Abstract— As the time is passing the traffic of developing city
is increasing So it creates congestion at intersection. Ahmedabad
is the highest populated city in Gujarat .Roundabouts are
constructed to maintain the traffic flow but when the flow of
traffic at intersection is more than its capacity it increase the
delay of travel time. The smooth flow of traffic cannot be
possible at roundabout. The purpose of providing a roundabout
can`t be fulfilled. Therefore it is necessary to provide a suitable
alternative to overcome this situation. There is a roundabout on
Anjali intersection in Ahmedabad which has traffic flow more
than its capacity. So to overcome this situation as an alternative
signal design is carried out in this research work.
Index Terms— Roundabout, Capacity estimation, Signal
Design(3-phase,4-phase).
I. INTRODUCTION
The rate of growth of vehicles is increasing rapidly in
developing cities. This situation makes the city to be
congested on roads and on intersection. In Ahmedabad
private vehicles are increasing. As the vehicles are increasing
the congestion at roundabout also increases. This lead to
redesign the roundabout or to provide suitable alternative at
intersection. It is concluded that the Anjali intersection has
more traffic than its capacity .therefore it is necessary to
redesign it or to provide suitable alternative. But as per IRC
65:1975 the flow of traffic at intersection should not be more
than 3000 veh/hour. At Anjali intersection the flow is more
than 3000 veh/hour.so redesign of roundabout could not give
satisfied result. So as a solution signal design is carried out.
The videography survey is done at Anjali intersection in peak
hours from 9 a.m. to 10 a.m. for data collection to know flow
of traffic on lanes and then 4-phase and 3-phase signal design
is done.
II. OBJECTIVES
Objectives for this study of Roundabout are (1) To carry out
the inventory survey for the Anjali roundabout. (2) To know
the flow pattern at Anjali roundabout. (3) To provide traffic
signal at roundabout.
Manuscript received Feb. 13, 2014.
Harshad C Prajapati, Student, M.E. Civil (Transportation) – 4rth Sem
L.D.College of Engineering, Gujarat Technological University,
Navrangpura, Ahmedabad
Subhas kumar C Singh, Student, M.E. Civil (Transportation) – 4rth
Sem L.D.College of Engineering, Gujarat Technological University,
Navrangpura, Ahmedabad
III. DATA COLLECTION
Traffic data are collected from videographic survey, which
are then converted into PCU/hour as given below. It was
found that maximum number of vehicles were passing
through Anjali was from Anjali to University in straight
direction.
Leg towards
Gujarat
University
Left side Straight Right side
81 798 276
Table: (vehicles in PCU/hour)
Leg towards
Anjali
Left side Straight Right side
315 1402 729
Table: (vehicles in PCU/hour)
Leg towards
Paldi
Left side Straight Right side
296 1119 230
Table: (vehicles in PCU/hour)
Leg towards
Vasna
Left side Straight Right side
506 1345 139
Table: (vehicles in PCU/hour)
Fig: 1 Traffic data in PCU /hour at Anjali Roundabout
Provision of Suitable Alternative in Place of a
Roundabout: A Case Study of Anjali Roundabout.
Harshad C Prajapati, Subhas kumar C Singh
Provision of Suitable Alternative in Place of a Roundabout: A Case Study of Anjali Roundabout.
84 www.erpublication.org
IV. SIGNAL DESIGN
Signal design should be carried out as per IRC: 93-1985.
The
Webster method is adopted for signal design. Saturation
flow
(S) is measured using formulas as described Raval et al.
The
value of y of each phase is calculated using formula y = q/s.
For signal design the first alternative is taken as 4-phase
signal design in which vehicles movement for all four phase
is taken as straight and right direction i.e.,(1)
Phase-1:University: straight and right direction vehicles
considered. (2) Phase-2: Paldi: straight and right direction
vehicles are considered. (3) Phase-3: Anjali: straight and
right direction vehicles are considered. (4) Phase-4:
Vasna: straight and right direction vehicles are considered
in.
Phase Q S1 y =
Q/S1
Phase-1 1074 56017.8 0.19
Phase-2 1349 7017.18 0.19
Phase-3 2132 5601.78 0.38
Phase-4 1484 5264.78 0.28
. The value of y1= 0.19, y2= 0.38, y3= 0.19, y4= 0.30 are
calculated.
The ∑Y is come out equal to 1.04 which is greater than 1.
Hence
traffic is oversaturated, so signal design cannot be done
and 4-phase
signal design is not possible.
Then another alternative is chosen as 3-phase signal
design in which,
(1) Phase-1: Paldi: straight and right direction of
vehicles are considered,
For Vasna: straight and right direction of vehicles are
considered.
(2) Phase-2: University: Only right direction is
considered,
For Anjali: right direction vehicles are considered.
(3) Phase-3: University: straight direction vehicles are
considered.
.
Phase Q S1 y = Q/S1
Phase-1 1484 5264.08 0.28
Phase-2 729 2872.10 0.25
Phase-3 1402 2872.08 0.49
The value of y1= 0.28, y2= 0.25, y3= 0.49 are calculated.
The ∑Y is
come out equal to 1.02 which is greater than 1. Showing
the oversaturated traffic. The meaning of which is that in
this case also signal design cannot be done and 3-phase
signal design is not possible.
V. SUMMARY:
The flow of vehicles at intersection is very much high. It
cannot be maintained smoothly by providing traffic signals.
In both phase of signal design i.e. 4-phase and 3-phase the
condition is oversaturated. So alternatives are,
1.To provide diversion for left turners before entering the
roundabout.
2.To provide flyover at cross section from Vasna to Paldi leg
in order to reduce the traffic.
3.To go for provision of half cloverleaf at roundabout.
VI. CONCLUSION
Total vehicles entering into the Anjali roundabout per hour is
11594. And that is too much high compared to the suggested
traffic of IRC. The traffic signal is not adequate as the traffic
condition is oversaturated. In this case Fly over brides or
Underpass can be introduced for orderly movement of traffic.
The traffic flow is heavy in which our intersection consists of
12% of Auto rickshaws, 2% of Buses, 75% two wheelers,
11% Cars. BRTS buses are also carried around the
roundabout. As arrival of BRTS is every 2 minute to 3
minute, it affects the main traffic across the roundabout at
REFERENCES
[1] IRC 65-1975, ―Recommended Practice for Traffic Rotaries‖,
Indian Road Congress, New Delhi.
[2] IRC 93-1985, ―Guidelines on Design and Installation of Road Traffic
Signals‖, Indian Road Congress, New Delhi.
[3] Kadiyali L.R (2005) ―Traffic Engineering Transportation
planning‖, Khanna publishers Delhi.
[4] Saxena S.C. (1989) Traffic planning and design, Dhanpat Rai and
sons, Nai sark, Delhi.
[5] https://www.google.co.in
[6] http://en.wikipedia.org/wiki/Roundabout
[7] Shruti B. Khara(2011) ―A Formula to evaluate capacity of
roundabout:
[8] case study of Nehrunagar Intersection‖, M.E. Thesis, civil engg.
Department, L.D. collage of Engineering Ahmedabad.

