Outrigger Pads for Mobile Cranes
Rules – Standards
Rules of Thumb
Sizing Recommendations
Setting Up For Success
Objectives
 Disclaimer
 Share information to assist you in making better decisions
 Agree on Basic Definitions
 Identify the Rules & Standards that apply to:
 Ground Conditions
 Blocking Cribbing & Pads
 Identify & evaluate different industry “Rules of Thumb”
 Sizing Advice
2
Focus on Outrigger Enabled Equipment
3
Float, Foot, Pontoon, Pad
4
Pad, Mat, Blocking, Cribbing,
5
Mobile Crane
Applicable Rules & Standards
6
OSHA
• 1926 Subpart CC Section1402 • Definitions
ASME B30.5 Mobile & Locomotive Cranes
• 3.2.1.5 • Moving the Load
• 3.4.6 • Footing
What's Important to Note About OSHA Regulations
BASIC RULE: You must not assemble or use a crane unless ground conditions
are firm, drained, and graded to a sufficient extent so that, in conjunction
(if necessary) with the use of supporting materials (such as blocking, mats, cribbing,
or marsh buggies), the equipment manufacturer's specifications for adequate
support and degree of level of the equipment are met.
7
What's Important to Note About OSHA Regulations
OSHA does not have a rule regulating the construction, design, or materials
used as foundation support. (pads, mats, blocking or cribbing)
8
9
Abbreviated Inspection Checklist
1. Determine the adequacy of ground conditions beneath the
equipment set up area such as the support/foundation matting,
cribbing, blocking, etc.
https://www.osha.gov/OshDoc/Directive_pdf/CPL_02-01-057.pdf
OSHA 1402 Ground Conditions “Summarized”
10
 Equipment must stay within manufactures specifications for
support and level.
 Use supporting materials (blocking, mats, cribbing) to accomplish this
 Controlling entity is responsible for ground conditions.
 Including underground hazards
 If there is not a controlling entity, then the responsibility shifts to
the employer.
 Crane company & operator are responsible for evaluating the
ground conditions. They must notify others of inadequate ground
conditions before beginning or continuing operations.
ASME B30.5-2011
11
3.2.1.5 Moving the Load
(i) When outrigger floats are used, they shall be attached to the
outriggers. Blocking under outrigger floats, when required, shall
meet the following requirements:
(1) sufficient strength to prevent crushing, bending, or shear
failure.
(2) such thickness, width, and length, as to completely
support the float, transmit the load to the supporting surface,
and prevent shifting, toppling, or excessive settlement under
load.
Not Sufficient Strength (Physical Failure)
12
Not sufficient rigidity (Functional Failure)
13
14
ASME B30.5-2011
3.2.1.5 Moving the Load
Blocking under outrigger floats, when required, shall meet the
following requirements:
(3) Use of blocking only under the outer bearing surface of
the extended outrigger beam
15
http://www.elcosh.org/document/1488/748/d000104/selection.html
(3) use of blocking only under the outer bearing surface of
the extended outrigger beam
5-3.1.3.3 Responsibilities of Crane Operators.
(b) knowing what types of site conditions could adversely affect the
operation of the crane and consulting with the lift director
concerning the possible presence of those conditions.
16
ASME B30.5-2011
17
Know Your Ground Conditions
(Waikato)
Industry Rules of Thumb
18
Industry Rules of Thumb
• Estimating Outrigger Reaction Force
• Estimating Ground Strength
• Estimating Pad Sizing
19
Outrigger Reaction Force = Pressure
20
PRESSURE
(PSF)
Common Outrigger Load Rules of Thumb
Capacity x 85%
Rated Capacity (lbs.) of the Crane x 85% = Outrigger Reaction Force
International - (Referenced in European and Australian standards)
(Total Crane Mass (lbs.) + Load(lbs.)) x 65% = Outrigger Reaction Force
21
Outrigger Load Rules of Thumb Example
Grove RT890E
Capacity x 85%
180,000 x 85% = 153,000 Lbs
International
(Mass + Load) x 65% = Outrigger Reaction Force
(117,235 + 180,000) = 297,235 x 65% = 193,200 Lbs
Difference = 40,200 Lbs
22
Outrigger Load Rules of Thumb Example
23
Outrigger Load Rules of Thumb Example
Grove GMK 5276
• Rated Capacity = 220 Tons, 440,000 Lbs
• Total crane mass = 150,000 Lbs
Capacity x 85% Example –
• 440,000 lbs. x 85% = 374,000 lbs.
24
Outrigger Load Rules of Thumb Example
Grove GMK 5276
• Rated Capacity = 220 Tons, 440,000 Lbs
• Total crane mass = 150,000 Lbs
International Example –
• (Total Crane Mass + Load) x 65%
• 150,000 Lbs + 440,000 Lbs = 590,000 Lbs
• 590,000 Lbs x 65% = 383,500 Lbs
25
Outrigger Load Rules of Thumb Example
26
Outrigger Load Rules of Thumb Example
What is the Maximum Outrigger Reaction Force (MORF) for
your crane?
 Crane manufactures provide this information
 Newer software solutions from manufacturers & others
 Manitowoc - Compu-Crane
 Liebherr - Liccon Software
 Link Belt – Technical specifications
 Tadano – Online request tool?
 3-D Lift Plan
27
28
Grove GMK5275 220 Ton Crane Full Cwt
Outrigger Load Rules of Thumb Example
Grove GMK 5275 220 Ton Crane
Compu-Crane Output
29
Know What Lifts Generate the Highest
Pressures Picks=126k (126psi) vs. 875 (104psi)
30
Outrigger Load Rules of Thumb
DICA Advice –
Don’t use a rule of thumb to determine the maximum outrigger reaction force.
