Rids, anantapur
 

Rids, anantapur

on

  • 333 views

 

Statistics

Views

Total Views
333
Views on SlideShare
331
Embed Views
2

Actions

Likes
0
Downloads
1
Comments
0

1 Embed 2

http://livolink.org 2

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Rids, anantapur Rids, anantapur Presentation Transcript

    • Historical Background to take up DBIGonchi management system is very old democratic and strong one.Gonchi is a Local Discipline water Governing Management System with well andstrong Social Regulations by the local Body.Gonchi is good Modal for distribution of water even in modern times.Some Gonchi Channels are breached, covered with silt and have damages atculvert. Due to these the flow of water is very slow to reach the fields and in someparts the water flow was stopped to meet the farmer’s lands.So the Gonchi farmers are not getting sufficient water and number of farmer’s land isreduced.Gonchi has a good decision power management committee by the land owningmembers and every farmer must follow the committee decision.If any one neglects this he is punished.
    •  Issues Identified Drilling of Bore Wells Village to Village Conflict. Sand Mining Major Repairs Soil Fertility Non Functioning Gonchis. Boundary dispute. Convergence DWMA MPDOs Irrigation
    • Achievements1) GPS Mapping2) Gonchi Data Collection.3) Gonchi Wise Problems Identification.4) Estimated the Repairs.5) Preparation of Documentation.6) Gathering of Information.7) Conducting Village wise meetings.8) Major repair works have been done.9) Damages and Leakages were repaired and rectified.10)Wastage water was controlled.11)Cropping Area has been increased.12)Crop Yielding quantity and quality have been achieved.13)Water is available for entire Rabi Season.14)SRI Paddy Development15)Small farmers development through Revaling Fund16)NPM methods practicing17)Awareness on the Sand transportation and new bore dug near the Gonchies.18) Gonchi Union Preparation in Penna and Tadakaleru basin Wise.19)Practicing New Technical Methods of Agriculture (Allias in Paddy, Ajolla in Paddy, Green Manure,etc..).20)Mobilization of NREGA Funds.
    • Kharrif & Rabi Acres details in Gonchi Wise VillagesVillageSeepageChannelYear-2010-11 (Acres) 2011-2012 (Acres) 2012-2013 (Acres)RemarkKharif Rabi Kharif Rabi KharifNo. ofFarmersAreaIrrigatedNo. ofFarmersAreaIrrigatedNo. ofFarmersAreaIrrigatedNo. ofFarmersAreaIrrigatedNo. ofFarmersAreaIrrigatedYear ofwork doneKopplakonda Kondakalva 179 655 152 280 188 670 188 670 175 625 Year 1Kopplakonda Kuntakalva 139 243 130 235 150 250 150 250 132 235 Year 1Kesavapuram Pedda Kalva 143 388 125 350 150 400 150 400 125 372 Year 1Kesavapuram Chinna Kalva 110 322 95 297 112 325 110 320 120 350 Year 2Patha Kalluru Kalluru Kalva 171 288 166 280 180 300 180 300 175 288 Year 1Appaji Peta Utakalva 61 179 55 168 65 185 50 170 68 195 Year 2Palyam Palyam Kalva 90 140 84 132 95 150 95 150 92 146 Year 1Kandlapalli Yeti Kalva 19 27 14 19 21 43 0 0 22 45 Year 2VankkarajuKalva Eguva Kalva 95 95 22 35 112 115 18 22 118 118 Year 2VankkarajuKalva Diguva Kalva 102 108 35 42 122 135 24 28 145 148 Year 2Madirepalli KodarajKalva 93 88 0 0 100 100 100 100 100 100Year 1& 2Guruguntla Yeti Kalva 92 185 25 33 98 212 22 25 105 215 Year 2JanthaluruChandrayaniKalva 95 135 0 0 92 128 0 0 95 146 Year 2Boya Kottala Urikalva 42 47 38 44 43 48 35 42 45 50 Year 2TOTAL: 1431 2900 941 1915 1528 3061 1122 2477 1517 3033
