SlideShare a Scribd company logo
1 of 15
From,
ASHISH KUMAR
Contact No: +971-567538685 (UAE)
To,
Respected Sir,
Sub: An application for placement in your reputed organization as a SR.NDT INSPECTOR & Lifting
Inspector
I have enclosed my resume for your kind perusal, which clearly shows my skills and qualifications. Furthermore, I
am open to hone my skills adapt myself to the organizational culture.
If given an opportunity to work with your esteemed organization, I shall put forth all my efforts in
accomplishment of its goals.
After you have pursued my resume, hope you will definitely find me suitable for the job.
Thank you very much for taking time to pursue my resume and I am looking forward to an early and positive
response from you.
Yours sincerely,
(ASHISH KUMAR)
Page 1 of 15
ASHISH KUMAR
Sr.NDT INSPECTOR & Lifting INSPECTOR
POSTAL ADDRESS INDIA: CONTACTS:
VILL-HALDRA, P.O -KOUNA INDIA - +919816409642
TEH.-PALAMPUR. District: KANGRA. UAE - +971567538685
ashu.guleria1988@gmail.com
INTERPERSONAL SKILLS: Can easily get along with people in any environment.
COMMUNICATION SKILLS: Can easily communicate ideas orally or through writing.
CURRENTLY WORKING WITH APPLUS VELOSI CERTIFICATION SERVICES LLC AS A SR.NDT
INSPECTOR & Lifting INSPECTOR IN UAE.
PROFICIENT SUMMARY
To work in a progressive and growing organization where my skills are relished and my knowledge as a
Sr.NDT INSPECTOR & Lifting INSPECTOR is enhanced for the benefit of organization as well as my
personal development. Having Seven Years experience in NDT in various Petrochemicals, Refineries and
Offshore (All ONGC field), Fully Conversant with various standards (ASME SEC V, ASME SEC VIII, API 1104,
B31.3 AWS D 1.1, ASME SEC IX.)
PERSONAL DETAILS
Name : ASHISH KUMAR
Date of Birth : 04.05.1988
Page 2 of 15
Sex : Male
Marital Status : Unmarried
Passport No. : G7380884
Date of Expiry : 26-02-2018
Qualification : DME
Languages Known : English, Hindi, Panjabi & Pahadi
Computer Knowledge : MS Office
ACADEMIC QUALIFICATION
DIPLOMA IN MECHANICAL ENGINEERING National Institute of Engineering under In Maharashtra
Government.
Higher Secondary School: from Himachal Board
PROFESSIONAL QUALIFICATION
Lifting Equipment Engineering Association
LEEA 1 - Entrance Certificate
LEEA 2 – Lifting Equipment General Diploma - Reg. No 24822
American Society of Nondestructive Testing
• I have Qualified Level-II Personal in NDT Method (s) stated below according to the requirements of ASNT
document SNT-TC-1A.
 Ultrasonic Testing (UT)
 Radiography Testing (RT)
 Magnet Particle Testing (MPT)
 Liquid Penetrate Testing (LPT)
 ASNT Level II in UT TKY
TECHNICAL EXPOSURE
Software Language : C
Office Tools : MSOffice, Photoshop.
Operating System : Windows 98, Windows xp, Windows 7.
SAFETY CERTIFICATION
OFFSHORE SAFETY TRANING COURSES AS PER STCW’ 95
Page 3 of 15
 Fire Fighting. (FF)
 Personal Survival Techniques. (PST)
 Elementary First Aid. (EFA)
 Helicopter Escape & Under Water Technique. (HEUT)
EMPLOYMENT HISTORYEMPLOYMENT HISTORY
Company Profile : Applus Velosi Certification Services L.L.C, Abu Dhabi
DESIGNATION : Sr.NDT & Lifting INSPECTOR
DURATION : SEP 2010 TO Till Date
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
MIPCO POWER PLANT MIRFA UAE (2016)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : 27
TH
November to 30
th
November
Project : NDT & VISUAL INSPECTION
Responsibilities : PERFORMED ULTRASONIC AND MPI TESTING IN BOILER #3 &
BOILER 4 ON STEAM DRUM, LOWER DRUM,SUPER HEATER
AREA, COMBUSTION CHAMBER, ECONOMIZER AREA, AUXILIARY
BOILER, BLOW DOWN TANK, WATER STORAGE TANK.
CHECK BURNER VISUALLY
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
STAR CEMENT (2016)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : 2
nd
, 20th April & 8
th
, 23rd May
Project : INSPECTION
Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR
HOLDING
PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER
FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE
SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT,
RAW
MILL SEPERATOR SHAFT , RAW MILL BAG HOUSE SHAFT
AND
ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN
EVERY
POSSITION.
PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE
QUALITY INTERNATIONAL (2016)
Page 4 of 15
Designation : SR.NDT INSPECTOR
Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS
Work period : Feb 3
RD
Feb 18
TH
Project : INSPECTION OF PLATES OF Pressure Vessel
Responsibilities : PERFORMED ULTRASONIC SCANNING
PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE
Dusup (Dubai supply authority) (2015)
Designation : SR.NDT INSPECTOR
Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS
Work period : SEP 1
ST
Nov 26
th
2015
Shut Down : INSPECTION OF PIPELINE IN SERVICE
Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS
GUAGING ON IN SERVICE PIPELINE FITTINGS, MAKING GRID
50X50mm AND 100X100mm AND SCAN WHOLE PIPE FITTINGS
LIKE REDUCER, TEE AND ELBOW.
.
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
STAR CEMENT (2015)
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : MARCH 21
ST
to APRIL 15
TH
Project : INSPECTION
Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR
HOLDING
PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER
FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE
SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT,
RAW
MILL SEPERATOR SHAFT, RAW MILL BAG HOUSE SHAFT
AND
ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN
EVERY
POSSITION.
SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE
Page 5 of 15
