Actual Quantity At Actual Mix
Actual Quantity At Standard
X Standard Rate
Standard Quantity Allowed
At Standard Mix
X Standard Rate
Material Mix Variance
Material Yield Variance
Material Quantity
Variance
TOPIC: VARIANCE ANALYST/STANDARD COSTING
VARAINCE FORMULAS
1) DIRECT MATERIAL VARIANCE:-
*DIAGRAM:
DIRECT MATERIAL
VARIANCE
Material Quantity Variance
(Difference between Standard
and Actual Quantity) x Standard
Rate
Material Mix Variance
(Difference b/w actual qty
used and actual qty at std mix)
x Standard price
Material Yeild Variance
(Difference b/w actual qty at
std mix and std qty at std mix)
x Standard price
Material Price Variance
(Difference between Standard
and Actual rate) xActual
quantity purchased or issued
Material Quantity Variance
Formula: Difference between Standard and Actual Quantity x Standard Rate
1 Standard quantity allowed for production
(per unit material consumption x actual units produce) XXX
2 Actual quantity used in production XXX
Variance XXX
Standard Rate XXX
Material quantity variance XXX
Material Price Variance
Formula: Difference between Standard and Actual rate x Actual quantity purchased or issued
1 Standard rate for purchases XXX
2 Actual rate on purchases XXX
Variance XXX
Actual Quantity purchase / issue XXX
Material price variance XXX
Material Mix Variance
Formula: (Difference b/w actual qty used and actual qty at std mix) x Standard price
1 Actual Quantity Used XXX
2 Actual Quantity At Standard Mix XXX
Variance XXX
Standard Price XXX
Material Mix Variance XXX
Material Yeild Variance
Formula: (Difference b/w actual qty at std mix and std qty at std mix) x Standard price
1 Actual Quantity At Standard Mix XXX
2 Standarad Quantity At Standard Mix XXX
Variance XXX
Standard Price XXX
Material Yeild Variance XXX
Actual hours worked
Std. hours allowed at Expected output
X Standard Rate
Std. hours allowed at Actual
output
X Standard Rate
LEV (at expected
output)
Labor Yield Variance
Total Labor Efficiency
Variance
2) DIRECT LABOR VARIANCE:
*DIAGRAM:
DIRECT LABOR
VARIANCE
Labour Hour/ Efficency
Variance
(Difference between Standard
and Actual hours) x Standard
Rate
Labor Yeild Variance
(Difference b/w Expected
output and actual output x per
unit hour cons.) x Std. Rate
Labor Efficiency Variance At
Expected Output
(Difference b/w Actual hours
and Standard hours at
expected output) x Standard
Rate
Labour Price Variance
(Difference between Standard
and Actual rate) x Actual hours
used
Labour hour/ efficency Variance
Formula: Difference between Standard and Actual hours x Standard Rate
1 Standard hours allowed for actual production
(per unit hour consumption x actual units produce) XXX
2 Actual hours used in production XXX
Variance XXX
Standard Rate XXX
Labour hour/ efficency Variance XXX
Labour Price Variance
Formula: Difference between Standard and Actual rate x Actual hours used
Standard rate for payment of labour XXX
Actual rate paid to labour XXX
Variance XXX
Actual hours used XXX
Labour Price Variance XXX
Labour Efficiency Variance
Formula: (Difference b/w Actual hours and Standard hours at expected output) x Standard Rate
Std. Hours allowed for Expected Output XXX
Actual hours used XXX
Variance XXX
Std. Rate XXX
Labor Efficiency Variance XXX
Labour Yeild Variance:
Formula: (Difference b/w Expected output and actual output x per unit hour cons.) x Std. Rate
Standard hours allowed for Expected Output
(hours per units x Expected Output) XXX
Standard hours allowed for Actual output
(hours per units x Actual Output) XXX
Variance XXX
Std. Rate XXX
Labour Yeild Variance: XXX
Actual hours worked
Std. hours allowed at Expected output
X Standard Rate
Std. hours allowed at Actual
output
X Standard Rate
FOH (at expected
output)
FOH Yield Variance
Total FOH Efficiency
Variance
3) FACTORY OVERHEAD VARIANCE:-
*DIAGRAM:
FACTORY OVERHEAD
VARIANCE
Factory
Overhead Two
Variance
Controllable
Variance
(Difference b/w
Actual Amount Of
FOH and Bugeted
Amount Of FOH)
Volume Variance
(Difference b/w
Budgeted Amount
Of FOH and Standard
Amount Of FOH)
Factory
Overhead
Three Variance
Spending
Variance
(Difference B/w
Actual amount of
FOH and Budget
allowance based in
actual hours)
Idle Capacity
Variance
(Difference B/w
Budget allowance
based in Actual
hours and
Standard
overhead charged
to production)
Efficiency
Variance
[Difference B/w
Standard overhead
charged to
production (Based
on Actual hours)
and Standard
overhead charged
to production
(Based on Standard
hours)]
FOH Efficiency Variacne
At Expected Output
(Difference B/w Actual Hours
Worked and Std. Hours
Allowed At Expected Output)
x Std. Rate
FOH Yeild Variacne
(Difference B/w Std. Hours
Allowed At Expected Output and
