SlideShare a Scribd company logo
1 of 3
AHMED ADEL ABD EL-LATIF, CPIM
PLANNER/SCHEDULER
 Mobile: +2 01155966300  ahmed1987ag2012@gmail.com
Planning Officer with 5+ year experience in Advanced Production Planning within a large multi-product
environment. Particular strengths and experience within SAP ERP. An impressive track record optimizing
performance to plan, establishing new control systems, minimizing production losses and reducing downtime,
whilst meeting company objectives within set budgets.
Goal: To find a position in planning department or supply chain department
CORE COMPETENCE
Production &
Inventory
Management
Production planning, Materials Management, Scheduling, Supply chain Management,
Execution and control of operation, Inventory management, ERP;
Others Technical office works, Cost engineering, Developing programs, Project management …
EDUCATION
Minia University,
Faculty of Engineering
B.E. in Production Engineering, 2008
Professional Certification
CPIM
Certified in Execution and Control of Operations (ECO)
Certified in
Production
and Inventory
Management
2013
Certified in Detailed Scheduling and Planning (DSP) 2013
Certified in Master Planning of Resources (MPR) 2013
Certified in Basics of Supply Chain Management (BSCM) 2013
FE Exam Certified in Fundamentals of Engineering Exam (EIT)
US
Engineering
License
2009
AREAS OF EXPERTISE
Production Planning
Planning and preparing Master Production Schedule. Following-up production in the
shop floor and analyzing production sequence.
Materials Management
Implementation and optimization of the Materials activities. Developing MRP and
observing inventory records.
Inventory Management
Insuring the correct stock level in accordance with the forecasted demand. Observing
WIP between workcenters.
Master Scheduling Planning and scheduling weekly and daily plans for machines according to the MPS.
Lean Manufacturing
Aware about lean philosophy and manufacturing systems and its applications and
tools
Last updated Mar-15
Total Quality
Management (TQM)
Having knowledge in TQM, its tools and applications such as TOC, TPM, etc..
PROFESSIONAL EXPERIENCE
Samsung Electronics
Egypt (SEEG), Beni-
suef, Egypt
Production Planning Supervisor, 11/2013-Until Now
Main activities include but not limited to the following
 Receiving SOP from HQ every Monday then check capacity and material availability.
 Developed scheduling systems, formulated production plans that optimized output
against SOP targets
 Scheduling SOP Confirmed week to distributed daily plan according to Work
Calendar, Lines Capacity, Material availability dates, Vessel cut-off dates
 Minimized inventory costs by inventory management
 Issuing load profile for each product category
 Follow up the orders while execution to ensure On Time Production, Quantitative
Production, Loss Rate, On-time factory-out, OTD and SOP Execution Ratio
 Running MRP daily to ensure right requirements to be checked by Procurement
Egypt Cable
Manufacturing (ECM),
Beni-suef, Egypt
Planning Officer, 4/2011-11/2013
Main activities include but not limited to the following
 Developing monthly priority planning, and weekly plan according to demand due
dates, backlog and rough-cut capacity plan.
 Developed scheduling systems, formulated production plans that optimized output
against service targets
 Developing an Utilization report for the Month plan to fill the stopping time of the
machine
 Minimized inventory costs by inventory management
 Issuing load profile for each product category
 Follow up the orders while execution to ensure on time delivery and recommend
corrective actions if needed.
Developing MRP according to MPS & CRP and following Purchasement dept.
El-Sewedy for Electric
Industries (EGYLUX),
Cairo, Egypt
Technical Office Engineer, 9/2019-4/2011
 Very Good Experience in the Industrial ORACLE ERP System
 Design project’s cable tray installation and its supports
 Making sheet nesting for cable tray orders for minimum cost
 Supervising my designed samples and stating its fabrication steps
 Costing cable tray orders and aiding to minimize this cost
Last updated Mar-15
ACHIEVEMENTS
Samsung Electronics
Egypt (SEEG), Beni-
suef, Egypt
• 1st in company that run MRP with a right way with discovering all of its errors
and solving them resulting in reducing material shortage in SOP.
• Developing many applications that make work more accurate and quicker by
70%.
• Increase Line Productivity by 10% in 3 months by increasing resources
utilization.
Egypt Cable
Manufacturing (ECM),
Beni-suef, Egypt
• Developing Mini-ERP database with (MS Access 2010) for cables
manufacturing which could concludes all the technical data according to the
IEC. Also it develops production order and machine plans with all technical
data, following-up all orders and developing MRP Plan.
El-Sewedy for Electric
Industries (EGYLUX),
Cairo, Egypt
 Developing Pricing program with (VB. 6 Program) for cable tray industry that
makes automatically the pricing orders in an Excel sheet
 Developing an AutoVBA program that draw cable tray connectors with any
dimensions automatically in an AutoCAD drawing sheet
 Developing Sheet Nesting program with (VB. 6 Program) for cable tray industry
that calculate automatically the minimum number of steel sheets required to
this order
COURSES
CPIM Certified in Production and Inventory Management
American
chamber
2012/
2013
VB 6.00 Visual Basic 6.00 AUC 2009
PRMG020 Management of Project Resources AUC 2009
PERSONAL SKILLS
 Excellent in MS Access, MS Excel, MS Word
 Visual Basic Programming
 AutoCAD Program
 Time management
 Troubleshooting utility problems
 Supervise production leaders, operators and technicians
PERSONAL DETAILS
 Gender: Male Nationality: Egyptian Military status: Exempted
 Marital status: Married Date of Birth: 21.Mar.1987
Open to Relocation and travel
Last updated Mar-15

