Past Drainage Practice and issues
•

In Malaysia, the traditional approach widely practiced to manage
storm water design where allow developers to put in drains where
appropriate.

•

The engineers job is only to determine drain size to comply with
drainage capacity

•

Urban drainage practice is based on the 1975 DID Urban Drainage
Design Manual, “Planning and design Procedure No 1: Urban
Drainage Design Standard For Peninsular Malaysia.

•

Rapid disposal approach as adopted in this manual has led to
increase in the occurrence of flash floods as a result of increase in
surface runoff, peak discharge, shorter flow duration and others.
•

If the country continues to urbanize, the flood problem
continue to increase. (Zakaria & Ainan, 2000)

•

Due to this problem, Department of Irrigation and Drainage
(DID) is taking a proactive step by introducing New Urban
Drainage Manual known as Strom Water Management Manual
for Malaysia (Manual Saliran Mesra Alam or MSMA)

•

Effective from 1st January 2001 all new development in
Malaysia must comply with this new guideline which control
storm water from the aspect of quantity and quality runoff to
achieve zero development impact contribution.

•

This new strategy will give a sustainable solution to mitigate
the existing flood problems but it also to prevent the
occurrence of such problem in the new area developed
URBAN STORMWATER MANAGEMENT
MANUAL FOR MALAYSIA
•
•

•
•

•

The manual has 48 Chapters.
It is divided into 9 parts
The manual is published in
20 volumes
The first 3 parts contain
background information on
environmental process and
storm water management
The remaining parts contain
detailed information on
hydrology and hydraulic,
runoff quantity control,
sources and treatment runoff
quantity control, runoff quality
control and special storm
water applications
•

The main focus of MSMA is to manage storm water
instead of draining it away as fast as possible

•

This manual also considers the current existing problem
such as flash flood, river pollution, soil erosion, hill
development and etc.

•

MSMA have a multiple objectives including to:
1. Ensure the safety of the public
2. Control nuisance flooding and provide for the safe
passage of less frequent and larger flood events
3. Stabilize the landform and control erosion
4. Optimize the land available for urban development
5. Minimize the environmental impact of urban runoff on
water quality
6. Enhance the urban landscape
Gross Pollutant Trap
Swale
Dry Pond
Wetland
ESTIMATING PEAK FLOW

•

Chapter 13 – Design Rainfall

•

Chapter 14 – Flow Estimation and
Routing
ESTIMATING PEAK FLOW
 Rational Formula
Select Design ARI (Average Recurrence Interval)
 Design Acceptance Criteria :
• The minor system is intended to collect and convey runoff from relatively

frequent storm events to minimise inconvenience and nuisance flooding.
• The major system is intended to safely convey runoff not collected by the

minor drainage system to waterways or rivers.
Major and Minor System
RUNOFF ESTIMATION
– refer Chapter 14 – Flow Estimation and Routing
•

Estimating Time of Concentration, tc

 The time of concentration is the flow travel time from the most hydraulically

remote point in the contributing catchment area to the point under study.

Time of Concentration, tc for small cacthment
• Overland Flow time
Overland flow can occur on either grassed or paved surfaces.
From 14.4.2 Calculation of Flow Time …page 14-2
Design Chart 14.1 …page 14-25
• Roof Drainage Flow Time

• Kerbed Gutter Flow Time
• Channel Flow Time

• Pipe Flow Time
DESIGN RAINFALL INTENSITIES
– refer Chapter 13 – Design Rainfall

• Determine Average Rainfall Intensity, RIt
1. The total storm rainfall depth at a point, for a given rainfall duration and ARI,
is a function of the local climate.
2. Rainfall depths can be further processed and converted into rainfall intensities
(intensity = depth/duration), which are then presented in IDF curves.
3. Users need to be aware of the limitations of these IDF curves ( see 13.2.4
IDF Curves for Selected Cities and Towns )
4. Local authorities are advised to find out from the DID to the availability of IDF
curves or coefficients for their respective areas, or to obtain local pluviometer
data for those wishing to conduct their own analysis
RAINFALL INTENSITYDURATION-FREQUENCY (IDF)
 Design storm defines the rainfall intensity for a given frequency and

therefore affects the resulting runoff peak and volume

Rainfall Intensity (mm/hr)

