PRESENTATION
                   ON
GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR)


Kalpasar as a prospective Water solution
              - Saurashtra


          A Truly Matchless Project
MISSION
VISION

To create world’s largest fresh water reservoir
in sea, by constructing 30 km long dam in the
Gulf of Khambhat, to store more than 10,000
MCM of surface water, i.e. 25% of volume of
State’s average annual rain water inflow.
Per Capita Availability of Water Water 2001)
                 Per Capita Availability of (Year
              730 m3/Annum                                                      North 343 m3/Annum
                Kutch                                                          Gujarat
                                                                PALANPUR
                                      RANN OF
                                       KUTCH

                                                              MEHSANA
                                         LITTLE RANN
                             Bhuj
                                                              GANDHINAGAR
                                                               AHMEDABAD
     Saurashtra                                                        KHEDA
                                                                                   GODHRA
                                                       SURENDRANAGAR
540 m3/Annum
                               JAMNAGAR                            VADODARA
                                       RAJKOT

                                                  BHAVNAGAR
                                                AMRELI                   BHARUCH            Central &
                                    JUNAGADH                                                  South
                                                                        SURAT                Gujarat
                                                                                 DANG
                                                                                            1880 m3/Annum
                                                                        VALSAD




  Note :    As per M. Falkenmark if renewable freshwater availability falls below 1000 M 3 per
           capita, water supply begins to hamper health, economy growth and human well being.
Why Project is required ?
1. Gujarat is a water scarce state, with 6.39% of
   geographical area, 5% of population & only 2%
   of water resources.
2. 71% of water resources available in 25% of
   geographical area of central & south Gujarat.
3. In Saurashtra region per capita water
   availability is only 540 M3/annum against 1700
   m3/annum minimum requirement.
4. In Saurashtra region,only 15 lakh ha
   agricultural land will cover under irrigation
   (including Sardar Sarovar Project), against 42
   lakh ha agricultural land. Hence, 27 lakh ha
   agricultural land will remain rainfed.
5. The excessive pumping of groundwater resulted
   in intrusion of saline water up to 10 km of entire
   coastal belt of Saurashtra.
6. The water storage capacity of Gujarat state is
   20480 Mm3 in 196 medium & major reservoirs,
   against the total rainwater availability of 38000
   MCM per annum.
7. Non availability of any suitable site for major
   irrigation scheme in the state, the “Gulf of
   Khambhat Development Project” is the only
   option available to store 10,000 MCM rainwater.
GULF OF KHAMBHAT DEVELOPMENT PROJECT (W.R.)
Salient features (Tentative)
1 Length of dam between two shores of Gulf Approx. 30 km
2 Top of dam                               100m wide
                                           10 lane road + railway
3 Reservoir features:
  (i) Full Reservoir Level(FRL)            (+) 3.0m
  (ii) Maximum Water Level(MWL)            (+) 4.0m
  (iii) Minimum Draw Down Level(MDDL)      (-) 4.0m
  (iv) Live storage                        10500 Mm3
  (v) Storage between MWL & FRL            1900 Mm3
  (vi) Reservoir area                      2000 Sq.km

4 Bhadbhut Barrage & Narmada
    Diversion Canal
(i) Barrage including earthen dykes         10 to 12 km
(ii) Narmada Diversion Canal
                                  Discharge 100000 cusecs
                                     Length 32 km
5 Irrigation Command
(i) Water envisaged for irrigation   6558 Mm3
(ii) Envisaged three garland canal
                         Discharge 4000 to 6000 cusecs
                            Length 600 to 700 km
                          Elevation EL50 m, EL80 m, EL100 m
6 Life of reservoir                  400 to 500 years
7 Ground Water Quality               7,00000 Ha
  Improvement in Catchment
  area
8 Land recover between               150000 to 200000 ha
  EL + 5.0m to EL+ 8.0m
9 Reduction in distance
        Bhavnagar – Dahej 200 km
  Bhavnagar – South Gujarat 225 km
10 Ports                      Bhavnagar port will be
                              rejuvenate, Dahej port will be
                              outside of reservoir, New
                              ports are proposed at down
                              stream of dam.
11 Rivers debouching in the   Sabarmati, Mahi, Dhadhar,
   reservoir                  Narmada (through diversion
                              canal), Limbadi Bhogavo,
                              Sukhbhadar, Utavali, Keri,
                              and Vagad
12 Construction of dam        5 to 7 years
Estimated Cost of the Project
• Earlier the dam was envisaged between Ghogha
  to Hansot having length of 64 km. wherein tidal
  power component was combined alongwith
  development of fresh water reservoir in the Gulf.

