Radnor Township
Stormwater Program and Fee
December, 2013
Stormwater Program and Fee Background
3
Impervious Area & Stormwater
4
Stormwater Challenges
Earth and Environmental
Provides specialist consultancy and
engineering services
 Aging Infrastructure
 Maintenance Needs
 Flood Safety and Mitigation
 Regulatory Requirements
 Water Quality Protection
Even without new challenges, the complexity and cost of
stormwater management in Radnor will continue to increase.
5
Stormwater Challenges
Flooding Related Challenges
6
Stormwater Challenges
Maintenance Related Challenges
7
Stormwater Challenges
Water Quality Related Challenges
8
Stormwater in Radnor – Infrastructure Needs
 Water (Aqua PA) and wastewater (RHM) services are supported by
dedicated fees – not stormwater
 The Township is responsible for operation and maintenance of:
 Radnor must comply with Municipal Separate Storm Sewer System
(MS4) Permit requirements
 Reduced staffing and limited funding has deferred maintenance
 Some infrastructure requires more frequent maintenance to maximize
capacity
 Some infrastructure is rapidly deteriorating requiring emergency repair
 Majority of stormwater infrastructure is located underground in Radnor -
Out of Sight/Out of Mind!
N Wayne Field Basin 100 Miles of Streets
57+ Miles of Stormwater Pipe 1,500+ Inlets
Roadside swales New Public SW Infrastructure
9
TOWNSHIP WIDE
STORMWATER
NEEDS
FOCUS AREAS
1 - Flood Mitigation
2 - Infrastructure Replacement & Flood
Mitigation
3 - BMP Installation and Infrastructure
Stabilization
4 - Culvert Replacement
5 - Dam Assessment and Infrastructure
Replacement
6 - Skunk Hollow Facility
7 - BMP Installation and Infrastructure
Replacement
Public Stormwater BMPs
!( Outfalls
!. Private Stormwater BMPs (1997 - 2009)
Public Storm Sewer
Street Sweeping / Leaf Collection Routes
Focus Areas
Streams
Floodplain
State Roads
Township Boundary
^
10
Stakeholder Advisory Committee and Township staff
developed a 20-year plan to start addressing the
concerns and identified an alternative funding method.
Goals:
 Reduce the threat to public safety and
local property from stormwater runoff.
 Establish a dedicated and sustainable
funding mechanism.
 Comply with regulatory requirements
and protect local water resources.
 Provide public education and
awareness.
 Offer an incentive program to property
owners to encourage private activities.
To achieve the stated goals,
a new program fee was the
preferred method of
funding.
All developed parcels
contribute to stormwater
runoff – so all should share
in paying for stormwater
related costs.
How was the Stormwater Program Developed?
11
Frequently Used Terms
Impervious Surface: a surface that prevents or impedes the infiltration
of water into the ground. Impervious surfaces include, but are not limited to,
streets, sidewalks, pavements, driveway areas and roofs. Any surface
areas designed to be gravel or crushed stone shall be regarded as
impervious surfaces.
Impervious Surface Examples:
 Roofs / Buildings
 Parking Lots
 Roads/Driveways
 Sidewalks/Paved Walking Paths
 Crushed Gravel
 Compacted Dirt
 Patios
 Roads/Driveways
Non-Impervious Surface Examples:
 Lawn
 Grass
 Meadow
 Woods/Forest
12
Frequently Used Terms
Stormwater Management Costs: The associated public costs of
equipment and facilities, energy, manpower, materials, property
acquisition, transportation and services required to (i) avoid
reduce, manage, treat, collect, convey, detain, infiltrate, pump and
transport Stormwater; (ii) provide flood protection; (iii) keep
equipment and facilities including best management practices
functioning satisfactorily and economically; (iv) administer the
Stormwater management program, including regulatory
compliance, and (v) to improve Radnor's Stormwater Management
System.
Best Management Practice (BMP): methods,
procedures and analyses specified in the
Pennsylvania Stormwater Best Management
Practices Manual to reduce flooding potential and
control the volume, flow rate and water quality of
Stormwater.
13
Frequently Used Terms
Single Family Residential (SFR) Property:
Single family detached homes, attached homes, townhouses,
duplexes and row homes.
Other Developed Property (ODP):
All developed properties other than single family residential
properties, including, but not limited to multi-family properties such as
apartment or condominium complexes and common areas associated
with such uses, and commercial, institutional, governmental and
industrial parcels.
14
Frequently Used Terms
• For SFR properties, the SAC determined a flat rate for SFR
properties was did not reflect the diversity of Radnor. Instead, the
number of Billing Units associated with a property is assigned into 1 of
4 tiers based on lot size.
• For ODPs, the number of billing units associated with a property is a
function of the impervious surface that exists within the parcel