Ruwais Fertilizer Industries (Fertil) 2015
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : MAY 21
ST
to JUNE 11
TH
Shut Down : INSPECTION OF AMMONIA STORAGE TANK T-4102
Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS
GUAGING AFTER THE MFL IN ANNULAR PLATE AND BOTTOM
PLATE, THICKNESS GUAGING ON INSIDE AND OUTSIDE
SHELL, THICKNESS GUAGING AND CORROSION MAPING ON
ROOF AND STAIRTOWER, THICKNESS GUAGING ON ALL THE
PIPING CONNECTING TO THE TANK INCLUDED STAIR
TOWER, THICKNESS GUAGING ON ALL THE NOZZLES
CONNECTED TO THE TANK.
PROJECT EXPERIENCEPROJECT EXPERIENCE
VVARIOUSARIOUS SITESSITES FORFOR NDTNDT FIELDFIELD ININ BAHRAINBAHRAIN
BAHRAINBAHRAIN NATURALNATURAL GAS (GAS (BANAGASBANAGAS )) 2015
Designation : NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : November 9
th
to November 30
th
Project : INSPECTION OF BUTANE TANKS & PIPING
Responsibilities : performed ultrasonic scanning and thickness
guaging after the mfl in annular plate and bottom
plate, thickness guaging on inside and outside
shell, thickness guaging and corrosion maping on
roof and stairtower, thickness guaging on all the
piping connecting to the tank included stair
tower, thickness guaging on all the nozzles connected
to the tank.
VARIOUS SITES FOR NDT FIELD IN IRAQ ERBIL
WEATHERFORD OIL TOOL-MIDDLE EAST LTD
Designation : QC/NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : October 03
rd
-2013 to November 06
th
-2013
Page 6 of 15
Project : INSPECTION OF DRILLING TOOLS & ONSHORE
RIG
Responsibilities : Performed PMI & Hardness testing on drilling tools
Like separator wings, shaft, valve, elbow, tee & reducer
VARIOUS SITES FOR NDT FIELD IN ABUDHABI&DUBAI U.A.E
ALFASI CONSTRUCTIONS PTE LTd
Designation : QC/NDT INSPECTOR
Reporting to : QC Manager / QC Engineer
Work period : October 19
th
-2010 to January 13
th
-2011
Project : NEW DOHA INTERNATIONAL AIRPORT (NDIA)
Responsibilities : Performed UT.MT, PT, PMI & Hardness testing on frames
& all structural joint
GASCO/PETROFAC/TARGET ENGINEERING (SHUT DOWN)
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : February 17
th
-2011 to February 28
th
-2011
Project : GASCO PROJECT TRAIN 3 (SHUT DOWN)
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Pressure Vessels, Piping, Column, and Heat Exchanger etc During
Shut down
GASCO/PETROFAC/TARGET ENGINEERING (PROJECT)
Designation : NDT COORDINATOR
Reporting to : QC Engineer
Work period : MARCH 6
th
-2011 to FEBRUARY 25
th
-2012
Project : 4
TH
NGL TRAIN GASCO PROJECT
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Piping &Various Plant Equipment during erection / Installation
TAKREER RUWAIS REFINERY SHUTDOWN
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : FEBRUARY 26
th
-2012 to MARCH 10
th
-2012 &
APRIL 03
th
-2012 to APRIL 24
th
-2012
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Pressure Vessels, Piping, Column, and Heat Exchanger
Etc. During Shut down and reported to QC Engineer.
Page 7 of 15
TAKREER RUWAIS REFINERY EXPANSION PROJECT
Designation : QC/NDT INSPECTOR
Reporting to : QC Engineer
Work period : MAY 02
th
-2012 to MAY 29
th
-2012
Project : TAKREER RUWAIS REFINERY EXPANSION PROJECT
Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on
Various Plant Equipment during erection / installation
GASCO/PETROFAC/ALHASSAN ENGINEERING (PROJECT)
Designation : NDT SUPERVISOR
Reporting to : QC Engineer
Work period : MAY 29
TH
2012
-
31
ST
JULY 2013
Project : 4
TH
NGL TRAIN GASCO PROJECT
DUSUP MARGHAM PLANT DUBAI (SHUT DOWN)
Designation : NDT INSPECTOR
Reporting to : QC Engineer
Work period : MAY 19
TH
& 20
TH
2014, JUNE 1
ST
& 2
ND
, 9TH&10
TH
2014
SHUT DOWN : VESSEL 90-V-202, VESSEL 90-V-101, VESSEL 90-V-302
Responsibilities : Performed PT, MT, UT & UTG VESSEL
FULL ON Job Responsibilities:
1)
• Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major
clients such as TAKREER.
• Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major
clients such as GASCO.
• Perform Ultrasonic Testing’s on piping in detection of Corrosion, Erosions and Pitting.
• Carried out Ultrasonic Thickness measurement of pipe lines.
• Perform Ultrasonic thickness survey of piping.
Page 8 of 15
• Carried out MT on weld, Nozzle fillet weld and inspected by using different methods like wet method, dry
method using Yoke.
• Carried out Ultrasonic thickness measurement of Pipe lines, Lamination check of Raw materials.
2)
 Performing N.D.T. on Welds UT, MPT, RTFI, DPT, HARDNESS TESTING, PMI.
 Carry out visual inspection of weldments during NDT Inspection, shut down, welder qualification test.
 Making & Review of the final reports.
 Familiar with international standards such as AWS, API, ASME, ASNT, ASTM etc.
 Co-ordination with NDT personnel. Also making arrangements for DPT and RT.
 Arranging the Technician as per job requirements.
Carried out weld repairs by making tracings and locating of the defects on the weld
VARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAIVARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAI
CLIENT
1. Weatherford-Dubai
2. AL-Shirawi
3. Dusup -Dubai
4. Archirodon-Rak
5. Titan– Dubai
6. Titan- Sharjah
7. Petronash- Jebel Ali Free Zone
8. Fugro- Ras AL Khaima
9. Oil well – Sharja
10. Speedy – Ras al Khor
11. INTEGRATED Industries-Ras Al khaima
12. Project Quality Engineer (VAIL) DUSUP- JAFZA
13. Mammoet – Jebel Ali Free Zone
14. Habtoor – Plant Dubai
15. Volga – Sharjah
16. Specialist- Dubai
17. Hawker Pacific- Sharjah
18. Gulftainer – Sharjah Port Khalid
Page 9 of 15
19. Amana - DIP
20. Maverick –Ajman
21. Chicago – Al Quoz 4
22. Amana – DIP