Runoff peak

Frequency (year)

10yr
5yr
2yr

Duration (minutes)

 Current practice is to select the design storm duration as equal to or

longer than the time of concentration for the catchment (or some
minimum value when the time of concentration is short)
 IDF for SHORT DURATION

Rainfall Intensity (mm/hr)

5 minutes to < 30 minutes

Frequency (year)

10yr
5yr
2yr

30

Duration (minutes)
 IDF for FREQUENCY STORM

Rainfall Intensity (mm/hr)

(Water quality design)
1 month (0.083 yr), 3 month (0.25 yr), 6 month
(0.5 yr) and 12 month (1 yr)

Frequency (year)

0.5yr
0.25yr
0.083yr
30

Duration (minutes)
• Polynomial Approximation of IDF Curves ( see 13.2.6)

APPENDIX 13.A FITTED COEFFICIENTS FOR IDF CURVES FOR 35 URBAN
CENTRES …page 13-11
• IDF Values for Short Duration Storms (see 13.2.7)
• Figure 13.3 Values of 2P24h for use with Table 13.3(page 13-6)
• IDF Values for Frequent Storms(see 13.2.8)
Example 1
 To determine the design peak flow generated

from a minor drainage of medium density
residential area of 10 hectares in Kuala Lumpur.
Assume 80m of overland flow followed by 400m
of flow in an open drain. Catchment area average
slope = 0.5%
URBAN DRAINAGE SYSTEM
 Design Storm
Table 4.1 Design Storm ARIs for Urban Stormwater Systems
Type of Development
(See Note 1)

Open Space, Parks and Agricultural
Land in urban areas

Average Recurrence Interval (ARI) of Design
Storm (year)
Quantity
Quality
Minor
Major System
System
(see Note 2 and
3)
1

up to 100

Low density

2

up to 100

Medium density

5

up to 100

High density

10

up to 100

5

up to 100

10

up to 100

Residential:

Commercial, Business and Industrial –
Other than CBD
Commercial, Business, Industrial in
Central Business District (CBD) areas of
Large Cities

3 month ARI
(for all types
of
development)
 Drainage Reserves and geometry
C

Drainage Reserve
0.5 m
min

300mm freeboard

Qminor

Design flow width + freeboard

1

0.5 m
min

4 min

4 min

1

Design flow width + freeboard

(a) ' Vee' Shaped

(a)

Grassed Swale

C

300mm freeboard

Qminor

Drainage Reserve
1.5 m minimum

1.0 m

1
4 min

Batter

1

50

50

1

4 min

Base

1

Batter

Design flow width + freeboard

(b)
Figure 26.1

Lined Open Drain

Reserve Width for Open Drain

(b) Trapezoidal Shaped

Figure26.2
Sections

Recommended Grassed Swale Cross-
26.2.4 Freeboard
The depth of a grassed swale shall include a minimum
freeboard of 50 mm above the design storm water level in the
swale.

26.2.5 Velocities and Grades
 To prevent sedimentation and vegetative
growth, the minimum average flow velocity
shall not be less than 0.6 m/s.
 The maximum average flow velocity shall
not exceed 4 m/s. The average flow velocity
in a grassed swale shall not exceed 2 m/s. If
this is not practical, an underground pipeline,
lined open drain, or grass reinforcement
system should be provided.
Example
Determine the size of a lined rectangular drain tp
convey a 5-year ARI minor system design flow from
a proposed 3 hectare bungalow development in
Kuala Lumpur. The post development time of
concentration, tc at the development outlet is
estimated to be 20 minutes.

