1. Apply for position - Project Director / General Manager/Business Development Chief
Engineer for Civil and Infrastructure Big Project
Aung Moe Thein @ Paul Cell: +959255804406/+959970710758
Age:42 High – 6 ft tall
Work experiences in building and infrastructure management- 14 years in Malaysia and
19 months in Myanmar
Email – amt1993g@gmail.com
Religious: Mon / Buddhist-Christian
MartialStatus: Divorced
Present Address - South Dagon / Yangon
Father - Retired Township Education Officer /Mother – Retired Middle Head School Mistress
EDUCATION DETAILS
Yangon Institute of Technology 08/94 – 08/98 Third Year In Aeronautical
NayLa Institute (City&Guild((London)) 01/98 – 06/99 Second Year of Building
Certificates-Contract&Project Management,QS,TotalStation,welding,IT ,Microsoft
Project ,Surveying ,AirconRefrigeration&Wireman,AutoCad,Safety sewerage ,Mental Health .
working experiences in MALAYSIA
Tekad Construction Sdn. Bhd/ Hup Lee Construction Sdn. Bhd. 08/00 – 03/01 Site
Engineer
Twin 38 Stories, 2,000 m2 Residential Units, (4 Levels parking, and 1 Level Swimming Pool),
Suasana Condominium Project (K.L Central) 6 Months
200 units Terrace Housing (Double Storey),Near KLIA Quarter ,Nilai - 4 Months
S.J.I (Selangor) Sdn. Bhd. 03/01 – 03/03 Site Engineer
S.K &S.M.K (Smart School) 2 yrs - 61 millions
2. 60 Class Rooms for Students, 24 Lab Rooms, Road, R.C.Wall (7nos), Drainage, Fencing,
Sewerage, Guard
Kenwin Engineering Sdn. Bhd. 03/03 – 03/04 Site Engineer
4thStorey Smart Building (16-Blocks), 3-Condominium, Carpark&Infrastructure 1 yr - 1420
millions
2000 Residential Units,Carparking 2-Level SubStructure, 4-Level Superstructure;Sewerage,
Drainage, Road
Responsibilities:
Assistance To Senior Project Manager,ToLiase With M.K. Contractor Manager And Consultant
Supervision of Infrastructure and Architecture Works,Monitoring and Supervision of QA&QC
Works
Preparation of Mile Stone Program To Contract Manager(Client)
Curio Construction Sdn. Bhd. 03/04 – 08/04 Site Engineer
4-Nos of Road cross Bridges, Religious School, Flood Mitigation Project KL-GOMBAK -12
millions
7 m Length Road Crossing Bridge With 1.8m x1.8 m Box Culvert&Wingwall
3rdstorey Religious School with 24 Class Room and Infrastructure Works
25 m Width, 5 m Depth Open and Close Channel Drainage (Flood Mitigation)
Legend Plan Sdn. Bhd. 09/2005 – 2/07 Site Manager
(1)Low and Medium Cost Apartment (2400 Units) 7 Months – 3 millions
3000 m Length Sewerage Pipe Laying(Diameter 150mm,175mm,225mm,300mm),
• ength Drainage R.C. Pipe Laying(Diameter 300mm,600mm,1500mm)
(2) (48)Units Terrace Housing (Single Storey) 9 Months , 2 Million (Water Reservoir project)
23 m high (79m2) Water Tank, 100 m2 Suction Tank&26 m2 Pump House
MegahBerkatSdn. Bhd. 17/02/2007 – 01/08/2008 Site Agent
CandanganPembinaanAsramaAnggotaBujangKapalMengandungi 5 Blok 6 Tingkat
DipangkalanTLDM , LUMUT ( 40 millions)
Responsibilities
Materials Procurement And Progress Claim of Sub Contractors
Progress Claim to MINDAF and follow up payment
Prepare and submit to Mindaf and Tldm for foreign workers pass.
Handle Petty Cashes and find new subcontractors
Monitoring progress of work and direct report to Big Boss
Proper Prospective Engineering Sdn. Bhd.( 1/10/08 till 1/11/08 ) - Site Engineer
Project : factory at Cyberjaya (Q-Cell , Germany (Client))
Task Builder SdnBhd . (15 /1/09 to 15 / 4 /09 ) -Quantity Surveyor
Project : 9 millionsbanglo house for DatoHaris Hussein Oon
3. MegahBerkatSdn. Bhd. (16/4/09 to April 2011 ) - Project Manager
Project : 15 Millions School Project in Terengganu
Supervision of Infrastructure and Architecture Works, Monitoring and Supervision of QA&QC
Works
Preparation of Mile Stone Program
Project planning, programming ,updating,survey,Qs,earth work ,infrastructure and materials
procurement.