23. Action – JAFZA
24. Manlift Middle East - DIP 2
25. ALU NASA – Jebel Ali 2
26. National Oilwell Varco- JAFZA
Performing N.D.T. on Welds UT, UTG,MPT, RTFI, DPT, HARDNESS TESTING& PMI
WORK EXPERIENCE IN INDIAWORK EXPERIENCE IN INDIA
• Company Profile : SMART TECHNOCRATS & CONSULTANCY SERVICES PVT. LDT.
NAVI MUMBAI
• DESIGNATION : NDT/QC INSPECTOR
• DURATION : JANUARY 01 2007 TO JULY 07 2010
ONSHORE EXPERIENCE
POSITION : NDT INSPECTOR & QC ENGINEER
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : H.P.C.L. (Hidustan Petroleum Corporation Ltd.)
Job Profile : P.M.I
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : Gammon Ind. Ltd. (Mumbai)
Job Profile : UT (BPCL Pipe Line Project)
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : GEI HEMON Industrial (Bhopal M.P.)
Job Profile : P.M.I.
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : TATA POWER (Mumbai)
Job Profile : UT, MPT, LPT
Organization : SPIC SMO
Client : NARMADA FERTILIZER BHARUCH (GUJRAT)
Job Profile : UT, HARDNESS, FERRITE
Organization : SPIC SMO
Page 10 of 15
Client : NPCIL KALYAN (Mumbai)
Job Profile : UT, HARDNESS
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : IOCIL/IOTEP REFINERY PANIPAT (HARYANA)
Job Profile : PMI, UT
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : DAS Offshore Ltd. (Mumbai)
Job Profile : UT, MPT, PT (Mumbai Stadiam Structure)
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : MAZAGON DOCK Ltd. (Mumbai)
Job Profile : UT, MPT, PT (SABMARIN PROJECT)
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : ASHAI GLASS (Mumbai)
Job Profile : UT, MPT
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : TEE KAY TUBE (Mumbai)
Job Profile : UT, MPT, PMI
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : SURAY PIPE Ltd. (HARAYANA)
Job Profile : UT Inspection
Organization : S.T.C.S (Smart Technocrats & Consultancy Services)
Client : United Vender Horst Ltd. (Mumbai)
Job Profile : UT, MPT, PMI
Organization : Smart Technocrats & Consultancy Services
Client : Mazagon Dock Ltd.
Project : Submarine
Job Profile : Carried out Ultrasonic Testing of Critical weld joints of Submarine
and Outlets.
Coordinate with client for inspection plan and preparation of inspection report.
Inspection : GLIS, IRS, CEIL, EIL, DNV, BV etc
Organization : Smart Technocrats & Consultancy Services
Job Profile : QC/NDT INSPECTOR (UT, MPT, LPT & RT INT)
Inspection : I.R.S, EIL, BVIS and EIL ect.
Client : H.P.C.L (Mahul), Zenith Steel (Khopoli), Tee Kay tubes (MIDC),
Page 11 of 15
UVDHL (Taloja), Intertech fittings (Rabale), Shreeji Engg. (Rabale),
Das offshore (MIDC), Dolphin Offshore etc.
Job Responsibilities : The primary role is to establish Ultrasonic testing Technique for jobs
As per ASME, API etc.
Co-ordination with Third Party Surveyors.
Carried out Non-Destructive testing such as Ultrasonic testing for Heavy
engineering turnkey project for chemical, petro chemicals.
Refinery, Fertilizers, oil & gas power project and steel industries.
Shutdown and Maintenance Inspection of Vessels, Piping, Valves
Etc. Inspection of fabricated items, such as heat exchangers,
Columns, Spheres, Bullets, Storage Tank etc.
Detection of corrosion and other service defect on various vessels Pipelines
Job Involved:
 Co-ordination with NDT personnel. Also making arrangements for MPT, UT, DPT and RT.
Review of RT Films and Submission of the same for client approval.
FAMILIARIZATION OF EQUIPMENT LISTFAMILIARIZATION OF EQUIPMENT LIST
ULTRASONIC TESTINGS : EEC EX-10, PX-10, PX- 20, DIGISCAN,
SONATEST, KRAUTKRAMER-USM35X
LPT : ADROX, MAGNAFLUX, PRDEEP, P-MET,All Method
MPI : MAGNAFLUX, K-ELECTRONICS, SIMS-Y A/D Central
Conductor, Yoke, Coil & PROD machine.
HARDNESS TESTING : TIME GROUP TH-130
FERITE TESTING : FERITESCOPE MP 30 E-S (Fischer)
THICKNESS MEASURMENT : MODSONIC, EEC D-METER, DMS2, DMS5
PMI : X-MET3000TX, X-MET3000TX+, INOVEX, NITON,NITON
SURFACE PROFILE GAUGE : TYPE J10A (0.002 – 2mm) BAKER
HOLIDAY TESTING : MULTIVOLTAGE PIN HOLE
(LOW VOLTAGE & HIGH VOLTAGE)
Page 12 of 15
LOAD TESTING : Belt & Chain pulley
FERITSCOPE : MP 30
OFFSHORE WORK EXPERIENCE ONGC FIELDOFFSHORE WORK EXPERIENCE ONGC FIELD
Project : PRP II PROJECT (RISER BEND)
Inspection : GLIS & CEIL
Period : January 2008 to May 2008
Barge : ABUZAR-81
Client : M/S DOLPHIN OFFSHORE
Responsibilities : Performed PT, MT, UT in TKY joints
Project : PRP II PROJECT
Inspection : I.R.S.
Period : September 2008 to October 2008
Barge : CEMEC
Client : M/S LEIGHTON & DAS
Responsibilities : Performed UT in TKY joints
Project : BINA PROJECT (PIPELINE)
Inspection : E.I.L.
Period : November 17 – 27, 2008
Client : M/S OCENEERING
Responsibilities : Performed PT, MT & PMI
Project : BG OFFSHORE
Page 13 of 15
Inspection : GEIL
Period : December 2008 to January 2009
Rig : ENSCO – 50 / DD – 4
Responsibilities : Performed MT, UT in TKY joints & Hardness testing
Project : PRP I
Inspection : I.R.S.
Period : February 15, 2009
Barge : CEMEC-1
Client : M/S LEIGHTON & DAS
Responsibilities : Performed PT, MT, UT in TKY joints
Project : PRP II PROJECT (RISER BEND & PIPE LINE)
Inspection : I.R.S & CEIL
Period : November 03, 2009 to DECEMBER 31, 2009
Badge : ECLIPSE SINGAPUR
Client : M/S LEIGHTON INDIA
Project : PRP II PROJECT (RISER BEND & PIPE LINE)
Responsibilities : Performed PT, MT,PMI
Inspection : IRS & CEIL
Period : January 01 2010 to February 07 2010
Barge : SMITH BORNEO SINGAPORE
Client : M/S LEIGHTON INDIA
Responsibilities : Performed UT in TKY joints & RTFI
Page 14 of 15
Thanking you
Yours Truly,
ASHISH KUMAR
Page 15 of 15

