SlideShare a Scribd company logo
1 of 4
Download to read offline
-II-
Ahmed Hamdy Allam Emam
 E-mail: A.hamdy.global@gmail.com Mobile: (002) 01022002317
 CareerHistory:
 December 2016 till Presence Project coordinator (Vodafone Account) at
ERICSSON Egypt for Transmission (Rollout , fixed account, self-built) projects:
Job Responsibilities:
 Receive Workorder fromcustomer.
 Check access status for sites planned to be visit.
 Send daily plan and planned visit.
 Order BOQ fromIE team.
 Order to release equipment fromware house to delivery team.
 Follow up withdelivery team to deliver equipment - in parallel - confirmwith installation team to
be in site in the same time.
 Follow up withinstallation team till finishing installation and alignment to proceed in
management process with TX change team.
 Order Acceptance visit from our Acceptanceteam and close site fromoperation side.
 Trackall installed material or missing material foreach site.
 Trackall activities status in my tracking sheet day by day.
 Update all done activities in site handler day by day.
 Prepare and follow plan for upcoming activities after confirm with customer about expected
upcoming activities weekly.
 June 2016 till December 2016 senior coordinator (Vodafone Account) at Afro
Egypt Group Field Maintenance (Giza Region):
Job Responsibilities:
 Manage Duty teams and supervise their tasks.
 Make sure that duty team received Resilience TTplan from NFM team.
 Prepare plan with Duty team (sites coordinates, needed spare, needed keys and access status.
 Follow up withteams to solve all TT in SLA frame.
 Send plan update forResilience TT every 2 hours during workday to keep customer up to date.
 Make sure for CM teams readiness to move to any downsite once receive TT.
 Check H&S tools forall teams at the start of each shift to keep our teams working safely as per
Vodafone H&S rules.
 Prepare weekly rooster forall my teams in area to set the weekly day off of each team according
to workload.
 Close the solved TT with customer and give him comment forthe faulty reason to avoidRepeated
TT.
 Make sure that TTstatus is resolved on remedy after finish it.
-III-
 November 2015 till June 2016 (senior coordinator) & project manager
assistance (Vodafone Account) at EGY-TECS Group.
Job Responsibilities:
 Prepare Projectquotation to the customer.
 Prepare business case for the project included(scope ,time schedule,
 Needed budget, needed resources and project risks).
 Discuss business case withtop management team.
 Assign tasks to my team members to proceed hiring needed resources, tools, OHS tools and cars
for the new project to meet our expected start date after get the approval fromtop management
team on project business case.
 Executing the project after prepare all needed due to customer requirement.
 Monitor my team members and be standby forany interface to keep my project schedule and
performance up to my plan.
 Prepare monthly report to discuss it with top management team in our monthly meeting.
 September 2014 till November 2015 (senior coordinator) & project manager
assistance (Nokia Siemens Account) at MAG-consulting.
Job Responsibilities:
 Get Projectquotation fromthe customer.
 Discuss business case withmy direct manager to acceptto start project or not.
 If prices not agreed starting negotiation with customer to can get better price.
 If prices agreed starting prepare teams as per project requirement specially H&S requirements
according to H&S manager.
 Put clear plan with expected starting date forteams during preparation.
 After teams start work,follow up with projectcoordinator about team's progress and support
him in any problems.
 August 2013 – September 2014 3G-EXP (Ericsson-Vodafone) project
coordinator at Mobillink Group.
Job Responsibilities:
 Starting coordinate 5 teams and increase number of teams to be 10 during one month in two