• As per pre-feasibility report of the project, the
  cost of project was estimated of Rs. 53,000 crore
  (base year 1998) in which the tidal power
  component was Rs.33000 crore. Considering,
  average 8% inflation per annum present cost
  works out to approximate Rs.1,40,000 crore, in
  which the tidal power component is Rs.86,000
  crore.
• Recently, tidal power component is delinked
  from the project and the dam alignment is
  shifted northward by 15 km, leads to reduction
  of length of dam from 64 km to 30 km & height of
  dam is also reduced from 55 m to 35 m.

• Considering above the approximate project cost
  at present is Rs. 50,000 to 60,000 crore.
Benefits of the Project
GULF OF KHAMBHAT DEVELOPMENT PROJECT (W.R.)




         Irrigation Benefit
Irrigation Benefit
10.54 lakh ha. land in 39 talukas of 6
districts of Saurashtra region will get
irrigation facilities including rejuvenation
of rivers and filling of more than 60
existing dams as well as check dams,
tidal regulators, spreading channels
permanently.
Perceived Agricultural Benefits
Transportation Benefits
Transportation Benefit
• Substantial saving in travel time and fuel due
  to reduction in distance by about 200 km
  between Bhavnagar and Surat.

• Surat is one of the fastest growing city in the
  country and the diamond oriented business
  hub of the world.

• Most of the diamond workers (more than 10
  lakhs) are migrated from Saurashtra (Mostly,
  from Bhavanagr, Amreli district).
• After the completion of dam and Bhadbhut
  Barrage, the route from Bhavnagar to Surat
  will be Bhavnagar—Dahej—Hansot—Olpad—
  Surat.
• New coastal highway will be developed to
  connect present petro-chemical hub Hazira
  (Surat) to future petro-chemical hub PCPIR
  (Dahej).
• 10 lane road is proposed on the top of the
  dam. 75000 vehicles per day is estimated for
  year 2020, and 1,00,000 vehicles per day for
  year 2030.
• The   toll-tax generation is estimated
  approximately Rs. 1500 crore for year 2020
  and Rs. 2000 crore for year 2030.

• Considering 10% I.R.R., Capital investment of
  Rs.15,000 crore to Rs. 20,000 crore may likely
  available from transport component (30% to
  40% cost of the project)
Land Reclamation Benefits
• Gulf of Khambhat is one of the Gulf in world
  having maximum tide of 11 m and the average
  tide of 8.8 m .
• During the high tide and flood in Narmada, Mahi,
  Sabarmati river etc., the sea water rise up to
  level of +7.0 m to +8.0 m from MSL.
• After closure of the Gulf of Khambhat, land
  which is frequently submerged during high tide
  will be permanently opened.
• About 1.5 to 2 lakh ha land along the periphery
  of reservoir will be opened which can be used
  for the project development.
Land recovery (As per BISAG Study)
Value Addition Of Land

Projects in vicinity of Kalpasar project

•   Dholera SIR
•   Fedara International Airport
•   PCPIR at Dahej
•   SEZ, GIDC etc.
•   Delhi- Mumbai Industrial Corridor
• Proposed 10 lane road for Ahmedabad-
  Bhavnagar route

• 2000 sq. km world’s biggest fresh water
  reservoir (in sea) with 6-lane periphery road of
   270 km long

• Solar and Wind power, Tourism, Bio-fuel park,
  Transportation,  Fisheries    etc.   project
  components / benefits
Benefit -Reduction in Salinity