More Related Content

What's hot

Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavementBhavik A Shah
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types M Aamer Raza
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesMohsin Siddique
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysisvivek gami
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fslAditya Mistry
 
Infiltration equations and index
Infiltration equations and indexInfiltration equations and index
Infiltration equations and indexTharun Reddy
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compactionNatalie Ulza
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1GARRE RAVI KUMAR
 
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12World University of Bangladesh
 
determination of flakiness index test.
determination of flakiness index test. determination of flakiness index test.
determination of flakiness index test. YASMINE HASLAN
 

What's hot (20)

Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
 
Chapter 4 embankment dams
Chapter 4 embankment damsChapter 4 embankment dams
Chapter 4 embankment dams
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
 
Sewerage System
Sewerage SystemSewerage System
Sewerage System
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Chapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examplesChapter 6 concrete dam engineering with examples
Chapter 6 concrete dam engineering with examples
 
Hyetograph and hydrograph analysis
Hyetograph and hydrograph analysisHyetograph and hydrograph analysis
Hyetograph and hydrograph analysis
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Infiltration equations and index
Infiltration equations and indexInfiltration equations and index
Infiltration equations and index
 
Proktor compaction
Proktor compactionProktor compaction
Proktor compaction
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
Atterberg
AtterbergAtterberg
Atterberg
 
Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1Irc method of design of flexible pavement 1
Irc method of design of flexible pavement 1
 
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
Class lectures on Hydrology by Rabindra Ranjan Saha Lecture 12
 
determination of flakiness index test.
determination of flakiness index test. determination of flakiness index test.
determination of flakiness index test.
 

Similar to Chapter 6

sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenanceManish Goyal
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]guest7dbf4
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)Jaydeep Dave
 
Cimahi river benchmarking flood analysis based on threshold of total rainfall
Cimahi river benchmarking flood analysis based on threshold of total rainfallCimahi river benchmarking flood analysis based on threshold of total rainfall
Cimahi river benchmarking flood analysis based on threshold of total rainfalleSAT Journals
 
Unit 2 Quantity of Sewage.pptx
Unit 2 Quantity of Sewage.pptxUnit 2 Quantity of Sewage.pptx
Unit 2 Quantity of Sewage.pptxmilangiri12
 
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...RSIS International
 
SWMM Presentation.pptx of NIT srinager kashmir
SWMM Presentation.pptx of NIT srinager kashmirSWMM Presentation.pptx of NIT srinager kashmir
SWMM Presentation.pptx of NIT srinager kashmirmujtabamalik84
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Kishan Bhadiyadra
 
Flood - Mitigation & Management
Flood - Mitigation & ManagementFlood - Mitigation & Management
Flood - Mitigation & ManagementAmaljit Bharali
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeAnkit Gola
 
Radnor Township Stormwater Program
Radnor Township Stormwater ProgramRadnor Township Stormwater Program
Radnor Township Stormwater ProgramRegina Majercak, PE
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslidesonika patel
 
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...Robert Muir
 

Similar to Chapter 6 (20)

sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
OSD using SWMM...
OSD using SWMM...OSD using SWMM...
OSD using SWMM...
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
WATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdfWATERSHED CATCHMENT.pdf
WATERSHED CATCHMENT.pdf
 
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
2150602 hwre 150113106007-008 (HYDROLOGY & WATER RESOURCE ENGINEERING)
 
Cimahi river benchmarking flood analysis based on threshold of total rainfall
Cimahi river benchmarking flood analysis based on threshold of total rainfallCimahi river benchmarking flood analysis based on threshold of total rainfall
Cimahi river benchmarking flood analysis based on threshold of total rainfall
 
Unit 2 Quantity of Sewage.pptx
Unit 2 Quantity of Sewage.pptxUnit 2 Quantity of Sewage.pptx
Unit 2 Quantity of Sewage.pptx
 
Stormwater Compliance
Stormwater ComplianceStormwater Compliance
Stormwater Compliance
 
Waste water estimation
Waste water estimationWaste water estimation
Waste water estimation
 
WATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptxWATERSHED CATCHMENT.pptx
WATERSHED CATCHMENT.pptx
 
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
Assessment and Analysis of Maximum Precipitation at Bharkawada Village, Palan...
 
SWMM Presentation.pptx of NIT srinager kashmir
SWMM Presentation.pptx of NIT srinager kashmirSWMM Presentation.pptx of NIT srinager kashmir
SWMM Presentation.pptx of NIT srinager kashmir
 
Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...Storm water drainage problem of Surat city & its solutions due to flood in ri...
Storm water drainage problem of Surat city & its solutions due to flood in ri...
 