areas (Cairo & Giza).
 Preparing all site updated documents needed forsite engineer.
 Daily workprogress followsup with site engineers
 Providing a daily report clarifying all site status and workprogress.
 Coordinating with client team
 Site Visit (Plan & Follow)
 Structure Analysis (Modification& Follow Up)
 Follow up acceptancepackages and keep progress with zero backlogs.
-IV-
 May 2013 – August 2013 Ericsson projects coordinator at MAG-consulting.
Projects:
 2G EXP (Rented teams).
 3G EXP (serviceteams).
 Rollout (sub-contractorteams).
 Modernization (rented teams).
Job Responsibilities:
 Coordinate with client team and all related persons fromvendors.
 Resources allocation (Engineers, Teams, Cars & Sub-contractor).
 Request & Follow up all related document for the project.
 Requesting all free issue materials fromclient and all material relating to the working sites.
 Develop and write procedures forinstallation, use, and troubleshooting of communications
hardware.
 Workwith other engineers, systems analysts, programmers, technicians, scientists and top-level
managers in the design, testing and evaluation of systems.
 Reviewing final quantities of used materials with warehouse keepers & Material planning.
 Contacting subcontractorsand followingup their work progress including moving materials to
site when needed (Installation, Transportation, A/C, Cranes & checkthere invoices).
 Visit workingplaces (BTSSites) to determine present and future site's needs.
 Read TechnicalManuals & Brochures to determine which equipment meets establishment
requirements.
 Assist users todiagnose and solvedata communication problems.
 Following up for team Commitment withsafety wise and weekly report for all teams.
 Visit workingplaces (BTSSites) to quality assurances and reporting to top management.
 March 2012 – May 2013 field engineer at MAG-consulting Ericsson –Vodafone Project.
Job Responsibilities:
 New Rollout sites (macro,micro, enclosure, outdoor)
 EXP (2G,3G, CO).
 3G (3418, 3518, 6601)
 Minilink upgrade, Minilink Traffic Node installing all types of (TN2P, 6P and 20P)
troubleshooting softwareand hardware, TN management, upgrading of TN forReleasing R3, R4
and softwarebackup configuration.
 October2010 - March 2012 field Engineer (Huawei-Etisalat project) at Geni process
Job Responsibilities:
 Installing and commissioning HUAWEIMW-LinksNew site Project
 (OptiX RTN 950 & 680).
 Installing and commissioning Huawei GSM equipment's of Radio Base Station BTS (APM 30, BTS
3900) for Etisalat Egypt Projectaccordingto Huawei standard (ROT).
 3G 2100 Node-B IDU (BTS 3812E) & ODU (DBS 3800, 3900).
 Acceptance and H.O for all sites.
 VSWR checkand good solution for all H/W problems.
-V-
 Professional Courses:
PMP,Transmission Traffic node R5 installation and commissioning, Ericsson RBS 2000
& 6000 series installation, commissioning & Troubleshooting, tower climbing, first aid, risk
Assessment and MIS (Mission in Sales).
 Personal Skills
 Strong leadership, planning, and management skills.
 Team player withgood interpersonal and negotiation skills.
 Good communication skills facilitating interaction with team members and clients.
 Ability to workwith internal and external customers, understand their requirements,
and build excellent customer relations.
 Ability to workin a demanding environment and handle multiple projects
Language Skills:
 Arabic language (Mother language).
 English language (Very good speaks and writes).
 Personal Data:
Mobile:(002)01022002317
E-mail: A.hamdy.global@gmail.com
Education:Communications and electronics Department- Faculty of Engineering- Modern
Academy
GraduationDate: 2010
GraduationProject: "Design and analyzing using CDMA ".
ProjectGrade: Excellent (A).
Date ofbirth: 04 – Feb - 1988.
Gender: male.
Nationality: Egyptian.
Marital Status: Married.
MilitaryStatus: Exemption.
Reference ready upon request…

