SlideShare a Scribd company logo
1 of 4
Amir Bakhsh Mirani
Mobie: 0300-3147147
Email: amirbuxmirani110@gmail.com
Seeking assignments in Managerial Position in the Civil Engineering field with an organization of
repute
Key Achievements
• Completion of Darawat Dam in Sindh Province
• Completion and Handing over of CRBC distribution System to Punjab
Irrigation Department.
• East Khairpur Tile Drainage Project
• Electrification work of Jinnah Hydro Power Project
• Completion of Hamal Lake Regulator and construction of Bridge at zero point
of Manchar Lake.
• Completion and Handing over of 12 Nos. desalinization plants in the vicinity
of Manchar Lake.
• Restoration of construction work of Irrigation system of Darawat Dam Project
• Restoration of Terminated contract of Rainee Canal Project
• Ground Breaking Ceremony of Naulong Dam Project
Employment Profile
2012-2014 : GENERAL MANAGER (PROJECTS) SOUTH WAPDA
Projects Handled:
Supervision of the following water sector development projects carried out by
WAPDA in Sindh & Balochistan Provinces:
• Rainee Canal Project offtaking from Guddu Barrage to irrigate district Ghotki,
Sukkur and Khairpur.
• Right Bank Outfall Drain
• Darawat Dam Sindh
• Nai Gaj Dam Sindh
• Operation & Maintenance of Mirani Dam Balochistan
• Pilot Treatment Plant Dadu Sindh Province
• Other Feasibility studies of lining of canals of Sukkur Barrage & Kotri Barrage.
• 50 bedded WAPDA Hospital Hyderabad.
Nov 2011- Jun 2012 : Chief Engineer/PD
Nai Gaj Dam Project
Responsibilities:
• Construction of Dam on Nai Baran to conserve rain water for irrigation of
25,000 acres of virgin land in District Thatta and Jamshoro
Jul 2011-Nov 2012 : Chief Engineer
Jinnah Hydro Power Project
Responsibilities:
• Responsible for Civil works of hydro power projects which includes Power
house units 12 MW each, 2 Nos. installation and commissioning completed.
2009-2011 : Project Director
Darawat Dam Project
Responsibilities:
• Construction of Dam on Nai Baran to conserve rain water for irrigation of
25,000 acres of virgin land in District Thatta and Jamshoro
• Establishment of new school building
2008-2009 : Director Civil
Office of the General Manager (Projects) South
Responsibilities:
• To assist the General Manager (P) South on Technical matters of the projects
under the jurisdiction (Sindh & Balochistan)
2006-2008 : Project Director
RBOD III Sukkur
Responsibilities:
• Supervision of the construction of open surface drains and its allied cross
drainage works comprise bridges, watercourses aqueducts, under
pass/siphons and drainage inlets. This surface drainage system was built to
collect the drainage effluent of Balochistan and district Larkana and Kamber
Shahdadkot of Sindh Province.
• Remodelling of Scarp Drainage System, Construction and Handing over of
Ratodero Pump Station.
2004-2006 : Director (Civil)
National Transmission & Dispatch Company
(NTDC) Lahore
Responsibilities:
• Supervision and monitoring of construction work of Grid Stations and
transmission lines & residential buildings of the company.
2003-2004 : Executive Engineer (Civil)
Thermal Power Station, Guddu
Responsibilities:
• Supervision of the construction of the civil works and O&M of Thermal Station
Guddu.
2000-2003 : Executive Engineer (Civil)
Chashma Right Bank Canal D.I Khan
Responsibilities:
• Supervision of the construction work of the distribution system of the CRBC
Canal.
• After completion, handing and taking over to Punjab Irrigation Department.
1996-2000 : Executive Engineer (Civil)
Common Services Division, WAPDA, Hyderabad
Responsibilities:
• O&M of the Water Wing Colony and office building of General Manager (P)
South, Hyderabad
1993-1996 : Executive Engineer (Civil)
Thermal Power Station, Jamshoro
Responsibilities:
• Construction of residential colonies, building for Thermal Power Station and
their O&M
1989-1993 : Technical Officer
Office of the Project Director LBOD Main WAPDA
Hyderabad
Responsibilities:
• To assist the Project Director in technical matters regarding Left Bank Outfall
Drain (LBOD) Project WAPDA Hyderabad
1987-1989 : Executive Engineer (Civil)
LBOD Spinal Drain Badin
Responsibilities:
• Supervision of the construction of the LBOD Spinal Drain for carrying out the
drainage effluent of Sanghar, Mirpurkhas and Nawabshah Districts and finally
dispose into sea through Tidal Link.
• O&M of LBOD Spinal Drain from Nawabshah to Badin
• Survey of Tidal Link with the help of Hover Craft.
1978-1987 : Junior Engineer (Civil)
East Khairpur Title Drainage Project
Responsibilities:
• Worked as Junior Engineer with ILACO consultants and project office.
• Involved in designing and supervision of construction work of 600 Kms of
lateral drains of 4 inch dia pipe.
• Supervision and construction of collector drains.
• Construction of sump houses, open surface drains and cross drainage
structures (Siphon, Bridges, Watercourse aqueducts and Drainage inlets.
• Supervision of the construction works of residential colony and its O&M.
Trainings
• Irrigation & Drainage with Mott MacDonald Cambridge (UK)
• Middle Management Course at WAPDA Staff College Islamabad
• Mandatory course for promotion at WAPDA Engineering Academy Faisalabad
Education
 Bachelor of Engineering (B.E) (Civil) from Mehran University of
Engineering and Technology, Jamshoro Sindh
Personal Details
Date of Birth 08-03-1953
Domicile (Rural) SUKKUR
CNIC 45504-9777104-1
PEC NO. Civ/4505
Nationality Pakistani
Address House No. 18, Mid Land Colony, near Sonehri
Book Land Qasimabad, Hyderabad
Languages Known English, Urdu, Sindhi & Punjabi
Total Work Experience 36 years in the field of Civil Engineering
References:
• Mr. Ali Sher Baloch, Ex-General Manager (Projects) South
• Mr. Irshad Ahmed Bohio, Chief Engineer Rainee Canal Project, Guddu