Std. Hours Allowed At Actual
Output) x Std. Rate
Factory
Overhead Four
Variance
Spending
Variance
(Difference B/w
Actual amount of
FOH and Budget
allowance based
in actual hours)
Idle Capacity
Variance
(Difference B/w
Budget
allowance based
in Actual hours
and Standard
overhead
charged to
production)
Variable
Efficiency
Variance
(Difference B/w
Budget allowance
based in actual
hours and Budget
allowance based
in Standard
hours)
Fixed Efficiency
Variance
(Difference B/w
Budgeted
allowance - Based
on Actual Hours
and Budgeted
allowance - Based
on Standard Hours)
1 Controllable Variance
a) Actual amount of factory overhead
i) Fixed FOH XXX
ii) Variable FOH XXX XXX
b) Budgeted amount of Factory overhead
i) Fixed budgeted overhead XXX
ii) Variable budgeted OH
(Standard hours allowed x
Variable per unit rate) XXX XXX
CONTROLLABLE VARIANCE XXX
2 Volume Variance
a) Budgeted amount of Factory overhead: XXX
b) Standard amount of Factory overhead
i) Fixed budgeted overhead(Std. hours allowed x FFOH rate) XXX
ii) Variable budgeted OH (Std. hours allowed x VFOH rate) XXX
XXX
VOLUME VARIANCE XXX
1 Spending Variance
a) Actual amount of factory overhead
i) Fixed FOH XXX
ii) Variable FOH XXX XXX
b) Budget allowance based in actual hours
i) Fixed FOH XXX
ii) Variable FOH
(Actual hours x V.FOH Rate) XXX XXX
Spending Variance XXX
2 Idle Capacity Variance
a) Budget allowance based in Actual hours XXX
b) Standard overhead charged to production
i) Fixed FOH (Actual hours worked x F.FOH rate) XXX
ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX
Idle Capacity Variance XXX
3 Efficiency Variance
a) Standard overhead charged to production (Based on Actual hours)
2 - Variance method
3 - Variance method
FACTORY OVERHEAD VARIANCE
i) Fixed FOH (Actual hours worked x F.FOH rate) XXX
ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX
b) Standard overhead charged to production (Based on Standard hours)
i) Fixed FOH (Std. hours allowed x F.FOH rate) XXX
ii) Variable FOH (Std. hours allowed x V.FOH rate) XXX XXX
Efficiency Variance XXX
1 Spending Variance
a) Actual amount of factory overhead
i) Fixed FOH XXX
ii) Variable FOH XXX XXX
b) Budget allowance based in actual hours
i) Fixed FOH XXX
ii) Variable FOH
(Actual hours x V.FOH Rate) XXX XXX
Spending Variance XXX
2 Idle Capacity Variance
a) Budget allowance based in Actual hours XXX
b) Standard overhead charged to production
i) Fixed FOH (Actual hours worked x F.FOH rate) XXX
ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX
Idle Capacity Variance XXX
3 Variable Efficiency Variance:
a) Budget allowance based in actual hours
i) Fixed FOH XXX
ii) Variable FOH
(Actual hours x V.FOH Rate) XXX XXX
b) Budget allowance based in Standard hours
i) Fixed FOH XXX
ii) Variable FOH
(Standard hours allowed x V.FOH Rate) XXX XXX
Variable Efficiency Variance: XXX
4 Fixed Efficiency Variance:
a) Budgeted allowance - Based on Actual Hours:
i) Fixed FOH Actual hours x Fixed FOH rate XXX
b) Budgeted allowance - Based on Standard Hours:
i) Fixed FOH Standard hours allowed x Fixed FOH rate XXX
Fixed Efficiency Variance: XXX
4 - Variance method
Standard Hours Allowed
Actual Hours Allowed
Estimated Hours Allowed
Fixed FOH Volume
Efficiency Variance
Fixed FOH Volume
Capacity Variance
Fixed FOH Volume Variance
4) FACTORY OVERHEAD VARIANCE (AT BRITISH METHOD):-
 DIAGRAM:
FACTORY
OVERHEAD
Fixed Factory
Overhead Variance
Fixed FOH Expenditure
Variance
(Difference Between bugeted
amount of fixed FOH and actual
amount of fixed FOH)
Fixed FOH Volume
Variance
(Difference Between
standard hour allowed for
production and estimated
hours allowed)
Fixed FOH Volume
Efficiency Variance
(Difference Between
standard hour allowed for
production and actual hours
worked)
Fixed FOH Volume
Capacity Variance
(Difference Between
estimated hours allowed
and actual hours worked)
Variable Factory
Overhead Variance
Variable FOH
Expenditure Variance
(Difference Between Std
rate of V.FOH and Actual
V.FOH) x Actual hours
worked
Variable FOH Efficiency
Variance
(Difference Between Std.
hours allowed and actual
hours worked) x Standard rate
of V.FOH
Variable OH - Expenditure Variance:
(Difference Between Std rate of V.FOH and Actual V.FOH) x Actual hours worked
Standard rate of Variable expenditure per hour = XXX
Actual rate of Variable expenditure per hour:
(Rs 910,000 / 13,000 hours) XXX
Variance XXX
Actual hours worked XXX
Variable OH - Expenditure Variance XXX
Variable OH - Efficiency Variance:
(Difference Between Std. hours allowed and actual hours worked) x Standard rate of V.FOH
1 Standard hours allowed for actual production
(per unit hour consumption x actual units produce)
(1.5 hours per unit x 9,500 units) XXX