More Related Content

What's hot

Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
karuppa samy
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
Makbul
 
MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16
MAHESH PANDIT
 
RAJISH CHANDRA- QAQC MECHANICAL CV.
RAJISH CHANDRA- QAQC MECHANICAL  CV.RAJISH CHANDRA- QAQC MECHANICAL  CV.
RAJISH CHANDRA- QAQC MECHANICAL CV.
rajish chandra
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
Sathish Murugesan
 
CV of Siva Grandhe - Jan 2017
CV of Siva Grandhe - Jan 2017CV of Siva Grandhe - Jan 2017
CV of Siva Grandhe - Jan 2017
Siva Grandhe
 

What's hot (20)

CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
 
CV-Aji Varghese.
CV-Aji Varghese.CV-Aji Varghese.
CV-Aji Varghese.
 
Inspection Engineer 1
Inspection Engineer 1Inspection Engineer 1
Inspection Engineer 1
 
Thiru.CV_Latest
Thiru.CV_LatestThiru.CV_Latest
Thiru.CV_Latest
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Resume - Jayesh Vanza
Resume - Jayesh Vanza Resume - Jayesh Vanza
Resume - Jayesh Vanza
 
MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16MAHESH CV updated on 13.10.16
MAHESH CV updated on 13.10.16
 
API_CV (1)
API_CV (1)API_CV (1)
API_CV (1)
 
Resume
ResumeResume
Resume
 
UPDATED CV 1
UPDATED CV 1UPDATED CV 1
UPDATED CV 1
 
Neel CV_Updated
Neel CV_UpdatedNeel CV_Updated
Neel CV_Updated
 
doss sri cv
doss sri cvdoss sri cv
doss sri cv
 
RAJISH CHANDRA- QAQC MECHANICAL CV.
RAJISH CHANDRA- QAQC MECHANICAL  CV.RAJISH CHANDRA- QAQC MECHANICAL  CV.
RAJISH CHANDRA- QAQC MECHANICAL CV.
 
CURRICULUM VITE
CURRICULUM VITECURRICULUM VITE
CURRICULUM VITE
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
S. Vibin CV
S. Vibin CVS. Vibin CV
S. Vibin CV
 
CV of Siva Grandhe - Jan 2017
CV of Siva Grandhe - Jan 2017CV of Siva Grandhe - Jan 2017
CV of Siva Grandhe - Jan 2017
 
my cv
my cvmy cv
my cv
 
Nasir-CV
Nasir-CVNasir-CV
Nasir-CV
 
Joseph raj resume
Joseph raj resumeJoseph raj resume
Joseph raj resume
 

Viewers also liked

Presentation2
Presentation2Presentation2
Presentation2
jameshyde
 

Viewers also liked (13)

Presentation2
Presentation2Presentation2
Presentation2
 
Xtreme Telecoms Presentation
Xtreme Telecoms PresentationXtreme Telecoms Presentation
Xtreme Telecoms Presentation
 
Analise dos clubes brasileiros de futebol 2016
Analise dos clubes brasileiros de futebol  2016Analise dos clubes brasileiros de futebol  2016
Analise dos clubes brasileiros de futebol 2016
 
[알고리즘 스터디 4주차]LCS 알고리즘
[알고리즘 스터디 4주차]LCS 알고리즘[알고리즘 스터디 4주차]LCS 알고리즘
[알고리즘 스터디 4주차]LCS 알고리즘
 
Calendario escolar anual 15 16 y mensuales
Calendario escolar anual 15 16 y mensualesCalendario escolar anual 15 16 y mensuales
Calendario escolar anual 15 16 y mensuales
 
PPS LA REDENCION SE ACERCA
PPS LA REDENCION SE ACERCAPPS LA REDENCION SE ACERCA
PPS LA REDENCION SE ACERCA
 
Enfermedad de Von Gierke
Enfermedad de Von GierkeEnfermedad de Von Gierke
Enfermedad de Von Gierke
 
