1. From,
ASHISH KUMAR
Contact No: +971-567538685 (UAE)
To,
Respected Sir,
Sub: An application for placement in your reputed organization as a SR.NDT INSPECTOR & Lifting
Inspector
I have enclosed my resume for your kind perusal, which clearly shows my skills and qualifications. Furthermore, I
am open to hone my skills adapt myself to the organizational culture.
If given an opportunity to work with your esteemed organization, I shall put forth all my efforts in
accomplishment of its goals.
After you have pursued my resume, hope you will definitely find me suitable for the job.
Thank you very much for taking time to pursue my resume and I am looking forward to an early and positive
response from you.
Yours sincerely,
(ASHISH KUMAR)
Page 1 of 15
2. ASHISH KUMAR
Sr.NDT INSPECTOR & Lifting INSPECTOR
POSTAL ADDRESS INDIA: CONTACTS:
VILL-HALDRA, P.O -KOUNA INDIA - +919816409642
TEH.-PALAMPUR. District: KANGRA. UAE - +971567538685
ashu.guleria1988@gmail.com
INTERPERSONAL SKILLS: Can easily get along with people in any environment.
COMMUNICATION SKILLS: Can easily communicate ideas orally or through writing.
CURRENTLY WORKING WITH APPLUS VELOSI CERTIFICATION SERVICES LLC AS A SR.NDT
INSPECTOR & Lifting INSPECTOR IN UAE.
PROFICIENT SUMMARY
To work in a progressive and growing organization where my skills are relished and my knowledge as a
Sr.NDT INSPECTOR & Lifting INSPECTOR is enhanced for the benefit of organization as well as my
personal development. Having Seven Years experience in NDT in various Petrochemicals, Refineries and
Offshore (All ONGC field), Fully Conversant with various standards (ASME SEC V, ASME SEC VIII, API 1104,
B31.3 AWS D 1.1, ASME SEC IX.)
PERSONAL DETAILS
Name : ASHISH KUMAR
Date of Birth : 04.05.1988
Page 2 of 15
3. Sex : Male
Marital Status : Unmarried
Passport No. : G7380884
Date of Expiry : 26-02-2018
Qualification : DME
Languages Known : English, Hindi, Panjabi & Pahadi
Computer Knowledge : MS Office
ACADEMIC QUALIFICATION
DIPLOMA IN MECHANICAL ENGINEERING National Institute of Engineering under In Maharashtra
Government.
Higher Secondary School: from Himachal Board
PROFESSIONAL QUALIFICATION
Lifting Equipment Engineering Association
LEEA 1 - Entrance Certificate
LEEA 2 – Lifting Equipment General Diploma - Reg. No 24822
American Society of Nondestructive Testing
• I have Qualified Level-II Personal in NDT Method (s) stated below according to the requirements of ASNT
document SNT-TC-1A.
Ultrasonic Testing (UT)
Radiography Testing (RT)
Magnet Particle Testing (MPT)
Liquid Penetrate Testing (LPT)
ASNT Level II in UT TKY
TECHNICAL EXPOSURE
Software Language : C
Office Tools : MSOffice, Photoshop.
Operating System : Windows 98, Windows xp, Windows 7.
SAFETY CERTIFICATION
OFFSHORE SAFETY TRANING COURSES AS PER STCW’ 95
Page 3 of 15
4. Fire Fighting. (FF)
Personal Survival Techniques. (PST)
Elementary First Aid. (EFA)
Helicopter Escape & Under Water Technique. (HEUT)
EMPLOYMENT HISTORYEMPLOYMENT HISTORY
Company Profile : Applus Velosi Certification Services L.L.C, Abu Dhabi
DESIGNATION : Sr.NDT & Lifting INSPECTOR
DURATION : SEP 2010 TO Till Date
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
MIPCO POWER PLANT MIRFA UAE (2016)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : 27
TH
November to 30
th
November
Project : NDT & VISUAL INSPECTION
Responsibilities : PERFORMED ULTRASONIC AND MPI TESTING IN BOILER #3 &
BOILER 4 ON STEAM DRUM, LOWER DRUM,SUPER HEATER
AREA, COMBUSTION CHAMBER, ECONOMIZER AREA, AUXILIARY
BOILER, BLOW DOWN TANK, WATER STORAGE TANK.