More Related Content

What's hot

Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCrosstown TO
 
City Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project updateCity Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project updateCity of San Angelo Texas
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Crosstown TO
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMAhmet Ozgur
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Crosstown TO
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction ProjectsCourtney Hayden
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Pont Samuel-De Champlain Bridge
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Crosstown TO
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 

What's hot (20)

Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 
City Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project updateCity Council Feb. 5, 2013 river project update
City Council Feb. 5, 2013 river project update
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
Pharmacy-Kennedy Construction Liaison Committee Meeting - June 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017Cedarvale & Forest Hill Stations Open House - November 2017
Cedarvale & Forest Hill Stations Open House - November 2017
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
 
A.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIMA.ÖZGÜR MISIRLIOĞLU TANITIM
A.ÖZGÜR MISIRLIOĞLU TANITIM
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
 
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
Public Information Meeting L’Île-des-Soeurs - New Champlain Bridge Corridor P...
 
Tsps
TspsTsps
Tsps
 
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
Leaside & Laird Stations Construction Liaison Committee Meeting - Feb 2018
 
Fitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement ProjectFitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement Project
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 

Similar to CV Mirani Sb Color

Circular waterway project
Circular waterway projectCircular waterway project
Circular waterway projectWRE Forum
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...Rajnish Bajaj
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1naveed ahmed
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Polavaram project
Polavaram projectPolavaram project
Polavaram projectHari Harish
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016Asit Kumar Adhikary
 
Planning of irrigation project/resrvoir(irrigation management)
Planning of irrigation project/resrvoir(irrigation management)Planning of irrigation project/resrvoir(irrigation management)
Planning of irrigation project/resrvoir(irrigation management)siva ch
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cvBladina.com
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cvBladina.com
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveFairfax County
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116Majeed Hashim
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 

Similar to CV Mirani Sb Color (20)

Circular waterway project
Circular waterway projectCircular waterway project
Circular waterway project
 
Resume
ResumeResume
Resume
 
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...PLANNING AND DESIGN OF SEWERS  USING ADVANCED TECHNIQUES  FOR PROPOSED SEWERA...
PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERA...
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
Muhammad Sheraz Khan CV (Updated)
Muhammad Sheraz Khan CV (Updated)Muhammad Sheraz Khan CV (Updated)
Muhammad Sheraz Khan CV (Updated)
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016
 
Planning of irrigation project/resrvoir(irrigation management)
Planning of irrigation project/resrvoir(irrigation management)Planning of irrigation project/resrvoir(irrigation management)
Planning of irrigation project/resrvoir(irrigation management)
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cv
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cv
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr DriveStorm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
Storm Pipe Rehabilitation at Cider Barrel Circle and Orr Drive
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 