A paisagem e as relações entre seus elementos (Módulo 3) - 6º Ano (2016)
A paisagem e as relações entre seus elementos (Módulo 3) -  6º Ano  (2016)A paisagem e as relações entre seus elementos (Módulo 3) -  6º Ano  (2016)
A paisagem e as relações entre seus elementos (Módulo 3) - 6º Ano (2016)
 
Absolutismo e Mercantilismo - 7º Ano (2016)
Absolutismo e Mercantilismo - 7º Ano (2016)Absolutismo e Mercantilismo - 7º Ano (2016)
Absolutismo e Mercantilismo - 7º Ano (2016)
 
Navidad: El que viene
Navidad: El que vieneNavidad: El que viene
Navidad: El que viene
 
ELECTRICIDAD TEÓRICO-PRÁCTICA. Tomo 2. Electroquímica. Electromagnestismo. In...
ELECTRICIDAD TEÓRICO-PRÁCTICA. Tomo 2. Electroquímica. Electromagnestismo. In...ELECTRICIDAD TEÓRICO-PRÁCTICA. Tomo 2. Electroquímica. Electromagnestismo. In...
ELECTRICIDAD TEÓRICO-PRÁCTICA. Tomo 2. Electroquímica. Electromagnestismo. In...
 
Egito Antigo (6º Ano - 2016)
Egito Antigo (6º Ano - 2016)Egito Antigo (6º Ano - 2016)
Egito Antigo (6º Ano - 2016)
 
Calendario para Imprimir móvil
Calendario para Imprimir móvil Calendario para Imprimir móvil
Calendario para Imprimir móvil
 

Similar to ashish updated cv.doc 12-12-2016 (20)

Resume
ResumeResume
Resume
 
VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1VEERAPANDIAN CV.doc1
VEERAPANDIAN CV.doc1
 
Kumar.R Multi Inspector cv -5 - Copy
Kumar.R   Multi Inspector cv   -5 - CopyKumar.R   Multi Inspector cv   -5 - Copy
Kumar.R Multi Inspector cv -5 - Copy
 
NDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CVNDT PCN MULTI WITH ROPEACCESS CV
NDT PCN MULTI WITH ROPEACCESS CV
 
SERAJ CV
SERAJ CVSERAJ CV
SERAJ CV
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Meshak cv
Meshak cv Meshak cv
Meshak cv
 
Akp resume 23.02.2019
Akp resume 23.02.2019Akp resume 23.02.2019
Akp resume 23.02.2019
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspector
 
Muhammad Sajid (CV)
Muhammad Sajid (CV)Muhammad Sajid (CV)
Muhammad Sajid (CV)
 
Adil Ahmad
Adil AhmadAdil Ahmad
Adil Ahmad
 
sujesh cv 2016
sujesh cv 2016sujesh cv 2016
sujesh cv 2016
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
kiran qc inspector
kiran qc inspectorkiran qc inspector
kiran qc inspector
 
Senthilnathan
SenthilnathanSenthilnathan
Senthilnathan
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
LINGAM
LINGAMLINGAM
LINGAM
 
vijayanandselnaraj_cv new
vijayanandselnaraj_cv newvijayanandselnaraj_cv new
vijayanandselnaraj_cv new
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
 