In coastal region of Saurashtra and
Central Gujarat, saline ground water
will be converted into sweet water,
resulting reduction in inland salinity
Benefit- Port Development on
              d/s of Dam
Project presents highly attractive locational
attributes for port development downstream of
the dam such as increased water level, lower
current velocity, reduced sedimentation
NIO MODEL STUDY
  i. Model study results show that after the
     construction of the dam the tide level
     increases at all the port locations.
  i. The currents decrease at the locations near
     to the dam (Bhavnagar, Ghoga).
  i. Sediment transport results indicate that the
     sediment concentration reduces in the
     southern gulf (outside the dam) with a
     maximum reduction at Dahej and Gogha.
Bhavnagar port will be rejuvenated, therefore
this region will be speedily developed
Benefits- Generation of
    Non-conventional Energy

Wind and solar power would be
generated which will also be used for
lifting of fresh water of reservoir.
Wind Energy
Wind energy is planned to be used for
pumping of irrigation water. Approximately
250 crore unit will be required for lifting
irrigation water. As per Suzlon study, 1600
MW with an estimated cost of about Rs. 9000
crore can be generated by installing wind
mills/ solar units. Wind mill will have added
benefit   of    its   installation   after   dam
construction.
Benefits-fisheries Development

• Fish production to the tune of 3,00,000 tonnes
  per annum amounting to Rs.22,500 Million at
  full development stage

• Direct employment to approximately 1,00,000
  beneficiaries and indirect employment to
  approximately 3,00,000 beneficiaries.
Kalpasar presentation final

More Related Content

What's hot

Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar DamKp Ahm
 
Skempton's analysis for cohesive soils
Skempton's analysis for cohesive soilsSkempton's analysis for cohesive soils
Skempton's analysis for cohesive soilsSANJEEV Wazir
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar damShubham Shah
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devicesGurdeep singh Johar
 
Methods of flood control
Methods of flood controlMethods of flood control
Methods of flood controlvivek gami
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryLatif Hyder Wadho
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVERvikas rahangdale
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modulesbhalinder singh
 
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...Hasrat Arjjumend
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Headworks and barrages in pakistan
Headworks and barrages in pakistanHeadworks and barrages in pakistan
Headworks and barrages in pakistanMuhammad Bilal
 
Case study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayCase study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayMRINALJYOTI ADHYAPOK
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its typesBilal Mirani
 
Irrigation field report
Irrigation field reportIrrigation field report
Irrigation field reportSushrut Gautam
 

What's hot (20)

Sardar Sarovar Dam
Sardar Sarovar DamSardar Sarovar Dam
Sardar Sarovar Dam
 
Skempton's analysis for cohesive soils
Skempton's analysis for cohesive soilsSkempton's analysis for cohesive soils
Skempton's analysis for cohesive soils
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar dam
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devices
 
Methods of flood control
Methods of flood controlMethods of flood control
Methods of flood control
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
EIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVEREIA PRESENTATION ON NARMDA RIVER
EIA PRESENTATION ON NARMDA RIVER
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Canal outlets and modules
Canal outlets and modulesCanal outlets and modules
Canal outlets and modules
 
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...Environmental and Social Impacts of Hydro-Electric Dams  in Chamba District o...
Environmental and Social Impacts of Hydro-Electric Dams in Chamba District o...
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Macchu dam
Macchu dam Macchu dam
Macchu dam
 
Headworks and barrages in pakistan
Headworks and barrages in pakistanHeadworks and barrages in pakistan
Headworks and barrages in pakistan
 
Water resource engineering project list 2
Water resource engineering project list 2Water resource engineering project list 2
Water resource engineering project list 2
 
Sujalam
SujalamSujalam
Sujalam
 
Case study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahayCase study of dam failure ppt by ankur sahay
Case study of dam failure ppt by ankur sahay
 
Spillway and its types
Spillway and its typesSpillway and its types
Spillway and its types
 
Final Project Report
Final Project ReportFinal Project Report
Final Project Report
 
1. i Highway Planning.pdf
1. i  Highway Planning.pdf1. i  Highway Planning.pdf
1. i Highway Planning.pdf
 
Irrigation field report
Irrigation field reportIrrigation field report
Irrigation field report
 