More Related Content

What's hot

Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow FundamentalsShaira Lucero
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyFiroz Ovi
 
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...Hossam Shafiq I
 
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLDESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLSAMADHANA
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1Syafiqah Jamian
 
Comparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsComparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsRaghupathi Kandiboina
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planningPratyush Kumar
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordinationKartik Yadiyapur
 
Lect 30- traffic signal i
Lect 30- traffic signal iLect 30- traffic signal i
Lect 30- traffic signal iHamidullahFarhang
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)irjes
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineeringAKANSHA GURELE
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Pronob Ghosh
 
Chapter 6 Fundamentals of traffic flow
Chapter 6 Fundamentals of traffic flowChapter 6 Fundamentals of traffic flow
Chapter 6 Fundamentals of traffic flowFayaz Rashid
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For HighwaysLatif Hyder Wadho
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySai Santosh Yakkali
 
A case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiA case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiSukhdeep Jat
 
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...Hossam Shafiq I
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Pronob Ghosh
 
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 

What's hot (20)

Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow Fundamentals
 
Presentation on Traffic Volume Survey
Presentation on Traffic Volume SurveyPresentation on Traffic Volume Survey
Presentation on Traffic Volume Survey
 
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
9-Traffic Volume ( Transportation and Traffic Engineering Dr. Sheriff El-Bada...
 
