19 Desember 2023
SEKSI SICINCIN - PADANG
LAPORAN MINGGUAN
LOKASI PEKERJAAN
Panjang
36,6 km
(Rigid,flexiblePavement)
KecepatanRencana
80 km/jam
Gerbang Tol
3 buah
JumlahLajur
2x2 Tahap Awal
12+200 15+900 24+435 28+700 30+400 36+600
6+200
0+000
ZONA 1
6,200km
ZONA 2
6,000 km
ZONA 3
3,700 km
ZONA 4
8,535 km
ZONA 5
4,265 km
ZONA 6
1,700
km
ZONA 7
6,200 km
PetaTrase SeksiSicincin– LubukAlung – Padang
STA. 35+900
STA. 19+000
STA. 1+850
STA. 23+000
Data Kontrak (Exc PPN)
• KONTRAK TAHAP I
• KONTRAK TAHAP II
- KontrakAwal
- AddendumI Tahap II
: RP. 1.416.518.189.549,-
: RP. 3.856.648.164.589,92
: RP. 3.856.648.164.589,92
: Rp. 3.856.648.164.589,92
- AddendumII Tahap II : Rp. 5.826.301.187.811,46
- AddendumIII Tahap II : Rp.6.623.283.374.079,68
JangkaWaktu Kontrak : 630 Hari Kalender
PetaTrase Ruas Pekanbaru - Padang
PROFIL RUAS PEKERJAAN
DATA KONTRAK KONSULTAN PMI
PENGENDALIAN MUTU INDEPENDEN
Nomor Kontrak : HK.02.03/Bb3/PPK-PJJ/1057/IX-2023
Tanggal Kontrak : 5 September 2023
Nomor SPMK : PB.03.01/Bb3/PPK-PJJ/1058/IX-2023
Tanggal SPMK : 5 September 2023
Addendum 1 : ADD-I/KU.03.02/PPK-PJJ/Bb3/IX/2023
Tanggal Addendum 1 : 13 September 2023
Nilai Kontrak : Rp. 5.075.160.000,-
Masa Layanan : 12 Bulan
Jenis Kontrak : Satuan Waktu (Man Month)
DATA KONTRAK KONTRAKTOR PT HKI
KONTRAK AWAL
Tanggal Kontrak Awal : 25 NOVEMBER 2022
Nomor Kontrak : PJT/FE.1989/S.PERJ.279/XI/2022
Nilai Kontrak : 4.280.879.462.694
Waktu Pelaksanaan : 540 HARI KALENDER
ADDENDUM I
Tanggal : 05 JANUARI 2023
Nomor Kontrak : PJT/FE.032A/S.Perj.04/I/2023
Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN
ADDENDUM II
Tanggal : 24 MEI 2023
Nomor Kontrak : PJT/FE.938/S.Perj.94/V/2023
Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN
ADDENDUM III
Tanggal : 21 AGUSTUS 2023
Nomor Kontrak : PJT/FE.1558/S.Perj.168/VIII/2023
Nilai Kontrak : 7.351.844.545.288
Waktu Pelaksanaan : 630 HARI KALENDER
Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN
DATA KONTRAK KONSULTAN SUPERVISI
PT ANUGRAH KRIDAPRADANA – PT EGIS INTERNASIONAL INDONESIA KSO
KONTRAK AWAL
Tanggal Kontrak Awal : 22 Desember 2022
Nomor Kontrak : RJT/MH.1334/S.PERJ.14/XII/2022
Nilai Kontrak : Rp.16.856.504.400,00 (Inc PPN 11%)
SPMK : RJT/SDN.1374A/SPMK/10/XII/2022
Tanggal : 27 Desember 2022
KONTRAK ADDENDUM 1
Tanggal Kontrak Add 1 : 15 Agustus 2023
Nomor Kontrak Add 1 : RJT/SDN.873K/S.PERJ.9B/VIII/2023
Nilai Kontrak Add 1 : Rp.17.864.384.400,00 (Inc PPN 11%)
Waktu Pelaksanaan : 21 Bulan / 630 Hari Kalender
DATA TEKNIS
SICINCIN
KE BUKIT TINGGI
No Uraian Keterangan
1 Panjang 36,6 km
2 Kecepatan Rencana 80 km/jam
3 Jumlah Lajur Awal 2 x 2 @ 3,6 m
4 Lebar Lajur 3,6 m
5 Lebar Bahu Luar 3,0 m
6 Lebar Bahu Dalam 1,5 m
7 Lebar Median 2,5 m
8 Jenis Perkerasan
- Timbunan Tanah Perkerasan kaku
- Struktur (elevated dan pile slab) Aspal (tebal 5 cm)
9 Masa Konsesi 35 tahun
10 Jumlah Gerbang Tol 3 buah
No Uraian Keterangan
11 Jumlah Simpang Susun 2 buah
12 Jumlah Ramp On/Off 2 buah
13 Jumlah Box Culvert 118 buah
14 Jumlah Box Traffic 24 buah
15 Jumlah Box Pedestrian 5 buah
16 Jumlah Jembatan Sungai 8 buah
17 Jumlah Jembatan Irigasi 2 buah
18 Jumlah Underbridge 14 buah
