PP End User Training – SAP (Level – 3)
16th December - 2013
Page 2 An HCC Group companyCTM Training - ATEPresentation Title
This presentation contains certain forward looking statements concerning future business prospects and profitability of Highbar Technologies
Limited, which are subject to a number of risks and uncertainties and actual results could materially differ from those in such forward looking
statements, important developments that could affect the company's operations include a downtrend in the information technology and
infrastructure sectors, significant changes in political and economic environment in India, tax laws, labor relations, litigation etc. The company
does not undertake to make any announcement in case any of these forward looking statements become materially incorrect in future or update
any forward looking statements made from time to time by or on behalf of the company.
All rights reserved. Copyright with Highbar Technologies Limited. Highbar is a trademark of Highbar Technologies Limited & other names, logos
are trademarks of their respective owners.
DISCLAIMER
Page 3 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 4 An HCC Group companyCTM Training - ATE
Objective
• Should be able to execute the Steps of process in the system
• Understand end to end process with integration with Processes
• Understand the process integration with other systems
• Understand the validations & controls in system.
Page 5 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 6 An HCC Group companyCTM Training - ATE
General Information
• Current Stage of the project
• Landscape details for testing
• Other information
• Schedule of Training
Page 7 An HCC Group companyCTM Training - ATE
General Inforn.– Road Map Of ATE SAP Implementation
Project Preparation Business Blueprint Realization Final Preparation Go-live & Support
Training-Level1
Workshop
System design
BPD
System handing over
On going support
Prepare Project Plan
Receive hardware
Receive software
Mobilize project team
‘Business Projects’ scope
AS-IS
Study/Clarification
1 2
3
4 5
O n g o i n g k n o w l e g d e t r a n s f e r b e t w e e n H I G H B A R a n d A T E C o r e t e a m
Enabled project Team
System understanding &
Gap identification
Understanding and
concept s Buy In
Documentation and
end user comfort
Ongoing support and
continuous improvement
End user training
Finalize cutover data
Finalize master data
Developments
Internal System
testing – SIT - 1
CTM Training
18/11/2012
09/02/2013
08/05/2013
05/07/2013 06/07/2013
Stabilization & BI-
BO Impl.
6
System Config
18/11/2012
10/03/2013
30/11/2013
31/12/2013 09/01/2014
Completed
In process
Planned date
Revised Date
LEGEND
16.12.2013
UAT
Page 8 An HCC Group companyCTM Training - ATE
Stores
Unrestricted
stock at
Storage
Location
General Information – Landscape details for Testing
Contractor
Client No
100
Configuration
-----------------------
Client No
120/150
ABAP
development
Development
Server
Client No
200
CTM Training
&
SIT - Testing
-----------------------
Client No
210
End User
Quality
Server
Client No
300
Production
Server
Page 9 An HCC Group companyCTM Training - ATE
General Information – Other
• Attend the full sessions of the training
• Please make this sessions interactive
• Carry out the testing by the way of exercises given in training
• Appraise process owners about change processes if required.
• Practice in system by executing the transaction in system post training
• We should discourage the discussions around the process mapped in system
• Process observations if any shall be recorded separately for clarification later
Page 10 An HCC Group companyCTM Training - ATE
General Information – Schedule of Training
Page 11 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 12 An HCC Group companyCTM Training - ATE
PP Organization Structure
Page 13 An HCC Group companyCTM Training - ATE
PP Organization Structure - Plant
Page 14 An HCC Group companyCTM Training - ATE
PP Organization Structure – Storage Location
Page 15 An HCC Group companyCTM Training - ATE
Organizational Structure - Plant
Page 16 An HCC Group companyCTM Training - ATE
Organizational Structure - Plant
Page 17 An HCC Group companyCTM Training - ATE
Organizational Structure – Storage Location
Page 18 An HCC Group companyCTM Training - ATE
Organizational Structure – Storage Location
Page 19 An HCC Group companyCTM Training - ATE
Organizational Structure – Storage Location
Page 20 An HCC Group companyCTM Training - ATE
Organizational Structure – Storage Location
Page 21 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 22 An HCC Group companyCTM Training - ATE
 PP Master Data
 Long Term Planning ( Block,Interlock,Kerbstone,Crusher)
 Make To Stock production planning & execution (Block,Interlock,Kerbstone,Crusher)
 Make To Order production planning & execution – Sales Order MRP ( Pre-casting )
List of Processes
Page 23 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 24 An HCC Group companyCTM Training - ATE
PP Master Data – Sub Processes
Production Planning & Control – Master Data
 Maintain Bill Of Material
 Maintain Work center
 Maintain Routing
Interdepartmental – Master Data
 Activity Master
 Cost Center
Page 25 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 26 An HCC Group companyCTM Training - ATE
PP Master Data – Key Terms & Concepts
Material Master:
• Material Master contains all the information, for all the material‘s, that company Procures, Produces,
Stores and Sales.
• Material Type (Similar Basic Attributes) - Raw Material (ZRAW) and FG (ZFIN).
• Production Area related Information – Basic Data1, MRP1, MRP2, MRP3, MRP4 & Work Scheduling
Page 27 An HCC Group companyCTM Training - ATE
PP Master Data – Key Terms & Concepts
Bill Of Material:
• The Bill Of Material is a complete formally structured list of the components that make up a product.
• Different BOM can be used – Company Usage Area wise e.g. Costing, Production etc.
• BOM Header: Base Quantity, Active/Inactive Status
• BOM Item Details: Material No, Quantity, UOM, Item Category, Production plant.
• BOM Data is used by activities MRP, Work Scheduling, Procurement, Product Costing.
• Multi-Level Explosion: MRP, Product Cost and Production Order
Page 28 An HCC Group companyCTM Training - ATE
PP Master Data – Key Terms & Concepts
Work Center:
• Work center is the place where an operation or activity is carried out within a plant
• Work center: Represents as general as geographical location or as specific as a particular
M/C/Production Line within a department or Person or Group of Persons performing a job.
• Based on Usage Selection: Decides different Task Lists e.g. Routing, Rate Routing & Insp Plan
• Work Center: SAP Plant Level
• Work Center View: Basic data, Default values, Capacities, Scheduling and Costing
Page 29 An HCC Group companyCTM Training - ATE
PP Master Data – Key Terms & Concepts
Routing:
• A routing contains the operations to be performed, their sequence and the various work centers involved
to manufacture an item.
• Routing: Standard Values (Times) for activities such as setup and processing.
• Control Key for Internal or External Operations
• Material Operation Components Assignment
• Production resources / tools.
• Inspection Characteristics (Inspection Specification)
Page 30 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 31 An HCC Group companyCTM Training - ATE
PP Master Data – Process Flow
Page 32 An HCC Group companyCTM Training - ATE
PP Master Data - Process Flow
Page 33 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 34 An HCC Group companyCTM Training - ATE
PP Master Data - Scenarios
Bill Of Material (BOM):
• Standard Bill Of Material
Sales Order Bill Of Material (BOM):
• Sales Order BOM
Work center
• Work Center
Routing
• Standard Routing
Page 35 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 36 An HCC Group companyCTM Training - ATE
PP Master Data - Highlights
Material Master:
Material Types: ZRAW, ZFIN
Price Control ZRAW: ‘V’ Moving Average Price
Price Control ZFIN: ‘S’ Standard Price
Material BOM:
Material BOM Usage: 1 i.e. Production
Page 37 An HCC Group companyCTM Training - ATE
PP Master Data - Highlights
Sales Order BOM:
Material BOM Usage: 3 i.e. Universal
Work center:
Work Center Category: 0001 i.e. Machine
Routing:
Task List Type: N i.e. Routing
Page 38 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 39 An HCC Group companyCTM Training - ATE
‘MTS PP’ Master Data – Process Change
1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP
Parameters
2. Cross Plant Planning: Special Procurement Key Maintenance in ‘ZFIN’
material type material master at receiving plant.
3. Joint Production: Co-Product setting and Cost Apportion Structure
Maintenance in ‘ZFIN’ material type material master.
4. Work center creation with available capacity requirements for representing
total Batching Plant Production Capacity.
5. Work center creation with cost center & activity master details
6. Routing creation with Planned Activity Values
Page 40 An HCC Group companyCTM Training - ATE
‘MTO PP’ Master Data – Process Change
1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP
Parameters
2. ‘ZRAW’ Material Type Maintenance with Procurement details i.e. Individual
and Collective.
3. Work center creation with available capacity requirements for representing
total Batching Plant Production Capacity.
4. Work center creation with cost center & activity master details
5. Routing creation with Planned Activity Values
Page 41 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process - PP Master Data
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 42 An HCC Group companyCTM Training - ATE
PP Master Data - Transaction Codes
Page 43 An HCC Group companyCTM Training - ATE
PP Master Data - Transaction Codes
Page 44 An HCC Group companyCTM Training - ATE
PP Master Data - Transaction Codes
Page 45 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 46 An HCC Group companyCTM Training - ATE
Long Term Planning – Key Terms & Concepts
Long Term Planning:
• Long term planning is used to analyse the production capacity load situation and material dependent
requirements required for the production. Duration of LTP analysis can be from a one month to the
years, subject to the realistic sales and production projections availability.
Planning Scenario:
• Planning scenario to determines the control parameters for long-term planning. This includes the plant
where long-term planning is to be carried out, the planning period, and the independent requirements
versions to be planned. Planning Scenario represents a particular division or a particular business area.
Inactive Planned Independent Requirements Version :
• LTP is carried out with inactive Planned Independent Requirements version.
• Version ‘02’ is used for this purpose.
Page 47 An HCC Group companyCTM Training - ATE
Long Term Planning – Key Terms & Concepts
LTP MRP Run (MS02 or MSBT):
• Long term planning MRP Run is carried out separately i.e. It is not part of operative planning. LTP MRP
run can be carried out in foreground MS02 or background MSBT. Frequency of background MRP Run can
be monthly or multiple months.
LTP Evaluation (MS05 or MS04):
• Long term planning MRP evaluation is carried out separately i.e. It is not part of operative planning. LTP
evaluation is done once MRP Run takes place or it can be dynamically done as required.
LTP Material Analysis (MCEC/MCEB):
• Long term planning Material Analysis is possible only if material master is created with procurement
type ‘F’.
Page 48 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 49 An HCC Group companyCTM Training - ATE
Long Term Planning - Process Flow
Page 50 An HCC Group companyCTM Training - ATE
Long Term Planning – Steps & Reports
Page 51 An HCC Group companyCTM Training - ATE
Long Term Planning – Steps & Reports
Page 52 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 53 An HCC Group companyCTM Training - ATE
Long Term Planning - Scenarios
• LTP With Capacity Planning & Material Analysis
Page 54 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 55 An HCC Group companyCTM Training - ATE
Long Term Planning - Highlights
Current Stock:
• LTP Considers current material stock during planning.
Firm Receipts:
• LTP Considers current firm receipts e.g. purchase orders, production orders from operative planning.
• Firm Purchase Requisitions and firm planned orders are also considered during LTP planning
Customer Receipts:
• LTP Considers current customer orders from operative planning
LTP Capacity Analysis (CM38):
• LTP Capacity Analysis is done to analyze any future bottlenecks in terms of machine capacity
availability.
Page 56 An HCC Group companyCTM Training - ATE
Long Term Planning - Highlights
LTP Material Analysis (MCEC & MCEB):