boundary. The Billing Units for ODP properties was based upon the
median amount of impervious surface (1 Billing unit/1,500 SF of
impervious area) associated with the first SFR tier.
Billing Unit: The unit of measure by which properties are assessed a
stormwater fee.
15
Radnor’s Existing Service, Expanded Services
Existing Services to Remain in General Fund
• Minor system clearing
• Street sweeping
• Leaf collection and composting
• Vehicle maintenance
• Pre-storm activities
Existing 2013
Program Budget:
$1.1M
16
Radnor’s Expanded Stormwater Program
 Dedicated funding source.
 Public stormwater services to be funded:
 Stormwater Capital Projects
 Proactive infrastructure maintenance
 Watershed studies to identify the most impactful projects
 Asset management & mapping
 Aerial imagery
 Fee support & billing
 Increased inspections of structural BMPs
 Public education
Enhanced
Program Budget:
$1M
Total
Program Budget:
$2.1M
17
Radnor’s Expanded Stormwater Program
 84% of ENHANCED revenue dedicated to Capital Improvements and
Operations & Maintenance
 Emergency Preparedness and Response not budgeted – handled via
operating reserve
CURRENT ENHANCED TOTAL  PROGRAM
COST CENTER 2013 SNAPSHOT AVERAGE YEAR AVERAGE ANNUAL
CAPITAL IMPROVEMENTS                                       $0  $526,000  $526,000 
OPERATIONS & MAINTENANCE                             $930,711  $254,000  $1,184,711
ENGINEERING, ENFORCEMENT 
&REGULATORY COMPLIANCE  
$134,807  $33,600  $168,407 
EMERGENCY PREPAREDNESS AND RESPONSE $0  $0  $0 
PROGRAM MANAGEMENT $45,519  $117,200  $162,719 
TOTAL ANNUAL  COST $1,111,037  $930,800  $2,041,837 
18
Benefits of a Stormwater Fee
 More equitable than increase to property taxes
 Distributes costs evenly
 Allows for long-range planning (20-year horizon) to bring down $10M
backlog
 Enables proactive strategies
 Provides incentive to minimize stormwater runoff
 Supports property owners that want to invest in Green Infrastructure
19
Basis for Rate Determination
 The $29 rate was based on cost estimates for Township’s expanded
stormwater program:
 Capital improvements,
 Expanded operations and maintenance activities, and
 Upgrades to the storm sewer system.
20
How are Bills Calculated?
Overview of a 3-Step Process
1. Classify Property.
SFR (6,000 properties)
ODP (1,000 properties)
2. Assign Billing Units.
SFR – Tiering structure based on lot size
ODP – Measured impervious surface
3. Calculate Annual Fee.
Multiply Billing Units by the rate of $29
21
Step 1 Classify Properties
Classified each of Radnor’s 7,000+ parcels into 1 of 2 categories, using:
• County tax data,
• Aerial imagery, and
• Visual classification.
Single Family Residential (SFR) Property:
Other Developed Property (ODP):
22
Step 2 Assign Billing Units
• All developed SFR parcels assigned to one of the following Tiers
based upon lot size:
• All ODPs be billed for stormwater at a rate of one billing unit per 1,500
SF of impervious area.
23
Step 2 Assign Billing Units (SFR Property)
• Delaware County Board of Assessments and Appeals maintains
record of lot sizes
• Each Tier was designated a defined number of Billing Units based
upon an analysis of impervious surfaces for lots of that size.
Tier
(Lot Square Footage) Billing Units Acreage Annual Fee
0 to 7,000 1 0 to 0.16 $29
7,000 to 20,000 2 0.16 to 0.46 $58
20,000 to 43,560 3 0.46 to 1 acre $87
>43,560 4 > 1 acre $116
24
SFR Example
Lot Area: 28,125 SF
SFR Tier: 3
Billing Units: 3
25
Step 2 Assign Billing Units (ODP)
• ODPs were assigned Billing Units based on measured impervious
surface.
• One billing = 1,500 SF of impervious surface.
• Billing Units were rounded up to the next highest integer.
10,000 sq ft
Building
5,000 sq ft
Parking 
Lot
10,000SF + 1,500SF = 15,000SF
10 Billing Units
• Impervious surface on every
ODP has been measured.
• All ODPs are billed a minimum
of one Billing Unit.
26
ODP Example
Impervious Surface: 65,088 SF
Billing Units: 44
27
Step 3 Calculate Annual Fee
Billing Units x $29 = Annual Fee
x =$29
Adequate funding for defined
program expansion
for defined program expansion
Total Billing
Units
28
Parcel owners in Radnor have been and will continue to be
notified about the new Stormwater Program and Fee:
 Stakeholder Advisory Committee Meetings – November 2012 through April 2013
 Public Presentations at BOC Meetings in December 2012 and June, July, August,
September, and October 2013
 League of Women Voters Public Outreach Forums in August and September 2013
 Township Newsletter Articles in Fall 2012, Winter 2012, Fall 2013
 Township-wide Information Mailers in August and November 2013
 Delco Times coverage in August 2013
 Main Line Times article in September 2013
 Initial Stormwater Bill Insert
 Stormwater Management web-page: www.radnor.org
 Township’s YouTube Channel
Outreach
20 ways to find out
about Stormwater
Program expansion
since Fall 2012