More Related Content

What's hot (20)

Waseem Al-Ezz Resume
Waseem Al-Ezz ResumeWaseem Al-Ezz Resume
Waseem Al-Ezz Resume
 
Jim styles CV May 2015
Jim styles CV  May 2015Jim styles CV  May 2015
Jim styles CV May 2015
 
WEB_CV_2015_DL_EN_MTL_R3.2
WEB_CV_2015_DL_EN_MTL_R3.2WEB_CV_2015_DL_EN_MTL_R3.2
WEB_CV_2015_DL_EN_MTL_R3.2
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
 
Job role desired
Job role desiredJob role desired
Job role desired
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
RHODORA UY TAN CV
RHODORA UY TAN CVRHODORA UY TAN CV
RHODORA UY TAN CV
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
My Last Cv August 2010
My Last Cv August 2010My Last Cv August 2010
My Last Cv August 2010
 
Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016Ryan Ministrelli Resume 2016
Ryan Ministrelli Resume 2016
 
Mechanical Engineer Anjum
Mechanical Engineer AnjumMechanical Engineer Anjum
Mechanical Engineer Anjum
 
GenMach_Insert
GenMach_InsertGenMach_Insert
GenMach_Insert
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
Ibtihaj cv.
Ibtihaj cv.Ibtihaj cv.
Ibtihaj cv.
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
RESUME-1
RESUME-1RESUME-1
RESUME-1
 
MA CV
MA CVMA CV
MA CV
 
Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014Khalaf Hassanin, EPC Project Manager 9-2014
Khalaf Hassanin, EPC Project Manager 9-2014
 
Ian C. Shannon
Ian C. ShannonIan C. Shannon
Ian C. Shannon
 

Viewers also liked

SCC Brochure_def_mrt16
SCC Brochure_def_mrt16SCC Brochure_def_mrt16
SCC Brochure_def_mrt16Heidi Plas
 
11slide
11slide11slide
11slideIIUM
 
Welcome to the northridge middle 2
Welcome to the northridge middle 2Welcome to the northridge middle 2
Welcome to the northridge middle 2Lisa Pixley
 
Newly Developed Products 2016 - Part 1
Newly Developed Products 2016 - Part 1Newly Developed Products 2016 - Part 1
Newly Developed Products 2016 - Part 1Master Bond
 
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...Mesfin Kebede
 
paper no.01 The Renaissance Literature,
paper no.01 The Renaissance Literature,paper no.01 The Renaissance Literature,
paper no.01 The Renaissance Literature,poojabhaliya007
 
Windows Mobile Presentation
Windows Mobile PresentationWindows Mobile Presentation
Windows Mobile Presentationamsedky
 
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvek
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvekVrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvek
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvekIvana Miklovic
 

Viewers also liked (13)

Diseño plan accion tutorial
Diseño plan accion tutorialDiseño plan accion tutorial
Diseño plan accion tutorial
 
SCC Brochure_def_mrt16
SCC Brochure_def_mrt16SCC Brochure_def_mrt16
SCC Brochure_def_mrt16
 
Pearson article
Pearson articlePearson article
Pearson article
 
docen
docendocen
docen
 
11slide
11slide11slide
11slide
 
Welcome to the northridge middle 2
Welcome to the northridge middle 2Welcome to the northridge middle 2
Welcome to the northridge middle 2
 
Newly Developed Products 2016 - Part 1
Newly Developed Products 2016 - Part 1Newly Developed Products 2016 - Part 1
Newly Developed Products 2016 - Part 1
 
Jsf 2.0 in depth
Jsf 2.0 in depthJsf 2.0 in depth
Jsf 2.0 in depth
 
Diseño plan accion tutorial
Diseño plan accion tutorialDiseño plan accion tutorial
Diseño plan accion tutorial
 
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...
Abstract_ Genetic Analysis of Stripe Rust Resistance in a Common Wheat Landra...
 
paper no.01 The Renaissance Literature,
paper no.01 The Renaissance Literature,paper no.01 The Renaissance Literature,
paper no.01 The Renaissance Literature,
 
Windows Mobile Presentation
Windows Mobile PresentationWindows Mobile Presentation
Windows Mobile Presentation
 
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvek
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvekVrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvek
Vrchy a udolia ... alebo ako byť v živote šťastný, nech sa deje čokoľvek
 

Similar to Ahmed hamdy CV (20)

Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)Eng Mutaz Ahmed Ali (Senior Project  Manager Resume)
Eng Mutaz Ahmed Ali (Senior Project Manager Resume)
 
Rami Abou Omeira_CV
Rami Abou Omeira_CVRami Abou Omeira_CV
Rami Abou Omeira_CV
 
Rama Resume2015(1)
Rama Resume2015(1)Rama Resume2015(1)
Rama Resume2015(1)
 