• LTP Material Analysis is done for a particular material or for a particular material group.
• As per material forecasting PO Value, Order Quantity and PO Price is possible to analyze.
Page 57 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 58 An HCC Group companyCTM Training - ATE
Long Term Planning – Process Change
1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP
Parameters
2. Cross Plant Planning: Special Procurement Key Maintenance in ‘ZFIN’
material type material master at receiving plant.
3. Work center creation with LTP Setting
4. Work center creation with available capacity requirements for representing
total available Production Capacity.
5. Routing creation with Planned Activity Values – Capacity Planning
6. LTP – Planning Scenario Creation and Maintenance (MS31/MS32/MS3)
7. LTP – Inactive Version Planned Independent Creation (MD61)
Page 59 An HCC Group companyCTM Training - ATE
Long Term Planning – Process Change
8. LTP – MRP Run (MS02)
9. LTP – Stock Requirement List (MS04)
10. LTP – MRP List (MS05)
11. LTP – Setting Purchase Info Records
12. LTP Material Analysis (MCEC/MCEB)
13. LTP Work center Capacity Planning (CM38)
Operative Planning:
14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to Operative
Planning (MS66)
15. ‘ZFIN’ Material Type – LTP Planned Independent Requirements Copy to
Operative Planning (MD61)
Page 60 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Long Term Planning
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 61 An HCC Group companyCTM Training - ATE
Long Term Planning - Transaction Codes
Page 62 An HCC Group companyCTM Training - ATE
Long Term Planning – Master Data
1. Material Master – (Finish Good’s, Raw Materials)
2. Bill Of Material – Material BOM
3. Work Center
4. Routing
Page 63 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 64 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Sub Processes
1. Make To Stock Planning & Execution with Planning Strategy 10
2. Make To Stock Planning & Execution with Joint Production ( Crusher )
Page 65 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 66 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Make To Stock:
• Make To Stock production environment produces good’s, products based on sales or production forecast.
The production planning and execution activities takes place before receipt of firm customer orders.
With this production environment it is possible to respond to customer orders fast with short lead time.
Demand Management:
• Demand Management consists of creation of planned independent requirements based on sales or
production forecast. PIR are transferred to production planning & execution once MRP run takes place.
MRP Run:
• MRP i.e. Material Requirement Planning ensures material availability for in-house and external
procurements. It transfers MTS requirements from demand management as well as a particular sales
order requirements to production planning and execution. MRP Run also takes care of special
procurement e.g. cross plant planning.
Page 67 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – key Terms & Concepts
Cross Plant Planning:
• Cross plant planning insures stock transfer reservations across production plant. During MRP Run at
receiver plant, stock transfer reservations are created in sender plant. The stock transfer can be done
from available stock or if shortage is there, then production is done against stock transfer reservations.
Special procurement key 40, 41 and 42 is used for this purpose.
Planned Order:
• Planned Order is generated after MRP Run for in-house production as well as for external procurements.
Capacity planning (finite scheduling) is done for in-house production on the basis of Planned order.
Material availability is checked on the basis of planned order. Planned Orders are further converted to
production orders for in-house production and to purchased orders for external procurements.
• Planned Orders are changed or deleted during MRP run
• Planned Order can be manually generated if MRP run is not applicable in process.
• Firm planned orders are not changed or deleted during MRP run.
Page 68 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Planned Order
Page 69 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Joint Production (Crusher Only):
• Joint Production SAP functionality is applicable when there is requirement to simultaneously produce
multiple finish good’s materials. Total cost of production is distributed on all valuated finish good’s
produced.
Co-Product:
• Co-Product are valuated materials produced along with main finish good. Total Cost of production is
apportioned on co-product.
Cost Apportion Structure:
• Cost Apportion structure is created in main finish good material master. Total cost of production is
apportioned on main production material and co-products as per this cost-apportion structure. Total of
equivalence numbers for all FG materials in cost apportion structure is equal to 1000. Bill of material is
the basis for defining cost-apportion structure.
Page 70 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Co-Product
Page 71 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Cost Apportion Structure
Page 72 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order:
• Production order is created, to start the production of a material within a plant and to specify the
material and quantity that will be produced. It decides the work location (capacity) that is used, which
operations are required and the date on which production takes place. It also defines the
Planned/Target production cost for the given production quantity.
• Production Orders are considered as firm requirements.
• Production order is released for production as per production plan.
Production Order Type:
• Production Order type decides control parameters for a particular production order.
• Production Order types are configured in background.
• Production Order Type defined at a particular division level.
• Production Order type decides number range. Internal number range is followed at client level.
Page 73 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order System Status
• Production Order system status is automatically updated once a particular business transaction is carried
out.
• It is not possible to modify any of the production order system status.
Production Order User Status
• Production Order user status is automatically updated once a particular business transaction is carried
out.
• It is possible to modify any of the production order user status.
• User status is activated based on business transaction
• Authorization is required to modify any of the production order user status.
Page 74 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – System Status/User Status
Page 75 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Production Order
Page 76 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Production Order Types
Page 77 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order Good’s Issue (GI):
• Raw Materials are issued against production order. Actual material consumption is booked during Good’s
Issue against production order as and when material is physically issued.
• Production Order GI is integrated with Store and Account departments.
• Raw Material can be handled in batches.
Production Order GI Transactions:
• MIGO: Store person issue Good’s Issue through normal MM transaction.
Page 78 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order Operation Confirmation:
• Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against production order.
Machine and Manpower confirmation is done on daily basis.
• Planned Production Overhead confirmation can be done on daily basis. Difference between plan and
actual is posted at the end of the month once actual data is available by production order confirmation.
• Yield, Scrap and Rework is booked during production execution. Scrap declared during production
confirmation is not placed in stock.
Page 79 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Production Ord. Confirmation
Page 80 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order Good’s Receipt (GR):
• Production Order Good’s Receipt is done (TCode MIGO) to declare production and to place finish good’s
in to stock.
• Production Order GR is integrated with Store and Account departments.
• Target Cost is updated in a production order for GR Quantity delivered.
• With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches.
• Marble Tiles Line (TCode COWBHUWE): GR Posting with Handling Unit
Page 81 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Material Document
Page 82 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order Locking:
• Production Order is temporary restricted for transactions by locking production order.
• Once decision is to continue production, production order is un-locked
Production Order Technical Completion (TECO):
• Production Order is logistically completed at the end of the production activities.
• TECO system status is updated once production order is technically completed.
• GI, Production Confirmation and GR is not possible once production order is technically completed.
• ‘DAC’ (Disallow Cost) user status is updated once technical completion is done. Authorization is
required to revert this user status.
Page 83 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Key Terms & Concepts
Production Order Settlement:
• Technical completion is prerequisite to settle production order.
• Production Order CO settlement is done at the end of period i.e. at the end of month by costing person.
Production order balance becomes zero after production order settlement.
Production Order Business Completion (CLSD):
• Production Order business completion is done once production order is settled. Business completion is
possible only if Production order balance becomes zero.
• This activity is normally carried out by Costing person.
Page 84 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 85 An HCC Group companyCTM Training - ATE
ATE Group – Process Matrix
Page 86 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Process Flow
Page 87 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Process Flow
Page 88 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Steps & Reports
Page 89 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Steps & Reports
Page 90 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Steps & Reports
Page 91 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 92 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Scenarios
MTS Planning:
A. MTS Planning
• MTS Demand Management – Copy PIR from LTP Planning
• MTS Manual Planned Order
B. MTS Execution
• MTS
• MTS with Joint Production
Page 93 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 94 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Highlights
Planned Independent Creation:
• Copy from LTP
MRP Group:
• MRP Group: Z004 - MTS (10) Manufacturing
MRP Strategy:
• MRP Strategy: 10
Page 95 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Highlights
Planned Order Profile:
• Planned Order Profile: LA
Production Order GI:
• Production Order is Debited at the time of Good’s Issue
Production Order Confirmation:
• Production Order is Debited at the time of Production Operation Confirmation
Page 96 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Highlights
Production Order GR:
• Production Order is Credited at the time of Production Good’s Receipt
Production Order Variance:
• Production Order variance is calculated on the basis of Target Cost.
• Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed
• Difference between Target cost and Actual Cost is settled as per production order settlement rule, on
production variance account and cost center.
Page 97 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 98 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Process Change
1. Planned Dependent Requirement (MD61) - ‘ZFIN’ Material Type – LTP
Planned Independent Requirements Copy to Operative Planning (MD61)
2. MRP Run (MD03/MDBT)
3. MRP List (MD05)
4. Stock Requirement List (MD04)
5. Planned Order Maintenance
6. Capacity Planning
7. Capacity Leveling
8. Planned Order Conversion to Production Order (Partial / Complete)
9. Production Order Capacity Planning
10. Production Order Capacity Evaluation
11. Production Order Release
Page 99 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Process Change
12. Raw Material Availability Check – For a particular production order (lot).
13. Good’s Issue – Actual Qty for a particular production order (lot).
14. Activity Confirmation – Actual Machine/Manpower Hrs for a particular
production order (lot).
15. Target Cost Run – ‘ZFIN’ material type.
16. Good’s Receipt – Good’s Receipt to declare Stock of Finish Good for a
particular production order (lot).