More Related Content

What's hot

Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Robert Muir
 
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...Robert Muir
 
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...EfficientGovNow
 
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...Robert Muir
 
Day 2 IUCN The case for using ecosystem service valuation and economic instru...
Day 2 IUCN The case for using ecosystem service valuation and economic instru...Day 2 IUCN The case for using ecosystem service valuation and economic instru...
Day 2 IUCN The case for using ecosystem service valuation and economic instru...elodieperrat
 
ICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackStephen Flood
 
Jim Proce - December 2013 Ice Storm Analysis Briefing
Jim Proce - December 2013 Ice Storm Analysis BriefingJim Proce - December 2013 Ice Storm Analysis Briefing
Jim Proce - December 2013 Ice Storm Analysis BriefingJim Proce
 
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...Robert Muir
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Climate Resilience in the Hudson Valley
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Libby Zemaitis
 
Cost Effectiveness of LID Implementation
Cost Effectiveness of LID ImplementationCost Effectiveness of LID Implementation
Cost Effectiveness of LID ImplementationRobert Muir
 

What's hot (12)

Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
Green Infrastructure / Low Impact Development LID Design Tool and Lifecycle C...
 
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
Robert Muir Level of Service Upgrades and Climate Change Adaptation NRC Works...
 
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...
2/10/10 - Kent State Intergovernmental Collaboration Forum - Stark County Sto...
 
Tom 030810 Setawwa
Tom 030810 SetawwaTom 030810 Setawwa
Tom 030810 Setawwa
 
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
Wetland Flood Reduction - Distribution of Wetland Features and Applicability ...
 
Day 2 IUCN The case for using ecosystem service valuation and economic instru...
Day 2 IUCN The case for using ecosystem service valuation and economic instru...Day 2 IUCN The case for using ecosystem service valuation and economic instru...
Day 2 IUCN The case for using ecosystem service valuation and economic instru...
 
ICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate PackICE Flooding 2013 - MIKE by DHI Delegate Pack
ICE Flooding 2013 - MIKE by DHI Delegate Pack
 
Jim Proce - December 2013 Ice Storm Analysis Briefing
Jim Proce - December 2013 Ice Storm Analysis BriefingJim Proce - December 2013 Ice Storm Analysis Briefing
Jim Proce - December 2013 Ice Storm Analysis Briefing
 
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
WASTEWATER COLLECTION SYSTEM PERFORMANCE UNDER CLIMATE CHANGE – SAFETY FACTOR...
 