19 Jumlah Overpass 4 buah
20 Jumlah Pile Slab 5 buah
21 Rest Area 1 pasang
PROGRESS KONSTRUKSI
SICINCIN
KE BUKIT TINGGI
Lahan Bebas
94.10%
Sisa Lahan
5.90%
Progress Lahan
Realisasi
Pekerjaan
65.63%
Sisa
Pekerjaan
34.37%
Progress Supervisi
Realisasi
Pekerjaan
31.90%
Sisa
Pekerjaan
68.10%
Progress PMI
Progress Lahan (18 Desember 2023)
Realisasi (Bidang) 94.10%
Sisa (Bidang) 5.90%
Total Bidang yang Bebas 1531
Sisa Bidang Yang Belum Bebas 91
Realisasi
Pekerjaan
47.53%
Sisa
Pekerjaan
52.82%
Progress Konstruksi HKI
Progress Konstruksi (19 Desember 2023)
Rencana (Addendum III) 46.53%
Realisasi (Addendum III) 47.18%
Sisa Pekerjaan 52.82%
Deviasi 0.65%
Waktu Pelaksanaan 630 Hari
Waktu Terpakai 386 Hari
Sisa Waktu 244 Hari
Progress PMI (18 Desember 2023)
Rencana 29.98%
Realisasi 31.90%
Sisa Pekerjaan 69.10%
Deviasi 1.91%
Waktu Pelaksanaan 359 Hari
Waktu Terpakai 101 Hari
Sisa Waktu 258 Hari
Progress Supervisi (18 Desember 2023)
Rencana (Addendum I) 65.63%
Realisasi (Addendum I) 65.63%
Sisa Pekerjaan 34.37%
Deviasi 0.00%
Waktu Pelaksanaan 630 Hari
Waktu Terpakai 386 Hari
Sisa Waktu 244 Hari
STRIPMAP KONSTRUKSI
ZONA 1 ZONA 2 ZONA 3
Status Lahan Kondisi Eksisting
Lahan Bebas Kebun/Persawahan
SPP Permukiman
Konsinyasi Perbukitan
ZONA 4 ZONA 5 ZONA 6 ZONA 7
NO
Total
Panjang
(km)
00+000
00+500
01+000
01+500
02+000
02+500
03+000
03+500
04+000
04+500
05+000
05+500
06+000
06+500
07+000
07+500
08+000
08+500
09+000
09+500
10+000
10+500
11+000
11+500
12+000
12+500
13+000
13+500
14+000
14+500
15+000
15+500
16+000
16+500
17+000
17+500
18+000
18+500
19+000
19+500
20+000
20+500
21+000
21+500
22+000
22+500
23+000
23+500
24+000
24+500
25+000
25+500
26+000
26+500
27+000
27+500
28+000
28+500
29+000
29+500
30+000
30+500
31+000
31+500
32+000
32+500
33+000
33+500
34+000
34+500
35+000
35+500
36+000
36+500
36+600
1 Concrete Barrier 5.7
2 6.7
3 Lean Concrete 11.7
4 Base A / Drainage Layer 16.2
5 Capping Layer 13.5
6 Pek Galtim 28.7
7 Clearing 32
8 Status Lahan 34.0
8 Status Lahan 34.0
7 Clearing 32
6 Pek Galtim 28.7
5 Capping Layer 13.5
4 Base A / Drainage Layer 16.2
3 Lean Concrete 11.7
2 6.7
1 Concrete Barrier 5.7
MAINROAD
KIRI
Perkerasan Beton
KANAN
Perkerasan Beton
DPPT PENLOK
Tahap I Tahap II Tahap I Tahap II
Penlok III
(Buyung Cs.)
02/02/18 11/02/20 05/02/18 26/03/20 26/04/21
Persentase Sudah UGK pada Tabel diatas sudah
termasuk UGK, PHH dan Fasos/Fasum
13+100
20+700
31+350
24+350
KAB. PADANG PARIAMAN
TAHAP 2
TAHAP 1
0+000
4+200
36+600
Kec. Batang Anai Kec. Lubuk Alung Kec. 2 x 11 Enam Lingkung Kec. 2 x 11 Kayu Tanam
Kec. Enam Lingkung
4+725
7+550
14+42
5
19+00
0
Kasang
Sung
ai
Bulu
h
Selat
an
Nagari
Sungai
Buluh
Barat
Sung
ai
Bulu
h
Utar
a
Buayan
Lbk.
Alung
Sikabu Lbk
Alung
Lbk.
Alun
g
Singguling Pasie
Laweh
Parit
Malintang
Lubuk Pandan Sicinc
in
Kpl
Hllg
26+82
5
17+275
Blh
Hilir
Lbk.
Alun
g
30+45
0
30+85
0
Sicinci
n
Kapalo
Hilalang
4,64 Km
1,52
Km
5,37
Km
0,93
Km
15+90
0
2,16
Km
0,47
Km
1,04 Km
10+47
5
11+85
0
19+87
5
15+30
0
0,60
Km
0,73
Km
2,21
Km 0,9
0
K
m
1,1
7
K
m
Akses Lubuk Alung
0,0
05
Km
1,78
Km
4,4
6
Km
0,18
Km
4,44
Km
0,07
Km
0,1
6
Km
0,0
1
K
m
Akses Tarok City
Uraian
Kebutuhan Tanah Akses