17. Activity Confirmation – Actual Overheads for a particular production order
(lot).
18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis
19. Production Order Technical Completion
20. Production Order Settlement
Page 100 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Process Change
Operative Planning:
14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to Operative
Planning (MS66)
15. ‘ZRAW’ Material Type – Planning on the basis of Production Order
Reservations.
Page 101 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Stock Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 102 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Transaction Codes
Page 103 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Transaction Codes
Page 104 An HCC Group companyCTM Training - ATE
MTS Planning & Execution - Transaction Codes
Page 105 An HCC Group companyCTM Training - ATE
MTS Planning & Execution – Master Data
1. Material Master – (Finish Good’s, Raw Materials)
2. Bill Of Material – (Material BOM)
3. Work Center
4. Routing
Page 106 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 107 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Sub Processes
1. Make To Order Planning & Execution with Sales Order MRP
Page 108 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 109 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Make To Order:
• Make To Order production environment produces good’s, products based on sales orders. The production
planning and execution activities takes place only after receipt of firm customer orders. With this
production environment it is possible to respond to minimize production inventory as well as this
process caters effectively to deliver finish good’s with short shelf life e.g. Ready Mix Concrete etc.
Sales Order:
• Sales Order is created against contract based on customer delivery Schedule and delivery confirmation.
System treats each schedule line as a separate procurement item. Production is done separately against
each schedule line.
Page 110 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Sales Order MRP Run:
• MRP i.e. Material Requirement Planning ensures material availability for in-house and external
procurements. It transfers customer requirements from a sales order requirements to production
planning and execution. MRP Run also takes care of in-house production as well as external
procurements.
Planned Order:
• Planned Order is generated after MRP Run for in-house production as well as for external procurements.
Capacity planning (finite scheduling) is done for in-house production on the basis of Planned order.
Material availability is checked on the basis of planned order. Planned Orders are further converted to
production orders for in-house production and to purchased orders for external procurements.
• Planned Orders are changed or deleted during MRP run
• Planned Order can be manually generated if MRP run is not applicable in process.
• Firm planned orders are not changed or deleted during MRP run.
Page 111 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Planned Order
Page 112 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Planned Order
Page 113 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order:
• Production order is created, to start the production of a material within a plant and to specify the
material and quantity that will be produced. It decides the work location (capacity) that is used, which
operations are required and the date on which production takes place. It also defines the
Planned/Target production cost for the given production quantity.
• Production Orders are considered as firm requirements.
• Production order is released for production as per production plan.
Production Order Type:
• Production Order type decides control parameters for a particular production order.
• Production Order types are configured in background.
• Production Order Type defined at a particular division level.
• Production Order type decides number range. Internal number range is followed at client level.
Page 114 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order System Status
• Production Order system status is automatically updated once a particular business transaction is carried
out.
• It is not possible to modify any of the production order system status.
Production Order User Status
• Production Order user status is automatically updated once a particular business transaction is carried
out.
• It is possible to modify any of the production order user status.
• User status is activated based on business transaction
• Authorization is required to modify any of the production order user status.
Page 115 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – System Status/User Status
Page 116 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Production Order
Page 117 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Production Order Types
Page 118 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order Good’s Issue (GI):
• Raw Materials are issued against production order. Actual material consumption is booked during Good’s
Issue against production order as and when material is physically issued.
• Production Order GI is integrated with Store and Account departments.
• System handles individual or collective procurements as per the setting in raw material, material master
• Raw Material can be handled in batches.
Production Order GI Transactions:
1. MIGO: Store person issue Good’s Issue through normal MM transaction.
2. CO11N (Sohar Marble Slab Line only): Material is issued through production order confirmation
transaction. Here the input batches are linked with production order.
Page 119 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order Operation Confirmation:
• Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against production order.
Machine and Manpower confirmation is done on daily basis.
• Planned Production Overhead confirmation can be done on daily basis. Difference between plan and
actual is posted at the end of the month once actual data is available by production order confirmation.
• Yield, Scrap and Rework is booked during production execution. Scrap declared during production
confirmation is not placed in stock.
Page 120 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Production Ord. Confirmation
Page 121 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order Good’s Receipt (GR):
• Production Order Good’s Receipt is done to declare production and to place finish good’s in to stock.
• Here production good’s are places in special stock with reference to a particular sales order.
• Production Order GR is integrated with Store and Account departments.
• Target Cost is updated in a production order for GR Quantity delivered.
• With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches.
Page 122 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Material Document
Page 123 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Sales Order Stock Transfer:
• Sales Order stock can be transferred from one sales order to another, by a separate transaction.
• Unrestricted stock can be transferred to Sales Order stock, by a separate transaction.
• Sales Order stock can be transferred to Unrestricted stock, by a separate transaction.
Page 124 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order Locking:
• Production Order is temporary restricted for transactions by locking production order.
• Once decision is to continue production, production order is un-locked
Production Order Technical Completion (TECO):
• Production Order is logistically completed at the end of the production activities.
• TECO system status is updated once production order is technically completed.
• GI, Production Confirmation and GR is not possible once production order
• ‘DAC’ (Disallow Cost) user status is updated once technical completion is done. Authorization is
required to revert this user status.
Page 125 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Key Terms & Concepts
Production Order Settlement:
• Technical completion is prerequisite to settle production order.
• Production Order CO settlement is done at the end of period i.e. at the end of month by costing person.
Production order balance becomes zero after production order settlement.
Production Order Business Completion (CLSD):
• Production Order business completion is done once production order is settled. Business completion is
possible only if Production order balance becomes zero.
• This activity is normally carried out by Costing person.
Page 126 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 127 An HCC Group companyCTM Training - ATE
ATE Group – Process Matrix
Page 128 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Process Flow
Page 129 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Process Flow
Page 130 An HCC Group companyCTM Training - ATE
MTO-ATO Planning & Execution – Steps & Reports
Page 131 An HCC Group companyCTM Training - ATE
MTO-ATO Planning & Execution – Steps & Reports
Page 132 An HCC Group companyCTM Training - ATE
MTO Sales Ord. MRP Planning & Execution – Steps & Reports
Page 133 An HCC Group companyCTM Training - ATE
MTO Sales Ord. MRP Planning & Execution – Steps & Reports
Page 134 An HCC Group companyCTM Training - ATE
MTO Sales Ord. MRP Planning & Execution – Steps & Reports
Page 135 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 136 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Scenarios
MTO Planning:
A. MTO Planning
• MTO Planning – With Individual and Collective Procurement
• MTO Planning – With Collective Procurement
B. MTO Execution
• MTO
Page 137 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 138 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Highlights
MRP Group:
• MRP group: Z002 - MTO (20)
MRP Strategy:
• MRPP Strategy: 20
Page 139 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Highlights
Planned Order Profile:
• Planned Order Profile: KD
Production Order GI:
• Production Order is Debited at the time of Good’s Issue
Production Order Confirmation:
• Production Order is Debited at the time of Production Operation Confirmation
Page 140 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Highlights
Production Order GR:
• Production Order is Credited at the time of Production Good’s Receipt
Production Order Variance:
• Production Order variance is calculated on the basis of Target Cost.
• Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed
• Difference between Target cost and Actual Cost is settled as per production order settlement rule, on
production variance account and cost center.
Page 141 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 142 An HCC Group companyCTM Training - ATE
‘MTO – Sales Order MRP’ Planning & Execution – Process Change
1. Sales Order MRP Run (MD50)
2. MRP List (MD05)
3. Stock Requirement List (MD04)
4. Planned Order Maintenance
5. Capacity Planning
6. Capacity Leveling
7. Planned Order Conversion to Production Order (Partial / Complete)
8. Planned Order Conversion to Purchase Requisition – External Procurement
9. Production Order Capacity Planning
10. Production Order Capacity Evaluation
11. Production Order Release
Page 143 An HCC Group companyCTM Training - ATE
‘MTO – Sales Order MRP’ Planning & Execution – Process Change
12. Raw Material Availability Check – For a particular production order (lot).
13. Good’s Issue – Actual Qty for a particular production order (lot).
14. Activity Confirmation – Actual Machine/Manpower Hrs for a particular
production order (lot).
15. Sales Order Cost Run – ‘ZFIN’ material type.
16. Good’s Receipt – Good’s Receipt to declare Stock of Finish Good for a
particular production order (lot).
17. Activity Confirmation – Actual Overheads for a particular production order
(lot).
18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis
19. Production Order Technical Completion
20. Production Order Settlement
Page 144 An HCC Group companyCTM Training - ATE
Agenda
 Objective
 General Information
 PP SAP Org. Structure
 List of Processes
 Process – Make To Order Planning & Execution
 Sub Processes
 Key Terms & Concepts
 Process flow with steps & Reports
 Scenarios in Process
 Highlights of process
 Process Change
 SAP T-codes & Master data to be used
 DMS documents to be attached
 Exercise
 Assessment Questionnaire
Page 145 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Transaction Codes
Page 146 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Transaction Codes
Page 147 An HCC Group companyCTM Training - ATE
MTO Planning & Execution - Transaction Codes
Page 148 An HCC Group companyCTM Training - ATE
MTO Planning & Execution – Master Data
1. Material Master – (Finish Good’s, Raw Materials)
2. Bill Of Material – (Material BOM, Sales Order BOM)
3. Work Center
4. Routing