Maintaining a functional relationship with the client, client representatives, professional
consultants, subcontractors, suppliers and officials involved in project
Financial monitoring of the project budget in conjunction to ensure accurate cost
control/reporting and project forecasting.
CT Indah M&E Construction SdnBhd (May 2011 to November 2011) – Site Agent
Project SOHO condominium (Structure Work)
Legend Plan SdnBhd (December 2012 – Feburary 2013 ) – Site Manager
Road Side RCP drainage - National Cancer Institute ,Putrajaya
EK Build SdnBhd (March 2013- May 2013 ) – Site Agent
Earth Work (Cut/Fill ) – Cyberjaya
Task Builder SdnBhd (May 2013 – October 2013 )- Site Agent
3 – storyBanglo - Mines Resort City
Vertex SolticeSdnBhd (November 2013 – April 2014 )- Site Agent
All paperwork , Drawing ,Inspection ,Material accepting ,Test Tube ,Architect supervision .
working experiences in Myanmar
Marga Landmark Development Co. Ltd. (July 2014 –January 2015)- Project Coordinator
Project - Show flat of Dagon City at 22 acres Yangon downtown development
. Personal assistance to General Manager (Hongkong).
Inspection, site supervision, and material quality control of construction works in
accordance with the project’s specifications, drawings and standards
Coordination and cooperation with subcontractors and subcontract engineers to
develop the project
HTE (Myanmar) Limited (February 2015 – April 2015) – Project Manager
4. Preparing tender submissions for Poker Factory(Mingalardon) and Singapore Myanmar
Vocational School – Nat Mount street ,Yangon.
Review, check and co-ordinates architectural drawing in relation with other
engineering drawing.
Clarify with developer and consultants, any discrepancies or co-ordination
problems found in the drawing through request for information.
Produce construction shop drawings and details drawing for consultant’s approval
on time.
Planning, material submission and schedule of worked based on master
programmed.
Upkeep the drawing records regularly to ensure that approved correct drawings
are issued and used for construction.
Latest approved set of drawings and drawing list are to be maintained at all times.
Find /meet and presentation to contractors to put prices for quotations
CTMCC-HTE (Myanmar) Limited (May 2015 –August 2015)–Project Coordinator
Chris Plaza Project (2 Blks of 10-storey condominiums, 3 story commercial(Yoma Bank) with
promenade and basement carpark, Naypidaw.)
Review, check and co-ordinates architectural drawing in relation with other
engineering drawing.
Clarify with developer and consultants, any discrepancies or co-ordination
problems found in the drawing through request for information.
Produce construction shop drawings and details drawing of Structure and
Architecture for NCDC’s approval on time.
Planning, material submission and schedule of worked based on master
programmed.
Upkeep the drawing records regularly to ensure that approved correct drawings
are issued and used for construction.
Latest approved set of drawings and drawing list are to be maintained at all times.
5. Establish personalized client,NCDC,Construction,Home Minitry relationships
from start.
Meets with the client to discuss and explain all espects of the project
Coordination with Structure engineer to develop the project.
Play active role in company decision making
CTMCC (Myanmar) Limited (August 2015 –November 2015)–Architecture Coordinator
Crystal Tower and Residences – 5 storey Podium/Level 6 swimming pool/16 storey offices
tower /16 storey residential units , Junction Square Extension, Yangon.
Review, check and co-ordinates architectural drawing in relation with other
engineering drawing.
Clarify with developer and consultants, any discrepancies or co-ordination
problems found in the drawing through request for information.
Produce construction shop drawings and details drawing for consultant’s approval
on time.
Planning, material submission and schedule of worked based on master
programmed.
Upkeep the drawing records regularly to ensure that approved correct drawings
are issued and used for construction.
Latest approved set of drawings and drawing list are to be maintained at all times.
Establish personalized client relationships from start to finish on
Meets with the client to discuss and explain all espects of the project
Coordination with engineers (Structure, MEP ) and Facade Nsc to develop the
project.
Find ,meet and presentation to Contractors /Supplier /Specialists to get quotation
for final decisions
Submit Method of Statements / RFI /RFA for material and drawing to Tokyu
management for approval as a QA/QC manager .
Play active role in company decision making
6. Kumagai Gumi Co. Ltd . (December 2015 – February 2016 )-Chief Engineer
Improvement of Taugoo Education College
. Pre- Inspection of Formwork , Rebar , Concrete and Roof truss
Reason for leave : My abilities was more than requirement
Additional Skills
Great inter-personal skills and comfortable working effectively both independently and
in a team environment.
Great ability to perform multi-task and meet deadlines.
Expected Date to start - ASAP
Expected Salary - Negiotiate