More Related Content

What's hot

Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english version
Luizclaudiomatto
 

What's hot (20)

Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
computer aided process planning
computer aided process planning computer aided process planning
computer aided process planning
 
B 37 km
B 37 kmB 37 km
B 37 km
 
Manufacturing
ManufacturingManufacturing
Manufacturing
 
Eresource nfra overview
Eresource nfra overviewEresource nfra overview
Eresource nfra overview
 
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
 
Capc & computer monitoring
Capc & computer monitoringCapc & computer monitoring
Capc & computer monitoring
 
KITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning systemKITARON Finite Capacity Production Planning system
KITARON Finite Capacity Production Planning system
 
anchal
anchalanchal
anchal
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
BIJENDRA CHAUBEY NEW
BIJENDRA CHAUBEY NEWBIJENDRA CHAUBEY NEW
BIJENDRA CHAUBEY NEW
 
CAPP
CAPPCAPP
CAPP
 
Resume
ResumeResume
Resume
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM Work
 
praveen
praveenpraveen
praveen
 
Syed mohamed ak
Syed mohamed akSyed mohamed ak
Syed mohamed ak
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
 
Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english version
 

Viewers also liked (10)

Anubis Slideshow
Anubis SlideshowAnubis Slideshow
Anubis Slideshow
 
Eco friendly
Eco friendlyEco friendly
Eco friendly
 
100 cases in_paediatrics
100 cases in_paediatrics100 cases in_paediatrics
100 cases in_paediatrics
 
Electrician
ElectricianElectrician
Electrician
 
My last Vacations
My last VacationsMy last Vacations
My last Vacations
 
Umbrella Share
Umbrella ShareUmbrella Share
Umbrella Share
 
Photos de Saint-Denis
Photos de Saint-DenisPhotos de Saint-Denis
Photos de Saint-Denis
 
anand danu 2015
anand danu 2015anand danu 2015
anand danu 2015
 
amenorrhea
amenorrheaamenorrhea
amenorrhea
 
2° verifica di chimica 14 15
2° verifica di chimica 14 152° verifica di chimica 14 15
2° verifica di chimica 14 15
 

Similar to Ahmed- Resume-CPIM (20)

Anand_Kaulwar_Resume_V2[1]
Anand_Kaulwar_Resume_V2[1]Anand_Kaulwar_Resume_V2[1]
Anand_Kaulwar_Resume_V2[1]
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Manufacturing Production Planning AI - ERP system
Manufacturing Production Planning AI -  ERP systemManufacturing Production Planning AI -  ERP system
Manufacturing Production Planning AI - ERP system
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
Resume
ResumeResume
Resume
 
Resume new
Resume newResume new
Resume new
 
Resume
ResumeResume
Resume
 
my cv
my cv my cv
my cv
 
New CV
New CV New CV
New CV
 
my cv
my cv my cv
my cv
 
Resume Anuj
Resume AnujResume Anuj
Resume Anuj
 
Ahmed Redwan
Ahmed RedwanAhmed Redwan
Ahmed Redwan
 
cv .
cv .cv .
cv .
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 
VASANT MANGALE FINAL_new
VASANT MANGALE FINAL_newVASANT MANGALE FINAL_new
VASANT MANGALE FINAL_new
 
RS VIKRAM RESUME PPC
RS VIKRAM RESUME PPCRS VIKRAM RESUME PPC
RS VIKRAM RESUME PPC
 
RESUME_difronzo_2016
RESUME_difronzo_2016RESUME_difronzo_2016
RESUME_difronzo_2016
 