Viewers also liked

Author's purpose
Author's purposeAuthor's purpose
Author's purposeMondstrahl
 
Module 1 lesson 1.3
Module 1 lesson 1.3Module 1 lesson 1.3
Module 1 lesson 1.3Mondstrahl
 
Transheat profile presentationnew
Transheat   profile presentationnewTransheat   profile presentationnew
Transheat profile presentationnewVeravalOnline Incl
 
Heart management
Heart managementHeart management
Heart managementshirish6165
 
Module 5 lesson 5.2
Module 5 lesson 5.2Module 5 lesson 5.2
Module 5 lesson 5.2Mondstrahl
 
Enzootic Bovine Hematuria
Enzootic Bovine HematuriaEnzootic Bovine Hematuria
Enzootic Bovine HematuriaSanju Paul
 
Ketaksamaan peluang pendidikan murid orang asli, peribumi
Ketaksamaan peluang pendidikan murid orang asli, peribumiKetaksamaan peluang pendidikan murid orang asli, peribumi
Ketaksamaan peluang pendidikan murid orang asli, peribumielleirys
 
Module 7 lesson 7.1
Module 7 lesson 7.1Module 7 lesson 7.1
Module 7 lesson 7.1Mondstrahl
 
English 2- Module 5 lesson 1
English 2- Module 5 lesson 1English 2- Module 5 lesson 1
English 2- Module 5 lesson 1Mondstrahl
 
E3 m3.1. Details
E3 m3.1. DetailsE3 m3.1. Details
E3 m3.1. DetailsMondstrahl
 
Module 1 lesson 1.1
Module 1 lesson 1.1Module 1 lesson 1.1
Module 1 lesson 1.1Mondstrahl
 
E3 m4.1 What is an essay
E3 m4.1 What is an essayE3 m4.1 What is an essay
E3 m4.1 What is an essayMondstrahl
 
E3 m2.2 Concluding sentences
E3 m2.2 Concluding sentencesE3 m2.2 Concluding sentences
E3 m2.2 Concluding sentencesMondstrahl
 
Mega engineering structure kalpasar...chetz
Mega engineering structure kalpasar...chetzMega engineering structure kalpasar...chetz
Mega engineering structure kalpasar...chetzchetannicmar13
 
English 2 - Module 4 Lesson 2
English 2 - Module 4 Lesson 2English 2 - Module 4 Lesson 2
English 2 - Module 4 Lesson 2Mondstrahl
 

Viewers also liked (17)

The National Association of Realtors
The National Association of RealtorsThe National Association of Realtors
The National Association of Realtors
 
Author's purpose
Author's purposeAuthor's purpose
Author's purpose
 
Module 1 lesson 1.3
Module 1 lesson 1.3Module 1 lesson 1.3
Module 1 lesson 1.3
 
Transheat profile presentationnew
Transheat   profile presentationnewTransheat   profile presentationnew
Transheat profile presentationnew
 
Gbi
GbiGbi
Gbi
 
Heart management
Heart managementHeart management
Heart management
 
Module 5 lesson 5.2
Module 5 lesson 5.2Module 5 lesson 5.2
Module 5 lesson 5.2
 
Enzootic Bovine Hematuria
Enzootic Bovine HematuriaEnzootic Bovine Hematuria
Enzootic Bovine Hematuria
 
Ketaksamaan peluang pendidikan murid orang asli, peribumi
Ketaksamaan peluang pendidikan murid orang asli, peribumiKetaksamaan peluang pendidikan murid orang asli, peribumi
Ketaksamaan peluang pendidikan murid orang asli, peribumi
 
Module 7 lesson 7.1
Module 7 lesson 7.1Module 7 lesson 7.1
Module 7 lesson 7.1
 
English 2- Module 5 lesson 1
English 2- Module 5 lesson 1English 2- Module 5 lesson 1
English 2- Module 5 lesson 1
 
E3 m3.1. Details
E3 m3.1. DetailsE3 m3.1. Details
E3 m3.1. Details
 
Module 1 lesson 1.1
Module 1 lesson 1.1Module 1 lesson 1.1
Module 1 lesson 1.1
 
E3 m4.1 What is an essay
E3 m4.1 What is an essayE3 m4.1 What is an essay
E3 m4.1 What is an essay
 