Total Sudah UGK Belum UGK
Lubuk
Alung
Tarok City
Luas (ha) 23.48 3.49 26.97 - 0.00% 26.97 100.00%
Bidang 214 47 261 - 0.00% 261 100.00%
Panjang (Km) 1.00 2.50 3.50 - 0.00% 3.50 100.00%
0.474 0.842
0.037
0.800
0.000
29.977
2.886
1.505
Potensi Konsinyasi
SPP Konsinyasi
Appraisal
Musyawarah
SPP
Sudah UGK
PHH
Fasos/Fasum
REALISASI PEMBEBASAN LAHAN SEKSI
SICINCIN – PADANG (DALAM KM)
TOTAL 36,60 KM
PROGRES LAHAN JALAN TOL SEKSI SICINCIN – PADANG
Penlok 1 Penlok 2 Bobot (%) Bobot (%)
Luas (ha) 26,15 290,36 316,50 298,44 94,29 18,06 5,71
Bidang 129,00 1.498,00 1.627,00 1.531,00 94,10 96,00 5,90
Panjang (Km) 4,20 32,40 36,60 34,45 94,13 2,15 5,87
Sudah UGK Sisa (Belum UGK)
Kebutuhan Tanah
Total
Uraian
MONITORING PROGRESS PEKERJAAN M3 NOVEMBER 2023
SICINCIN
KE BUKIT TINGGI
KE PADANG
RESUME MONITORING PEKERJAAN STRUKTUR
*Satuan Buah
PROGRESS KONSTRUKSI
SICINCIN
KE BUKIT TINGGI
REALISASI PROGRES STA 4+200 – STA 36+600 & TAROK CITY (3 KM)
PEKERJAAN MAIN ROAD (KM)
PEKERJAAN STRUKTUR
RESUME MONITORING PEKERJAAN BOX PEDESTRIAN
DAN JEMBATAN
SICINCIN
KE BUKIT TINGGI
KE PADANG
SICINCIN
KE BUKIT TINGGI
KE PADANG
RESUME MONITORING PEKERJAAN UNDERBRIDGE
DAN PILE SLAB
SICINCIN
KE BUKIT TINGGI
KE PADANG
RESUME MONITORING PEKERJAAN BOX TRAFFIC
IMPLEMENTASI ICP
SICINCIN
KE BUKIT TINGGI
KE PADANG
Formulir Praktik Yang baik
Konstruksi Jalan Tol Pekanbaru - Padang Seksi Sicincin - Padang (Form 2)
Uraian Tempat Foto Isi dari praktik yang baik
Efek yang Diharapkan
STA 24+000
Efek yang Diharapkan
Menghampar
drainage layer
menggunakan
finisher
Ketebalan dan kerataan
dapat terjaga dengan
baik
Penghamparan drainage
layer menggunakan
finisher, sehingga
ketebalan dan kerataan
dapat terjaga dengan
baik
IMPLEMENTASI ICP
SICINCIN
KE BUKIT TINGGI
KE PADANG
Formulir Kesalahan Umum Lainnya (Form 2)
Kategori Tempat Foto Isi dari kesalahan umum lainnya
Pekerjaan rigid retak pada bagian
tepi
Rekomendasi PMI :
Rekomendasi PMI :
Mutu Matrial STA 28+400
Honey comb dan tidak rapih pada
dinding saluran Box Trafic
Segera dilakukan finishing
Mutu Matrial STA 27+225
Segera di grouting/inject agar retak
tidak meluas
IMPLEMENTASI ICP
SICINCIN
KE BUKIT TINGGI
KE PADANG
Kesalahan Umum Batching Plant ( Common Mistake Of Batching Plant)
(form 7)
Konstruksi Jalan Tol Pekanbaru - Padang Seksi Sicincin - Padang
Tanggal Nama Batching Plant Temuan Photo
30 Nov'23 Batching Plant HK SIS 1
Kawasan truck mixer
bermanufer becek
Rekomendasi PMI :
Kawasan manufer truck
mixer dijaga agar tetap
kering
30 Nov'23 Batching Plant HK SIS 1
Stock pile aggregate kasar
tidak terlindungi
Rekomendasi PMI :
Agar aggregate ditutup
terpal
DOKUMENTASI KEGIATAN PEKERJAAN STRUKTUR
SICINCIN
KE BUKIT TINGGI
KE PADANG
Install Launcher di Sta 12+250
Erection Slab di Sta 20+950
DOKUMENTASI KEGIATAN KONSTRUKSI DRAINAGE
SICINCIN
KE BUKIT TINGGI
KE PADANG
Terdapat celah antara timbunan lereng
dengan DS1 yang berpotensi terjadinya
aliran air dibawah DS1
Finishing saluran samping tidak rapih
DOKUMENTASI KEGIATAN RIGID PAVEMENT
SICINCIN
KE BUKIT TINGGI
KE PADANG
Rigid Pavement di Sta 24+695 B
slump 3cm
Rigid Pavement di Sta 24+695 B
menggunakan slipform
concrete paver
PENUTUP

