Welcome to
Supervisor training
program
Team- A: 1st Course 25th August
2nd Course 1st September
Team- B: 1st Course 26th August
2nd Course 2nd September
Team- C: 1st Course 31th August
2nd Course 5th September
Examination: 8th September
Certificate & Prize ceremony: 10th
September
 Supervisor should do:
1. Conducting motion study and correcting
faulty motions
2. Hourly operator capacity check
3. Conduct R&D (Research & development) for
the garment:
4. Use best possible line layout
5. Scientific work station layout
6. Reduce line setting time
7. Improve line balancing
8. Use work aids, attachments, guides, correct
pressure foots and folders:
9. Continuous feeding to the sewing line
10. Feed fault free and precise cutting to line
11. Training to sewing operators
12. Setting individual operator target
13. Eliminate loss time and off-standard time
14. Using auto trimmer sewing machine
15. Installing better equipment
16. Inline quality inspection at regular interval
17. Operator motivation
 1. Absence of Quality Awareness
 2. Unavailability of Quality monitoring tools
 3. Poor Material handling
 4. Inferior quality of raw material
 5. Communication Gap
 6. Non- maintenance machines
 7. Untrained checking personnel at Check points
 8. Untidy floor and workshops
 9. Use of damaged equipment
 10. Production team biased on quantity than quality
You shouldn't compromise with quality over production quantity.
Make your process defect free then your production will go up
automatically.
 What is main 3 reason for productivity less
more that 20% to above?
 What is main 3 reason for worker migration?
 What is main 3 reason for worker absent?
 What is SMV?
 Why productivity less at 1st hour about 50%
and how to improve?
Thank You from
Bando Global Co. Ltd
Sheikh Nazir Ahmed
Small but strong

Supervisor training

  • 2.
  • 3.
    Team- A: 1stCourse 25th August 2nd Course 1st September Team- B: 1st Course 26th August 2nd Course 2nd September Team- C: 1st Course 31th August 2nd Course 5th September
  • 4.
    Examination: 8th September Certificate& Prize ceremony: 10th September
  • 10.
     Supervisor shoulddo: 1. Conducting motion study and correcting faulty motions 2. Hourly operator capacity check 3. Conduct R&D (Research & development) for the garment: 4. Use best possible line layout 5. Scientific work station layout 6. Reduce line setting time
  • 11.
    7. Improve linebalancing 8. Use work aids, attachments, guides, correct pressure foots and folders: 9. Continuous feeding to the sewing line 10. Feed fault free and precise cutting to line 11. Training to sewing operators 12. Setting individual operator target 13. Eliminate loss time and off-standard time 14. Using auto trimmer sewing machine
  • 12.
    15. Installing betterequipment 16. Inline quality inspection at regular interval 17. Operator motivation
  • 13.
     1. Absenceof Quality Awareness  2. Unavailability of Quality monitoring tools  3. Poor Material handling  4. Inferior quality of raw material  5. Communication Gap  6. Non- maintenance machines  7. Untrained checking personnel at Check points  8. Untidy floor and workshops  9. Use of damaged equipment  10. Production team biased on quantity than quality You shouldn't compromise with quality over production quantity. Make your process defect free then your production will go up automatically.
  • 14.
     What ismain 3 reason for productivity less more that 20% to above?  What is main 3 reason for worker migration?  What is main 3 reason for worker absent?  What is SMV?  Why productivity less at 1st hour about 50% and how to improve?
  • 15.
    Thank You from BandoGlobal Co. Ltd Sheikh Nazir Ahmed Small but strong