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALLDESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
DESIGN OF TRAFFIC SIGNAL AT S.R.NAGR COMMUNITY HALL
 
Cc503 traffic managemant part1
Cc503   traffic managemant part1Cc503   traffic managemant part1
Cc503 traffic managemant part1
 
Comparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditionsComparison of PCU for Indian and American conditions
Comparison of PCU for Indian and American conditions
 
Spot speed study, transport planning
Spot speed study, transport planningSpot speed study, transport planning
Spot speed study, transport planning
 
Traffic signal co ordination
Traffic signal co ordinationTraffic signal co ordination
Traffic signal co ordination
 
Lect 30- traffic signal i
Lect 30- traffic signal iLect 30- traffic signal i
Lect 30- traffic signal i
 
International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)International Refereed Journal of Engineering and Science (IRJES)
International Refereed Journal of Engineering and Science (IRJES)
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011Speed report from panthpoath to russel square by pronob ghosh buet 1204011
Speed report from panthpoath to russel square by pronob ghosh buet 1204011
 
Chapter 6 Fundamentals of traffic flow
Chapter 6 Fundamentals of traffic flowChapter 6 Fundamentals of traffic flow
Chapter 6 Fundamentals of traffic flow
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
Spot speed studies and speed delay time survey
Spot speed studies and speed delay time surveySpot speed studies and speed delay time survey
Spot speed studies and speed delay time survey
 
A case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,ChennaiA case study on Rajkillpakkam Junction,Chennai
A case study on Rajkillpakkam Junction,Chennai
 
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011Parking design in front of CE building BUET by Pronob ghosh 1204011
Parking design in front of CE building BUET by Pronob ghosh 1204011
 
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
Lec 15 Transit Operations (Transportation Engineering Dr.Lina Shbeeb)
 

Viewers also liked (20)

Ijetr021134
Ijetr021134Ijetr021134
Ijetr021134
 
Ijetr021123
Ijetr021123Ijetr021123
Ijetr021123
 
Ijetr021113
Ijetr021113Ijetr021113
Ijetr021113
 
Ijetr021235
Ijetr021235Ijetr021235
Ijetr021235
 
Ijetr021140
Ijetr021140Ijetr021140
Ijetr021140
 
Ijetr021253
Ijetr021253Ijetr021253
Ijetr021253
 
Ijetr021121
Ijetr021121Ijetr021121
Ijetr021121
 
Ijetr021264
Ijetr021264Ijetr021264
Ijetr021264
 
Ijetr021117
Ijetr021117Ijetr021117
Ijetr021117
 
Ijetr021115
Ijetr021115Ijetr021115
Ijetr021115
 
Ijetr021145
Ijetr021145Ijetr021145
Ijetr021145
 
Ijetr021132
Ijetr021132Ijetr021132
Ijetr021132
 
Ijetr021229
Ijetr021229Ijetr021229
Ijetr021229
 
Ijetr021138
Ijetr021138Ijetr021138
Ijetr021138
 
Ijetr021249
Ijetr021249Ijetr021249
Ijetr021249
 
Ijetr021233
Ijetr021233Ijetr021233
Ijetr021233
 
Ijetr021221
Ijetr021221Ijetr021221
Ijetr021221
 
Ijetr021242
Ijetr021242Ijetr021242
Ijetr021242
 
Ijetr021251
Ijetr021251Ijetr021251
Ijetr021251
 
Ijetr021265
Ijetr021265Ijetr021265
Ijetr021265
 

Similar to Ijetr021237

Major Project ppt.pptx
Major Project ppt.pptxMajor Project ppt.pptx
Major Project ppt.pptxDeluserDebasish
 
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhStudy of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhIJERA Editor
 
IRJET- Analysis of Saturation Flow at Signalized Intersections
IRJET-  	  Analysis of Saturation Flow at Signalized IntersectionsIRJET-  	  Analysis of Saturation Flow at Signalized Intersections
IRJET- Analysis of Saturation Flow at Signalized IntersectionsIRJET Journal
 
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in Kerala
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in KeralaIRJET- Analysis of Passenger Flow Parameters of Rail Transportation in Kerala
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in KeralaIRJET Journal
 