More Related Content

Similar to 13. Lap. Ming. PMI 191223..pptx

ppt baru.pptx
ppt baru.pptxppt baru.pptx
ppt baru.pptxMutikk1
 
Tugas perkerasan lentur dan kaku kelompok 1
Tugas perkerasan lentur dan kaku kelompok 1Tugas perkerasan lentur dan kaku kelompok 1
Tugas perkerasan lentur dan kaku kelompok 1markusengineer
 
Rigid Pavement di Jalan Tol (Agus Wardhono).pdf
Rigid Pavement di Jalan Tol (Agus Wardhono).pdfRigid Pavement di Jalan Tol (Agus Wardhono).pdf
Rigid Pavement di Jalan Tol (Agus Wardhono).pdfAdamTaufik2
 
Presentasi pci klp i
Presentasi pci klp iPresentasi pci klp i
Presentasi pci klp idianretno16
 
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptx
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptxTUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptx
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptxpajarajinugraha
 
PCM JEMBATAN alahan.pptx
PCM JEMBATAN alahan.pptxPCM JEMBATAN alahan.pptx
PCM JEMBATAN alahan.pptxhulumascte
 
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptx
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptxPersiapan Penerapan Ekatalog Wilayah 1 (100821).pptx
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptxneni hasnini
 
Dimensi Angkutan Barang ( 2008 )
Dimensi Angkutan Barang ( 2008 )Dimensi Angkutan Barang ( 2008 )
Dimensi Angkutan Barang ( 2008 )Om Gama Ayah Nanda
 
PPT Talud.pptx
PPT Talud.pptxPPT Talud.pptx
PPT Talud.pptxHafidzMan
 
Pro-Cons Karanganyar 2022 (added).pdf
Pro-Cons Karanganyar 2022 (added).pdfPro-Cons Karanganyar 2022 (added).pdf
Pro-Cons Karanganyar 2022 (added).pdf0m35h
 
PPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxPPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxssuser6b795e
 
Analisis Drainase Green Lake Cipondoh.pdf
Analisis Drainase Green Lake Cipondoh.pdfAnalisis Drainase Green Lake Cipondoh.pdf
Analisis Drainase Green Lake Cipondoh.pdfedipurnomo68
 
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptxAnnisaNurHasanah27
 
Rizky dian amalia i0118128
Rizky dian amalia i0118128Rizky dian amalia i0118128
Rizky dian amalia i0118128RizkyDianAmalia
 
PPT NATUNA (1).pptx
PPT NATUNA (1).pptxPPT NATUNA (1).pptx
PPT NATUNA (1).pptxFadliST
 
power point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnpower point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnHeri Susanto
 
Presentasi drainase se sumsel dan lintim 8 maret
Presentasi drainase se sumsel dan lintim 8 maretPresentasi drainase se sumsel dan lintim 8 maret
Presentasi drainase se sumsel dan lintim 8 maretrahma sari
 
PCM JEMBATAN POGARI.pptx
PCM JEMBATAN POGARI.pptxPCM JEMBATAN POGARI.pptx
PCM JEMBATAN POGARI.pptxhulumascte
 

Similar to 13. Lap. Ming. PMI 191223..pptx (20)

ppt baru.pptx
ppt baru.pptxppt baru.pptx
ppt baru.pptx
 
Taman Pedestrian.pdf
Taman Pedestrian.pdfTaman Pedestrian.pdf
Taman Pedestrian.pdf
 
Tugas perkerasan lentur dan kaku kelompok 1
Tugas perkerasan lentur dan kaku kelompok 1Tugas perkerasan lentur dan kaku kelompok 1
Tugas perkerasan lentur dan kaku kelompok 1
 