CHECK BURNER VISUALLY
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
STAR CEMENT (2016)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : 2
nd
, 20th April & 8
th
, 23rd May
Project : INSPECTION
Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR
HOLDING
PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER
FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE
SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT,
RAW
MILL SEPERATOR SHAFT , RAW MILL BAG HOUSE SHAFT
AND
ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN
EVERY
POSSITION.
PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE
QUALITY INTERNATIONAL (2016)
Page 4 of 15
5. Designation : SR.NDT INSPECTOR
Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS
Work period : Feb 3
RD
Feb 18
TH
Project : INSPECTION OF PLATES OF Pressure Vessel
Responsibilities : PERFORMED ULTRASONIC SCANNING
PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE
Dusup (Dubai supply authority) (2015)
Designation : SR.NDT INSPECTOR
Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS
Work period : SEP 1
ST
Nov 26
th
2015
Shut Down : INSPECTION OF PIPELINE IN SERVICE
Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS
GUAGING ON IN SERVICE PIPELINE FITTINGS, MAKING GRID
50X50mm AND 100X100mm AND SCAN WHOLE PIPE FITTINGS
LIKE REDUCER, TEE AND ELBOW.
.
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
STAR CEMENT (2015)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : MARCH 21
ST
to APRIL 15
TH
Project : INSPECTION
Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR
HOLDING
PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER
FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE
SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT,
RAW
MILL SEPERATOR SHAFT, RAW MILL BAG HOUSE SHAFT
AND
ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN
EVERY
POSSITION.
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
Page 5 of 15
6. Ruwais Fertilizer Industries (Fertil) 2015
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : MAY 21
ST
to JUNE 11
TH
Shut Down : INSPECTION OF AMMONIA STORAGE TANK T-4102
Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS
GUAGING AFTER THE MFL IN ANNULAR PLATE AND BOTTOM
PLATE, THICKNESS GUAGING ON INSIDE AND OUTSIDE
SHELL, THICKNESS GUAGING AND CORROSION MAPING ON
ROOF AND STAIRTOWER, THICKNESS GUAGING ON ALL THE
PIPING CONNECTING TO THE TANK INCLUDED STAIR
TOWER, THICKNESS GUAGING ON ALL THE NOZZLES
CONNECTED TO THE TANK.
PROJECT EXPERIENCEPROJECT EXPERIENCE
VVARIOUSARIOUS SITESSITES FORFOR NDTNDT FIELDFIELD ININ BAHRAINBAHRAIN
BAHRAINBAHRAIN NATURALNATURAL GAS (GAS (BANAGASBANAGAS )) 2015
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : November 9
th
to November 30
th
Project : INSPECTION OF BUTANE TANKS & PIPING
Responsibilities : performed ultrasonic scanning and thickness
guaging after the mfl in annular plate and bottom
plate, thickness guaging on inside and outside
shell, thickness guaging and corrosion maping on
roof and stairtower, thickness guaging on all the
piping connecting to the tank included stair
tower, thickness guaging on all the nozzles connected
to the tank.
VARIOUS SITES FOR NDT FIELD IN IRAQ ERBIL
WEATHERFORD OIL TOOL-MIDDLE EAST LTD
Designation : QC/NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : October 03
rd
-2013 to November 06
th
-2013
Page 6 of 15
7. Project : INSPECTION OF DRILLING TOOLS & ONSHORE
RIG
Responsibilities : Performed PMI & Hardness testing on drilling tools
Like separator wings, shaft, valve, elbow, tee & reducer
VARIOUS SITES FOR NDT FIELD IN ABUDHABI&DUBAI U.A.E
ALFASI CONSTRUCTIONS PTE LTd
Designation : QC/NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : October 19
th
-2010 to January 13
th
-2011
Project : NEW DOHA INTERNATIONAL AIRPORT (NDIA)
Responsibilities : Performed UT.MT, PT, PMI & Hardness testing on frames
& all structural joint
GASCO/PETROFAC/TARGET ENGINEERING (SHUT DOWN)
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : February 17
th
-2011 to February 28
th
-2011
Project : GASCO PROJECT TRAIN 3 (SHUT DOWN)
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Pressure Vessels, Piping, Column, and Heat Exchanger etc During
Shut down
GASCO/PETROFAC/TARGET ENGINEERING (PROJECT)
Designation : NDT COORDINATOR
Reporting to : QC Engineer
Work period : MARCH 6
th
-2011 to FEBRUARY 25
th
-2012
Project : 4
TH
NGL TRAIN GASCO PROJECT
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Piping &Various Plant Equipment during erection / Installation
TAKREER RUWAIS REFINERY SHUTDOWN
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : FEBRUARY 26
th
-2012 to MARCH 10
th
-2012 &
APRIL 03
th
-2012 to APRIL 24
th
-2012
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Pressure Vessels, Piping, Column, and Heat Exchanger
Etc. During Shut down and reported to QC Engineer.
