals - Attending progress meeting to update client on project's progress and resolve outstanding issues  2012 May – 2013 May , Al Amar Consulting Group S.A, Cairo, Egypt; Senior Site Architectural Engineer for Westown is Sheikh Zayed’s ground –breaking new city center, westown is being designed by award-winning Egyptian and international architect with its shops, restaurants, homes and offices. Owner & Project Manager : SODIC, Main Contractor El Rwad, Project total Budget: 650,000,000. Duties include the following: - Construction supervision of architecture work. - Reviewing contractors submittals ( Shop drawing, materials, RFI’s ..etc). - Attending progress meeting to update on project’s progress. - Resolve outstanding issues. - Prepares the weekly progress reports. - Assist the construction manager in preparing the monthly reports..  2010Mar -2012May, ECG Engineering Consultants Group S.A., Cairo, Egypt; Extension of Al Rehab city, Senior Site Architect.
  • 3. AHMED EL SAYED SAKR Senior Architect Complete finishes of 750 villa, 250 residential apartment buildings, one mosque and one school including the infrastructure and landscape works. Duties include the following: - Maintains daily diaries of events associated work on site - Supervises his subordinate staff members in the execution of their responsibilities. - Monitors, reviews, comments and reports on progress payment, quality control and safety. - Logs and monitors all contractors' submittals. (Correspondence and shop drawings) to assure timely response and process change and field orders for reviews by construction manager. - Prepares necessary draft correspondence for final approval - Assists as applicable, with pre-tender and pre-construction activities for contracts relative to his site and provides input for all change orders and claims analysis. - Hold daily meeting with the contractor's representative. - Prepares the weekly progress reports. - Assist the construction manager in preparing the monthly reports.. - Assist in preparing the final acceptance and completion report. - Reviews and presents the contractors valuations payments for final approval by construction manager. - Studies and give comments on the contractor's claims.  2009 Mar- 2010 Feb Architecture Consultant Group (ACG) Abu Dhabi, UAE, Architect, Production Office. Duties include the following :- - Preparation of detailed working drawings. - Review of workshop drawings & coordinate. - Site supervision & quality control. - Preparation of tender documents & time schedule. For the following project:- -Fujrah Mall. -El Nasser Headquarter building. -Hodafi Tower II ( Qatar).  2007 Nov- 2009 Mar : Engineering Consultants Group (ECG) Dubai, UAE, Architect; Duties include the following :- - Design projects & presentation for clients. - Preparation of tender documents . - Coordination with clients and contractor. - Site supervision for the following projects; - Burj Al Alam. Burj el Alam , Dubai , UAE - Designed by Nikken Sikkei, Japan - Tokyo. The project consists of 108 floors classified as follows: 5 Basements, 11 Podiums, 70 Office Floors, 21 5-Star Hotel Floors, 12 Hotel Apartment Floors and 4 Floors High-end Shopping Plaza. Burj Al Alam towers 501m with a total built-up area of 268 580 sqm, 108-storey building, making it the tallest commercial tower in the world. The project comprises 27-storey of hotel plus service apartments, 74- storey office spaces. It has the world's first Roof Top SPA. The tower tapers as it rises before splaying out with 6 filaments which resemble the opening of a flower's petal; set within is a multifaceted glazing area which takes the shape of a hexagonal diamondless. - (10) 132/11kV Substations for DEWA.
  • 4. AHMED EL SAYED SAKR Senior Architect - (3) Labor Camp Accommodation (JAM).  2007 Feb- 2007 Nov: Engineering Consultants Group (ECG) Cairo, Egypt; Junior Architect. Duties include the following :- - Preparation of workshop drawings. - Review of the shop drawings. - Preparation of tender documents. - Presentations for the following projects: - CFC Festival City Cairo (Workshop drawings) - Mena House (Workshop drawings & Presentation) - Doha Airport (Workshop drawings) - Burj Al Alam (Workshop drawings)  2006 May - 2007 Feb: New Line Group (Contractor), Alexandria, Egypt; Project Coordinator . Duties include meeting clients; presentation for clients; preparation of workshop drawing; site supervision; coordination with subcontractor; turn key projects for the following projects: - Heackt Company – Sadat City - Part # 1: Office Building - Part # 2: Extension of Workshop - Redesigned of Eyvap Factory – Borge El Arab City - La Quinta Residential Village – El Attima, Cairo – Assistant Designer Architect - Redesigned of National Bank of Egypt (Ahly Bank) Main Branch Elevations – Cairo - Designer of Royal Hotel Elevations – El Manchia, Alexandria - Redesigned of Events Hall (Novotel Hotel) – Cairo Airport - Redesigned of Piano Hall (Oyoun Sharm Hotel) – Sharm El Sheikh - Kaiser Loran Residential Building – Alexandria - Villa of Eng. Khaled Abd El Wahed – Alexandria - 15 Villas in Marine Turnkey Project with Internal Decoration-Alexandria. - Residential Apartment in Smouha (Turn Key Project) – Smouha.  2005 Oct - 2006 May: Seoudy for Planning & Architecture (Consultant) ,Alexandria, Egypt; Architecture & Planning Designer. Duties include; preparation of workshop drawing; site supervision; coordination with subcontractor; turn key projects for the following projects: - Planning of Access Road and Main Entrance of Damanhour City - Planning of Damanhour City Bus Terminal & Main Market - Replanning of Damanhour Corniche - Design and Working Drawing of El Omanlia University. Training Course - Effective presentation – ECG center. - Adobe Photoshop CS2. - AutoCAD 2001. Computer Skills -- OOppeerraattiinngg SSyysstteemmss:: WWiinnddoowwss 9988,, MMEE,, PPrrooffeessssiioonnaall aanndd XXPP..
  • 5. AHMED EL SAYED SAKR Senior Architect -- SSuurrffiinngg IInntteerrnneett.. -- MMss OOffffiiccee:: PPoowweerr PPooiinntt,, WWoorrdd,, EExxcceell.. DDrraaffttiinngg PPrrooggrraammss:: - AutoCAD 2000 – 2014. PPrreesseennttaattiioonn PPrrooggrraammss:: - Adobe Photoshop cs5. AAnniimmaattiioonn && RReennddeerriinngg PPrrooggrraammss::. - 3D Max 2012. End