Rigid Pavement di Jalan Tol (Agus Wardhono).pdf
Rigid Pavement di Jalan Tol (Agus Wardhono).pdfRigid Pavement di Jalan Tol (Agus Wardhono).pdf
Rigid Pavement di Jalan Tol (Agus Wardhono).pdf
 
Presentasi pci klp i
Presentasi pci klp iPresentasi pci klp i
Presentasi pci klp i
 
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptx
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptxTUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptx
TUGAS TEKNIK PEMBORAN KELOMPOK 3 (2).pptx
 
PCM JEMBATAN alahan.pptx
PCM JEMBATAN alahan.pptxPCM JEMBATAN alahan.pptx
PCM JEMBATAN alahan.pptx
 
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptx
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptxPersiapan Penerapan Ekatalog Wilayah 1 (100821).pptx
Persiapan Penerapan Ekatalog Wilayah 1 (100821).pptx
 
Dimensi Angkutan Barang ( 2008 )
Dimensi Angkutan Barang ( 2008 )Dimensi Angkutan Barang ( 2008 )
Dimensi Angkutan Barang ( 2008 )
 
PPT Talud.pptx
PPT Talud.pptxPPT Talud.pptx
PPT Talud.pptx
 
Pro-Cons Karanganyar 2022 (added).pdf
Pro-Cons Karanganyar 2022 (added).pdfPro-Cons Karanganyar 2022 (added).pdf
Pro-Cons Karanganyar 2022 (added).pdf
 
PPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptxPPT PENDAHULUAN TRITIS.pptx
PPT PENDAHULUAN TRITIS.pptx
 
Analisis Drainase Green Lake Cipondoh.pdf
Analisis Drainase Green Lake Cipondoh.pdfAnalisis Drainase Green Lake Cipondoh.pdf
Analisis Drainase Green Lake Cipondoh.pdf
 
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
2021 - 12 - 10 PAPARAN AKHIR LEGGER JALAN.pptx
 
Rizky dian amalia i0118128
Rizky dian amalia i0118128Rizky dian amalia i0118128
Rizky dian amalia i0118128
 
Gersik27.doc
Gersik27.docGersik27.doc
Gersik27.doc
 
PPT NATUNA (1).pptx
PPT NATUNA (1).pptxPPT NATUNA (1).pptx
PPT NATUNA (1).pptx
 
power point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnnpower point jalan dan jembatannnnnnnnnnn
power point jalan dan jembatannnnnnnnnnn
 
Presentasi drainase se sumsel dan lintim 8 maret
Presentasi drainase se sumsel dan lintim 8 maretPresentasi drainase se sumsel dan lintim 8 maret
Presentasi drainase se sumsel dan lintim 8 maret
 
PCM JEMBATAN POGARI.pptx
PCM JEMBATAN POGARI.pptxPCM JEMBATAN POGARI.pptx
PCM JEMBATAN POGARI.pptx
 

Recently uploaded

05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.pptSonyGobang1
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++FujiAdam
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxmuhammadrizky331164
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptxMuhararAhmad
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studiossuser52d6bf
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaRenaYunita2
 

Recently uploaded (6)

05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt05 Sistem Perencanaan Pembangunan Nasional.ppt
05 Sistem Perencanaan Pembangunan Nasional.ppt
 
MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++MAteri:Penggunaan fungsi pada pemrograman c++
MAteri:Penggunaan fungsi pada pemrograman c++
 
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptxPembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
Pembangkit Listrik Tenaga Nuklir Kelompok 1.pptx
 
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
001. Ringkasan Lampiran Juknis DAK 2024_PAUD.pptx
 
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open StudioSlide Transformasi dan Load Data Menggunakan Talend Open Studio
Slide Transformasi dan Load Data Menggunakan Talend Open Studio
 
Strategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di IndonesiaStrategi Pengembangan Agribisnis di Indonesia
Strategi Pengembangan Agribisnis di Indonesia
 