More Related Content

What's hot

Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationAnand Subramaniam
 
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...Bhagya Lakshmi
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configurationVikranth Ikkalaki
 
Erp Presentation
Erp Presentation Erp Presentation
Erp Presentation guest0269c8
 
Sap PLM Online Training Course
Sap  PLM Online Training CourseSap  PLM Online Training Course
Sap PLM Online Training CourseVenkat reddy
 
SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewRonaldo Abdon
 
Sap – pp online training course
Sap – pp online training courseSap – pp online training course
Sap – pp online training courseVenkat reddy
 
Sap pp tutorial
Sap pp tutorialSap pp tutorial
Sap pp tutorialRaja180
 
beas for process and regulated industries 14.2
beas for process and regulated industries 14.2beas for process and regulated industries 14.2
beas for process and regulated industries 14.2beasgroup
 
Framework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftFramework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftPennonSoft
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14remilaw
 
SAP ERP History & Implementation Details
SAP ERP History & Implementation Details SAP ERP History & Implementation Details
SAP ERP History & Implementation Details Technopad Ameerpet
 

What's hot (20)

Sap overview bala
Sap overview balaSap overview bala
Sap overview bala
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...
SAP Fico Training In Hyderabad | SAP Fico Coaching In Hyderabad | SAP Fico In...
 
Production module
Production moduleProduction module
Production module
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
ATCO-SAP ERP Implementation
ATCO-SAP ERP ImplementationATCO-SAP ERP Implementation
ATCO-SAP ERP Implementation
 
Report w13
Report w13Report w13
Report w13
 
Erp Presentation
Erp Presentation Erp Presentation
Erp Presentation
 
Sap PLM Online Training Course
Sap  PLM Online Training CourseSap  PLM Online Training Course
Sap PLM Online Training Course
 
SAP PM Plant Maintenance Overview
SAP PM Plant Maintenance OverviewSAP PM Plant Maintenance Overview
SAP PM Plant Maintenance Overview
 
Sap – pp online training course
Sap – pp online training courseSap – pp online training course
Sap – pp online training course
 
Erp for manufacturing industry
Erp   for manufacturing industryErp   for manufacturing industry
Erp for manufacturing industry
 
Pp interview questions
Pp interview questionsPp interview questions
Pp interview questions
 
Sap pp tutorial
Sap pp tutorialSap pp tutorial
Sap pp tutorial
 
SapPreventive Maintenance
SapPreventive Maintenance SapPreventive Maintenance
SapPreventive Maintenance
 
beas for process and regulated industries 14.2
beas for process and regulated industries 14.2beas for process and regulated industries 14.2
beas for process and regulated industries 14.2
 
Sap pp dinakar skype himbuj
Sap pp  dinakar skype himbujSap pp  dinakar skype himbuj
Sap pp dinakar skype himbuj
 
Framework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoftFramework of sap mm blueprint by pennonsoft
Framework of sap mm blueprint by pennonsoft
 
Heizer om10 ch14
Heizer om10 ch14Heizer om10 ch14
Heizer om10 ch14
 
SAP ERP History & Implementation Details
SAP ERP History & Implementation Details SAP ERP History & Implementation Details
SAP ERP History & Implementation Details
 

Similar to 3.pp level iii training ppt block&precasting, crusher

Basem zidan resume
Basem zidan  resumeBasem zidan  resume
Basem zidan resumeBasem Zidan
 
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC Advisory Group
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)Pradipta Mallick
 
StudySapuri Data Analytics Platform with Treasure Data
StudySapuri Data Analytics Platform with Treasure DataStudySapuri Data Analytics Platform with Treasure Data
StudySapuri Data Analytics Platform with Treasure DataTetsuo Yamabe
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Hari Krishna
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Hari Krishna
 
Sudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer babu
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinarAisurya Puhan
 
Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017Ted Thorne
 
Business Capital Planning PowerPoint Presentation Slides
Business Capital Planning PowerPoint Presentation SlidesBusiness Capital Planning PowerPoint Presentation Slides
Business Capital Planning PowerPoint Presentation SlidesSlideTeam
 