Study on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka RoadStudy on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka RoadJournal For Research
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highwayBharat Upadhyay
 
IRJET- Traffic Study on Mid-Block Section & Intersection
IRJET-  	  Traffic Study on Mid-Block Section & IntersectionIRJET-  	  Traffic Study on Mid-Block Section & Intersection
IRJET- Traffic Study on Mid-Block Section & IntersectionIRJET Journal
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...EditorIJAERD
 
design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone ElbichAkhtarkhan
 
Paper id 37201529
Paper id 37201529Paper id 37201529
Paper id 37201529IJRAT
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYJournal For Research
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET Journal
 
Project Report Modified222
Project Report Modified222Project Report Modified222
Project Report Modified222Ratan Patil
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)eSAT Journals
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...eSAT Publishing House
 
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...Saurav Barua
 
Ot3425662590
Ot3425662590Ot3425662590
Ot3425662590IJERA Editor
 
Reduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingReduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingIRJET Journal
 
IRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET Journal
 

Similar to Ijetr021237 (20)

Major Project ppt.pptx
Major Project ppt.pptxMajor Project ppt.pptx
Major Project ppt.pptx
 
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, ChandigarhStudy of Traffic Volume and Level of Service of Panjab University, Chandigarh
Study of Traffic Volume and Level of Service of Panjab University, Chandigarh
 
IRJET- Analysis of Saturation Flow at Signalized Intersections
IRJET-  	  Analysis of Saturation Flow at Signalized IntersectionsIRJET-  	  Analysis of Saturation Flow at Signalized Intersections
IRJET- Analysis of Saturation Flow at Signalized Intersections
 
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in Kerala
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in KeralaIRJET- Analysis of Passenger Flow Parameters of Rail Transportation in Kerala
IRJET- Analysis of Passenger Flow Parameters of Rail Transportation in Kerala
 
Study on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka RoadStudy on Pedestrian Behaviour near an Ashoka Road
Study on Pedestrian Behaviour near an Ashoka Road
 
Operational analysis of two lane highway
Operational analysis of two lane highwayOperational analysis of two lane highway
Operational analysis of two lane highway
 
IRJET- Traffic Study on Mid-Block Section & Intersection
IRJET-  	  Traffic Study on Mid-Block Section & IntersectionIRJET-  	  Traffic Study on Mid-Block Section & Intersection
IRJET- Traffic Study on Mid-Block Section & Intersection
 
Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...Identification of vehicular growth and its management on nh 202 in ranga redd...
Identification of vehicular growth and its management on nh 202 in ranga redd...
 
A2114065115
A2114065115A2114065115
A2114065115
 
design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone design of saperate lane for ambulance at high intensity traffic zone
design of saperate lane for ambulance at high intensity traffic zone
 
Paper id 37201529
Paper id 37201529Paper id 37201529
Paper id 37201529
 
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLYSTUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
STUDY ON INTERSECTION AT 26TH MILE, KANJIRAPPALLY
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
 
Project Report Modified222
Project Report Modified222Project Report Modified222
Project Report Modified222
 
Traffic census and analysis (a case study)
Traffic census and analysis (a case study)Traffic census and analysis (a case study)
Traffic census and analysis (a case study)
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
 
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...
TE004, A Study On Feasible Traffic Operation Alternatives At Signalized Inter...
 
Ot3425662590
Ot3425662590Ot3425662590
Ot3425662590
 
Reduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and SchedulingReduction in Travel Time of Ambulances using Simulation and Scheduling
Reduction in Travel Time of Ambulances using Simulation and Scheduling
 
IRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary DesignIRJET- Traffic Congestion Overcome by Rotary Design
IRJET- Traffic Congestion Overcome by Rotary Design
 

More from Engineering Research Publication (20)