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...Visions for a flood resilient waterfront: examples from the Kingston Flooding...
Visions for a flood resilient waterfront: examples from the Kingston Flooding...
 
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
Visions for a Flood Resilient Waterfront: Examples from the Kingston Floodin...
 
Cost Effectiveness of LID Implementation
Cost Effectiveness of LID ImplementationCost Effectiveness of LID Implementation
Cost Effectiveness of LID Implementation
 

Viewers also liked

Kharakteristika napoleon
Kharakteristika napoleonKharakteristika napoleon
Kharakteristika napoleonYulia22bbb
 
Naruto 43
Naruto 43Naruto 43
Naruto 43hanu78a
 
Hello Watch! Build your First Apple Watch App
Hello Watch! Build your First Apple Watch AppHello Watch! Build your First Apple Watch App
Hello Watch! Build your First Apple Watch AppKristina Fox
 
Software Engineering unit 2
Software Engineering unit 2Software Engineering unit 2
Software Engineering unit 2Abhimanyu Mishra
 
Internacional privado garantias constitucionales
Internacional privado garantias constitucionalesInternacional privado garantias constitucionales
Internacional privado garantias constitucionalesNesmaryPalluotto
 
The future of the university
The future of the universityThe future of the university
The future of the universitypallab01pb
 
DIDÁCTICA CRITICA
DIDÁCTICA CRITICADIDÁCTICA CRITICA
DIDÁCTICA CRITICAmaripoproa
 

Viewers also liked (16)

Test
TestTest
Test
 
Śniadanie Daje Moc
Śniadanie Daje MocŚniadanie Daje Moc
Śniadanie Daje Moc
 
Kharakteristika napoleon
Kharakteristika napoleonKharakteristika napoleon
Kharakteristika napoleon
 
Naruto 43
Naruto 43Naruto 43
Naruto 43
 
flat unit1
flat unit1flat unit1
flat unit1
 
Napoleon
NapoleonNapoleon
Napoleon
 
Śniadanie Daje Moc
Śniadanie Daje MocŚniadanie Daje Moc
Śniadanie Daje Moc
 
Hello Watch! Build your First Apple Watch App
Hello Watch! Build your First Apple Watch AppHello Watch! Build your First Apple Watch App
Hello Watch! Build your First Apple Watch App
 
Corals i orquestra Orff
Corals i orquestra OrffCorals i orquestra Orff
Corals i orquestra Orff
 
Software Engineering unit 2
Software Engineering unit 2Software Engineering unit 2
Software Engineering unit 2
 
SoC Newsletter
SoC NewsletterSoC Newsletter
SoC Newsletter
 
Internacional privado garantias constitucionales
Internacional privado garantias constitucionalesInternacional privado garantias constitucionales
Internacional privado garantias constitucionales
 
Alexandre Basa CV16
Alexandre Basa CV16Alexandre Basa CV16
Alexandre Basa CV16
 
The future of the university
The future of the universityThe future of the university
The future of the university
 
DIDÁCTICA CRITICA
DIDÁCTICA CRITICADIDÁCTICA CRITICA
DIDÁCTICA CRITICA
 
Uitstap Gent
Uitstap GentUitstap Gent
Uitstap Gent
 

Similar to Radnor Township Stormwater Program

NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos New Jersey Future
 
Town of Franklin: Stormwater Info Session #2
Town of Franklin: Stormwater Info Session #2Town of Franklin: Stormwater Info Session #2
Town of Franklin: Stormwater Info Session #2Franklin Matters
 
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Robert Muir
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11MairaNoor4
 
http://www.RaincycleSystems.com
http://www.RaincycleSystems.comhttp://www.RaincycleSystems.com
http://www.RaincycleSystems.comclaytoncolleran
 
E2 friday navigating crs
E2 friday   navigating crsE2 friday   navigating crs
E2 friday navigating crsPlanning_1
 
Vietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingVietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingByoungjaeBJLee
 
The Toolbox for Clean Water Construction
The Toolbox for Clean Water ConstructionThe Toolbox for Clean Water Construction
The Toolbox for Clean Water ConstructionBuzzards Bay Coalition
 