Ahmed- Resume-CPIM

  • 1. AHMED ADEL ABD EL-LATIF, CPIM PLANNER/SCHEDULER  Mobile: +2 01155966300  ahmed1987ag2012@gmail.com Planning Officer with 5+ year experience in Advanced Production Planning within a large multi-product environment. Particular strengths and experience within SAP ERP. An impressive track record optimizing performance to plan, establishing new control systems, minimizing production losses and reducing downtime, whilst meeting company objectives within set budgets. Goal: To find a position in planning department or supply chain department CORE COMPETENCE Production & Inventory Management Production planning, Materials Management, Scheduling, Supply chain Management, Execution and control of operation, Inventory management, ERP; Others Technical office works, Cost engineering, Developing programs, Project management … EDUCATION Minia University, Faculty of Engineering B.E. in Production Engineering, 2008 Professional Certification CPIM Certified in Execution and Control of Operations (ECO) Certified in Production and Inventory Management 2013 Certified in Detailed Scheduling and Planning (DSP) 2013 Certified in Master Planning of Resources (MPR) 2013 Certified in Basics of Supply Chain Management (BSCM) 2013 FE Exam Certified in Fundamentals of Engineering Exam (EIT) US Engineering License 2009 AREAS OF EXPERTISE Production Planning Planning and preparing Master Production Schedule. Following-up production in the shop floor and analyzing production sequence. Materials Management Implementation and optimization of the Materials activities. Developing MRP and observing inventory records. Inventory Management Insuring the correct stock level in accordance with the forecasted demand. Observing WIP between workcenters. Master Scheduling Planning and scheduling weekly and daily plans for machines according to the MPS. Lean Manufacturing Aware about lean philosophy and manufacturing systems and its applications and tools Last updated Mar-15
  • 2. Total Quality Management (TQM) Having knowledge in TQM, its tools and applications such as TOC, TPM, etc.. PROFESSIONAL EXPERIENCE Samsung Electronics Egypt (SEEG), Beni- suef, Egypt Production Planning Supervisor, 11/2013-Until Now Main activities include but not limited to the following  Receiving SOP from HQ every Monday then check capacity and material availability.  Developed scheduling systems, formulated production plans that optimized output against SOP targets  Scheduling SOP Confirmed week to distributed daily plan according to Work Calendar, Lines Capacity, Material availability dates, Vessel cut-off dates  Minimized inventory costs by inventory management  Issuing load profile for each product category  Follow up the orders while execution to ensure On Time Production, Quantitative Production, Loss Rate, On-time factory-out, OTD and SOP Execution Ratio  Running MRP daily to ensure right requirements to be checked by Procurement Egypt Cable Manufacturing (ECM), Beni-suef, Egypt Planning Officer, 4/2011-11/2013 Main activities include but not limited to the following  Developing monthly priority planning, and weekly plan according to demand due dates, backlog and rough-cut capacity plan.  Developed scheduling systems, formulated production plans that optimized output against service targets  Developing an Utilization report for the Month plan to fill the stopping time of the machine  Minimized inventory costs by inventory management  Issuing load profile for each product category  Follow up the orders while execution to ensure on time delivery and recommend corrective actions if needed. Developing MRP according to MPS & CRP and following Purchasement dept. El-Sewedy for Electric Industries (EGYLUX), Cairo, Egypt Technical Office Engineer, 9/2019-4/2011  Very Good Experience in the Industrial ORACLE ERP System  Design project’s cable tray installation and its supports  Making sheet nesting for cable tray orders for minimum cost  Supervising my designed samples and stating its fabrication steps  Costing cable tray orders and aiding to minimize this cost Last updated Mar-15
  • 3. ACHIEVEMENTS Samsung Electronics Egypt (SEEG), Beni- suef, Egypt • 1st in company that run MRP with a right way with discovering all of its errors and solving them resulting in reducing material shortage in SOP. • Developing many applications that make work more accurate and quicker by 70%. • Increase Line Productivity by 10% in 3 months by increasing resources utilization. Egypt Cable Manufacturing (ECM), Beni-suef, Egypt • Developing Mini-ERP database with (MS Access 2010) for cables manufacturing which could concludes all the technical data according to the IEC. Also it develops production order and machine plans with all technical data, following-up all orders and developing MRP Plan. El-Sewedy for Electric Industries (EGYLUX), Cairo, Egypt  Developing Pricing program with (VB. 6 Program) for cable tray industry that makes automatically the pricing orders in an Excel sheet  Developing an AutoVBA program that draw cable tray connectors with any dimensions automatically in an AutoCAD drawing sheet  Developing Sheet Nesting program with (VB. 6 Program) for cable tray industry that calculate automatically the minimum number of steel sheets required to this order COURSES CPIM Certified in Production and Inventory Management American chamber 2012/ 2013 VB 6.00 Visual Basic 6.00 AUC 2009 PRMG020 Management of Project Resources AUC 2009 PERSONAL SKILLS  Excellent in MS Access, MS Excel, MS Word  Visual Basic Programming  AutoCAD Program  Time management  Troubleshooting utility problems  Supervise production leaders, operators and technicians PERSONAL DETAILS  Gender: Male Nationality: Egyptian Military status: Exempted  Marital status: Married Date of Birth: 21.Mar.1987 Open to Relocation and travel Last updated Mar-15