2 Actual hours used in production XXX
Variance XXX
Standard Rate XXX
Variable OH - Efficiency Variance: XXX
Fixed FOH - Expenditure Variance:
(Difference Between budegted amount of fixed FOH and actual amount of fixed FOH)
Budgeted amount of Fixed FOH XXX
Actual amount of Fixed FOH XXX
Fixed FOH - Expenditure Variance: XXX
Fixed FOH - Volume Variance:
(Difference Between standard hour allowed for production and estimated hours worked)
1 Standard hour allowed for production
(Actual units x Std hours allowed per unit)
(9,500 units x 1.5 hours per unit) XXX
2 Estimated hours allowed
(Std. units x Std hours allowed per unit)
(10,500 units x 1.5 hours per unit) XXX
XXX
Std rate of F.FOH XXX
Fixed FOH - Volume Variance: XXX
FACTORY OVERHEAD FORMULAS (AT BRITISH METHOD)
Fixed FOH - Volume EFFICIENCY Variance:
(Difference Between standard hour allowed for production and actual hours worked)
1 Standard hour allowed for production XXX
2 Actual hours worked XXX
XXX
Std rate of F.FOH XXX
Fixed FOH - Volume EFFICIENCY Variance: XXX
Fixed FOH - Volume CAPACITY Variance:
(Difference Between estimated hours allowed and actual hours worked)
1 Actual hours worked XXX
2 Estimated hours allowed XXX
XXX
Std rate of F.FOH XXX
Fixed FOH - Volume CAPACITY Variance: XXX
Actual Sales
Actual Sales At Base Year Rate
Base Year Sales
Sales Price Variance
Sales Volume Variance
Total Sales Variance
Actual COGS
Actual COGS At Base Year Rate
Base Year COGS
Cost Price Variance
Cost Volume Variance
Total Cost Variance
4) SALES VARIANCE AND COST VARIANCE:
 DIAGRAM:
SALES VARIANCE
Sales Price Variance
(Difference b/w Base year
rate and current year rate) x
Current sales (in units)
Sales Volume Variance
(Difference b/w Base year
units and current year units)
x Base year unit
COST VARAINCE
Cost Volume Variance
(Difference b/w base year
units and current year units)
x Base year rate
Cost Price Variance
(Difference b/w base year
rate and current year rate) x
Current Sales (in units)
Sales Volume Variance & Cost
Volume Variance Further
divided into two parts mention
below:
Final Sales Volume Variance
(Difference b/w base years sales
and current sales (in units)) x
average base year gross profit
per unit
Sales Mix Variance:
(Difference b/w current year
sales and current year mix at
base year mix) x Base year G.P.
Sales Price Variance
Formula (Difference b/w Base year units and current year units) x Base year rate
1 Base Year Rate XXX
2 Current Year Rate XXX
Variance XXX
Current Sales (In Units) XXX
Sales Price Variance XXX
Sales Volume Variance
Formula (Difference b/w Base year units and current year units) x Base year rate
1 Base Year Unit XXX
2 Current Year Unit XXX
Variance XXX
Base Year Unit XXX
Sales Price Variance XXX
Sales Mix Variance
Formula (Difference b/w current year sales and current year mix at base year mix) x Base year G.P.
1 Current Year Sales XXX
2 Actual Quantity At Base Year Mix
[Actual Sales *(Mix Product/Total Mix Product)] XXX
Variance XXX
Base Year Unit XXX
Sales Mix Variance XXX
Final Sales Volume Variance
Formula (Difference b/w base years sales and current sales (in units)) x average base year gross profit per unit
1 Current Year Sales XXX
2 Base Yeat Sales XXX
Variance XXX
Average base year Gross profit per unit XXX
Final Sales Volume Variance XXX
Cost Price Variance (Rate means cost rate)
Formula (Difference b/w base year rate and current year rate) x Current Sales (in units)
1 Base Year Rate XXX
2 Current Year Rate XXX
Variance XXX
Current Sales (In Units) XXX
Sales Price Variance XXX
Cost Volume Variance
Formula (Difference b/w base year units and current year units) x Base year rate
1 Base Year Unit XXX
2 Current Year Unit XXX
Variance XXX
Base Year Cost Rate XXX
Cost Volume Variance XXX
If nos. of units increased (in sales) resulting increase in the cost spending
RECONCILATION STATEMENT OF GROSS PROFIT
Favourable/UnFavourable sales Price variance XXX/(XXX)
Unfavourable/Favourable cost Price variance (XXX)/XXX
XXX/(XXX)
Favourable/UnFavourable Sales Mix Variance XXX/(XXX)
Unfavourable/Favourable Final Sale Volume Variance (XXX)/XXX XXX/(XXX)
Increase/Decrease in Gross profit XXX/(XXX)
1 Sales Price Variance
2 Cost Price variance
3 Sales Mix Variance
4 Final Sales volume variance
If Unfav. Then "Loss due to increase in Cost price"
If Favourable then "Gain due to shift in Sales mix"
If Unfav. Then "Loss due to shift in Sales mix"
If Favourable then " Gain due to increase in units sold"
If Unfav. Then " Loss due to decrease in units sold"
INTERPRETATION
If Favourable then "Gain due to increase in Sales price"
If Unfav. Then "Loss due to decrease in sales price"
If Favourable then "Gain due to decrease in cost price"