ashish updated cv.doc 12-12-2016

  • 1. From, ASHISH KUMAR Contact No: +971-567538685 (UAE) To, Respected Sir, Sub: An application for placement in your reputed organization as a SR.NDT INSPECTOR & Lifting Inspector I have enclosed my resume for your kind perusal, which clearly shows my skills and qualifications. Furthermore, I am open to hone my skills adapt myself to the organizational culture. If given an opportunity to work with your esteemed organization, I shall put forth all my efforts in accomplishment of its goals. After you have pursued my resume, hope you will definitely find me suitable for the job. Thank you very much for taking time to pursue my resume and I am looking forward to an early and positive response from you. Yours sincerely, (ASHISH KUMAR) Page 1 of 15
  • 2. ASHISH KUMAR Sr.NDT INSPECTOR & Lifting INSPECTOR POSTAL ADDRESS INDIA: CONTACTS: VILL-HALDRA, P.O -KOUNA INDIA - +919816409642 TEH.-PALAMPUR. District: KANGRA. UAE - +971567538685 ashu.guleria1988@gmail.com INTERPERSONAL SKILLS: Can easily get along with people in any environment. COMMUNICATION SKILLS: Can easily communicate ideas orally or through writing. CURRENTLY WORKING WITH APPLUS VELOSI CERTIFICATION SERVICES LLC AS A SR.NDT INSPECTOR & Lifting INSPECTOR IN UAE. PROFICIENT SUMMARY To work in a progressive and growing organization where my skills are relished and my knowledge as a Sr.NDT INSPECTOR & Lifting INSPECTOR is enhanced for the benefit of organization as well as my personal development. Having Seven Years experience in NDT in various Petrochemicals, Refineries and Offshore (All ONGC field), Fully Conversant with various standards (ASME SEC V, ASME SEC VIII, API 1104, B31.3 AWS D 1.1, ASME SEC IX.) PERSONAL DETAILS Name : ASHISH KUMAR Date of Birth : 04.05.1988 Page 2 of 15
  • 3. Sex : Male Marital Status : Unmarried Passport No. : G7380884 Date of Expiry : 26-02-2018 Qualification : DME Languages Known : English, Hindi, Panjabi & Pahadi Computer Knowledge : MS Office ACADEMIC QUALIFICATION DIPLOMA IN MECHANICAL ENGINEERING National Institute of Engineering under In Maharashtra Government. Higher Secondary School: from Himachal Board PROFESSIONAL QUALIFICATION Lifting Equipment Engineering Association LEEA 1 - Entrance Certificate LEEA 2 – Lifting Equipment General Diploma - Reg. No 24822 American Society of Nondestructive Testing • I have Qualified Level-II Personal in NDT Method (s) stated below according to the requirements of ASNT document SNT-TC-1A.  Ultrasonic Testing (UT)  Radiography Testing (RT)  Magnet Particle Testing (MPT)  Liquid Penetrate Testing (LPT)  ASNT Level II in UT TKY TECHNICAL EXPOSURE Software Language : C Office Tools : MSOffice, Photoshop. Operating System : Windows 98, Windows xp, Windows 7. SAFETY CERTIFICATION OFFSHORE SAFETY TRANING COURSES AS PER STCW’ 95 Page 3 of 15
  • 4.  Fire Fighting. (FF)  Personal Survival Techniques. (PST)  Elementary First Aid. (EFA)  Helicopter Escape & Under Water Technique. (HEUT) EMPLOYMENT HISTORYEMPLOYMENT HISTORY Company Profile : Applus Velosi Certification Services L.L.C, Abu Dhabi DESIGNATION : Sr.NDT & Lifting INSPECTOR DURATION : SEP 2010 TO Till Date SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE MIPCO POWER PLANT MIRFA UAE (2016) Designation : NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : 27 TH November to 30 th November Project : NDT & VISUAL INSPECTION Responsibilities : PERFORMED ULTRASONIC AND MPI TESTING IN BOILER #3 & BOILER 4 ON STEAM DRUM, LOWER DRUM,SUPER HEATER AREA, COMBUSTION CHAMBER, ECONOMIZER AREA, AUXILIARY BOILER, BLOW DOWN TANK, WATER STORAGE TANK. CHECK BURNER VISUALLY SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE STAR CEMENT (2016) Designation : NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : 2 nd , 20th April & 8 th , 23rd May Project : INSPECTION Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR HOLDING PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT, RAW MILL SEPERATOR SHAFT , RAW MILL BAG HOUSE SHAFT AND ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN EVERY POSSITION. PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE QUALITY INTERNATIONAL (2016) Page 4 of 15
  • 5. Designation : SR.NDT INSPECTOR Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS Work period : Feb 3 RD Feb 18 TH Project : INSPECTION OF PLATES OF Pressure Vessel Responsibilities : PERFORMED ULTRASONIC SCANNING PROJECT/SHUTDOWN EXPERIENCEPROJECT/SHUTDOWN EXPERIENCE Dusup (Dubai supply authority) (2015) Designation : SR.NDT INSPECTOR Reporting to : PIPELINE ENGINEER/PIPELINE OPERATIONS Work period : SEP 1 ST Nov 26 th 2015 Shut Down : INSPECTION OF PIPELINE IN SERVICE Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS GUAGING ON IN SERVICE PIPELINE FITTINGS, MAKING GRID 50X50mm AND 100X100mm AND SCAN WHOLE PIPE FITTINGS LIKE REDUCER, TEE AND ELBOW. . SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE STAR CEMENT (2015) Designation : NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : MARCH 21 ST to APRIL 15 TH Project : INSPECTION Responsibilities : PERFORMED ULTRASONIC TESTING ON GRITH GEAR HOLDING PIN, TYRE, COAL MILL BOOSTER FAN SHAFT, PREATHERHEATER FAN SHAFT, RAW MILL FAN SHAFT, KILN MAIN DRIVE SHAFT, CLINKER BREAKER SHAFT, COOLER VENT SHAFT, RAW MILL SEPERATOR SHAFT, RAW MILL BAG HOUSE SHAFT AND ULTRASONIC THICKNESS GUAGING IN KILN SHELL IN EVERY POSSITION. SHUTDOWN EXPERIENCESHUTDOWN EXPERIENCE Page 5 of 15
