3. SCOPE OF WORK
• Scope of work includes complete engineering, supply, installation, integration
with existing systems, testing and commissioning of 2X100% redundant HCI
storage tanks with associated unloading pumps, transfer pumps and
instrumentation in accordance with latest International standard
requirements and local regulations applicable for hazardous chemical storage
and handling.
• Complete scope of works are turnkey in nature and shall include all civil,
mechanical, electrical and I&C works that are required for proposed HCI
storage & handling system
4. Site activities
Soil Testing
Excavation
Soil Leveling & Compacting
PCC With Water Proofing & Screeding
Steel Fixing & Shuttering for the Dyke Wall Foundation
Concreting of the Dyke Wall & Tank Foundations.
FAT for the HCl Tanks
Installation of the HCl Tanks
Leak Testing for the Dyke Wall
Structure Errection for the Shed
5. Installation of Sandwich Panels for the Shed
Tiles works on the Floor & Dyke wall
Installation of the Fume Trap & Seal Pot
Cable laying
Cable Tray works
Installation & Termination of the Pumps
Installation of JB & Conduits for the Lighting
Installation & Termination of the Lighting
6. Installation & Termination of LCP
Installation & Termination of MCC Feeders
Installation & Termination of Chiller
Access Road Modification
GRVE Piping Works
Installation of the Manual Valves
Installation & Termination of the Electuated Valves – MOV’s
UV Coating for the GRVE lines.
Hand Rail for the Dyke Wall
34. Testing & Commissioning
• Testing & Commissioning Procedure Submitted to DEWA.
• Pre-commissioning Activities Done successfully prior to the
Commissioning.
• Testing & Commissioning Activities was done successfully
with DEWA as Witness.
35. Project Hand Over
• Site Inspection Protocol (SIP)
completed Prior to the TOC.
• Rectify all the Punch points raised
at the Site Walk-down by DEWA.
• Project Ready for Hand Over to
DEWA