    • Kharrif & Rabi yield details in Gonchi Wise VillagesSl.NoName of the villageTotalAyacutfarmersTotalAyacutAcresYear-2010-11 (Acres) 2011-2012 (Acres) 2012-2013 (Acres)RemarksKharif Rabi Kharif Rabi KharifNo. ofAcreYieldingNo. ofAcreYieldingNo. ofAcreYieldingNo. ofAcreYieldingNo. ofAcreYielding1Kopplakonda 188 670 65517187.2280 7672 670 19229 670 17580.8 625 17937.5 Year 12Kopplakonda 150 250 2436376.32235 6439 250 7175 250 6560 235 6744.5 Year 13Kesavapuram 150 400 38810181.12350 9590 400 11480 400 10496 372 10676.4 Year 14Kesavapuram 112 325 322 297 325 7735 320 8768 350 9184 Year 25Patha Kalluru 180 300 2887557.12280 7504 300 8670 300 7872 288 7557.12 Year 16Appaji Peta 65 185 179 168 185 4477 170 4624 195 5116.8 Year 27Palyam 95 150 1403673.6132 150 4305 150 3936 146 3831.04 Year 18Kandlapalli 21 43 27 19 43 1057.8 0 0 45 1180.8 Year 29VankkarajuKalva 112 115 95 35 115 2794.5 22 623.48 118 3280.4 Year 210VankkarajuKalva 122 135 108 42 135 3348 28 770 148 4114.4 Year 211Madirepalli 100 100 882164.80 100 2624 100 2460 100 2780Year 1 &212Guruguntla 98 212 185 33 212 5088 25 670 215 6127.5 Year 213Janthaluru 92 128 135 0 128 3097.6 0 0 146 4161 Year 214Boya Kottala 43 48 47 44 48 1176 42 1121.4 50 1425 Year 21528 3061 2900 47140.161915 31205 1528 82256.92477 65481.68 3033 84116.46
    • Additional Yield Details in 1stYearSl.No Name of the village Name of the ChannelAdditional yield inKharrif in Qtl (2011-2012)Additional yield inRabi in Qtl (2011-2012)1 Kopplakonda Kondakaluva 2041.8 12521.42 Kopplakonda kuntakaluva) 798.68 1033.23 Kesavapuram Pedda Kaluva 1298.88 23784 Patha Kalluru Patha Kalluru kaluva 1112.88 1295.65 Palyam Palyam Kaluva 631.4 870.846 Madirepalli Kondaraju Kaluva 459.2 3034  Total   6342.84 21133.04Sl.NoName of thevillageName of the ChannelAdditional yieldin Kharrif in Qtl(2012-2013)1 Kesavapuram Chinna Kalva 14492 Appaji Peta Utakalva 639.83 Kandlapalli Yeti Kalva 1234 VankkarajuKalva Eguva Kalva 485.95 VankkarajuKalva Diguva Kalva 766.46 Guruguntla Yeti Kalva 1039.57 Janthaluru Chandrayani Kalva 1063.48 Boya Kottala Urikalva 249Total 5816.00Additional Yield Details in 2ndYear
    • Contribution details in 1stYearSNO: Village Name Work Name 30% people contribution1 Koppalakonda Culvert construction and Culvert repair 82500.002 Kesavapuram Side Wall Construction 73200.003 Patakalluru Sluice Repair and 36422.004 Palyam Side Wall Construction 39750.005 Madirepalli Pantala Construction 25800.00Total(five village) 7 works 2,57,672.00
    • Works Expenditure details in 1stYearSNO: Village Name Work NameProjectGrants(Rs.)Contribution(Rs.)Totalamount(Rs.)1 Koppalakonda Culvert construction 77,700.00 33,300.00 1,11,00.00Culvert Repair 1,14,800.00 49,200.00 1,64,000.002 Kesavapuram Side Wall Construction 1,70,800.00 73,200.00 2,44,000.003 PathakalluruDe silting of channel44,384.35 19,022.00 63,406.25Stone rivet motion to Side wall 40,600.00 17,400.00 58,000.004 Palyam Side Wall Construction 66,150.00 28,350.00 94,500.00Side Wall Construction 26,600.00 11,400.00 38,000.005 Madirepalli Pantala Construction 60,200.00 25,800.00 86,000.00Total 601234.35 257672.00 759006.25
    • Contribution details in 2ndYearSl. Village Name Chanel NameRenovation Workplanned30% peoplecontribution1 Appaji peta Utakalva Side wall construction 68,565.002 Kandlapalli Gonchi Kalva Desalting of Talipiri and Chanel,Side wall construction64,833.003 Vankarajukalva EguvaKalva Desalting of Talipiri and Chanel,Side wall construction34,667.004 “ Diguvakalava Desalting of Talipiri and Chanel,Side wall construction39,577.005 Kesavapuram Chinna Kalva Side wall construction 54,972.006 “ Pedda Kalva Culvert construction 10,560.007 Boya Kotala Urukalva Side wall construction and culvertconstruction75,637.008 Janthuluru Chandrayani kalva SP construction and Side wallconstruction40,950.009 Guruguntla Utakavla Desalting of Chanel and LBSConstruction41,580.0010 Madirepalli Kondarajukalva Side wall construction 29,670.00Total (8 village) 4,61,011.00