  • 6. Ruwais Fertilizer Industries (Fertil) 2015 Designation : NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : MAY 21 ST to JUNE 11 TH Shut Down : INSPECTION OF AMMONIA STORAGE TANK T-4102 Responsibilities : PERFORMED ULTRASONIC SCANNING AND THICKNESS GUAGING AFTER THE MFL IN ANNULAR PLATE AND BOTTOM PLATE, THICKNESS GUAGING ON INSIDE AND OUTSIDE SHELL, THICKNESS GUAGING AND CORROSION MAPING ON ROOF AND STAIRTOWER, THICKNESS GUAGING ON ALL THE PIPING CONNECTING TO THE TANK INCLUDED STAIR TOWER, THICKNESS GUAGING ON ALL THE NOZZLES CONNECTED TO THE TANK. PROJECT EXPERIENCEPROJECT EXPERIENCE VVARIOUSARIOUS SITESSITES FORFOR NDTNDT FIELDFIELD ININ BAHRAINBAHRAIN BAHRAINBAHRAIN NATURALNATURAL GAS (GAS (BANAGASBANAGAS )) 2015 Designation : NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : November 9 th to November 30 th Project : INSPECTION OF BUTANE TANKS & PIPING Responsibilities : performed ultrasonic scanning and thickness guaging after the mfl in annular plate and bottom plate, thickness guaging on inside and outside shell, thickness guaging and corrosion maping on roof and stairtower, thickness guaging on all the piping connecting to the tank included stair tower, thickness guaging on all the nozzles connected to the tank. VARIOUS SITES FOR NDT FIELD IN IRAQ ERBIL WEATHERFORD OIL TOOL-MIDDLE EAST LTD Designation : QC/NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : October 03 rd -2013 to November 06 th -2013 Page 6 of 15
  • 7. Project : INSPECTION OF DRILLING TOOLS & ONSHORE RIG Responsibilities : Performed PMI & Hardness testing on drilling tools Like separator wings, shaft, valve, elbow, tee & reducer VARIOUS SITES FOR NDT FIELD IN ABUDHABI&DUBAI U.A.E ALFASI CONSTRUCTIONS PTE LTd Designation : QC/NDT INSPECTOR Reporting to : QC Manager / QC Engineer Work period : October 19 th -2010 to January 13 th -2011 Project : NEW DOHA INTERNATIONAL AIRPORT (NDIA) Responsibilities : Performed UT.MT, PT, PMI & Hardness testing on frames & all structural joint GASCO/PETROFAC/TARGET ENGINEERING (SHUT DOWN) Designation : QC/NDT INSPECTOR Reporting to : QC Engineer Work period : February 17 th -2011 to February 28 th -2011 Project : GASCO PROJECT TRAIN 3 (SHUT DOWN) Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on Pressure Vessels, Piping, Column, and Heat Exchanger etc During Shut down GASCO/PETROFAC/TARGET ENGINEERING (PROJECT) Designation : NDT COORDINATOR Reporting to : QC Engineer Work period : MARCH 6 th -2011 to FEBRUARY 25 th -2012 Project : 4 TH NGL TRAIN GASCO PROJECT Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on Piping &Various Plant Equipment during erection / Installation TAKREER RUWAIS REFINERY SHUTDOWN Designation : QC/NDT INSPECTOR Reporting to : QC Engineer Work period : FEBRUARY 26 th -2012 to MARCH 10 th -2012 & APRIL 03 th -2012 to APRIL 24 th -2012 Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on Pressure Vessels, Piping, Column, and Heat Exchanger Etc. During Shut down and reported to QC Engineer. Page 7 of 15
  • 8. TAKREER RUWAIS REFINERY EXPANSION PROJECT Designation : QC/NDT INSPECTOR Reporting to : QC Engineer Work period : MAY 02 th -2012 to MAY 29 th -2012 Project : TAKREER RUWAIS REFINERY EXPANSION PROJECT Responsibilities : Performed PT, MT, UT, PMI, and Hardness testing on Various Plant Equipment during erection / installation GASCO/PETROFAC/ALHASSAN ENGINEERING (PROJECT) Designation : NDT SUPERVISOR Reporting to : QC Engineer Work period : MAY 29 TH 2012 - 31 ST JULY 2013 Project : 4 TH NGL TRAIN GASCO PROJECT DUSUP MARGHAM PLANT DUBAI (SHUT DOWN) Designation : NDT INSPECTOR Reporting to : QC Engineer Work period : MAY 19 TH & 20 TH 2014, JUNE 1 ST & 2 ND , 9TH&10 TH 2014 SHUT DOWN : VESSEL 90-V-202, VESSEL 90-V-101, VESSEL 90-V-302 Responsibilities : Performed PT, MT, UT & UTG VESSEL FULL ON Job Responsibilities: 1) • Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major clients such as TAKREER. • Carried out all NDT Methods on pipelines, Power vessels, Boiler Drums which was inspected by major clients such as GASCO. • Perform Ultrasonic Testing’s on piping in detection of Corrosion, Erosions and Pitting. • Carried out Ultrasonic Thickness measurement of pipe lines. • Perform Ultrasonic thickness survey of piping. Page 8 of 15
  • 9. • Carried out MT on weld, Nozzle fillet weld and inspected by using different methods like wet method, dry method using Yoke. • Carried out Ultrasonic thickness measurement of Pipe lines, Lamination check of Raw materials. 2)  Performing N.D.T. on Welds UT, MPT, RTFI, DPT, HARDNESS TESTING, PMI.  Carry out visual inspection of weldments during NDT Inspection, shut down, welder qualification test.  Making & Review of the final reports.  Familiar with international standards such as AWS, API, ASME, ASNT, ASTM etc.  Co-ordination with NDT personnel. Also making arrangements for DPT and RT.  Arranging the Technician as per job requirements. Carried out weld repairs by making tracings and locating of the defects on the weld VARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAIVARIOUS SITES FOR NDT CALLOUT JOB ABUDHABI & DUBAI CLIENT 1. Weatherford-Dubai 2. AL-Shirawi 3. Dusup -Dubai 4. Archirodon-Rak 5. Titan– Dubai 6. Titan- Sharjah 7. Petronash- Jebel Ali Free Zone 8. Fugro- Ras AL Khaima 9. Oil well – Sharja 10. Speedy – Ras al Khor 11. INTEGRATED Industries-Ras Al khaima 12. Project Quality Engineer (VAIL) DUSUP- JAFZA 13. Mammoet – Jebel Ali Free Zone 14. Habtoor – Plant Dubai 15. Volga – Sharjah 16. Specialist- Dubai 17. Hawker Pacific- Sharjah 18. Gulftainer – Sharjah Port Khalid Page 9 of 15
