Project / Task Deliverables Learnings
Plant 610 & 611 E/I ESDS
Development
• Worked with Krunal Shukla & Bharat Vora to develop E/I
equipment strategies for OPP and Primary Extraction.
• Successfully completed task, developing more than 30
ESDSs covering all relevant equipment tags.
• Developed a good understanding of different failure modes and
maintenance strategies for each asset.
• Gained understanding about the process followed to determine Risk
Ranks, Cost of Equipment Outage, Cost of Shutdown, Major Overhaul
Frequency etc.
• Learnt about 610 & 611 Process and Electrical systems while developing
ESDSs by going through relevant drawings, control narratives and
operating philosophies.
• Developed an understanding about the difference in reliability
approaches such as Preventive Maintenance, Predictive Maintenance,
Condition Based Monitoring etc.
Plant 613 & 614 E/I ESDS
Development
• Worked with Adnan Zaheer & Riekert Panther to develop all
E/I ESDSs for tailings area.
• Collected required information using equipment manuals,
datasheets and other relevant documents to develop over 20
ESDSs.
• Reviewed ESDSs with Tailings CFT and followed up for final
approval.
• Supported RPD in developing associated reliability plans.
• Expanded upon understanding developed while creating Plant 610 & 611
ESDSs.
• Learnt about 613 & 614 Process while developing ESDSs by going
through relevant control narratives and operating philosophies.
• Gained exposure to RPD and their work in developing required plans
using ESDSs.
System Scoping for PE &
Tailings Plants
• Utilized CASS tool to develop a consolidated list of
equipment tags per system
• Re-scoped revised Electrical SLDs.
• Performed tag list validation to ensure tag to system
accuracy and tag list completeness.
• Developed proficiency in using different features of the CASS tool to
scope engineering drawings and generate required reports.
• Learnt the SLDs to develop a good understanding of electrical equipment
layout within PE & Tailings.
Abdullah's Work Term Details
Room & Location Allocation
for Assets within PE &
Tailings
• Aided Krunal Shukla and Pedro Pulido in assigning room &
location to assets within PE.
• Assigned E-house (5th level FLOC) for Tailings electrical
assets for Pedro.
• Learnt how room & location is determined for an equipment on site
• Developed an understanding about the effectiveness of assigning room
& location to assets in order to develop effective and time-efficient
maintenance strategies.
Tailings ACR Review • Supported Riekert Panther and Sarmad Ahmed in facilitating
ACR review sessions with Tailings CFT by preparing list of
tags to be covered.
• Concept behind ACR and factors considered by CFT before assigning a
ranking to any asset.
RCM for PE & SE • Supported AST through RCM process for plants 610 & 611.
Actively participated in multiple sessions to learn about the
RCM process.
• Worked with AST to develop RCM reports for over 7
systems in Plant 610 & 611.
• Facilitated pre-session preparation for Plant 612 RCM by
collecting required information about different assets which
are to be covered during the first set of RCM sessions.
• Developed proficiency in using Meridium Software. Utilized software for
different requirements including the development of consolidated list of
actions and generation of RCM reports.
• Gained understanding of how an RCM process works.
• The methodology behind performing a rigorous RCM on an asset.
• Reporting structure utilized to report RCM and topics covered in the
report providing detail about purpose, scope of work, approach and types
of recommendations
Spare Part Strategy
Development for OPP & SE
• Worked with Jesus Hernandez and Adnan Zaheer on this
task.
• Collected information from datasheets and equipment
manuals to identify long-lead items. Prepared reports listing
these items and sent them to supply chain.
• Determined long-lead status for all E&I tags within plant 612
and supported development of initial spare strategies for all
OPP ESDSs.
• Criteria behind identifying an E/I equipment as long lead item.
Engineering Walk-down
(Inspection of E-Houses)
• Participated in walk downs with senior electrical engineers to inspect E-
Houses and identify any areas of concern.
• Participated in meetings where punch items are highlighted and
discussed after each walk down.
• Adhered strictly to Suncor’s PPE protocol and safety culture throughout
each walk-down.
• Gained a better understanding about different electrical assets through
these walk-downs.
Monthly Stewardship
Reports
• Collected information from different team members to
develop monthly stewardship reports.
• Maintained progress tracker to generate graphs displaying
progress made each month.
• Got a chance to meet the team members and work with them on one-on-
one basis.
• By collecting input from team members, learnt about different factors
affecting overall progress of Fort Hills reliability work for fixed plants,
mining and NPA.
United Way Campaign
Calgary
• As floor ambassador reached out to all Suncor employees
and contractors on the 38th floor to help raise awareness
about United Way initiatives and facilitate fund raising
activities.
• Suncor’s commitment to participate in initiatives strengthening local
communities.
• How a large-scale awareness and fund-raising initiative works within a
corporate environment.