More Related Content

Similar to Variance Formulae

Standard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptStandard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptJomarDoctora
 
Akaun Chapter 11
Akaun Chapter 11Akaun Chapter 11
Akaun Chapter 11WanBK Leo
 
Overhead cost variance
Overhead cost varianceOverhead cost variance
Overhead cost variancePAWANGUPTA327
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentationJay Singh
 
Variance Analysis
Variance Analysis Variance Analysis
Variance Analysis MACFAST
 
Flexible budgets & overhead costs
Flexible budgets & overhead costsFlexible budgets & overhead costs
Flexible budgets & overhead costsakanksha_020
 
Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)DSDEVDA
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysisSumit Malhotra
 
Standard costing short tutorial
Standard costing short tutorialStandard costing short tutorial
Standard costing short tutorialessiram413
 
COSTING FOR FACTORY OVERHEAD.pptx
COSTING FOR FACTORY OVERHEAD.pptxCOSTING FOR FACTORY OVERHEAD.pptx
COSTING FOR FACTORY OVERHEAD.pptxFahad Farooq
 
9. Chapter 23, 24 Performance Evaluation.pdf
9. Chapter 23, 24 Performance Evaluation.pdf9. Chapter 23, 24 Performance Evaluation.pdf
9. Chapter 23, 24 Performance Evaluation.pdfThyLinhLTh6
 
Costing formulae
Costing formulaeCosting formulae
Costing formulae450454
 
Costing formulae
Costing formulaeCosting formulae
Costing formulaeSunil Katal
 

Similar to Variance Formulae (20)

Standard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.pptStandard-Costing-Variance-Analysis.ppt
Standard-Costing-Variance-Analysis.ppt
 
Akaun Chapter 11
Akaun Chapter 11Akaun Chapter 11
Akaun Chapter 11
 
Overhead cost variance
Overhead cost varianceOverhead cost variance
Overhead cost variance
 
Standard Costing
Standard CostingStandard Costing
Standard Costing
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentation
 
Managment accounting
Managment accountingManagment accounting
Managment accounting
 
Variance analysis
Variance analysisVariance analysis
Variance analysis
 
Projecto variance
Projecto varianceProjecto variance
Projecto variance
 
3901853 standard-costing
3901853 standard-costing3901853 standard-costing
3901853 standard-costing
 
Variance Analysis
Variance Analysis Variance Analysis
Variance Analysis
 
Flexible budgets & overhead costs
Flexible budgets & overhead costsFlexible budgets & overhead costs
Flexible budgets & overhead costs
 
Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)Ca chap 13 standard costing&variance analysis(2)
Ca chap 13 standard costing&variance analysis(2)
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Standard costing short tutorial
Standard costing short tutorialStandard costing short tutorial
Standard costing short tutorial
 
Standard costing
Standard costingStandard costing
Standard costing
 
COSTING FOR FACTORY OVERHEAD.pptx
COSTING FOR FACTORY OVERHEAD.pptxCOSTING FOR FACTORY OVERHEAD.pptx
COSTING FOR FACTORY OVERHEAD.pptx
 
9. Chapter 23, 24 Performance Evaluation.pdf
9. Chapter 23, 24 Performance Evaluation.pdf9. Chapter 23, 24 Performance Evaluation.pdf
9. Chapter 23, 24 Performance Evaluation.pdf
 
Absorption costing
Absorption costingAbsorption costing
Absorption costing
 
Costing formulae
Costing formulaeCosting formulae
Costing formulae
 
Costing formulae
Costing formulaeCosting formulae
Costing formulae
 

More from Abdul Basit

Flexible budget (Management Accounting)
Flexible budget (Management Accounting)Flexible budget (Management Accounting)
Flexible budget (Management Accounting)Abdul Basit
 
Variance Formulae
Variance FormulaeVariance Formulae
Variance FormulaeAbdul Basit
 
Planning & decision_making
Planning & decision_makingPlanning & decision_making
Planning & decision_makingAbdul Basit
 
Challenges for managers
Challenges for managersChallenges for managers
Challenges for managersAbdul Basit
 
Motivation & leadership
Motivation & leadershipMotivation & leadership
Motivation & leadershipAbdul Basit
 
Management Accounting (Flexible budget)
Management Accounting (Flexible budget)Management Accounting (Flexible budget)
Management Accounting (Flexible budget)Abdul Basit
 

More from Abdul Basit (6)

Flexible budget (Management Accounting)
Flexible budget (Management Accounting)Flexible budget (Management Accounting)
Flexible budget (Management Accounting)
 
Variance Formulae
Variance FormulaeVariance Formulae
Variance Formulae
 
Planning & decision_making
Planning & decision_makingPlanning & decision_making
Planning & decision_making
 
Challenges for managers
Challenges for managersChallenges for managers
Challenges for managers
 
Motivation & leadership
Motivation & leadershipMotivation & leadership
Motivation & leadership
 
Management Accounting (Flexible budget)
Management Accounting (Flexible budget)Management Accounting (Flexible budget)
Management Accounting (Flexible budget)
 

Recently uploaded

Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsYourLegal Accounting
 
Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.sumayyasubhana321
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证ogawka
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingYourLegal Accounting
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© رnafizanafzal
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwadimosmejiaslendon
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.SNSW group8
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497dipikakk482
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledCaitlinCummins3
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accountshttps://localsmmshop.com/
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...Khaled Al Awadi
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesHaseebBashir5
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxNetapsFoundationAdmi
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerPusat Herbal
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...prakheeshc
 

Recently uploaded (20)

Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di BandungObat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
Obat Aborsi Bandung 0851\7696\3835 Jual Obat Cytotec Di Bandung
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.Presentation on cross cultural negotiations.
Presentation on cross cultural negotiations.
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Presentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelledPresentation4 (2) survey responses clearly labelled
Presentation4 (2) survey responses clearly labelled
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di DepokObat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
Obat Aborsi Depok 0851\7696\3835 Jual Obat Cytotec Di Depok
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg PfizerJual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
Jual Obat Aborsi Di Sibolga wa 0851/7541/5434 Cytotec Misoprostol 200mcg Pfizer
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
 