Ijetr042339
Ijetr042339Ijetr042339
Ijetr042339
 
Ijetr042336
Ijetr042336Ijetr042336
Ijetr042336
 
Ijetr042335
Ijetr042335Ijetr042335
Ijetr042335
 
Ijetr042334
Ijetr042334Ijetr042334
Ijetr042334
 
Ijetr042330
Ijetr042330Ijetr042330
Ijetr042330
 
Ijetr042329
Ijetr042329Ijetr042329
Ijetr042329
 
Ijetr042328
Ijetr042328Ijetr042328
Ijetr042328
 
Ijetr042327
Ijetr042327Ijetr042327
Ijetr042327
 
Ijetr042322
Ijetr042322Ijetr042322
Ijetr042322
 
Ijetr042321
Ijetr042321Ijetr042321
Ijetr042321
 
Ijetr042319
Ijetr042319Ijetr042319
Ijetr042319
 
Ijetr042318
Ijetr042318Ijetr042318
Ijetr042318
 
Ijetr042316
Ijetr042316Ijetr042316
Ijetr042316
 
Ijetr042313
Ijetr042313Ijetr042313
Ijetr042313
 
Ijetr042309
Ijetr042309Ijetr042309
Ijetr042309
 
Ijetr042301
Ijetr042301Ijetr042301
Ijetr042301
 
Ijetr042207
Ijetr042207Ijetr042207
Ijetr042207
 
Ijetr042201
Ijetr042201Ijetr042201
Ijetr042201
 
Ijetr042195
Ijetr042195Ijetr042195
Ijetr042195
 
Ijetr042192
Ijetr042192Ijetr042192
Ijetr042192
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsArindam Chakraborty, Ph.D., P.E. (CA, TX)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❀Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Ijetr021237