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainageRobin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainagePAS_Team
 
Franklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Matters
 
Flood water management_act_2010
Flood water management_act_2010Flood water management_act_2010
Flood water management_act_2010ECC_flood
 
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...CaBASupport
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
Dcr swm pgm rollout regional meetings 1
Dcr swm pgm rollout regional meetings 1Dcr swm pgm rollout regional meetings 1
Dcr swm pgm rollout regional meetings 1NSVRC
 
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Robert Muir
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]guest7dbf4
 
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Texas Living Waters Project
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa Nisenson
 

Similar to Radnor Township Stormwater Program (20)

NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos NJ Redevelopment Forum 2020 - Giannikopoulos
NJ Redevelopment Forum 2020 - Giannikopoulos
 
MetroWest Stormwater Management
MetroWest Stormwater ManagementMetroWest Stormwater Management
MetroWest Stormwater Management
 
Town of Franklin: Stormwater Info Session #2
Town of Franklin: Stormwater Info Session #2Town of Franklin: Stormwater Info Session #2
Town of Franklin: Stormwater Info Session #2
 
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
Extreme Weather Resiliency and Climate Adaptation Through Strategic Asset Man...
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11
 
http://www.RaincycleSystems.com
http://www.RaincycleSystems.comhttp://www.RaincycleSystems.com
http://www.RaincycleSystems.com
 
E2 friday navigating crs
E2 friday   navigating crsE2 friday   navigating crs
E2 friday navigating crs
 
Vietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban floodingVietnam disaster risk prevention aid system for urban flooding
Vietnam disaster risk prevention aid system for urban flooding
 
Stormwater Management Bylaw
Stormwater Management BylawStormwater Management Bylaw
Stormwater Management Bylaw
 
The Toolbox for Clean Water Construction
The Toolbox for Clean Water ConstructionThe Toolbox for Clean Water Construction
The Toolbox for Clean Water Construction
 
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainageRobin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
 
Franklin Dept Public Works -storm water
Franklin Dept Public Works -storm waterFranklin Dept Public Works -storm water
Franklin Dept Public Works -storm water
 
Flood water management_act_2010
Flood water management_act_2010Flood water management_act_2010
Flood water management_act_2010
 
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...
United Utilities Integrated Drainage Area Strategies (IDAS) – Addressing wate...
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Dcr swm pgm rollout regional meetings 1
Dcr swm pgm rollout regional meetings 1Dcr swm pgm rollout regional meetings 1
Dcr swm pgm rollout regional meetings 1
 
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
Clean Air Partnership Green Infrastructure CAC Meeting - Don Mills Channel Fl...
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
Case Study: The City of Fort Worth’s Application for SWIFT Funds: Process and...
 
Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
 

Radnor Township Stormwater Program

  • 1. Radnor Township Stormwater Program and Fee December, 2013
  • 2. Stormwater Program and Fee Background
  • 3. 3 Impervious Area & Stormwater
  • 4. 4 Stormwater Challenges Earth and Environmental Provides specialist consultancy and engineering services  Aging Infrastructure  Maintenance Needs  Flood Safety and Mitigation  Regulatory Requirements  Water Quality Protection Even without new challenges, the complexity and cost of stormwater management in Radnor will continue to increase.
  • 8. 8 Stormwater in Radnor – Infrastructure Needs  Water (Aqua PA) and wastewater (RHM) services are supported by dedicated fees – not stormwater  The Township is responsible for operation and maintenance of:  Radnor must comply with Municipal Separate Storm Sewer System (MS4) Permit requirements  Reduced staffing and limited funding has deferred maintenance  Some infrastructure requires more frequent maintenance to maximize capacity  Some infrastructure is rapidly deteriorating requiring emergency repair  Majority of stormwater infrastructure is located underground in Radnor - Out of Sight/Out of Mind! N Wayne Field Basin 100 Miles of Streets 57+ Miles of Stormwater Pipe 1,500+ Inlets Roadside swales New Public SW Infrastructure
  • 9. 9 TOWNSHIP WIDE STORMWATER NEEDS FOCUS AREAS 1 - Flood Mitigation 2 - Infrastructure Replacement & Flood Mitigation 3 - BMP Installation and Infrastructure Stabilization 4 - Culvert Replacement 5 - Dam Assessment and Infrastructure Replacement 6 - Skunk Hollow Facility 7 - BMP Installation and Infrastructure Replacement Public Stormwater BMPs !( Outfalls !. Private Stormwater BMPs (1997 - 2009) Public Storm Sewer Street Sweeping / Leaf Collection Routes Focus Areas Streams Floodplain State Roads Township Boundary ^
  • 10. 10 Stakeholder Advisory Committee and Township staff developed a 20-year plan to start addressing the concerns and identified an alternative funding method. Goals:  Reduce the threat to public safety and local property from stormwater runoff.  Establish a dedicated and sustainable funding mechanism.  Comply with regulatory requirements and protect local water resources.  Provide public education and awareness.  Offer an incentive program to property owners to encourage private activities. To achieve the stated goals, a new program fee was the preferred method of funding. All developed parcels contribute to stormwater runoff – so all should share in paying for stormwater related costs. How was the Stormwater Program Developed?
  • 11. 11 Frequently Used Terms Impervious Surface: a surface that prevents or impedes the infiltration of water into the ground. Impervious surfaces include, but are not limited to, streets, sidewalks, pavements, driveway areas and roofs. Any surface areas designed to be gravel or crushed stone shall be regarded as impervious surfaces. Impervious Surface Examples:  Roofs / Buildings  Parking Lots  Roads/Driveways  Sidewalks/Paved Walking Paths  Crushed Gravel  Compacted Dirt  Patios  Roads/Driveways Non-Impervious Surface Examples:  Lawn  Grass  Meadow  Woods/Forest
  • 12. 12 Frequently Used Terms Stormwater Management Costs: The associated public costs of equipment and facilities, energy, manpower, materials, property acquisition, transportation and services required to (i) avoid reduce, manage, treat, collect, convey, detain, infiltrate, pump and transport Stormwater; (ii) provide flood protection; (iii) keep equipment and facilities including best management practices functioning satisfactorily and economically; (iv) administer the Stormwater management program, including regulatory compliance, and (v) to improve Radnor's Stormwater Management System. Best Management Practice (BMP): methods, procedures and analyses specified in the Pennsylvania Stormwater Best Management Practices Manual to reduce flooding potential and control the volume, flow rate and water quality of Stormwater.
  • 13. 13 Frequently Used Terms Single Family Residential (SFR) Property: Single family detached homes, attached homes, townhouses, duplexes and row homes. Other Developed Property (ODP): All developed properties other than single family residential properties, including, but not limited to multi-family properties such as apartment or condominium complexes and common areas associated with such uses, and commercial, institutional, governmental and industrial parcels.
  • 14. 14 Frequently Used Terms • For SFR properties, the SAC determined a flat rate for SFR properties was did not reflect the diversity of Radnor. Instead, the number of Billing Units associated with a property is assigned into 1 of 4 tiers based on lot size. • For ODPs, the number of billing units associated with a property is a function of the impervious surface that exists within the parcel boundary. The Billing Units for ODP properties was based upon the median amount of impervious surface (1 Billing unit/1,500 SF of impervious area) associated with the first SFR tier. Billing Unit: The unit of measure by which properties are assessed a stormwater fee.