E3 m2.2 Concluding sentences
E3 m2.2 Concluding sentencesE3 m2.2 Concluding sentences
E3 m2.2 Concluding sentences
 
Mega engineering structure kalpasar...chetz
Mega engineering structure kalpasar...chetzMega engineering structure kalpasar...chetz
Mega engineering structure kalpasar...chetz
 
English 2 - Module 4 Lesson 2
English 2 - Module 4 Lesson 2English 2 - Module 4 Lesson 2
English 2 - Module 4 Lesson 2
 

Similar to Kalpasar presentation final

final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdfPravinaMistry2
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Nikul Gopani
 
Brahmaputra river protection By Dipankar Das
Brahmaputra river protection By Dipankar DasBrahmaputra river protection By Dipankar Das
Brahmaputra river protection By Dipankar DasDipankar Das
 
The Farakka Barrage
The Farakka BarrageThe Farakka Barrage
The Farakka BarrageABIR SUR
 
kalpsar project
kalpsar projectkalpsar project
kalpsar projectkriya143
 
inland waterways in india
inland waterways in indiainland waterways in india
inland waterways in indiaDaniel Josing
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation ReportAnuj Kumar
 
sardar sarovar.pptx
sardar sarovar.pptxsardar sarovar.pptx
sardar sarovar.pptxMukul753537
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIANarendrareddy123
 
Rajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptRajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptdathan cs
 
Canal Network of UPID.ppt
Canal Network of UPID.pptCanal Network of UPID.ppt
Canal Network of UPID.pptssuser7fd1e3
 
A Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictA Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictLokeswar
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.Oswar Mungkasa
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarEcotist
 
Ganges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectGanges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectSeemanto
 

Similar to Kalpasar presentation final (20)

final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdf
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 
Brahmaputra river protection By Dipankar Das
Brahmaputra river protection By Dipankar DasBrahmaputra river protection By Dipankar Das
Brahmaputra river protection By Dipankar Das
 
The Farakka Barrage
The Farakka BarrageThe Farakka Barrage
The Farakka Barrage
 
Sardar sarovar dam project
Sardar sarovar dam projectSardar sarovar dam project
Sardar sarovar dam project
 
kalpsar project
kalpsar projectkalpsar project
kalpsar project
 
inland waterways in india
inland waterways in indiainland waterways in india
inland waterways in india
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation Report
 
sardar sarovar.pptx
sardar sarovar.pptxsardar sarovar.pptx
sardar sarovar.pptx
 
Godavari River
Godavari RiverGodavari River
Godavari River
 
Cs bangladesh
Cs bangladeshCs bangladesh
Cs bangladesh
 
LINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIALINKING OF RIVERS IN INDIA
LINKING OF RIVERS IN INDIA
 
Nuclear reactor.....
Nuclear reactor.....Nuclear reactor.....
Nuclear reactor.....
 
Sardar sarovar dam
Sardar sarovar damSardar sarovar dam
Sardar sarovar dam
 
Rajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptRajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project ppt
 
Canal Network of UPID.ppt
Canal Network of UPID.pptCanal Network of UPID.ppt
Canal Network of UPID.ppt
 
A Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictA Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR District
 
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
Improving Water Security in Water Stressed Bagmati River Basin, Nepal.
 
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekarReview of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
Review of RRZ and CRZ notification in Maharashtra. by-P.P.nandusekar
 
Ganges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation ProjectGanges-Kobadak Irrigation Project
Ganges-Kobadak Irrigation Project
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 

Recently uploaded (20)