13. Lap. Ming. PMI 191223..pptx

  • 1. 19 Desember 2023 SEKSI SICINCIN - PADANG LAPORAN MINGGUAN
  • 3. Panjang 36,6 km (Rigid,flexiblePavement) KecepatanRencana 80 km/jam Gerbang Tol 3 buah JumlahLajur 2x2 Tahap Awal 12+200 15+900 24+435 28+700 30+400 36+600 6+200 0+000 ZONA 1 6,200km ZONA 2 6,000 km ZONA 3 3,700 km ZONA 4 8,535 km ZONA 5 4,265 km ZONA 6 1,700 km ZONA 7 6,200 km PetaTrase SeksiSicincin– LubukAlung – Padang STA. 35+900 STA. 19+000 STA. 1+850 STA. 23+000 Data Kontrak (Exc PPN) • KONTRAK TAHAP I • KONTRAK TAHAP II - KontrakAwal - AddendumI Tahap II : RP. 1.416.518.189.549,- : RP. 3.856.648.164.589,92 : RP. 3.856.648.164.589,92 : Rp. 3.856.648.164.589,92 - AddendumII Tahap II : Rp. 5.826.301.187.811,46 - AddendumIII Tahap II : Rp.6.623.283.374.079,68 JangkaWaktu Kontrak : 630 Hari Kalender PetaTrase Ruas Pekanbaru - Padang PROFIL RUAS PEKERJAAN
  • 4. DATA KONTRAK KONSULTAN PMI PENGENDALIAN MUTU INDEPENDEN Nomor Kontrak : HK.02.03/Bb3/PPK-PJJ/1057/IX-2023 Tanggal Kontrak : 5 September 2023 Nomor SPMK : PB.03.01/Bb3/PPK-PJJ/1058/IX-2023 Tanggal SPMK : 5 September 2023 Addendum 1 : ADD-I/KU.03.02/PPK-PJJ/Bb3/IX/2023 Tanggal Addendum 1 : 13 September 2023 Nilai Kontrak : Rp. 5.075.160.000,- Masa Layanan : 12 Bulan Jenis Kontrak : Satuan Waktu (Man Month)
  • 5. DATA KONTRAK KONTRAKTOR PT HKI KONTRAK AWAL Tanggal Kontrak Awal : 25 NOVEMBER 2022 Nomor Kontrak : PJT/FE.1989/S.PERJ.279/XI/2022 Nilai Kontrak : 4.280.879.462.694 Waktu Pelaksanaan : 540 HARI KALENDER ADDENDUM I Tanggal : 05 JANUARI 2023 Nomor Kontrak : PJT/FE.032A/S.Perj.04/I/2023 Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN ADDENDUM II Tanggal : 24 MEI 2023 Nomor Kontrak : PJT/FE.938/S.Perj.94/V/2023 Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN ADDENDUM III Tanggal : 21 AGUSTUS 2023 Nomor Kontrak : PJT/FE.1558/S.Perj.168/VIII/2023 Nilai Kontrak : 7.351.844.545.288 Waktu Pelaksanaan : 630 HARI KALENDER Dasar Addendum : PERUBAHAN LINGKUP PEKERJAAN
  • 6. DATA KONTRAK KONSULTAN SUPERVISI PT ANUGRAH KRIDAPRADANA – PT EGIS INTERNASIONAL INDONESIA KSO KONTRAK AWAL Tanggal Kontrak Awal : 22 Desember 2022 Nomor Kontrak : RJT/MH.1334/S.PERJ.14/XII/2022 Nilai Kontrak : Rp.16.856.504.400,00 (Inc PPN 11%) SPMK : RJT/SDN.1374A/SPMK/10/XII/2022 Tanggal : 27 Desember 2022 KONTRAK ADDENDUM 1 Tanggal Kontrak Add 1 : 15 Agustus 2023 Nomor Kontrak Add 1 : RJT/SDN.873K/S.PERJ.9B/VIII/2023 Nilai Kontrak Add 1 : Rp.17.864.384.400,00 (Inc PPN 11%) Waktu Pelaksanaan : 21 Bulan / 630 Hari Kalender
  • 7. DATA TEKNIS SICINCIN KE BUKIT TINGGI No Uraian Keterangan 1 Panjang 36,6 km 2 Kecepatan Rencana 80 km/jam 3 Jumlah Lajur Awal 2 x 2 @ 3,6 m 4 Lebar Lajur 3,6 m 5 Lebar Bahu Luar 3,0 m 6 Lebar Bahu Dalam 1,5 m 7 Lebar Median 2,5 m 8 Jenis Perkerasan - Timbunan Tanah Perkerasan kaku - Struktur (elevated dan pile slab) Aspal (tebal 5 cm) 9 Masa Konsesi 35 tahun 10 Jumlah Gerbang Tol 3 buah No Uraian Keterangan 11 Jumlah Simpang Susun 2 buah 12 Jumlah Ramp On/Off 2 buah 13 Jumlah Box Culvert 118 buah 14 Jumlah Box Traffic 24 buah 15 Jumlah Box Pedestrian 5 buah 16 Jumlah Jembatan Sungai 8 buah 17 Jumlah Jembatan Irigasi 2 buah 18 Jumlah Underbridge 14 buah 19 Jumlah Overpass 4 buah 20 Jumlah Pile Slab 5 buah 21 Rest Area 1 pasang