  • 15. 15 Radnor’s Existing Service, Expanded Services Existing Services to Remain in General Fund • Minor system clearing • Street sweeping • Leaf collection and composting • Vehicle maintenance • Pre-storm activities Existing 2013 Program Budget: $1.1M
  • 16. 16 Radnor’s Expanded Stormwater Program  Dedicated funding source.  Public stormwater services to be funded:  Stormwater Capital Projects  Proactive infrastructure maintenance  Watershed studies to identify the most impactful projects  Asset management & mapping  Aerial imagery  Fee support & billing  Increased inspections of structural BMPs  Public education Enhanced Program Budget: $1M Total Program Budget: $2.1M
  • 17. 17 Radnor’s Expanded Stormwater Program  84% of ENHANCED revenue dedicated to Capital Improvements and Operations & Maintenance  Emergency Preparedness and Response not budgeted – handled via operating reserve CURRENT ENHANCED TOTAL  PROGRAM COST CENTER 2013 SNAPSHOT AVERAGE YEAR AVERAGE ANNUAL CAPITAL IMPROVEMENTS                                       $0  $526,000  $526,000  OPERATIONS & MAINTENANCE                             $930,711  $254,000  $1,184,711 ENGINEERING, ENFORCEMENT  &REGULATORY COMPLIANCE   $134,807  $33,600  $168,407  EMERGENCY PREPAREDNESS AND RESPONSE $0  $0  $0  PROGRAM MANAGEMENT $45,519  $117,200  $162,719  TOTAL ANNUAL  COST $1,111,037  $930,800  $2,041,837 
  • 18. 18 Benefits of a Stormwater Fee  More equitable than increase to property taxes  Distributes costs evenly  Allows for long-range planning (20-year horizon) to bring down $10M backlog  Enables proactive strategies  Provides incentive to minimize stormwater runoff  Supports property owners that want to invest in Green Infrastructure
  • 19. 19 Basis for Rate Determination  The $29 rate was based on cost estimates for Township’s expanded stormwater program:  Capital improvements,  Expanded operations and maintenance activities, and  Upgrades to the storm sewer system.
  • 20. 20 How are Bills Calculated? Overview of a 3-Step Process 1. Classify Property. SFR (6,000 properties) ODP (1,000 properties) 2. Assign Billing Units. SFR – Tiering structure based on lot size ODP – Measured impervious surface 3. Calculate Annual Fee. Multiply Billing Units by the rate of $29
  • 21. 21 Step 1 Classify Properties Classified each of Radnor’s 7,000+ parcels into 1 of 2 categories, using: • County tax data, • Aerial imagery, and • Visual classification. Single Family Residential (SFR) Property: Other Developed Property (ODP):
  • 22. 22 Step 2 Assign Billing Units • All developed SFR parcels assigned to one of the following Tiers based upon lot size: • All ODPs be billed for stormwater at a rate of one billing unit per 1,500 SF of impervious area.
  • 23. 23 Step 2 Assign Billing Units (SFR Property) • Delaware County Board of Assessments and Appeals maintains record of lot sizes • Each Tier was designated a defined number of Billing Units based upon an analysis of impervious surfaces for lots of that size. Tier (Lot Square Footage) Billing Units Acreage Annual Fee 0 to 7,000 1 0 to 0.16 $29 7,000 to 20,000 2 0.16 to 0.46 $58 20,000 to 43,560 3 0.46 to 1 acre $87 >43,560 4 > 1 acre $116
  • 24. 24 SFR Example Lot Area: 28,125 SF SFR Tier: 3 Billing Units: 3
  • 25. 25 Step 2 Assign Billing Units (ODP) • ODPs were assigned Billing Units based on measured impervious surface. • One billing = 1,500 SF of impervious surface. • Billing Units were rounded up to the next highest integer. 10,000 sq ft Building 5,000 sq ft Parking  Lot 10,000SF + 1,500SF = 15,000SF 10 Billing Units • Impervious surface on every ODP has been measured. • All ODPs are billed a minimum of one Billing Unit.
  • 26. 26 ODP Example Impervious Surface: 65,088 SF Billing Units: 44
  • 27. 27 Step 3 Calculate Annual Fee Billing Units x $29 = Annual Fee x =$29 Adequate funding for defined program expansion for defined program expansion Total Billing Units
  • 28. 28 Parcel owners in Radnor have been and will continue to be notified about the new Stormwater Program and Fee:  Stakeholder Advisory Committee Meetings – November 2012 through April 2013  Public Presentations at BOC Meetings in December 2012 and June, July, August, September, and October 2013  League of Women Voters Public Outreach Forums in August and September 2013  Township Newsletter Articles in Fall 2012, Winter 2012, Fall 2013  Township-wide Information Mailers in August and November 2013  Delco Times coverage in August 2013  Main Line Times article in September 2013  Initial Stormwater Bill Insert  Stormwater Management web-page: www.radnor.org  Township’s YouTube Channel Outreach 20 ways to find out about Stormwater Program expansion since Fall 2012