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 

Kalpasar presentation final

  • 1. PRESENTATION ON GULF OF KHAMBHAT DEVELOPMENT PROJECT(WR) Kalpasar as a prospective Water solution - Saurashtra A Truly Matchless Project
  • 3. VISION To create world’s largest fresh water reservoir in sea, by constructing 30 km long dam in the Gulf of Khambhat, to store more than 10,000 MCM of surface water, i.e. 25% of volume of State’s average annual rain water inflow.
  • 4.
  • 5.
  • 6.
  • 7. Per Capita Availability of Water Water 2001) Per Capita Availability of (Year 730 m3/Annum North 343 m3/Annum Kutch Gujarat PALANPUR RANN OF KUTCH MEHSANA LITTLE RANN Bhuj GANDHINAGAR AHMEDABAD Saurashtra KHEDA GODHRA SURENDRANAGAR 540 m3/Annum JAMNAGAR VADODARA RAJKOT BHAVNAGAR AMRELI BHARUCH Central & JUNAGADH South SURAT Gujarat DANG 1880 m3/Annum VALSAD Note : As per M. Falkenmark if renewable freshwater availability falls below 1000 M 3 per capita, water supply begins to hamper health, economy growth and human well being.
  • 8.
  • 9. Why Project is required ?
  • 10. 1. Gujarat is a water scarce state, with 6.39% of geographical area, 5% of population & only 2% of water resources. 2. 71% of water resources available in 25% of geographical area of central & south Gujarat. 3. In Saurashtra region per capita water availability is only 540 M3/annum against 1700 m3/annum minimum requirement. 4. In Saurashtra region,only 15 lakh ha agricultural land will cover under irrigation (including Sardar Sarovar Project), against 42 lakh ha agricultural land. Hence, 27 lakh ha agricultural land will remain rainfed.
  • 11. 5. The excessive pumping of groundwater resulted in intrusion of saline water up to 10 km of entire coastal belt of Saurashtra. 6. The water storage capacity of Gujarat state is 20480 Mm3 in 196 medium & major reservoirs, against the total rainwater availability of 38000 MCM per annum. 7. Non availability of any suitable site for major irrigation scheme in the state, the “Gulf of Khambhat Development Project” is the only option available to store 10,000 MCM rainwater.
  • 12.
  • 13. GULF OF KHAMBHAT DEVELOPMENT PROJECT (W.R.)
  • 14.
  • 15. Salient features (Tentative) 1 Length of dam between two shores of Gulf Approx. 30 km 2 Top of dam 100m wide 10 lane road + railway 3 Reservoir features: (i) Full Reservoir Level(FRL) (+) 3.0m (ii) Maximum Water Level(MWL) (+) 4.0m (iii) Minimum Draw Down Level(MDDL) (-) 4.0m (iv) Live storage 10500 Mm3 (v) Storage between MWL & FRL 1900 Mm3 (vi) Reservoir area 2000 Sq.km 4 Bhadbhut Barrage & Narmada Diversion Canal (i) Barrage including earthen dykes 10 to 12 km (ii) Narmada Diversion Canal Discharge 100000 cusecs Length 32 km
  • 16. 5 Irrigation Command (i) Water envisaged for irrigation 6558 Mm3 (ii) Envisaged three garland canal Discharge 4000 to 6000 cusecs Length 600 to 700 km Elevation EL50 m, EL80 m, EL100 m 6 Life of reservoir 400 to 500 years 7 Ground Water Quality 7,00000 Ha Improvement in Catchment area 8 Land recover between 150000 to 200000 ha EL + 5.0m to EL+ 8.0m
  • 17. 9 Reduction in distance Bhavnagar – Dahej 200 km Bhavnagar – South Gujarat 225 km 10 Ports Bhavnagar port will be rejuvenate, Dahej port will be outside of reservoir, New ports are proposed at down stream of dam. 11 Rivers debouching in the Sabarmati, Mahi, Dhadhar, reservoir Narmada (through diversion canal), Limbadi Bhogavo, Sukhbhadar, Utavali, Keri, and Vagad 12 Construction of dam 5 to 7 years
  • 18. Estimated Cost of the Project • Earlier the dam was envisaged between Ghogha to Hansot having length of 64 km. wherein tidal power component was combined alongwith development of fresh water reservoir in the Gulf. • As per pre-feasibility report of the project, the cost of project was estimated of Rs. 53,000 crore (base year 1998) in which the tidal power component was Rs.33000 crore. Considering, average 8% inflation per annum present cost works out to approximate Rs.1,40,000 crore, in which the tidal power component is Rs.86,000 crore.