More Related Content

Viewers also liked (10)

Mural art
Mural artMural art
Mural art
 
DOLETA!
DOLETA!DOLETA!
DOLETA!
 
BEST WESTERN Indiana Inn
BEST WESTERN Indiana InnBEST WESTERN Indiana Inn
BEST WESTERN Indiana Inn
 
151207 tajikistan
151207 tajikistan151207 tajikistan
151207 tajikistan
 
قناة العربية
قناة العربيةقناة العربية
قناة العربية
 
Mono di hybrid cross (p.a.c 2015)
Mono di hybrid cross (p.a.c 2015)Mono di hybrid cross (p.a.c 2015)
Mono di hybrid cross (p.a.c 2015)
 
Final Revised PhD Thesis Jan 2014
Final Revised  PhD Thesis Jan 2014Final Revised  PhD Thesis Jan 2014
Final Revised PhD Thesis Jan 2014
 
China
ChinaChina
China
 
PROFILE
PROFILEPROFILE
PROFILE
 
RAR3 Sampler
RAR3 SamplerRAR3 Sampler
RAR3 Sampler
 

Similar to Work Term Report (20)

Inst Resume -16
Inst Resume -16Inst Resume -16
Inst Resume -16
 
Latest CV
Latest CVLatest CV
Latest CV
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
Anish Pandey_ B.Tech-EE _5yrs_AM-Procurement _Inventory_Logistic and Electric...
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
SHERIF EISSA - Resume-
SHERIF EISSA - Resume-SHERIF EISSA - Resume-
SHERIF EISSA - Resume-
 
Derar CM
Derar CMDerar CM
Derar CM
 
Lawanson Oluwasanmi Resume (2)
Lawanson Oluwasanmi Resume (2)Lawanson Oluwasanmi Resume (2)
Lawanson Oluwasanmi Resume (2)
 
Lawanson Oluwasanmi Resume..
Lawanson Oluwasanmi Resume..Lawanson Oluwasanmi Resume..
Lawanson Oluwasanmi Resume..
 
Electrical engineer cv
Electrical engineer cvElectrical engineer cv
Electrical engineer cv
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
RICKIE BILL RESUME
RICKIE BILL RESUMERICKIE BILL RESUME
RICKIE BILL RESUME
 