    • Works Expenditure details in 2ndYearSl. Village Name Channel Name Work NameProjectGrantsPeoples’ContributionTotalEstimationamount1 Appaji peta Utakalva Side wall construction171411.75 68,565.00 228,549.002 Kandlapalli Gonchi Kalva Desalting of Talipiri andChanel, Side wallconstruction162082.5 64,833.00 216,110.003 Vankarajukalva EguvaKalva Desalting of Talipiri andChanel, Side wallconstruction86665.5 34,667.00 121,333.004 Vankarajukalva Diguvakalava Desalting of Talipiri andChanel, Side wallconstruction98941.5 39,577.00 126,143.005 Kesavapuram Chinna Kalva Side wall construction137429 54,972.00 183,239.006 Kesavapuram Pedda Kalva Colvert construction 26400 10,560.00 35,200.007 Boya Kotala Urukalva Side wall constructionand culvert construction 189092 75,637.00 252,123.008 Janthuluru Chandrayani kalva SP construction and Sidewall construction 102375 40,950.00 136,500.009 Guruguntla Utakavla Desalting of Chanel andLBS Construction 103950 41,580.00 138,600.0010 Madirepalli Kondarajukalva Side wall construction74145 29,670.00 98,900.00Total 1152492.25 461011 1536697
    • Revaling Fund DetailsSl.No VillageName Channel NameNo of Farmers Total Amount1 Kesavapuram Chinnakaluva 5 250002 Kesavapuram Peddakaluva 4 220003 Koppalakonda Kuntakaluva 5 225004 Koppalakonda Kondakaluva 5 220005 Madirapalli Kondarajukaluva 7 370006 Vankarajukaluva Yeguvakaluva 3 150007 Vankarajukaluva Diguvakaluva 3 150008 Palyam Yetikaluva 4 180009 Kandlapalli Gonchikaluva 8 3750010 Boyakottala Urikaluva 4 2000011 Appajipeta Yetikaluva 4 2000012 Jantuluru Chandrayunikaluva 4 20000  Total   56 274000
    • InnovationsSRI Paddy CultivationPaddy aliasTrips Clippings in PaddyVermi Compost Pits implementations.NADP compost Pits Implementations.NPM Methods (Non Pesticides Management)Jute, Jeeluga cultivations.Seed Production in Paddy.Seed production in Ground nut.
    • Difficulties faced & Process followed to overcome.Faced problems in Thirty Percent Farmer’s Contribution. We have overcome from thiswith Closed Monitoring, Awareness meetings; Awareness Programmes and Closeinteract with the farmers.Converted NREGS Works in Gonchi Channels. We have overcome from this problemas Taken the all farmers of Gonchi to the MPDO office and the farmers said impactabout the Gonchi Channels if these are developed.Materiel Cost Variation between the Works Proposed Time and Work Beginning Time.We have overcome from this variation as farmers have contributed the VariationAmount.
    • Leveraging for DBIThere are scopes to develop the Gonchies under catchment areas of Chitravathi andHagari rivers.The Villages which have Ponds and Tanks under the PABR.Budgets for remaining Works in Present Villages.Gonchi Samakya Budgets for developing.Budgets to apply the Zipsum and Zinc to the Fallow Lands.Budgets for Develop the Non Functional Gonchi Channels.
    • Talipiri (Spring) Locations
    • Talipiri (Spring) Locations
    • GPS Locations
    •  Village Level Meetings
    •  Village Level Meetings
    • Village Level Meetings
    •  Mandal Level Meetings Trainings
    •  Mandal Level Meetings Trainings
    • District level Meetings
    • District level Meetings
    • Zink & Neem Powder distribution
    • SRI Paddy cultivation
    • Crop Experiment
    • Works Photos
    • Works Photos
    • Culvert Construction at Koppalakonda
    • Photographs of works
    • Side Walls Construction Palyam
    • Pantham Construction at Madirepalli
    • Culvert Construction at Koppalakonda
    • Desilting Channel at Kalluru
    • Field Survey
    • Convergence of Desilting Channel at Kesavapuram
    • Convergence
    • Canal Locations
    • Visitors
    • Visitors
    • Media Coverage
    • Media Coverage