Page 7 of 15
8. TAKREER RUWAIS REFINERY EXPANSION PROJECT
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : MAY 02
th
-2012 to MAY 29
th
-2012
Project : TAKREER RUWAIS REFINERY EXPANSION PROJECT
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Various Plant Equipment during erection / installation
GASCO/PETROFAC/ALHASSAN ENGINEERING (PROJECT)
Designation : NDT SUPERVISOR
Reporting to : QC Engineer
Work period : MAY 29
TH
2012
-
31
ST
JULY 2013
Project : 4
TH
NGL TRAIN GASCO PROJECT
DUSUP MARGHAM PLANT DUBAI (SHUT DOWN)
Designation : NDT INSPECTOR
Reporting to : QC Engineer
Work period : MAY 19
TH
& 20
TH
2014, JUNE 1
ST
& 2
ND
, 9TH&10
TH
2014
SHUT DOWN : VESSEL 90-V-202, VESSEL 90-V-101, VESSEL 90-V-302
Responsibilities : Performed PT, MT, UT & UTG VESSEL
FULL ON Job Responsibilities:
1)
• Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major
clients such as TAKREER.
• Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major
clients such as GASCO.
• Perform Ultrasonic Testing’s on piping in detection of Corrosion, Erosions and Pitting.
• Carried out Ultrasonic Thickness measurement of pipe lines.
• Perform Ultrasonic thickness survey of piping.
Page 8 of 15
9. • Carried out MT on weld, Nozzle fillet weld and inspected by using different methods like wet method, dry
method using Yoke.
• Carried out Ultrasonic thickness measurement of Pipe lines, Lamination check of Raw materials.
2)
Performing N.D.T. on Welds UT, MPT, RTFI, DPT, HARDNESS TESTING, PMI.
Carry out visual inspection of weldments during NDT Inspection, shut down, welder qualification test.
Making & Review of the final reports.
Familiar with international standards such as AWS, API, ASME, ASNT, ASTM etc.
Co-ordination with NDT personnel. Also making arrangements for DPT and RT.
Arranging the Technician as per job requirements.
Carried out weld repairs by making tracings and locating of the defects on the weld
VARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAIVARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAI
CLIENT
1. Weatherford-Dubai
2. AL-Shirawi
3. Dusup -Dubai
4. Archirodon-Rak
5. Titan– Dubai
6. Titan- Sharjah
7. Petronash- Jebel Ali Free Zone
8. Fugro- Ras AL Khaima
9. Oil well – Sharja
10. Speedy – Ras al Khor
11. INTEGRATED Industries-Ras Al khaima
12. Project Quality Engineer (VAIL) DUSUP- JAFZA
13. Mammoet – Jebel Ali Free Zone
14. Habtoor – Plant Dubai
15. Volga – Sharjah
16. Specialist- Dubai
17. Hawker Pacific- Sharjah
18. Gulftainer – Sharjah Port Khalid
Page 9 of 15
10. 19. Amana - DIP
20. Maverick –Ajman
21. Chicago – Al Quoz 4
22. Amana – DIP
23. Action – JAFZA
24. Manlift Middle East - DIP 2
25. ALU NASA – Jebel Ali 2
26. National Oilwell Varco- JAFZA
Performing N.D.T. on Welds UT, UTG,MPT, RTFI, DPT, HARDNESS TESTING& PMI
WORK EXPERIENCE IN INDIAWORK EXPERIENCE IN INDIA
• Company Profile : SMART TECHNOCRATS & CONSULTANCY SERVICES PVT. LDT.
NAVI MUMBAI
• DESIGNATION : NDT/QC INSPECTOR
• DURATION : JANUARY 01 2007 TO JULY 07 2010
ONSHORE EXPERIENCE
POSITION : NDT INSPECTOR & QC ENGINEER
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : H.P.C.L. (Hidustan Petroleum Corporation Ltd.)
Job Profile : P.M.I
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : Gammon Ind. Ltd. (Mumbai)
Job Profile : UT (BPCL Pipe Line Project)
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : GEI HEMON Industrial (Bhopal M.P.)