Business process manual overview
Business process manual overviewBusiness process manual overview
Business process manual overviewsgetchel
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC Advisory Group
 
Pravin_SAP MM-CIN
Pravin_SAP MM-CINPravin_SAP MM-CIN
Pravin_SAP MM-CINPravin R
 
S3 infotech erp
S3 infotech erp S3 infotech erp
S3 infotech erp Raj Kumar
 
Basem Zidan
Basem ZidanBasem Zidan
Basem Zidanbzidan
 

Similar to 3.pp level iii training ppt block&precasting, crusher (20)

Basem zidan resume
Basem zidan  resumeBasem zidan  resume
Basem zidan resume
 
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
 
Sap erp
Sap erpSap erp
Sap erp
 
Mysap
MysapMysap
Mysap
 
RFP.docx
RFP.docxRFP.docx
RFP.docx
 
Asap implementation methodology (2)
Asap implementation methodology (2)Asap implementation methodology (2)
Asap implementation methodology (2)
 
StudySapuri Data Analytics Platform with Treasure Data
StudySapuri Data Analytics Platform with Treasure DataStudySapuri Data Analytics Platform with Treasure Data
StudySapuri Data Analytics Platform with Treasure Data
 
Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9Erp Asap implementation 1214825612078403-9
Erp Asap implementation 1214825612078403-9
 
Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9Erpasapimplementation 1214825612078403-9
Erpasapimplementation 1214825612078403-9
 
Sudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_ResumeSudheer_SAP_ABAP_Resume
Sudheer_SAP_ABAP_Resume
 
Npi with bpm webinar
Npi with bpm webinarNpi with bpm webinar
Npi with bpm webinar
 
Erp process flow
Erp process flowErp process flow
Erp process flow
 
Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017Ted V Thorne resume 03-09-2017
Ted V Thorne resume 03-09-2017
 
BIS11 ERP
BIS11 ERPBIS11 ERP
BIS11 ERP
 
Business Capital Planning PowerPoint Presentation Slides
Business Capital Planning PowerPoint Presentation SlidesBusiness Capital Planning PowerPoint Presentation Slides
Business Capital Planning PowerPoint Presentation Slides
 
Business process manual overview
Business process manual overviewBusiness process manual overview
Business process manual overview
 
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
ARC's Greg Gorbach CPM & Operations Mgmt Presentation @ ARC Industry Forum 2010
 
Pravin_SAP MM-CIN
Pravin_SAP MM-CINPravin_SAP MM-CIN
Pravin_SAP MM-CIN
 
S3 infotech erp
S3 infotech erp S3 infotech erp
S3 infotech erp
 
Basem Zidan
Basem ZidanBasem Zidan
Basem Zidan
 

Recently uploaded

ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 

Recently uploaded (20)

Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 

3.pp level iii training ppt block&precasting, crusher

  • 1. PP End User Training – SAP (Level – 3) 16th December - 2013
  • 2. Page 2 An HCC Group companyCTM Training - ATEPresentation Title This presentation contains certain forward looking statements concerning future business prospects and profitability of Highbar Technologies Limited, which are subject to a number of risks and uncertainties and actual results could materially differ from those in such forward looking statements, important developments that could affect the company's operations include a downtrend in the information technology and infrastructure sectors, significant changes in political and economic environment in India, tax laws, labor relations, litigation etc. The company does not undertake to make any announcement in case any of these forward looking statements become materially incorrect in future or update any forward looking statements made from time to time by or on behalf of the company. All rights reserved. Copyright with Highbar Technologies Limited. Highbar is a trademark of Highbar Technologies Limited & other names, logos are trademarks of their respective owners. DISCLAIMER
  • 3. Page 3 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 4. Page 4 An HCC Group companyCTM Training - ATE Objective • Should be able to execute the Steps of process in the system • Understand end to end process with integration with Processes • Understand the process integration with other systems • Understand the validations & controls in system.
  • 5. Page 5 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 6. Page 6 An HCC Group companyCTM Training - ATE General Information • Current Stage of the project • Landscape details for testing • Other information • Schedule of Training
  • 7. Page 7 An HCC Group companyCTM Training - ATE General Inforn.– Road Map Of ATE SAP Implementation Project Preparation Business Blueprint Realization Final Preparation Go-live & Support Training-Level1 Workshop System design BPD System handing over On going support Prepare Project Plan Receive hardware Receive software Mobilize project team ‘Business Projects’ scope AS-IS Study/Clarification 1 2 3 4 5 O n g o i n g k n o w l e g d e t r a n s f e r b e t w e e n H I G H B A R a n d A T E C o r e t e a m Enabled project Team System understanding & Gap identification Understanding and concept s Buy In Documentation and end user comfort Ongoing support and continuous improvement End user training Finalize cutover data Finalize master data Developments Internal System testing – SIT - 1 CTM Training 18/11/2012 09/02/2013 08/05/2013 05/07/2013 06/07/2013 Stabilization & BI- BO Impl. 6 System Config 18/11/2012 10/03/2013 30/11/2013 31/12/2013 09/01/2014 Completed In process Planned date Revised Date LEGEND 16.12.2013 UAT
  • 8. Page 8 An HCC Group companyCTM Training - ATE Stores Unrestricted stock at Storage Location General Information – Landscape details for Testing Contractor Client No 100 Configuration ----------------------- Client No 120/150 ABAP development Development Server Client No 200 CTM Training & SIT - Testing ----------------------- Client No 210 End User Quality Server Client No 300 Production Server
  • 9. Page 9 An HCC Group companyCTM Training - ATE General Information – Other • Attend the full sessions of the training • Please make this sessions interactive • Carry out the testing by the way of exercises given in training • Appraise process owners about change processes if required. • Practice in system by executing the transaction in system post training • We should discourage the discussions around the process mapped in system • Process observations if any shall be recorded separately for clarification later
  • 10. Page 10 An HCC Group companyCTM Training - ATE General Information – Schedule of Training
  • 11. Page 11 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 12. Page 12 An HCC Group companyCTM Training - ATE PP Organization Structure
  • 13. Page 13 An HCC Group companyCTM Training - ATE PP Organization Structure - Plant
  • 14. Page 14 An HCC Group companyCTM Training - ATE PP Organization Structure – Storage Location
  • 15. Page 15 An HCC Group companyCTM Training - ATE Organizational Structure - Plant
  • 16. Page 16 An HCC Group companyCTM Training - ATE Organizational Structure - Plant
  • 17. Page 17 An HCC Group companyCTM Training - ATE Organizational Structure – Storage Location
  • 18. Page 18 An HCC Group companyCTM Training - ATE Organizational Structure – Storage Location
  • 19. Page 19 An HCC Group companyCTM Training - ATE Organizational Structure – Storage Location
  • 20. Page 20 An HCC Group companyCTM Training - ATE Organizational Structure – Storage Location
  • 21. Page 21 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 22. Page 22 An HCC Group companyCTM Training - ATE  PP Master Data  Long Term Planning ( Block,Interlock,Kerbstone,Crusher)  Make To Stock production planning & execution (Block,Interlock,Kerbstone,Crusher)  Make To Order production planning & execution – Sales Order MRP ( Pre-casting ) List of Processes
  • 23. Page 23 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 24. Page 24 An HCC Group companyCTM Training - ATE PP Master Data – Sub Processes Production Planning & Control – Master Data  Maintain Bill Of Material  Maintain Work center  Maintain Routing Interdepartmental – Master Data  Activity Master  Cost Center
  • 25. Page 25 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 26. Page 26 An HCC Group companyCTM Training - ATE PP Master Data – Key Terms & Concepts Material Master: • Material Master contains all the information, for all the material‘s, that company Procures, Produces, Stores and Sales. • Material Type (Similar Basic Attributes) - Raw Material (ZRAW) and FG (ZFIN). • Production Area related Information – Basic Data1, MRP1, MRP2, MRP3, MRP4 & Work Scheduling
  • 27. Page 27 An HCC Group companyCTM Training - ATE PP Master Data – Key Terms & Concepts Bill Of Material: • The Bill Of Material is a complete formally structured list of the components that make up a product. • Different BOM can be used – Company Usage Area wise e.g. Costing, Production etc. • BOM Header: Base Quantity, Active/Inactive Status • BOM Item Details: Material No, Quantity, UOM, Item Category, Production plant. • BOM Data is used by activities MRP, Work Scheduling, Procurement, Product Costing. • Multi-Level Explosion: MRP, Product Cost and Production Order
  • 28. Page 28 An HCC Group companyCTM Training - ATE PP Master Data – Key Terms & Concepts Work Center: • Work center is the place where an operation or activity is carried out within a plant • Work center: Represents as general as geographical location or as specific as a particular M/C/Production Line within a department or Person or Group of Persons performing a job. • Based on Usage Selection: Decides different Task Lists e.g. Routing, Rate Routing & Insp Plan • Work Center: SAP Plant Level • Work Center View: Basic data, Default values, Capacities, Scheduling and Costing
  • 29. Page 29 An HCC Group companyCTM Training - ATE PP Master Data – Key Terms & Concepts Routing: • A routing contains the operations to be performed, their sequence and the various work centers involved to manufacture an item. • Routing: Standard Values (Times) for activities such as setup and processing. • Control Key for Internal or External Operations • Material Operation Components Assignment • Production resources / tools. • Inspection Characteristics (Inspection Specification)
  • 30. Page 30 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 31. Page 31 An HCC Group companyCTM Training - ATE PP Master Data – Process Flow
  • 32. Page 32 An HCC Group companyCTM Training - ATE PP Master Data - Process Flow
  • 33. Page 33 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 34. Page 34 An HCC Group companyCTM Training - ATE PP Master Data - Scenarios Bill Of Material (BOM): • Standard Bill Of Material Sales Order Bill Of Material (BOM): • Sales Order BOM Work center • Work Center Routing • Standard Routing
  • 35. Page 35 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 36. Page 36 An HCC Group companyCTM Training - ATE PP Master Data - Highlights Material Master: Material Types: ZRAW, ZFIN Price Control ZRAW: ‘V’ Moving Average Price Price Control ZFIN: ‘S’ Standard Price Material BOM: Material BOM Usage: 1 i.e. Production
  • 37. Page 37 An HCC Group companyCTM Training - ATE PP Master Data - Highlights Sales Order BOM: Material BOM Usage: 3 i.e. Universal Work center: Work Center Category: 0001 i.e. Machine Routing: Task List Type: N i.e. Routing
  • 38. Page 38 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 39. Page 39 An HCC Group companyCTM Training - ATE ‘MTS PP’ Master Data – Process Change 1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP Parameters 2. Cross Plant Planning: Special Procurement Key Maintenance in ‘ZFIN’ material type material master at receiving plant. 3. Joint Production: Co-Product setting and Cost Apportion Structure Maintenance in ‘ZFIN’ material type material master. 4. Work center creation with available capacity requirements for representing total Batching Plant Production Capacity. 5. Work center creation with cost center & activity master details 6. Routing creation with Planned Activity Values
  • 40. Page 40 An HCC Group companyCTM Training - ATE ‘MTO PP’ Master Data – Process Change 1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP Parameters 2. ‘ZRAW’ Material Type Maintenance with Procurement details i.e. Individual and Collective. 3. Work center creation with available capacity requirements for representing total Batching Plant Production Capacity. 4. Work center creation with cost center & activity master details 5. Routing creation with Planned Activity Values
  • 41. Page 41 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process - PP Master Data  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 42. Page 42 An HCC Group companyCTM Training - ATE PP Master Data - Transaction Codes
  • 43. Page 43 An HCC Group companyCTM Training - ATE PP Master Data - Transaction Codes
  • 44. Page 44 An HCC Group companyCTM Training - ATE PP Master Data - Transaction Codes
  • 45. Page 45 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 46. Page 46 An HCC Group companyCTM Training - ATE Long Term Planning – Key Terms & Concepts Long Term Planning: • Long term planning is used to analyse the production capacity load situation and material dependent requirements required for the production. Duration of LTP analysis can be from a one month to the years, subject to the realistic sales and production projections availability. Planning Scenario: • Planning scenario to determines the control parameters for long-term planning. This includes the plant where long-term planning is to be carried out, the planning period, and the independent requirements versions to be planned. Planning Scenario represents a particular division or a particular business area. Inactive Planned Independent Requirements Version : • LTP is carried out with inactive Planned Independent Requirements version. • Version ‘02’ is used for this purpose.
  • 47. Page 47 An HCC Group companyCTM Training - ATE Long Term Planning – Key Terms & Concepts LTP MRP Run (MS02 or MSBT): • Long term planning MRP Run is carried out separately i.e. It is not part of operative planning. LTP MRP run can be carried out in foreground MS02 or background MSBT. Frequency of background MRP Run can be monthly or multiple months. LTP Evaluation (MS05 or MS04): • Long term planning MRP evaluation is carried out separately i.e. It is not part of operative planning. LTP evaluation is done once MRP Run takes place or it can be dynamically done as required. LTP Material Analysis (MCEC/MCEB): • Long term planning Material Analysis is possible only if material master is created with procurement type ‘F’.
  • 48. Page 48 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 49. Page 49 An HCC Group companyCTM Training - ATE Long Term Planning - Process Flow
  • 50. Page 50 An HCC Group companyCTM Training - ATE Long Term Planning – Steps & Reports
  • 51. Page 51 An HCC Group companyCTM Training - ATE Long Term Planning – Steps & Reports
  • 52. Page 52 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 53. Page 53 An HCC Group companyCTM Training - ATE Long Term Planning - Scenarios • LTP With Capacity Planning & Material Analysis
  • 54. Page 54 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 55. Page 55 An HCC Group companyCTM Training - ATE Long Term Planning - Highlights Current Stock: • LTP Considers current material stock during planning. Firm Receipts: • LTP Considers current firm receipts e.g. purchase orders, production orders from operative planning. • Firm Purchase Requisitions and firm planned orders are also considered during LTP planning Customer Receipts: • LTP Considers current customer orders from operative planning LTP Capacity Analysis (CM38): • LTP Capacity Analysis is done to analyze any future bottlenecks in terms of machine capacity availability.