Rami_CV
Rami_CVRami_CV
Rami_CV
 
Hossam Rashad CV
Hossam Rashad CVHossam Rashad CV
Hossam Rashad CV
 
CV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHITCV_VIKAS RAJPUROHIT
CV_VIKAS RAJPUROHIT
 
Rv
Rv Rv
Rv
 
CV_Umer Haneef
CV_Umer HaneefCV_Umer Haneef
CV_Umer Haneef
 
Eng.Mohamed Khater C.V.
Eng.Mohamed Khater C.V.Eng.Mohamed Khater C.V.
Eng.Mohamed Khater C.V.
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
uzair cv for O&M
uzair cv for O&Muzair cv for O&M
uzair cv for O&M
 
Giuseppe Esposito - AGUST 2016
Giuseppe Esposito - AGUST 2016Giuseppe Esposito - AGUST 2016
Giuseppe Esposito - AGUST 2016
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
Waqas Khan(Project Manager)
Waqas Khan(Project Manager)Waqas Khan(Project Manager)
Waqas Khan(Project Manager)
 
SAHEEM CV
SAHEEM CVSAHEEM CV
SAHEEM CV
 
ahmed othman CV
ahmed othman CVahmed othman CV
ahmed othman CV
 
BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]BI CV 6 June 2016 [448161]
BI CV 6 June 2016 [448161]
 
Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
Tarek CV 2015 planning
Tarek CV 2015 planningTarek CV 2015 planning
Tarek CV 2015 planning
 