Variance Formulae

  • 1. Actual Quantity At Actual Mix Actual Quantity At Standard X Standard Rate Standard Quantity Allowed At Standard Mix X Standard Rate Material Mix Variance Material Yield Variance Material Quantity Variance TOPIC: VARIANCE ANALYST/STANDARD COSTING VARAINCE FORMULAS 1) DIRECT MATERIAL VARIANCE:- *DIAGRAM: DIRECT MATERIAL VARIANCE Material Quantity Variance (Difference between Standard and Actual Quantity) x Standard Rate Material Mix Variance (Difference b/w actual qty used and actual qty at std mix) x Standard price Material Yeild Variance (Difference b/w actual qty at std mix and std qty at std mix) x Standard price Material Price Variance (Difference between Standard and Actual rate) xActual quantity purchased or issued
  • 2. Material Quantity Variance Formula: Difference between Standard and Actual Quantity x Standard Rate 1 Standard quantity allowed for production (per unit material consumption x actual units produce) XXX 2 Actual quantity used in production XXX Variance XXX Standard Rate XXX Material quantity variance XXX Material Price Variance Formula: Difference between Standard and Actual rate x Actual quantity purchased or issued 1 Standard rate for purchases XXX 2 Actual rate on purchases XXX Variance XXX Actual Quantity purchase / issue XXX Material price variance XXX Material Mix Variance Formula: (Difference b/w actual qty used and actual qty at std mix) x Standard price 1 Actual Quantity Used XXX 2 Actual Quantity At Standard Mix XXX Variance XXX Standard Price XXX Material Mix Variance XXX Material Yeild Variance Formula: (Difference b/w actual qty at std mix and std qty at std mix) x Standard price 1 Actual Quantity At Standard Mix XXX 2 Standarad Quantity At Standard Mix XXX Variance XXX Standard Price XXX Material Yeild Variance XXX
  • 3. Actual hours worked Std. hours allowed at Expected output X Standard Rate Std. hours allowed at Actual output X Standard Rate LEV (at expected output) Labor Yield Variance Total Labor Efficiency Variance 2) DIRECT LABOR VARIANCE: *DIAGRAM: DIRECT LABOR VARIANCE Labour Hour/ Efficency Variance (Difference between Standard and Actual hours) x Standard Rate Labor Yeild Variance (Difference b/w Expected output and actual output x per unit hour cons.) x Std. Rate Labor Efficiency Variance At Expected Output (Difference b/w Actual hours and Standard hours at expected output) x Standard Rate Labour Price Variance (Difference between Standard and Actual rate) x Actual hours used
  • 4. Labour hour/ efficency Variance Formula: Difference between Standard and Actual hours x Standard Rate 1 Standard hours allowed for actual production (per unit hour consumption x actual units produce) XXX 2 Actual hours used in production XXX Variance XXX Standard Rate XXX Labour hour/ efficency Variance XXX Labour Price Variance Formula: Difference between Standard and Actual rate x Actual hours used Standard rate for payment of labour XXX Actual rate paid to labour XXX Variance XXX Actual hours used XXX Labour Price Variance XXX Labour Efficiency Variance Formula: (Difference b/w Actual hours and Standard hours at expected output) x Standard Rate Std. Hours allowed for Expected Output XXX Actual hours used XXX Variance XXX Std. Rate XXX Labor Efficiency Variance XXX Labour Yeild Variance: Formula: (Difference b/w Expected output and actual output x per unit hour cons.) x Std. Rate Standard hours allowed for Expected Output (hours per units x Expected Output) XXX Standard hours allowed for Actual output (hours per units x Actual Output) XXX Variance XXX Std. Rate XXX Labour Yeild Variance: XXX
  • 5. Actual hours worked Std. hours allowed at Expected output X Standard Rate Std. hours allowed at Actual output X Standard Rate FOH (at expected output) FOH Yield Variance Total FOH Efficiency Variance 3) FACTORY OVERHEAD VARIANCE:- *DIAGRAM: FACTORY OVERHEAD VARIANCE Factory Overhead Two Variance Controllable Variance (Difference b/w Actual Amount Of FOH and Bugeted Amount Of FOH) Volume Variance (Difference b/w Budgeted Amount Of FOH and Standard Amount Of FOH) Factory Overhead Three Variance Spending Variance (Difference B/w Actual amount of FOH and Budget allowance based in actual hours) Idle Capacity Variance (Difference B/w Budget allowance based in Actual hours and Standard overhead charged to production) Efficiency Variance [Difference B/w Standard overhead charged to production (Based on Actual hours) and Standard overhead charged to production (Based on Standard hours)] FOH Efficiency Variacne At Expected Output (Difference B/w Actual Hours Worked and Std. Hours Allowed At Expected Output) x Std. Rate FOH Yeild Variacne (Difference B/w Std. Hours Allowed At Expected Output and Std. Hours Allowed At Actual Output) x Std. Rate Factory Overhead Four Variance Spending Variance (Difference B/w Actual amount of FOH and Budget allowance based in actual hours) Idle Capacity Variance (Difference B/w Budget allowance based in Actual hours and Standard overhead charged to production) Variable Efficiency Variance (Difference B/w Budget allowance based in actual hours and Budget allowance based in Standard hours) Fixed Efficiency Variance (Difference B/w Budgeted allowance - Based on Actual Hours and Budgeted allowance - Based on Standard Hours)