CV Mirani Sb Color

  • 1. Amir Bakhsh Mirani Mobie: 0300-3147147 Email: amirbuxmirani110@gmail.com Seeking assignments in Managerial Position in the Civil Engineering field with an organization of repute Key Achievements • Completion of Darawat Dam in Sindh Province • Completion and Handing over of CRBC distribution System to Punjab Irrigation Department. • East Khairpur Tile Drainage Project • Electrification work of Jinnah Hydro Power Project • Completion of Hamal Lake Regulator and construction of Bridge at zero point of Manchar Lake. • Completion and Handing over of 12 Nos. desalinization plants in the vicinity of Manchar Lake. • Restoration of construction work of Irrigation system of Darawat Dam Project • Restoration of Terminated contract of Rainee Canal Project • Ground Breaking Ceremony of Naulong Dam Project Employment Profile 2012-2014 : GENERAL MANAGER (PROJECTS) SOUTH WAPDA Projects Handled: Supervision of the following water sector development projects carried out by WAPDA in Sindh & Balochistan Provinces: • Rainee Canal Project offtaking from Guddu Barrage to irrigate district Ghotki, Sukkur and Khairpur. • Right Bank Outfall Drain • Darawat Dam Sindh • Nai Gaj Dam Sindh • Operation & Maintenance of Mirani Dam Balochistan • Pilot Treatment Plant Dadu Sindh Province • Other Feasibility studies of lining of canals of Sukkur Barrage & Kotri Barrage. • 50 bedded WAPDA Hospital Hyderabad.
  • 2. Nov 2011- Jun 2012 : Chief Engineer/PD Nai Gaj Dam Project Responsibilities: • Construction of Dam on Nai Baran to conserve rain water for irrigation of 25,000 acres of virgin land in District Thatta and Jamshoro Jul 2011-Nov 2012 : Chief Engineer Jinnah Hydro Power Project Responsibilities: • Responsible for Civil works of hydro power projects which includes Power house units 12 MW each, 2 Nos. installation and commissioning completed. 2009-2011 : Project Director Darawat Dam Project Responsibilities: • Construction of Dam on Nai Baran to conserve rain water for irrigation of 25,000 acres of virgin land in District Thatta and Jamshoro • Establishment of new school building 2008-2009 : Director Civil Office of the General Manager (Projects) South Responsibilities: • To assist the General Manager (P) South on Technical matters of the projects under the jurisdiction (Sindh & Balochistan) 2006-2008 : Project Director RBOD III Sukkur Responsibilities: • Supervision of the construction of open surface drains and its allied cross drainage works comprise bridges, watercourses aqueducts, under pass/siphons and drainage inlets. This surface drainage system was built to collect the drainage effluent of Balochistan and district Larkana and Kamber Shahdadkot of Sindh Province. • Remodelling of Scarp Drainage System, Construction and Handing over of Ratodero Pump Station. 2004-2006 : Director (Civil) National Transmission & Dispatch Company (NTDC) Lahore Responsibilities: • Supervision and monitoring of construction work of Grid Stations and transmission lines & residential buildings of the company.
  • 3. 2003-2004 : Executive Engineer (Civil) Thermal Power Station, Guddu Responsibilities: • Supervision of the construction of the civil works and O&M of Thermal Station Guddu. 2000-2003 : Executive Engineer (Civil) Chashma Right Bank Canal D.I Khan Responsibilities: • Supervision of the construction work of the distribution system of the CRBC Canal. • After completion, handing and taking over to Punjab Irrigation Department. 1996-2000 : Executive Engineer (Civil) Common Services Division, WAPDA, Hyderabad Responsibilities: • O&M of the Water Wing Colony and office building of General Manager (P) South, Hyderabad 1993-1996 : Executive Engineer (Civil) Thermal Power Station, Jamshoro Responsibilities: • Construction of residential colonies, building for Thermal Power Station and their O&M 1989-1993 : Technical Officer Office of the Project Director LBOD Main WAPDA Hyderabad Responsibilities: • To assist the Project Director in technical matters regarding Left Bank Outfall Drain (LBOD) Project WAPDA Hyderabad 1987-1989 : Executive Engineer (Civil) LBOD Spinal Drain Badin Responsibilities: • Supervision of the construction of the LBOD Spinal Drain for carrying out the drainage effluent of Sanghar, Mirpurkhas and Nawabshah Districts and finally dispose into sea through Tidal Link. • O&M of LBOD Spinal Drain from Nawabshah to Badin • Survey of Tidal Link with the help of Hover Craft. 1978-1987 : Junior Engineer (Civil) East Khairpur Title Drainage Project Responsibilities: • Worked as Junior Engineer with ILACO consultants and project office.
  • 4. • Involved in designing and supervision of construction work of 600 Kms of lateral drains of 4 inch dia pipe. • Supervision and construction of collector drains. • Construction of sump houses, open surface drains and cross drainage structures (Siphon, Bridges, Watercourse aqueducts and Drainage inlets. • Supervision of the construction works of residential colony and its O&M. Trainings • Irrigation & Drainage with Mott MacDonald Cambridge (UK) • Middle Management Course at WAPDA Staff College Islamabad • Mandatory course for promotion at WAPDA Engineering Academy Faisalabad Education  Bachelor of Engineering (B.E) (Civil) from Mehran University of Engineering and Technology, Jamshoro Sindh Personal Details Date of Birth 08-03-1953 Domicile (Rural) SUKKUR CNIC 45504-9777104-1 PEC NO. Civ/4505 Nationality Pakistani Address House No. 18, Mid Land Colony, near Sonehri Book Land Qasimabad, Hyderabad Languages Known English, Urdu, Sindhi & Punjabi Total Work Experience 36 years in the field of Civil Engineering References: • Mr. Ali Sher Baloch, Ex-General Manager (Projects) South • Mr. Irshad Ahmed Bohio, Chief Engineer Rainee Canal Project, Guddu