Mobeen CV
Mobeen CVMobeen CV
Mobeen CV
 

Ahmed hamdy CV

  • 1. -II- Ahmed Hamdy Allam Emam  E-mail: A.hamdy.global@gmail.com Mobile: (002) 01022002317  CareerHistory:  December 2016 till Presence Project coordinator (Vodafone Account) at ERICSSON Egypt for Transmission (Rollout , fixed account, self-built) projects: Job Responsibilities:  Receive Workorder fromcustomer.  Check access status for sites planned to be visit.  Send daily plan and planned visit.  Order BOQ fromIE team.  Order to release equipment fromware house to delivery team.  Follow up withdelivery team to deliver equipment - in parallel - confirmwith installation team to be in site in the same time.  Follow up withinstallation team till finishing installation and alignment to proceed in management process with TX change team.  Order Acceptance visit from our Acceptanceteam and close site fromoperation side.  Trackall installed material or missing material foreach site.  Trackall activities status in my tracking sheet day by day.  Update all done activities in site handler day by day.  Prepare and follow plan for upcoming activities after confirm with customer about expected upcoming activities weekly.  June 2016 till December 2016 senior coordinator (Vodafone Account) at Afro Egypt Group Field Maintenance (Giza Region): Job Responsibilities:  Manage Duty teams and supervise their tasks.  Make sure that duty team received Resilience TTplan from NFM team.  Prepare plan with Duty team (sites coordinates, needed spare, needed keys and access status.  Follow up withteams to solve all TT in SLA frame.  Send plan update forResilience TT every 2 hours during workday to keep customer up to date.  Make sure for CM teams readiness to move to any downsite once receive TT.  Check H&S tools forall teams at the start of each shift to keep our teams working safely as per Vodafone H&S rules.  Prepare weekly rooster forall my teams in area to set the weekly day off of each team according to workload.  Close the solved TT with customer and give him comment forthe faulty reason to avoidRepeated TT.  Make sure that TTstatus is resolved on remedy after finish it.
  • 2. -III-  November 2015 till June 2016 (senior coordinator) & project manager assistance (Vodafone Account) at EGY-TECS Group. Job Responsibilities:  Prepare Projectquotation to the customer.  Prepare business case for the project included(scope ,time schedule,  Needed budget, needed resources and project risks).  Discuss business case withtop management team.  Assign tasks to my team members to proceed hiring needed resources, tools, OHS tools and cars for the new project to meet our expected start date after get the approval fromtop management team on project business case.  Executing the project after prepare all needed due to customer requirement.  Monitor my team members and be standby forany interface to keep my project schedule and performance up to my plan.  Prepare monthly report to discuss it with top management team in our monthly meeting.  September 2014 till November 2015 (senior coordinator) & project manager assistance (Nokia Siemens Account) at MAG-consulting. Job Responsibilities:  Get Projectquotation fromthe customer.  Discuss business case withmy direct manager to acceptto start project or not.  If prices not agreed starting negotiation with customer to can get better price.  If prices agreed starting prepare teams as per project requirement specially H&S requirements according to H&S manager.  Put clear plan with expected starting date forteams during preparation.  After teams start work,follow up with projectcoordinator about team's progress and support him in any problems.  August 2013 – September 2014 3G-EXP (Ericsson-Vodafone) project coordinator at Mobillink Group. Job Responsibilities:  Starting coordinate 5 teams and increase number of teams to be 10 during one month in two areas (Cairo & Giza).  Preparing all site updated documents needed forsite engineer.  Daily workprogress followsup with site engineers  Providing a daily report clarifying all site status and workprogress.  Coordinating with client team  Site Visit (Plan & Follow)  Structure Analysis (Modification& Follow Up)  Follow up acceptancepackages and keep progress with zero backlogs.
  • 3. -IV-  May 2013 – August 2013 Ericsson projects coordinator at MAG-consulting. Projects:  2G EXP (Rented teams).  3G EXP (serviceteams).  Rollout (sub-contractorteams).  Modernization (rented teams). Job Responsibilities:  Coordinate with client team and all related persons fromvendors.  Resources allocation (Engineers, Teams, Cars & Sub-contractor).  Request & Follow up all related document for the project.  Requesting all free issue materials fromclient and all material relating to the working sites.  Develop and write procedures forinstallation, use, and troubleshooting of communications hardware.  Workwith other engineers, systems analysts, programmers, technicians, scientists and top-level managers in the design, testing and evaluation of systems.  Reviewing final quantities of used materials with warehouse keepers & Material planning.  Contacting subcontractorsand followingup their work progress including moving materials to site when needed (Installation, Transportation, A/C, Cranes & checkthere invoices).  Visit workingplaces (BTSSites) to determine present and future site's needs.  Read TechnicalManuals & Brochures to determine which equipment meets establishment requirements.  Assist users todiagnose and solvedata communication problems.  Following up for team Commitment withsafety wise and weekly report for all teams.  Visit workingplaces (BTSSites) to quality assurances and reporting to top management.  March 2012 – May 2013 field engineer at MAG-consulting Ericsson –Vodafone Project. Job Responsibilities:  New Rollout sites (macro,micro, enclosure, outdoor)  EXP (2G,3G, CO).  3G (3418, 3518, 6601)  Minilink upgrade, Minilink Traffic Node installing all types of (TN2P, 6P and 20P) troubleshooting softwareand hardware, TN management, upgrading of TN forReleasing R3, R4 and softwarebackup configuration.  October2010 - March 2012 field Engineer (Huawei-Etisalat project) at Geni process Job Responsibilities:  Installing and commissioning HUAWEIMW-LinksNew site Project  (OptiX RTN 950 & 680).  Installing and commissioning Huawei GSM equipment's of Radio Base Station BTS (APM 30, BTS 3900) for Etisalat Egypt Projectaccordingto Huawei standard (ROT).  3G 2100 Node-B IDU (BTS 3812E) & ODU (DBS 3800, 3900).  Acceptance and H.O for all sites.  VSWR checkand good solution for all H/W problems.
  • 4. -V-  Professional Courses: PMP,Transmission Traffic node R5 installation and commissioning, Ericsson RBS 2000 & 6000 series installation, commissioning & Troubleshooting, tower climbing, first aid, risk Assessment and MIS (Mission in Sales).  Personal Skills  Strong leadership, planning, and management skills.  Team player withgood interpersonal and negotiation skills.  Good communication skills facilitating interaction with team members and clients.  Ability to workwith internal and external customers, understand their requirements, and build excellent customer relations.  Ability to workin a demanding environment and handle multiple projects Language Skills:  Arabic language (Mother language).  English language (Very good speaks and writes).  Personal Data: Mobile:(002)01022002317 E-mail: A.hamdy.global@gmail.com Education:Communications and electronics Department- Faculty of Engineering- Modern Academy GraduationDate: 2010 GraduationProject: "Design and analyzing using CDMA ". ProjectGrade: Excellent (A). Date ofbirth: 04 – Feb - 1988. Gender: male. Nationality: Egyptian. Marital Status: Married. MilitaryStatus: Exemption. Reference ready upon request…