  • 8. PROGRESS KONSTRUKSI SICINCIN KE BUKIT TINGGI Lahan Bebas 94.10% Sisa Lahan 5.90% Progress Lahan Realisasi Pekerjaan 65.63% Sisa Pekerjaan 34.37% Progress Supervisi Realisasi Pekerjaan 31.90% Sisa Pekerjaan 68.10% Progress PMI Progress Lahan (18 Desember 2023) Realisasi (Bidang) 94.10% Sisa (Bidang) 5.90% Total Bidang yang Bebas 1531 Sisa Bidang Yang Belum Bebas 91 Realisasi Pekerjaan 47.53% Sisa Pekerjaan 52.82% Progress Konstruksi HKI Progress Konstruksi (19 Desember 2023) Rencana (Addendum III) 46.53% Realisasi (Addendum III) 47.18% Sisa Pekerjaan 52.82% Deviasi 0.65% Waktu Pelaksanaan 630 Hari Waktu Terpakai 386 Hari Sisa Waktu 244 Hari Progress PMI (18 Desember 2023) Rencana 29.98% Realisasi 31.90% Sisa Pekerjaan 69.10% Deviasi 1.91% Waktu Pelaksanaan 359 Hari Waktu Terpakai 101 Hari Sisa Waktu 258 Hari Progress Supervisi (18 Desember 2023) Rencana (Addendum I) 65.63% Realisasi (Addendum I) 65.63% Sisa Pekerjaan 34.37% Deviasi 0.00% Waktu Pelaksanaan 630 Hari Waktu Terpakai 386 Hari Sisa Waktu 244 Hari
  • 9. STRIPMAP KONSTRUKSI ZONA 1 ZONA 2 ZONA 3 Status Lahan Kondisi Eksisting Lahan Bebas Kebun/Persawahan SPP Permukiman Konsinyasi Perbukitan ZONA 4 ZONA 5 ZONA 6 ZONA 7 NO Total Panjang (km) 00+000 00+500 01+000 01+500 02+000 02+500 03+000 03+500 04+000 04+500 05+000 05+500 06+000 06+500 07+000 07+500 08+000 08+500 09+000 09+500 10+000 10+500 11+000 11+500 12+000 12+500 13+000 13+500 14+000 14+500 15+000 15+500 16+000 16+500 17+000 17+500 18+000 18+500 19+000 19+500 20+000 20+500 21+000 21+500 22+000 22+500 23+000 23+500 24+000 24+500 25+000 25+500 26+000 26+500 27+000 27+500 28+000 28+500 29+000 29+500 30+000 30+500 31+000 31+500 32+000 32+500 33+000 33+500 34+000 34+500 35+000 35+500 36+000 36+500 36+600 1 Concrete Barrier 5.7 2 6.7 3 Lean Concrete 11.7 4 Base A / Drainage Layer 16.2 5 Capping Layer 13.5 6 Pek Galtim 28.7 7 Clearing 32 8 Status Lahan 34.0 8 Status Lahan 34.0 7 Clearing 32 6 Pek Galtim 28.7 5 Capping Layer 13.5 4 Base A / Drainage Layer 16.2 3 Lean Concrete 11.7 2 6.7 1 Concrete Barrier 5.7 MAINROAD KIRI Perkerasan Beton KANAN Perkerasan Beton
  • 10. DPPT PENLOK Tahap I Tahap II Tahap I Tahap II Penlok III (Buyung Cs.) 02/02/18 11/02/20 05/02/18 26/03/20 26/04/21 Persentase Sudah UGK pada Tabel diatas sudah termasuk UGK, PHH dan Fasos/Fasum 13+100 20+700 31+350 24+350 KAB. PADANG PARIAMAN TAHAP 2 TAHAP 1 0+000 4+200 36+600 Kec. Batang Anai Kec. Lubuk Alung Kec. 2 x 11 Enam Lingkung Kec. 2 x 11 Kayu Tanam Kec. Enam Lingkung 4+725 7+550 14+42 5 19+00 0 Kasang Sung ai Bulu h Selat an Nagari Sungai Buluh Barat Sung ai Bulu h Utar a Buayan Lbk. Alung Sikabu Lbk Alung Lbk. Alun g Singguling Pasie Laweh Parit Malintang Lubuk Pandan Sicinc in Kpl Hllg 26+82 5 17+275 Blh Hilir Lbk. Alun g 30+45 0 30+85 0 Sicinci n Kapalo Hilalang 4,64 Km 1,52 Km 5,37 Km 0,93 Km 15+90 0 2,16 Km 0,47 Km 1,04 Km 10+47 5 11+85 0 19+87 5 15+30 0 0,60 Km 0,73 Km 2,21 Km 0,9 0 K m 1,1 7 K m Akses Lubuk Alung 0,0 05 Km 1,78 Km 4,4 6 Km 0,18 Km 4,44 Km 0,07 Km 0,1 6 Km 0,0 1 K m Akses Tarok City Uraian Kebutuhan Tanah Akses Total Sudah UGK Belum UGK Lubuk