  • 56. Page 56 An HCC Group companyCTM Training - ATE Long Term Planning - Highlights LTP Material Analysis (MCEC & MCEB): • LTP Material Analysis is done for a particular material or for a particular material group. • As per material forecasting PO Value, Order Quantity and PO Price is possible to analyze.
  • 57. Page 57 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 58. Page 58 An HCC Group companyCTM Training - ATE Long Term Planning – Process Change 1. ‘ZFIN’ & ‘ZRAW’ Material Type Material Masters Maintenance with MRP Parameters 2. Cross Plant Planning: Special Procurement Key Maintenance in ‘ZFIN’ material type material master at receiving plant. 3. Work center creation with LTP Setting 4. Work center creation with available capacity requirements for representing total available Production Capacity. 5. Routing creation with Planned Activity Values – Capacity Planning 6. LTP – Planning Scenario Creation and Maintenance (MS31/MS32/MS3) 7. LTP – Inactive Version Planned Independent Creation (MD61)
  • 59. Page 59 An HCC Group companyCTM Training - ATE Long Term Planning – Process Change 8. LTP – MRP Run (MS02) 9. LTP – Stock Requirement List (MS04) 10. LTP – MRP List (MS05) 11. LTP – Setting Purchase Info Records 12. LTP Material Analysis (MCEC/MCEB) 13. LTP Work center Capacity Planning (CM38) Operative Planning: 14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to Operative Planning (MS66) 15. ‘ZFIN’ Material Type – LTP Planned Independent Requirements Copy to Operative Planning (MD61)
  • 60. Page 60 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Long Term Planning  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 61. Page 61 An HCC Group companyCTM Training - ATE Long Term Planning - Transaction Codes
  • 62. Page 62 An HCC Group companyCTM Training - ATE Long Term Planning – Master Data 1. Material Master – (Finish Good’s, Raw Materials) 2. Bill Of Material – Material BOM 3. Work Center 4. Routing
  • 63. Page 63 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 64. Page 64 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Sub Processes 1. Make To Stock Planning & Execution with Planning Strategy 10 2. Make To Stock Planning & Execution with Joint Production ( Crusher )
  • 65. Page 65 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 66. Page 66 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Make To Stock: • Make To Stock production environment produces good’s, products based on sales or production forecast. The production planning and execution activities takes place before receipt of firm customer orders. With this production environment it is possible to respond to customer orders fast with short lead time. Demand Management: • Demand Management consists of creation of planned independent requirements based on sales or production forecast. PIR are transferred to production planning & execution once MRP run takes place. MRP Run: • MRP i.e. Material Requirement Planning ensures material availability for in-house and external procurements. It transfers MTS requirements from demand management as well as a particular sales order requirements to production planning and execution. MRP Run also takes care of special procurement e.g. cross plant planning.
  • 67. Page 67 An HCC Group companyCTM Training - ATE MTS Planning & Execution – key Terms & Concepts Cross Plant Planning: • Cross plant planning insures stock transfer reservations across production plant. During MRP Run at receiver plant, stock transfer reservations are created in sender plant. The stock transfer can be done from available stock or if shortage is there, then production is done against stock transfer reservations. Special procurement key 40, 41 and 42 is used for this purpose. Planned Order: • Planned Order is generated after MRP Run for in-house production as well as for external procurements. Capacity planning (finite scheduling) is done for in-house production on the basis of Planned order. Material availability is checked on the basis of planned order. Planned Orders are further converted to production orders for in-house production and to purchased orders for external procurements. • Planned Orders are changed or deleted during MRP run • Planned Order can be manually generated if MRP run is not applicable in process. • Firm planned orders are not changed or deleted during MRP run.
  • 68. Page 68 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Planned Order
  • 69. Page 69 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Joint Production (Crusher Only): • Joint Production SAP functionality is applicable when there is requirement to simultaneously produce multiple finish good’s materials. Total cost of production is distributed on all valuated finish good’s produced. Co-Product: • Co-Product are valuated materials produced along with main finish good. Total Cost of production is apportioned on co-product. Cost Apportion Structure: • Cost Apportion structure is created in main finish good material master. Total cost of production is apportioned on main production material and co-products as per this cost-apportion structure. Total of equivalence numbers for all FG materials in cost apportion structure is equal to 1000. Bill of material is the basis for defining cost-apportion structure.
  • 70. Page 70 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Co-Product
  • 71. Page 71 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Cost Apportion Structure
  • 72. Page 72 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order: • Production order is created, to start the production of a material within a plant and to specify the material and quantity that will be produced. It decides the work location (capacity) that is used, which operations are required and the date on which production takes place. It also defines the Planned/Target production cost for the given production quantity. • Production Orders are considered as firm requirements. • Production order is released for production as per production plan. Production Order Type: • Production Order type decides control parameters for a particular production order. • Production Order types are configured in background. • Production Order Type defined at a particular division level. • Production Order type decides number range. Internal number range is followed at client level.
  • 73. Page 73 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order System Status • Production Order system status is automatically updated once a particular business transaction is carried out. • It is not possible to modify any of the production order system status. Production Order User Status • Production Order user status is automatically updated once a particular business transaction is carried out. • It is possible to modify any of the production order user status. • User status is activated based on business transaction • Authorization is required to modify any of the production order user status.
  • 74. Page 74 An HCC Group companyCTM Training - ATE MTS Planning & Execution – System Status/User Status
  • 75. Page 75 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Production Order
  • 76. Page 76 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Production Order Types
  • 77. Page 77 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order Good’s Issue (GI): • Raw Materials are issued against production order. Actual material consumption is booked during Good’s Issue against production order as and when material is physically issued. • Production Order GI is integrated with Store and Account departments. • Raw Material can be handled in batches. Production Order GI Transactions: • MIGO: Store person issue Good’s Issue through normal MM transaction.
  • 78. Page 78 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order Operation Confirmation: • Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against production order. Machine and Manpower confirmation is done on daily basis. • Planned Production Overhead confirmation can be done on daily basis. Difference between plan and actual is posted at the end of the month once actual data is available by production order confirmation. • Yield, Scrap and Rework is booked during production execution. Scrap declared during production confirmation is not placed in stock.
  • 79. Page 79 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Production Ord. Confirmation
  • 80. Page 80 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order Good’s Receipt (GR): • Production Order Good’s Receipt is done (TCode MIGO) to declare production and to place finish good’s in to stock. • Production Order GR is integrated with Store and Account departments. • Target Cost is updated in a production order for GR Quantity delivered. • With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches. • Marble Tiles Line (TCode COWBHUWE): GR Posting with Handling Unit
  • 81. Page 81 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Material Document
  • 82. Page 82 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order Locking: • Production Order is temporary restricted for transactions by locking production order. • Once decision is to continue production, production order is un-locked Production Order Technical Completion (TECO): • Production Order is logistically completed at the end of the production activities. • TECO system status is updated once production order is technically completed. • GI, Production Confirmation and GR is not possible once production order is technically completed. • ‘DAC’ (Disallow Cost) user status is updated once technical completion is done. Authorization is required to revert this user status.
  • 83. Page 83 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Key Terms & Concepts Production Order Settlement: • Technical completion is prerequisite to settle production order. • Production Order CO settlement is done at the end of period i.e. at the end of month by costing person. Production order balance becomes zero after production order settlement. Production Order Business Completion (CLSD): • Production Order business completion is done once production order is settled. Business completion is possible only if Production order balance becomes zero. • This activity is normally carried out by Costing person.
  • 84. Page 84 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 85. Page 85 An HCC Group companyCTM Training - ATE ATE Group – Process Matrix
  • 86. Page 86 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Process Flow
  • 87. Page 87 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Process Flow
  • 88. Page 88 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Steps & Reports
  • 89. Page 89 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Steps & Reports
  • 90. Page 90 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Steps & Reports
  • 91. Page 91 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 92. Page 92 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Scenarios MTS Planning: A. MTS Planning • MTS Demand Management – Copy PIR from LTP Planning • MTS Manual Planned Order B. MTS Execution • MTS • MTS with Joint Production
  • 93. Page 93 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 94. Page 94 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Highlights Planned Independent Creation: • Copy from LTP MRP Group: • MRP Group: Z004 - MTS (10) Manufacturing MRP Strategy: • MRP Strategy: 10
  • 95. Page 95 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Highlights Planned Order Profile: • Planned Order Profile: LA Production Order GI: • Production Order is Debited at the time of Good’s Issue Production Order Confirmation: • Production Order is Debited at the time of Production Operation Confirmation
  • 96. Page 96 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Highlights Production Order GR: • Production Order is Credited at the time of Production Good’s Receipt Production Order Variance: • Production Order variance is calculated on the basis of Target Cost. • Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed • Difference between Target cost and Actual Cost is settled as per production order settlement rule, on production variance account and cost center.
  • 97. Page 97 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 98. Page 98 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Process Change 1. Planned Dependent Requirement (MD61) - ‘ZFIN’ Material Type – LTP Planned Independent Requirements Copy to Operative Planning (MD61) 2. MRP Run (MD03/MDBT) 3. MRP List (MD05) 4. Stock Requirement List (MD04) 5. Planned Order Maintenance 6. Capacity Planning 7. Capacity Leveling 8. Planned Order Conversion to Production Order (Partial / Complete) 9. Production Order Capacity Planning 10. Production Order Capacity Evaluation 11. Production Order Release
  • 99. Page 99 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Process Change 12. Raw Material Availability Check – For a particular production order (lot). 13. Good’s Issue – Actual Qty for a particular production order (lot). 14. Activity Confirmation – Actual Machine/Manpower Hrs for a particular production order (lot). 15. Target Cost Run – ‘ZFIN’ material type. 16. Good’s Receipt – Good’s Receipt to declare Stock of Finish Good for a particular production order (lot). 17. Activity Confirmation – Actual Overheads for a particular production order (lot). 18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis 19. Production Order Technical Completion 20. Production Order Settlement