Flood - Mitigation & Management
Flood - Mitigation & ManagementFlood - Mitigation & Management
Flood - Mitigation & Management
 
Estimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage dischargeEstimating sewage discharge and peak drainage discharge
Estimating sewage discharge and peak drainage discharge
 
Radnor Township Stormwater Program
Radnor Township Stormwater ProgramRadnor Township Stormwater Program
Radnor Township Stormwater Program
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslide
 
Swat model
Swat model Swat model
Swat model
 
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
 

Recently uploaded

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 

Recently uploaded (20)

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 

Chapter 6

  • 3.
  • 4. Past Drainage Practice and issues • In Malaysia, the traditional approach widely practiced to manage storm water design where allow developers to put in drains where appropriate. • The engineers job is only to determine drain size to comply with drainage capacity • Urban drainage practice is based on the 1975 DID Urban Drainage Design Manual, “Planning and design Procedure No 1: Urban Drainage Design Standard For Peninsular Malaysia. • Rapid disposal approach as adopted in this manual has led to increase in the occurrence of flash floods as a result of increase in surface runoff, peak discharge, shorter flow duration and others.
  • 5. • If the country continues to urbanize, the flood problem continue to increase. (Zakaria & Ainan, 2000) • Due to this problem, Department of Irrigation and Drainage (DID) is taking a proactive step by introducing New Urban Drainage Manual known as Strom Water Management Manual for Malaysia (Manual Saliran Mesra Alam or MSMA) • Effective from 1st January 2001 all new development in Malaysia must comply with this new guideline which control storm water from the aspect of quantity and quality runoff to achieve zero development impact contribution. • This new strategy will give a sustainable solution to mitigate the existing flood problems but it also to prevent the occurrence of such problem in the new area developed
  • 6. URBAN STORMWATER MANAGEMENT MANUAL FOR MALAYSIA • • • • • The manual has 48 Chapters. It is divided into 9 parts The manual is published in 20 volumes The first 3 parts contain background information on environmental process and storm water management The remaining parts contain detailed information on hydrology and hydraulic, runoff quantity control, sources and treatment runoff quantity control, runoff quality control and special storm water applications
  • 7. • The main focus of MSMA is to manage storm water instead of draining it away as fast as possible • This manual also considers the current existing problem such as flash flood, river pollution, soil erosion, hill development and etc. • MSMA have a multiple objectives including to: 1. Ensure the safety of the public 2. Control nuisance flooding and provide for the safe passage of less frequent and larger flood events 3. Stabilize the landform and control erosion 4. Optimize the land available for urban development 5. Minimize the environmental impact of urban runoff on water quality 6. Enhance the urban landscape
  • 12. ESTIMATING PEAK FLOW • Chapter 13 – Design Rainfall • Chapter 14 – Flow Estimation and Routing
  • 13. ESTIMATING PEAK FLOW  Rational Formula
  • 14.
  • 15. Select Design ARI (Average Recurrence Interval)  Design Acceptance Criteria : • The minor system is intended to collect and convey runoff from relatively frequent storm events to minimise inconvenience and nuisance flooding. • The major system is intended to safely convey runoff not collected by the minor drainage system to waterways or rivers.
  • 16. Major and Minor System
  • 17.
  • 18.
  • 19. RUNOFF ESTIMATION – refer Chapter 14 – Flow Estimation and Routing • Estimating Time of Concentration, tc  The time of concentration is the flow travel time from the most hydraulically remote point in the contributing catchment area to the point under study. Time of Concentration, tc for small cacthment
  • 20. • Overland Flow time Overland flow can occur on either grassed or paved surfaces. From 14.4.2 Calculation of Flow Time …page 14-2