  • 10. 19. Amana - DIP 20. Maverick –Ajman 21. Chicago – Al Quoz 4 22. Amana – DIP 23. Action – JAFZA 24. Manlift Middle East - DIP 2 25. ALU NASA – Jebel Ali 2 26. National Oilwell Varco- JAFZA Performing N.D.T. on Welds UT, UTG,MPT, RTFI, DPT, HARDNESS TESTING& PMI WORK EXPERIENCE IN INDIAWORK EXPERIENCE IN INDIA • Company Profile : SMART TECHNOCRATS & CONSULTANCY SERVICES PVT. LDT. NAVI MUMBAI • DESIGNATION : NDT/QC INSPECTOR • DURATION : JANUARY 01 2007 TO JULY 07 2010 ONSHORE EXPERIENCE POSITION : NDT INSPECTOR & QC ENGINEER Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : H.P.C.L. (Hidustan Petroleum Corporation Ltd.) Job Profile : P.M.I Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : Gammon Ind. Ltd. (Mumbai) Job Profile : UT (BPCL Pipe Line Project) Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : GEI HEMON Industrial (Bhopal M.P.) Job Profile : P.M.I. Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : TATA POWER (Mumbai) Job Profile : UT, MPT, LPT Organization : SPIC SMO Client : NARMADA FERTILIZER BHARUCH (GUJRAT) Job Profile : UT, HARDNESS, FERRITE Organization : SPIC SMO Page 10 of 15
  • 11. Client : NPCIL KALYAN (Mumbai) Job Profile : UT, HARDNESS Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : IOCIL/IOTEP REFINERY PANIPAT (HARYANA) Job Profile : PMI, UT Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : DAS Offshore Ltd. (Mumbai) Job Profile : UT, MPT, PT (Mumbai Stadiam Structure) Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : MAZAGON DOCK Ltd. (Mumbai) Job Profile : UT, MPT, PT (SABMARIN PROJECT) Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : ASHAI GLASS (Mumbai) Job Profile : UT, MPT Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : TEE KAY TUBE (Mumbai) Job Profile : UT, MPT, PMI Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : SURAY PIPE Ltd. (HARAYANA) Job Profile : UT Inspection Organization : S.T.C.S (Smart Technocrats & Consultancy Services) Client : United Vender Horst Ltd. (Mumbai) Job Profile : UT, MPT, PMI Organization : Smart Technocrats & Consultancy Services Client : Mazagon Dock Ltd. Project : Submarine Job Profile : Carried out Ultrasonic Testing of Critical weld joints of Submarine and Outlets. Coordinate with client for inspection plan and preparation of inspection report. Inspection : GLIS, IRS, CEIL, EIL, DNV, BV etc Organization : Smart Technocrats & Consultancy Services Job Profile : QC/NDT INSPECTOR (UT, MPT, LPT & RT INT) Inspection : I.R.S, EIL, BVIS and EIL ect. Client : H.P.C.L (Mahul), Zenith Steel (Khopoli), Tee Kay tubes (MIDC), Page 11 of 15
  • 12. UVDHL (Taloja), Intertech fittings (Rabale), Shreeji Engg. (Rabale), Das offshore (MIDC), Dolphin Offshore etc. Job Responsibilities : The primary role is to establish Ultrasonic testing Technique for jobs As per ASME, API etc. Co-ordination with Third Party Surveyors. Carried out Non-Destructive testing such as Ultrasonic testing for Heavy engineering turnkey project for chemical, petro chemicals. Refinery, Fertilizers, oil & gas power project and steel industries. Shutdown and Maintenance Inspection of Vessels, Piping, Valves Etc. Inspection of fabricated items, such as heat exchangers, Columns, Spheres, Bullets, Storage Tank etc. Detection of corrosion and other service defect on various vessels Pipelines Job Involved:  Co-ordination with NDT personnel. Also making arrangements for MPT, UT, DPT and RT. Review of RT Films and Submission of the same for client approval. FAMILIARIZATION OF EQUIPMENT LISTFAMILIARIZATION OF EQUIPMENT LIST ULTRASONIC TESTINGS : EEC EX-10, PX-10, PX- 20, DIGISCAN, SONATEST, KRAUTKRAMER-USM35X LPT : ADROX, MAGNAFLUX, PRDEEP, P-MET,All Method MPI : MAGNAFLUX, K-ELECTRONICS, SIMS-Y A/D Central Conductor, Yoke, Coil & PROD machine. HARDNESS TESTING : TIME GROUP TH-130 FERITE TESTING : FERITESCOPE MP 30 E-S (Fischer) THICKNESS MEASURMENT : MODSONIC, EEC D-METER, DMS2, DMS5 PMI : X-MET3000TX, X-MET3000TX+, INOVEX, NITON,NITON SURFACE PROFILE GAUGE : TYPE J10A (0.002 – 2mm) BAKER HOLIDAY TESTING : MULTIVOLTAGE PIN HOLE (LOW VOLTAGE & HIGH VOLTAGE) Page 12 of 15
  • 13. LOAD TESTING : Belt & Chain pulley FERITSCOPE : MP 30 OFFSHORE WORK EXPERIENCE ONGC FIELDOFFSHORE WORK EXPERIENCE ONGC FIELD Project : PRP II PROJECT (RISER BEND) Inspection : GLIS & CEIL Period : January 2008 to May 2008 Barge : ABUZAR-81 Client : M/S DOLPHIN OFFSHORE Responsibilities : Performed PT, MT, UT in TKY joints Project : PRP II PROJECT Inspection : I.R.S. Period : September 2008 to October 2008 Barge : CEMEC Client : M/S LEIGHTON & DAS Responsibilities : Performed UT in TKY joints Project : BINA PROJECT (PIPELINE) Inspection : E.I.L. Period : November 17 – 27, 2008 Client : M/S OCENEERING Responsibilities : Performed PT, MT & PMI Project : BG OFFSHORE Page 13 of 15
  • 14. Inspection : GEIL Period : December 2008 to January 2009 Rig : ENSCO – 50 / DD – 4 Responsibilities : Performed MT, UT in TKY joints & Hardness testing Project : PRP I Inspection : I.R.S. Period : February 15, 2009 Barge : CEMEC-1 Client : M/S LEIGHTON & DAS Responsibilities : Performed PT, MT, UT in TKY joints Project : PRP II PROJECT (RISER BEND & PIPE LINE) Inspection : I.R.S & CEIL Period : November 03, 2009 to DECEMBER 31, 2009 Badge : ECLIPSE SINGAPUR Client : M/S LEIGHTON INDIA Project : PRP II PROJECT (RISER BEND & PIPE LINE) Responsibilities : Performed PT, MT,PMI Inspection : IRS & CEIL Period : January 01 2010 to February 07 2010 Barge : SMITH BORNEO SINGAPORE Client : M/S LEIGHTON INDIA Responsibilities : Performed UT in TKY joints & RTFI Page 14 of 15
  • 15. Thanking you Yours Truly, ASHISH KUMAR Page 15 of 15