Alung Tarok City Luas (ha) 23.48 3.49 26.97 - 0.00% 26.97 100.00% Bidang 214 47 261 - 0.00% 261 100.00% Panjang (Km) 1.00 2.50 3.50 - 0.00% 3.50 100.00% 0.474 0.842 0.037 0.800 0.000 29.977 2.886 1.505 Potensi Konsinyasi SPP Konsinyasi Appraisal Musyawarah SPP Sudah UGK PHH Fasos/Fasum REALISASI PEMBEBASAN LAHAN SEKSI SICINCIN – PADANG (DALAM KM) TOTAL 36,60 KM PROGRES LAHAN JALAN TOL SEKSI SICINCIN – PADANG Penlok 1 Penlok 2 Bobot (%) Bobot (%) Luas (ha) 26,15 290,36 316,50 298,44 94,29 18,06 5,71 Bidang 129,00 1.498,00 1.627,00 1.531,00 94,10 96,00 5,90 Panjang (Km) 4,20 32,40 36,60 34,45 94,13 2,15 5,87 Sudah UGK Sisa (Belum UGK) Kebutuhan Tanah Total Uraian
  • 11. MONITORING PROGRESS PEKERJAAN M3 NOVEMBER 2023 SICINCIN KE BUKIT TINGGI KE PADANG RESUME MONITORING PEKERJAAN STRUKTUR *Satuan Buah
  • 12. PROGRESS KONSTRUKSI SICINCIN KE BUKIT TINGGI REALISASI PROGRES STA 4+200 – STA 36+600 & TAROK CITY (3 KM) PEKERJAAN MAIN ROAD (KM) PEKERJAAN STRUKTUR
  • 13. RESUME MONITORING PEKERJAAN BOX PEDESTRIAN DAN JEMBATAN SICINCIN KE BUKIT TINGGI KE PADANG
  • 14. SICINCIN KE BUKIT TINGGI KE PADANG RESUME MONITORING PEKERJAAN UNDERBRIDGE DAN PILE SLAB
  • 15. SICINCIN KE BUKIT TINGGI KE PADANG RESUME MONITORING PEKERJAAN BOX TRAFFIC
  • 16. IMPLEMENTASI ICP SICINCIN KE BUKIT TINGGI KE PADANG Formulir Praktik Yang baik Konstruksi Jalan Tol Pekanbaru - Padang Seksi Sicincin - Padang (Form 2) Uraian Tempat Foto Isi dari praktik yang baik Efek yang Diharapkan STA 24+000 Efek yang Diharapkan Menghampar drainage layer menggunakan finisher Ketebalan dan kerataan dapat terjaga dengan baik Penghamparan drainage layer menggunakan finisher, sehingga ketebalan dan kerataan dapat terjaga dengan baik
  • 17. IMPLEMENTASI ICP SICINCIN KE BUKIT TINGGI KE PADANG Formulir Kesalahan Umum Lainnya (Form 2) Kategori Tempat Foto Isi dari kesalahan umum lainnya Pekerjaan rigid retak pada bagian tepi Rekomendasi PMI : Rekomendasi PMI : Mutu Matrial STA 28+400 Honey comb dan tidak rapih pada dinding saluran Box Trafic Segera dilakukan finishing Mutu Matrial STA 27+225 Segera di grouting/inject agar retak tidak meluas
  • 18. IMPLEMENTASI ICP SICINCIN KE BUKIT TINGGI KE PADANG Kesalahan Umum Batching Plant ( Common Mistake Of Batching Plant) (form 7) Konstruksi Jalan Tol Pekanbaru - Padang Seksi Sicincin - Padang Tanggal Nama Batching Plant Temuan Photo 30 Nov'23 Batching Plant HK SIS 1 Kawasan truck mixer bermanufer becek Rekomendasi PMI : Kawasan manufer truck mixer dijaga agar tetap kering 30 Nov'23 Batching Plant HK SIS 1 Stock pile aggregate kasar tidak terlindungi Rekomendasi PMI : Agar aggregate ditutup terpal
  • 19. DOKUMENTASI KEGIATAN PEKERJAAN STRUKTUR SICINCIN KE BUKIT TINGGI KE PADANG Install Launcher di Sta 12+250 Erection Slab di Sta 20+950
  • 20. DOKUMENTASI KEGIATAN KONSTRUKSI DRAINAGE SICINCIN KE BUKIT TINGGI KE PADANG Terdapat celah antara timbunan lereng dengan DS1 yang berpotensi terjadinya aliran air dibawah DS1 Finishing saluran samping tidak rapih
  • 21. DOKUMENTASI KEGIATAN RIGID PAVEMENT SICINCIN KE BUKIT TINGGI KE PADANG Rigid Pavement di Sta 24+695 B slump 3cm Rigid Pavement di Sta 24+695 B menggunakan slipform concrete paver