Job Profile : P.M.I.
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : TATA POWER (Mumbai)
Job Profile : UT, MPT, LPT
Organization : SPIC SMO
Client : NARMADA FERTILIZER BHARUCH (GUJRAT)
Job Profile : UT, HARDNESS, FERRITE
Organization : SPIC SMO
Page 10 of 15
12. UVDHL (Taloja), Intertech fittings (Rabale), Shreeji Engg. (Rabale),
Das offshore (MIDC), Dolphin Offshore etc.
Job Responsibilities : The primary role is to establish Ultrasonic testing Technique for jobs
As per ASME, API etc.
Co-ordination with Third Party Surveyors.
Carried out Non-Destructive testing such as Ultrasonic testing for Heavy
engineering turnkey project for chemical, petro chemicals.
Refinery, Fertilizers, oil & gas power project and steel industries.
Shutdown and Maintenance Inspection of Vessels, Piping, Valves
Etc. Inspection of fabricated items, such as heat exchangers,
Columns, Spheres, Bullets, Storage Tank etc.
Detection of corrosion and other service defect on various vessels Pipelines
Job Involved:
Co-ordination with NDT personnel. Also making arrangements for MPT, UT, DPT and RT.
Review of RT Films and Submission of the same for client approval.
FAMILIARIZATION OF EQUIPMENT LISTFAMILIARIZATION OF EQUIPMENT LIST
ULTRASONIC TESTINGS : EEC EX-10, PX-10, PX- 20, DIGISCAN,
SONATEST, KRAUTKRAMER-USM35X
LPT : ADROX, MAGNAFLUX, PRDEEP, P-MET,All Method
MPI : MAGNAFLUX, K-ELECTRONICS, SIMS-Y A/D Central
Conductor, Yoke, Coil & PROD machine.
HARDNESS TESTING : TIME GROUP TH-130
FERITE TESTING : FERITESCOPE MP 30 E-S (Fischer)
THICKNESS MEASURMENT : MODSONIC, EEC D-METER, DMS2, DMS5
PMI : X-MET3000TX, X-MET3000TX+, INOVEX, NITON,NITON
SURFACE PROFILE GAUGE : TYPE J10A (0.002 – 2mm) BAKER
HOLIDAY TESTING : MULTIVOLTAGE PIN HOLE
(LOW VOLTAGE & HIGH VOLTAGE)
Page 12 of 15
13. LOAD TESTING : Belt & Chain pulley
FERITSCOPE : MP 30
OFFSHORE WORK EXPERIENCE ONGC FIELDOFFSHORE WORK EXPERIENCE ONGC FIELD
Project : PRP II PROJECT (RISER BEND)
Inspection : GLIS & CEIL
Period : January 2008 to May 2008
Barge : ABUZAR-81
Client : M/S DOLPHIN OFFSHORE
Responsibilities : Performed PT, MT, UT in TKY joints
Project : PRP II PROJECT
Inspection : I.R.S.
Period : September 2008 to October 2008
Barge : CEMEC
Client : M/S LEIGHTON & DAS
Responsibilities : Performed UT in TKY joints
Project : BINA PROJECT (PIPELINE)
Inspection : E.I.L.
Period : November 17 – 27, 2008
Client : M/S OCENEERING
Responsibilities : Performed PT, MT & PMI
Project : BG OFFSHORE
Page 13 of 15
14. Inspection : GEIL
Period : December 2008 to January 2009
Rig : ENSCO – 50 / DD – 4
Responsibilities : Performed MT, UT in TKY joints & Hardness testing
Project : PRP I
Inspection : I.R.S.
Period : February 15, 2009
Barge : CEMEC-1
Client : M/S LEIGHTON & DAS
Responsibilities : Performed PT, MT, UT in TKY joints
Project : PRP II PROJECT (RISER BEND & PIPE LINE)
Inspection : I.R.S & CEIL
Period : November 03, 2009 to DECEMBER 31, 2009
Badge : ECLIPSE SINGAPUR
Client : M/S LEIGHTON INDIA
Project : PRP II PROJECT (RISER BEND & PIPE LINE)
Responsibilities : Performed PT, MT,PMI
Inspection : IRS & CEIL
Period : January 01 2010 to February 07 2010
Barge : SMITH BORNEO SINGAPORE
Client : M/S LEIGHTON INDIA
Responsibilities : Performed UT in TKY joints & RTFI
Page 14 of 15