  • 6. 1 Controllable Variance a) Actual amount of factory overhead i) Fixed FOH XXX ii) Variable FOH XXX XXX b) Budgeted amount of Factory overhead i) Fixed budgeted overhead XXX ii) Variable budgeted OH (Standard hours allowed x Variable per unit rate) XXX XXX CONTROLLABLE VARIANCE XXX 2 Volume Variance a) Budgeted amount of Factory overhead: XXX b) Standard amount of Factory overhead i) Fixed budgeted overhead(Std. hours allowed x FFOH rate) XXX ii) Variable budgeted OH (Std. hours allowed x VFOH rate) XXX XXX VOLUME VARIANCE XXX 1 Spending Variance a) Actual amount of factory overhead i) Fixed FOH XXX ii) Variable FOH XXX XXX b) Budget allowance based in actual hours i) Fixed FOH XXX ii) Variable FOH (Actual hours x V.FOH Rate) XXX XXX Spending Variance XXX 2 Idle Capacity Variance a) Budget allowance based in Actual hours XXX b) Standard overhead charged to production i) Fixed FOH (Actual hours worked x F.FOH rate) XXX ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX Idle Capacity Variance XXX 3 Efficiency Variance a) Standard overhead charged to production (Based on Actual hours) 2 - Variance method 3 - Variance method FACTORY OVERHEAD VARIANCE
  • 7. i) Fixed FOH (Actual hours worked x F.FOH rate) XXX ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX b) Standard overhead charged to production (Based on Standard hours) i) Fixed FOH (Std. hours allowed x F.FOH rate) XXX ii) Variable FOH (Std. hours allowed x V.FOH rate) XXX XXX Efficiency Variance XXX 1 Spending Variance a) Actual amount of factory overhead i) Fixed FOH XXX ii) Variable FOH XXX XXX b) Budget allowance based in actual hours i) Fixed FOH XXX ii) Variable FOH (Actual hours x V.FOH Rate) XXX XXX Spending Variance XXX 2 Idle Capacity Variance a) Budget allowance based in Actual hours XXX b) Standard overhead charged to production i) Fixed FOH (Actual hours worked x F.FOH rate) XXX ii) Variable FOH (Actual hours worked x V.FOH rate) XXX XXX Idle Capacity Variance XXX 3 Variable Efficiency Variance: a) Budget allowance based in actual hours i) Fixed FOH XXX ii) Variable FOH (Actual hours x V.FOH Rate) XXX XXX b) Budget allowance based in Standard hours i) Fixed FOH XXX ii) Variable FOH (Standard hours allowed x V.FOH Rate) XXX XXX Variable Efficiency Variance: XXX 4 Fixed Efficiency Variance: a) Budgeted allowance - Based on Actual Hours: i) Fixed FOH Actual hours x Fixed FOH rate XXX b) Budgeted allowance - Based on Standard Hours: i) Fixed FOH Standard hours allowed x Fixed FOH rate XXX Fixed Efficiency Variance: XXX 4 - Variance method
  • 8. Standard Hours Allowed Actual Hours Allowed Estimated Hours Allowed Fixed FOH Volume Efficiency Variance Fixed FOH Volume Capacity Variance Fixed FOH Volume Variance 4) FACTORY OVERHEAD VARIANCE (AT BRITISH METHOD):-  DIAGRAM: FACTORY OVERHEAD Fixed Factory Overhead Variance Fixed FOH Expenditure Variance (Difference Between bugeted amount of fixed FOH and actual amount of fixed FOH) Fixed FOH Volume Variance (Difference Between standard hour allowed for production and estimated hours allowed) Fixed FOH Volume Efficiency Variance (Difference Between standard hour allowed for production and actual hours worked) Fixed FOH Volume Capacity Variance (Difference Between estimated hours allowed and actual hours worked) Variable Factory Overhead Variance Variable FOH Expenditure Variance (Difference Between Std rate of V.FOH and Actual V.FOH) x Actual hours worked Variable FOH Efficiency Variance (Difference Between Std. hours allowed and actual hours worked) x Standard rate of V.FOH