  • 21. Design Chart 14.1 …page 14-25
  • 22. • Roof Drainage Flow Time • Kerbed Gutter Flow Time
  • 23. • Channel Flow Time • Pipe Flow Time
  • 24.
  • 25. DESIGN RAINFALL INTENSITIES – refer Chapter 13 – Design Rainfall • Determine Average Rainfall Intensity, RIt 1. The total storm rainfall depth at a point, for a given rainfall duration and ARI, is a function of the local climate. 2. Rainfall depths can be further processed and converted into rainfall intensities (intensity = depth/duration), which are then presented in IDF curves. 3. Users need to be aware of the limitations of these IDF curves ( see 13.2.4 IDF Curves for Selected Cities and Towns ) 4. Local authorities are advised to find out from the DID to the availability of IDF curves or coefficients for their respective areas, or to obtain local pluviometer data for those wishing to conduct their own analysis
  • 27.  Design storm defines the rainfall intensity for a given frequency and therefore affects the resulting runoff peak and volume Rainfall Intensity (mm/hr) Runoff peak Frequency (year) 10yr 5yr 2yr Duration (minutes)  Current practice is to select the design storm duration as equal to or longer than the time of concentration for the catchment (or some minimum value when the time of concentration is short)
  • 28.  IDF for SHORT DURATION Rainfall Intensity (mm/hr) 5 minutes to < 30 minutes Frequency (year) 10yr 5yr 2yr 30 Duration (minutes)
  • 29.  IDF for FREQUENCY STORM Rainfall Intensity (mm/hr) (Water quality design) 1 month (0.083 yr), 3 month (0.25 yr), 6 month (0.5 yr) and 12 month (1 yr) Frequency (year) 0.5yr 0.25yr 0.083yr 30 Duration (minutes)
  • 30. • Polynomial Approximation of IDF Curves ( see 13.2.6) APPENDIX 13.A FITTED COEFFICIENTS FOR IDF CURVES FOR 35 URBAN CENTRES …page 13-11
  • 31. • IDF Values for Short Duration Storms (see 13.2.7)
  • 32. • Figure 13.3 Values of 2P24h for use with Table 13.3(page 13-6)
  • 33. • IDF Values for Frequent Storms(see 13.2.8)
  • 34.
  • 35. Example 1  To determine the design peak flow generated from a minor drainage of medium density residential area of 10 hectares in Kuala Lumpur. Assume 80m of overland flow followed by 400m of flow in an open drain. Catchment area average slope = 0.5%
  • 37.  Design Storm Table 4.1 Design Storm ARIs for Urban Stormwater Systems Type of Development (See Note 1) Open Space, Parks and Agricultural Land in urban areas Average Recurrence Interval (ARI) of Design Storm (year) Quantity Quality Minor Major System System (see Note 2 and 3) 1 up to 100 Low density 2 up to 100 Medium density 5 up to 100 High density 10 up to 100 5 up to 100 10 up to 100 Residential: Commercial, Business and Industrial – Other than CBD Commercial, Business, Industrial in Central Business District (CBD) areas of Large Cities 3 month ARI (for all types of development)
  • 38.  Drainage Reserves and geometry C Drainage Reserve 0.5 m min 300mm freeboard Qminor Design flow width + freeboard 1 0.5 m min 4 min 4 min 1 Design flow width + freeboard (a) ' Vee' Shaped (a) Grassed Swale C 300mm freeboard Qminor Drainage Reserve 1.5 m minimum 1.0 m 1 4 min Batter 1 50 50 1 4 min Base 1 Batter Design flow width + freeboard (b) Figure 26.1 Lined Open Drain Reserve Width for Open Drain (b) Trapezoidal Shaped Figure26.2 Sections Recommended Grassed Swale Cross-
  • 39. 26.2.4 Freeboard The depth of a grassed swale shall include a minimum freeboard of 50 mm above the design storm water level in the swale. 26.2.5 Velocities and Grades  To prevent sedimentation and vegetative growth, the minimum average flow velocity shall not be less than 0.6 m/s.  The maximum average flow velocity shall not exceed 4 m/s. The average flow velocity in a grassed swale shall not exceed 2 m/s. If this is not practical, an underground pipeline, lined open drain, or grass reinforcement system should be provided.
  • 40. Example Determine the size of a lined rectangular drain tp convey a 5-year ARI minor system design flow from a proposed 3 hectare bungalow development in Kuala Lumpur. The post development time of concentration, tc at the development outlet is estimated to be 20 minutes.