Lavakumar
LavakumarLavakumar
Lavakumar
 
Maintenance
MaintenanceMaintenance
Maintenance
 
new resume
new resumenew resume
new resume
 
CV
CVCV
CV
 
SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
 
DaleHobbsResume
DaleHobbsResumeDaleHobbsResume
DaleHobbsResume
 

Work Term Report

  • 1. Project / Task Deliverables Learnings Plant 610 & 611 E/I ESDS Development • Worked with Krunal Shukla & Bharat Vora to develop E/I equipment strategies for OPP and Primary Extraction. • Successfully completed task, developing more than 30 ESDSs covering all relevant equipment tags. • Developed a good understanding of different failure modes and maintenance strategies for each asset. • Gained understanding about the process followed to determine Risk Ranks, Cost of Equipment Outage, Cost of Shutdown, Major Overhaul Frequency etc. • Learnt about 610 & 611 Process and Electrical systems while developing ESDSs by going through relevant drawings, control narratives and operating philosophies. • Developed an understanding about the difference in reliability approaches such as Preventive Maintenance, Predictive Maintenance, Condition Based Monitoring etc. Plant 613 & 614 E/I ESDS Development • Worked with Adnan Zaheer & Riekert Panther to develop all E/I ESDSs for tailings area. • Collected required information using equipment manuals, datasheets and other relevant documents to develop over 20 ESDSs. • Reviewed ESDSs with Tailings CFT and followed up for final approval. • Supported RPD in developing associated reliability plans. • Expanded upon understanding developed while creating Plant 610 & 611 ESDSs. • Learnt about 613 & 614 Process while developing ESDSs by going through relevant control narratives and operating philosophies. • Gained exposure to RPD and their work in developing required plans using ESDSs. System Scoping for PE & Tailings Plants • Utilized CASS tool to develop a consolidated list of equipment tags per system • Re-scoped revised Electrical SLDs. • Performed tag list validation to ensure tag to system accuracy and tag list completeness. • Developed proficiency in using different features of the CASS tool to scope engineering drawings and generate required reports. • Learnt the SLDs to develop a good understanding of electrical equipment layout within PE & Tailings. Abdullah's Work Term Details
  • 2. Room & Location Allocation for Assets within PE & Tailings • Aided Krunal Shukla and Pedro Pulido in assigning room & location to assets within PE. • Assigned E-house (5th level FLOC) for Tailings electrical assets for Pedro. • Learnt how room & location is determined for an equipment on site • Developed an understanding about the effectiveness of assigning room & location to assets in order to develop effective and time-efficient maintenance strategies. Tailings ACR Review • Supported Riekert Panther and Sarmad Ahmed in facilitating ACR review sessions with Tailings CFT by preparing list of tags to be covered. • Concept behind ACR and factors considered by CFT before assigning a ranking to any asset. RCM for PE & SE • Supported AST through RCM process for plants 610 & 611. Actively participated in multiple sessions to learn about the RCM process. • Worked with AST to develop RCM reports for over 7 systems in Plant 610 & 611. • Facilitated pre-session preparation for Plant 612 RCM by collecting required information about different assets which are to be covered during the first set of RCM sessions. • Developed proficiency in using Meridium Software. Utilized software for different requirements including the development of consolidated list of actions and generation of RCM reports. • Gained understanding of how an RCM process works. • The methodology behind performing a rigorous RCM on an asset. • Reporting structure utilized to report RCM and topics covered in the report providing detail about purpose, scope of work, approach and types of recommendations Spare Part Strategy Development for OPP & SE • Worked with Jesus Hernandez and Adnan Zaheer on this task. • Collected information from datasheets and equipment manuals to identify long-lead items. Prepared reports listing these items and sent them to supply chain. • Determined long-lead status for all E&I tags within plant 612 and supported development of initial spare strategies for all OPP ESDSs. • Criteria behind identifying an E/I equipment as long lead item. Engineering Walk-down (Inspection of E-Houses) • Participated in walk downs with senior electrical engineers to inspect E- Houses and identify any areas of concern. • Participated in meetings where punch items are highlighted and discussed after each walk down. • Adhered strictly to Suncor’s PPE protocol and safety culture throughout each walk-down. • Gained a better understanding about different electrical assets through these walk-downs.
  • 3. Monthly Stewardship Reports • Collected information from different team members to develop monthly stewardship reports. • Maintained progress tracker to generate graphs displaying progress made each month. • Got a chance to meet the team members and work with them on one-on- one basis. • By collecting input from team members, learnt about different factors affecting overall progress of Fort Hills reliability work for fixed plants, mining and NPA. United Way Campaign Calgary • As floor ambassador reached out to all Suncor employees and contractors on the 38th floor to help raise awareness about United Way initiatives and facilitate fund raising activities. • Suncor’s commitment to participate in initiatives strengthening local communities. • How a large-scale awareness and fund-raising initiative works within a corporate environment.