  • 100. Page 100 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Process Change Operative Planning: 14. ‘ZRAW’ Material Type - LTP Dependent Requirements Copy to Operative Planning (MS66) 15. ‘ZRAW’ Material Type – Planning on the basis of Production Order Reservations.
  • 101. Page 101 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Stock Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 102. Page 102 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Transaction Codes
  • 103. Page 103 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Transaction Codes
  • 104. Page 104 An HCC Group companyCTM Training - ATE MTS Planning & Execution - Transaction Codes
  • 105. Page 105 An HCC Group companyCTM Training - ATE MTS Planning & Execution – Master Data 1. Material Master – (Finish Good’s, Raw Materials) 2. Bill Of Material – (Material BOM) 3. Work Center 4. Routing
  • 106. Page 106 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 107. Page 107 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Sub Processes 1. Make To Order Planning & Execution with Sales Order MRP
  • 108. Page 108 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 109. Page 109 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Make To Order: • Make To Order production environment produces good’s, products based on sales orders. The production planning and execution activities takes place only after receipt of firm customer orders. With this production environment it is possible to respond to minimize production inventory as well as this process caters effectively to deliver finish good’s with short shelf life e.g. Ready Mix Concrete etc. Sales Order: • Sales Order is created against contract based on customer delivery Schedule and delivery confirmation. System treats each schedule line as a separate procurement item. Production is done separately against each schedule line.
  • 110. Page 110 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Sales Order MRP Run: • MRP i.e. Material Requirement Planning ensures material availability for in-house and external procurements. It transfers customer requirements from a sales order requirements to production planning and execution. MRP Run also takes care of in-house production as well as external procurements. Planned Order: • Planned Order is generated after MRP Run for in-house production as well as for external procurements. Capacity planning (finite scheduling) is done for in-house production on the basis of Planned order. Material availability is checked on the basis of planned order. Planned Orders are further converted to production orders for in-house production and to purchased orders for external procurements. • Planned Orders are changed or deleted during MRP run • Planned Order can be manually generated if MRP run is not applicable in process. • Firm planned orders are not changed or deleted during MRP run.
  • 111. Page 111 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Planned Order
  • 112. Page 112 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Planned Order
  • 113. Page 113 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order: • Production order is created, to start the production of a material within a plant and to specify the material and quantity that will be produced. It decides the work location (capacity) that is used, which operations are required and the date on which production takes place. It also defines the Planned/Target production cost for the given production quantity. • Production Orders are considered as firm requirements. • Production order is released for production as per production plan. Production Order Type: • Production Order type decides control parameters for a particular production order. • Production Order types are configured in background. • Production Order Type defined at a particular division level. • Production Order type decides number range. Internal number range is followed at client level.
  • 114. Page 114 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order System Status • Production Order system status is automatically updated once a particular business transaction is carried out. • It is not possible to modify any of the production order system status. Production Order User Status • Production Order user status is automatically updated once a particular business transaction is carried out. • It is possible to modify any of the production order user status. • User status is activated based on business transaction • Authorization is required to modify any of the production order user status.
  • 115. Page 115 An HCC Group companyCTM Training - ATE MTO Planning & Execution – System Status/User Status
  • 116. Page 116 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Production Order
  • 117. Page 117 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Production Order Types
  • 118. Page 118 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order Good’s Issue (GI): • Raw Materials are issued against production order. Actual material consumption is booked during Good’s Issue against production order as and when material is physically issued. • Production Order GI is integrated with Store and Account departments. • System handles individual or collective procurements as per the setting in raw material, material master • Raw Material can be handled in batches. Production Order GI Transactions: 1. MIGO: Store person issue Good’s Issue through normal MM transaction. 2. CO11N (Sohar Marble Slab Line only): Material is issued through production order confirmation transaction. Here the input batches are linked with production order.
  • 119. Page 119 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order Operation Confirmation: • Production Order Operation Confirmation i.e. Time Ticket Confirmation is done against production order. Machine and Manpower confirmation is done on daily basis. • Planned Production Overhead confirmation can be done on daily basis. Difference between plan and actual is posted at the end of the month once actual data is available by production order confirmation. • Yield, Scrap and Rework is booked during production execution. Scrap declared during production confirmation is not placed in stock.
  • 120. Page 120 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Production Ord. Confirmation
  • 121. Page 121 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order Good’s Receipt (GR): • Production Order Good’s Receipt is done to declare production and to place finish good’s in to stock. • Here production good’s are places in special stock with reference to a particular sales order. • Production Order GR is integrated with Store and Account departments. • Target Cost is updated in a production order for GR Quantity delivered. • With WIP batch (Sohar Factory only): GR Batches consumes preceding WIP batches.
  • 122. Page 122 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Material Document
  • 123. Page 123 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Sales Order Stock Transfer: • Sales Order stock can be transferred from one sales order to another, by a separate transaction. • Unrestricted stock can be transferred to Sales Order stock, by a separate transaction. • Sales Order stock can be transferred to Unrestricted stock, by a separate transaction.
  • 124. Page 124 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order Locking: • Production Order is temporary restricted for transactions by locking production order. • Once decision is to continue production, production order is un-locked Production Order Technical Completion (TECO): • Production Order is logistically completed at the end of the production activities. • TECO system status is updated once production order is technically completed. • GI, Production Confirmation and GR is not possible once production order • ‘DAC’ (Disallow Cost) user status is updated once technical completion is done. Authorization is required to revert this user status.
  • 125. Page 125 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Key Terms & Concepts Production Order Settlement: • Technical completion is prerequisite to settle production order. • Production Order CO settlement is done at the end of period i.e. at the end of month by costing person. Production order balance becomes zero after production order settlement. Production Order Business Completion (CLSD): • Production Order business completion is done once production order is settled. Business completion is possible only if Production order balance becomes zero. • This activity is normally carried out by Costing person.
  • 126. Page 126 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 127. Page 127 An HCC Group companyCTM Training - ATE ATE Group – Process Matrix
  • 128. Page 128 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Process Flow
  • 129. Page 129 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Process Flow
  • 130. Page 130 An HCC Group companyCTM Training - ATE MTO-ATO Planning & Execution – Steps & Reports
  • 131. Page 131 An HCC Group companyCTM Training - ATE MTO-ATO Planning & Execution – Steps & Reports
  • 132. Page 132 An HCC Group companyCTM Training - ATE MTO Sales Ord. MRP Planning & Execution – Steps & Reports
  • 133. Page 133 An HCC Group companyCTM Training - ATE MTO Sales Ord. MRP Planning & Execution – Steps & Reports
  • 134. Page 134 An HCC Group companyCTM Training - ATE MTO Sales Ord. MRP Planning & Execution – Steps & Reports
  • 135. Page 135 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 136. Page 136 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Scenarios MTO Planning: A. MTO Planning • MTO Planning – With Individual and Collective Procurement • MTO Planning – With Collective Procurement B. MTO Execution • MTO
  • 137. Page 137 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 138. Page 138 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Highlights MRP Group: • MRP group: Z002 - MTO (20) MRP Strategy: • MRPP Strategy: 20
  • 139. Page 139 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Highlights Planned Order Profile: • Planned Order Profile: KD Production Order GI: • Production Order is Debited at the time of Good’s Issue Production Order Confirmation: • Production Order is Debited at the time of Production Operation Confirmation
  • 140. Page 140 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Highlights Production Order GR: • Production Order is Credited at the time of Production Good’s Receipt Production Order Variance: • Production Order variance is calculated on the basis of Target Cost. • Production Target Cost Vs. Actual Cost and Target Qty Vs. Actual Qty is analyzed • Difference between Target cost and Actual Cost is settled as per production order settlement rule, on production variance account and cost center.
  • 141. Page 141 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 142. Page 142 An HCC Group companyCTM Training - ATE ‘MTO – Sales Order MRP’ Planning & Execution – Process Change 1. Sales Order MRP Run (MD50) 2. MRP List (MD05) 3. Stock Requirement List (MD04) 4. Planned Order Maintenance 5. Capacity Planning 6. Capacity Leveling 7. Planned Order Conversion to Production Order (Partial / Complete) 8. Planned Order Conversion to Purchase Requisition – External Procurement 9. Production Order Capacity Planning 10. Production Order Capacity Evaluation 11. Production Order Release
  • 143. Page 143 An HCC Group companyCTM Training - ATE ‘MTO – Sales Order MRP’ Planning & Execution – Process Change 12. Raw Material Availability Check – For a particular production order (lot). 13. Good’s Issue – Actual Qty for a particular production order (lot). 14. Activity Confirmation – Actual Machine/Manpower Hrs for a particular production order (lot). 15. Sales Order Cost Run – ‘ZFIN’ material type. 16. Good’s Receipt – Good’s Receipt to declare Stock of Finish Good for a particular production order (lot). 17. Activity Confirmation – Actual Overheads for a particular production order (lot). 18. Production Order (lot) - Target Cost Vs. Actual Cost Analysis 19. Production Order Technical Completion 20. Production Order Settlement
  • 144. Page 144 An HCC Group companyCTM Training - ATE Agenda  Objective  General Information  PP SAP Org. Structure  List of Processes  Process – Make To Order Planning & Execution  Sub Processes  Key Terms & Concepts  Process flow with steps & Reports  Scenarios in Process  Highlights of process  Process Change  SAP T-codes & Master data to be used  DMS documents to be attached  Exercise  Assessment Questionnaire
  • 145. Page 145 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Transaction Codes
  • 146. Page 146 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Transaction Codes
  • 147. Page 147 An HCC Group companyCTM Training - ATE MTO Planning & Execution - Transaction Codes
  • 148. Page 148 An HCC Group companyCTM Training - ATE MTO Planning & Execution – Master Data 1. Material Master – (Finish Good’s, Raw Materials) 2. Bill Of Material – (Material BOM, Sales Order BOM) 3. Work Center 4. Routing