  • 19. • Recently, tidal power component is delinked from the project and the dam alignment is shifted northward by 15 km, leads to reduction of length of dam from 64 km to 30 km & height of dam is also reduced from 55 m to 35 m. • Considering above the approximate project cost at present is Rs. 50,000 to 60,000 crore.
  • 20. Benefits of the Project
  • 21. GULF OF KHAMBHAT DEVELOPMENT PROJECT (W.R.) Irrigation Benefit
  • 22. Irrigation Benefit 10.54 lakh ha. land in 39 talukas of 6 districts of Saurashtra region will get irrigation facilities including rejuvenation of rivers and filling of more than 60 existing dams as well as check dams, tidal regulators, spreading channels permanently.
  • 25. Transportation Benefit • Substantial saving in travel time and fuel due to reduction in distance by about 200 km between Bhavnagar and Surat. • Surat is one of the fastest growing city in the country and the diamond oriented business hub of the world. • Most of the diamond workers (more than 10 lakhs) are migrated from Saurashtra (Mostly, from Bhavanagr, Amreli district).
  • 26. • After the completion of dam and Bhadbhut Barrage, the route from Bhavnagar to Surat will be Bhavnagar—Dahej—Hansot—Olpad— Surat. • New coastal highway will be developed to connect present petro-chemical hub Hazira (Surat) to future petro-chemical hub PCPIR (Dahej). • 10 lane road is proposed on the top of the dam. 75000 vehicles per day is estimated for year 2020, and 1,00,000 vehicles per day for year 2030.
  • 27. • The toll-tax generation is estimated approximately Rs. 1500 crore for year 2020 and Rs. 2000 crore for year 2030. • Considering 10% I.R.R., Capital investment of Rs.15,000 crore to Rs. 20,000 crore may likely available from transport component (30% to 40% cost of the project)
  • 28. Land Reclamation Benefits • Gulf of Khambhat is one of the Gulf in world having maximum tide of 11 m and the average tide of 8.8 m . • During the high tide and flood in Narmada, Mahi, Sabarmati river etc., the sea water rise up to level of +7.0 m to +8.0 m from MSL. • After closure of the Gulf of Khambhat, land which is frequently submerged during high tide will be permanently opened. • About 1.5 to 2 lakh ha land along the periphery of reservoir will be opened which can be used for the project development.
  • 29.
  • 30. Land recovery (As per BISAG Study)
  • 31. Value Addition Of Land Projects in vicinity of Kalpasar project • Dholera SIR • Fedara International Airport • PCPIR at Dahej • SEZ, GIDC etc. • Delhi- Mumbai Industrial Corridor
  • 32. • Proposed 10 lane road for Ahmedabad- Bhavnagar route • 2000 sq. km world’s biggest fresh water reservoir (in sea) with 6-lane periphery road of 270 km long • Solar and Wind power, Tourism, Bio-fuel park, Transportation, Fisheries etc. project components / benefits
  • 33. Benefit -Reduction in Salinity In coastal region of Saurashtra and Central Gujarat, saline ground water will be converted into sweet water, resulting reduction in inland salinity
  • 34. Benefit- Port Development on d/s of Dam Project presents highly attractive locational attributes for port development downstream of the dam such as increased water level, lower current velocity, reduced sedimentation
  • 35. NIO MODEL STUDY i. Model study results show that after the construction of the dam the tide level increases at all the port locations. i. The currents decrease at the locations near to the dam (Bhavnagar, Ghoga). i. Sediment transport results indicate that the sediment concentration reduces in the southern gulf (outside the dam) with a maximum reduction at Dahej and Gogha. Bhavnagar port will be rejuvenated, therefore this region will be speedily developed
  • 36. Benefits- Generation of Non-conventional Energy Wind and solar power would be generated which will also be used for lifting of fresh water of reservoir.
  • 37. Wind Energy Wind energy is planned to be used for pumping of irrigation water. Approximately 250 crore unit will be required for lifting irrigation water. As per Suzlon study, 1600 MW with an estimated cost of about Rs. 9000 crore can be generated by installing wind mills/ solar units. Wind mill will have added benefit of its installation after dam construction.