  • 9. Variable OH - Expenditure Variance: (Difference Between Std rate of V.FOH and Actual V.FOH) x Actual hours worked Standard rate of Variable expenditure per hour = XXX Actual rate of Variable expenditure per hour: (Rs 910,000 / 13,000 hours) XXX Variance XXX Actual hours worked XXX Variable OH - Expenditure Variance XXX Variable OH - Efficiency Variance: (Difference Between Std. hours allowed and actual hours worked) x Standard rate of V.FOH 1 Standard hours allowed for actual production (per unit hour consumption x actual units produce) (1.5 hours per unit x 9,500 units) XXX 2 Actual hours used in production XXX Variance XXX Standard Rate XXX Variable OH - Efficiency Variance: XXX Fixed FOH - Expenditure Variance: (Difference Between budegted amount of fixed FOH and actual amount of fixed FOH) Budgeted amount of Fixed FOH XXX Actual amount of Fixed FOH XXX Fixed FOH - Expenditure Variance: XXX Fixed FOH - Volume Variance: (Difference Between standard hour allowed for production and estimated hours worked) 1 Standard hour allowed for production (Actual units x Std hours allowed per unit) (9,500 units x 1.5 hours per unit) XXX 2 Estimated hours allowed (Std. units x Std hours allowed per unit) (10,500 units x 1.5 hours per unit) XXX XXX Std rate of F.FOH XXX Fixed FOH - Volume Variance: XXX FACTORY OVERHEAD FORMULAS (AT BRITISH METHOD)
  • 10. Fixed FOH - Volume EFFICIENCY Variance: (Difference Between standard hour allowed for production and actual hours worked) 1 Standard hour allowed for production XXX 2 Actual hours worked XXX XXX Std rate of F.FOH XXX Fixed FOH - Volume EFFICIENCY Variance: XXX Fixed FOH - Volume CAPACITY Variance: (Difference Between estimated hours allowed and actual hours worked) 1 Actual hours worked XXX 2 Estimated hours allowed XXX XXX Std rate of F.FOH XXX Fixed FOH - Volume CAPACITY Variance: XXX
  • 11. Actual Sales Actual Sales At Base Year Rate Base Year Sales Sales Price Variance Sales Volume Variance Total Sales Variance Actual COGS Actual COGS At Base Year Rate Base Year COGS Cost Price Variance Cost Volume Variance Total Cost Variance 4) SALES VARIANCE AND COST VARIANCE:  DIAGRAM: SALES VARIANCE Sales Price Variance (Difference b/w Base year rate and current year rate) x Current sales (in units) Sales Volume Variance (Difference b/w Base year units and current year units) x Base year unit COST VARAINCE Cost Volume Variance (Difference b/w base year units and current year units) x Base year rate Cost Price Variance (Difference b/w base year rate and current year rate) x Current Sales (in units) Sales Volume Variance & Cost Volume Variance Further divided into two parts mention below: Final Sales Volume Variance (Difference b/w base years sales and current sales (in units)) x average base year gross profit per unit Sales Mix Variance: (Difference b/w current year sales and current year mix at base year mix) x Base year G.P.
  • 12. Sales Price Variance Formula (Difference b/w Base year units and current year units) x Base year rate 1 Base Year Rate XXX 2 Current Year Rate XXX Variance XXX Current Sales (In Units) XXX Sales Price Variance XXX Sales Volume Variance Formula (Difference b/w Base year units and current year units) x Base year rate 1 Base Year Unit XXX 2 Current Year Unit XXX Variance XXX Base Year Unit XXX Sales Price Variance XXX Sales Mix Variance Formula (Difference b/w current year sales and current year mix at base year mix) x Base year G.P. 1 Current Year Sales XXX 2 Actual Quantity At Base Year Mix [Actual Sales *(Mix Product/Total Mix Product)] XXX Variance XXX Base Year Unit XXX Sales Mix Variance XXX Final Sales Volume Variance Formula (Difference b/w base years sales and current sales (in units)) x average base year gross profit per unit 1 Current Year Sales XXX 2 Base Yeat Sales XXX Variance XXX Average base year Gross profit per unit XXX Final Sales Volume Variance XXX
  • 13. Cost Price Variance (Rate means cost rate) Formula (Difference b/w base year rate and current year rate) x Current Sales (in units) 1 Base Year Rate XXX 2 Current Year Rate XXX Variance XXX Current Sales (In Units) XXX Sales Price Variance XXX Cost Volume Variance Formula (Difference b/w base year units and current year units) x Base year rate 1 Base Year Unit XXX 2 Current Year Unit XXX Variance XXX Base Year Cost Rate XXX Cost Volume Variance XXX If nos. of units increased (in sales) resulting increase in the cost spending
  • 14. RECONCILATION STATEMENT OF GROSS PROFIT Favourable/UnFavourable sales Price variance XXX/(XXX) Unfavourable/Favourable cost Price variance (XXX)/XXX XXX/(XXX) Favourable/UnFavourable Sales Mix Variance XXX/(XXX) Unfavourable/Favourable Final Sale Volume Variance (XXX)/XXX XXX/(XXX) Increase/Decrease in Gross profit XXX/(XXX) 1 Sales Price Variance 2 Cost Price variance 3 Sales Mix Variance 4 Final Sales volume variance If Unfav. Then "Loss due to increase in Cost price" If Favourable then "Gain due to shift in Sales mix" If Unfav. Then "Loss due to shift in Sales mix" If Favourable then " Gain due to increase in units sold" If Unfav. Then " Loss due to decrease in units sold" INTERPRETATION If Favourable then "Gain due to increase in Sales price" If Unfav. Then "Loss due to decrease in sales price" If Favourable then "Gain due to decrease in cost price"