  • 1. International Journal of Engineering and Technical Research (IJETR) ISSN: 2321-0869, Volume-2, Issue-2, February 2014 83 www.erpublication.org  Abstract— As the time is passing the traffic of developing city is increasing So it creates congestion at intersection. Ahmedabad is the highest populated city in Gujarat .Roundabouts are constructed to maintain the traffic flow but when the flow of traffic at intersection is more than its capacity it increase the delay of travel time. The smooth flow of traffic cannot be possible at roundabout. The purpose of providing a roundabout can`t be fulfilled. Therefore it is necessary to provide a suitable alternative to overcome this situation. There is a roundabout on Anjali intersection in Ahmedabad which has traffic flow more than its capacity. So to overcome this situation as an alternative signal design is carried out in this research work. Index Terms— Roundabout, Capacity estimation, Signal Design(3-phase,4-phase). I. INTRODUCTION The rate of growth of vehicles is increasing rapidly in developing cities. This situation makes the city to be congested on roads and on intersection. In Ahmedabad private vehicles are increasing. As the vehicles are increasing the congestion at roundabout also increases. This lead to redesign the roundabout or to provide suitable alternative at intersection. It is concluded that the Anjali intersection has more traffic than its capacity .therefore it is necessary to redesign it or to provide suitable alternative. But as per IRC 65:1975 the flow of traffic at intersection should not be more than 3000 veh/hour. At Anjali intersection the flow is more than 3000 veh/hour.so redesign of roundabout could not give satisfied result. So as a solution signal design is carried out. The videography survey is done at Anjali intersection in peak hours from 9 a.m. to 10 a.m. for data collection to know flow of traffic on lanes and then 4-phase and 3-phase signal design is done. II. OBJECTIVES Objectives for this study of Roundabout are (1) To carry out the inventory survey for the Anjali roundabout. (2) To know the flow pattern at Anjali roundabout. (3) To provide traffic signal at roundabout. Manuscript received Feb. 13, 2014. Harshad C Prajapati, Student, M.E. Civil (Transportation) – 4rth Sem L.D.College of Engineering, Gujarat Technological University, Navrangpura, Ahmedabad Subhas kumar C Singh, Student, M.E. Civil (Transportation) – 4rth Sem L.D.College of Engineering, Gujarat Technological University, Navrangpura, Ahmedabad III. DATA COLLECTION Traffic data are collected from videographic survey, which are then converted into PCU/hour as given below. It was found that maximum number of vehicles were passing through Anjali was from Anjali to University in straight direction. Leg towards Gujarat University Left side Straight Right side 81 798 276 Table: (vehicles in PCU/hour) Leg towards Anjali Left side Straight Right side 315 1402 729 Table: (vehicles in PCU/hour) Leg towards Paldi Left side Straight Right side 296 1119 230 Table: (vehicles in PCU/hour) Leg towards Vasna Left side Straight Right side 506 1345 139 Table: (vehicles in PCU/hour) Fig: 1 Traffic data in PCU /hour at Anjali Roundabout Provision of Suitable Alternative in Place of a Roundabout: A Case Study of Anjali Roundabout. Harshad C Prajapati, Subhas kumar C Singh
  • 2. Provision of Suitable Alternative in Place of a Roundabout: A Case Study of Anjali Roundabout. 84 www.erpublication.org IV. SIGNAL DESIGN Signal design should be carried out as per IRC: 93-1985. The Webster method is adopted for signal design. Saturation flow (S) is measured using formulas as described Raval et al. The value of y of each phase is calculated using formula y = q/s. For signal design the first alternative is taken as 4-phase signal design in which vehicles movement for all four phase is taken as straight and right direction i.e.,(1) Phase-1:University: straight and right direction vehicles considered. (2) Phase-2: Paldi: straight and right direction vehicles are considered. (3) Phase-3: Anjali: straight and right direction vehicles are considered. (4) Phase-4: Vasna: straight and right direction vehicles are considered in. Phase Q S1 y = Q/S1 Phase-1 1074 56017.8 0.19 Phase-2 1349 7017.18 0.19 Phase-3 2132 5601.78 0.38 Phase-4 1484 5264.78 0.28 . The value of y1= 0.19, y2= 0.38, y3= 0.19, y4= 0.30 are calculated. The ∑Y is come out equal to 1.04 which is greater than 1. Hence traffic is oversaturated, so signal design cannot be done and 4-phase signal design is not possible. Then another alternative is chosen as 3-phase signal design in which, (1) Phase-1: Paldi: straight and right direction of vehicles are considered, For Vasna: straight and right direction of vehicles are considered. (2) Phase-2: University: Only right direction is considered, For Anjali: right direction vehicles are considered. (3) Phase-3: University: straight direction vehicles are considered. . Phase Q S1 y = Q/S1 Phase-1 1484 5264.08 0.28 Phase-2 729 2872.10 0.25 Phase-3 1402 2872.08 0.49 The value of y1= 0.28, y2= 0.25, y3= 0.49 are calculated. The ∑Y is come out equal to 1.02 which is greater than 1. Showing the oversaturated traffic. The meaning of which is that in this case also signal design cannot be done and 3-phase signal design is not possible. V. SUMMARY: The flow of vehicles at intersection is very much high. It cannot be maintained smoothly by providing traffic signals. In both phase of signal design i.e. 4-phase and 3-phase the condition is oversaturated. So alternatives are, 1.To provide diversion for left turners before entering the roundabout. 2.To provide flyover at cross section from Vasna to Paldi leg in order to reduce the traffic. 3.To go for provision of half cloverleaf at roundabout. VI. CONCLUSION Total vehicles entering into the Anjali roundabout per hour is 11594. And that is too much high compared to the suggested traffic of IRC. The traffic signal is not adequate as the traffic condition is oversaturated. In this case Fly over brides or Underpass can be introduced for orderly movement of traffic. The traffic flow is heavy in which our intersection consists of 12% of Auto rickshaws, 2% of Buses, 75% two wheelers, 11% Cars. BRTS buses are also carried around the roundabout. As arrival of BRTS is every 2 minute to 3 minute, it affects the main traffic across the roundabout at REFERENCES [1] IRC 65-1975, ―Recommended Practice for Traffic Rotaries‖, Indian Road Congress, New Delhi. [2] IRC 93-1985, ―Guidelines on Design and Installation of Road Traffic Signals‖, Indian Road Congress, New Delhi. [3] Kadiyali L.R (2005) ―Traffic Engineering Transportation planning‖, Khanna publishers Delhi. [4] Saxena S.C. (1989) Traffic planning and design, Dhanpat Rai and sons, Nai sark, Delhi. [5] https://www.google.co.in [6] http://en.wikipedia.org/wiki/Roundabout [7] Shruti B. Khara(2011) ―A Formula to evaluate capacity of roundabout: [8] case study of Nehrunagar Intersection‖, M.E. Thesis, civil engg. Department, L.D. collage of Engineering Ahmedabad.