Know the Maximum Outrigger Reaction Force of your crane.
Why – MORF drives the Strength Requirements of your Pad
31
Ground Strength Rules of Thumb
32
Bearing Capacity of Soils
Determining the bearing strength of the ground and soils is an
extremely complex combination of science, engineering and art.
Seek the advice of a geotechnical engineer.
33
Bearing Capacity of Soils
Ultimate bearing capacity (UGBC) is the theoretical maximum
pressure which can be supported without failure.
Allowable bearing capacity (AGBC) is what is used in
geotechnical design, and is the ultimate bearing capacity divided
by a factor of safety.
 In the case of temporary structures the typical FOS = 1.5 - 2
34
Ground Bearing Capacity –
Shear Failure
35
How To Prevent Shear Failure
Improve the Ground
 Compaction
 Bring in rock or other dense inorganic materials to increase ground bearing capacity
 Remove un-compacted surface layers
 If wet, allow time for moisture to evaporate
36
How To Prevent Shear Failure
Reduce the Pressures Imposed into the Ground
Increasing the contact area to the ground using load spreading tools such as
Pads, Mats, Blocking, Cribbing
37
How To Prevent Shear Failure
“It might make sense to do some of both…”
 Keith Anderson. Rigging Engineering Basics, 1st edition
38
Ground Strength Rules of Thumb
Visual Analysis –
• Reference a generally accepted Ground Bearing Pressure Chart based
on the soil type and condition
Roll Tests
• Know the Pressure exerted by the tires of your crane.
• Measure the compaction of the ground under the tires
• Develop a plan to identify the ground strength based on ground
compaction
39
Generally Accepted
Ground Bearing Pressures
40
Shapiro Cranes & Derricks, fourth edition
Know Your Ground Conditions
Dynamic Cone Penetrometer
The DCP procedure is currently standardized by ASTM D 6951-03.
(Good for depths up to 6’)
41
Ground Strength Rules of Thumb - Dangers
Little Jack Horner Sat in a corner, eating his Christmas pie, he put in his thumb, & pulled out a
plumb, & said, what a good lad am I!‘
42
Ground Strength Rules of Thumb
DICA Advice –
• Use Caution at All Times
• Understand Specific Site Information from the Controlling Entity
• Reference Geotechnical Information Whenever Possible
• Monitor the Ground During All Operations
43
Ground Strength Rules of Thumb
DICA Advice –
Know what Ground Strength Your Pads are Designed For
Why – Ground Strength is Key to Determining Pad Area
44
Pad Sizing Rules of Thumb
45
Pad Sizing Rules of Thumb
3x The Area
Area of the Float x 3 = Area of Matting
Shapiro Method
Capacity of the crane in Tons / 5 = Area of Matting
Duerr - Simple Mat Sizing
(Capacity x 1,100) / Soil Bearing Capacity = Area of Matting
Square Root Method
√ capacity / 4 = Area of Matting
46
Other Pad Sizing Methods
Equalization Method (soil bearing capacity method)
Outrigger Load/ ASBC = Area of Matting
Duerr – Effective Bearing Length of Crane Mats
Evaluation of the material being used to meet the matting objective.
47
Sizing Methods Evaluated
• 3x The Area
• Shapiro Method
• Duerr - Simple Mat Sizing (SMS)
• Square Root Method
• Equalization (Soil Bearing Capacity) Method
48
Crane Specific
Rule of Thumb Evaluation Assumptions
• Crane MORF is the Load to be fit for
• Weight of the mat is not included in the calculations.
• Steel pads generally add 50 – 100 Psf
• Pad size results are rounded up to the nearest foot.
• Allowable Ground Bearing Capacity of 5,000 Psf is used, when
applicable.
49
Generally Accepted Ground Bearing Pressures
50
Shapiro Cranes & Derricks, fourth edition
Grove RT650 E 50 Ton Crane
51
Link-Belt 3140 140 Ton Crane
52
Grove GMK6350 350 Ton Crane
53
Confused, Don’t Use Any Pads
54
Outrigger Pad Sizing Rules of Thumb Analysis
54 Total Cranes Evaluated
 Not every crane was evaluated in every method due to
unconfirmed data.
3 Different Crane Manufactures
 Grove, Link-Belt, Tadano
Range in Lifting Capacity from 8.5 Tons – 300 Tons (Defined Bands)
 < 50 Ton Cranes = 11
 > 50 and < 100 Ton Cranes = 16
 > 100 and < 200 Ton Cranes = 12
 > 200 Ton Cranes = 6
55
Outrigger Pad Sizing Rules of Thumb
56
Outrigger Pad Sizing Rules of Thumb
57
ROT Analysis – Soft Ground (2,500 Psf)
Avoid using a ROT in Soft Ground Conditions
58
Outrigger Pad Sizing Rules of Thumb
59
Outrigger Pad Sizing Rules of Thumb
60
3x The Area –
– Cranes < 100 tons, where ASBC > 5,000 Psf
– Small Cranes on Stable, Strong Ground
Shapiro Method
– Cranes up to 200 Tons, where the ASBC ~ 5,000 Psf
– +/- Changes in actual ASBC Significantly Alter the Results
Square Root Method
– Cranes up to 200 Tons, where the ASBC ~ 5,000 Psf
– +/- Changes in actual ASBC Significantly Alter the Results
Duerr - Simple Mat Sizing (SMS)
– Cranes from 50 – 200 Tons in All ASBC
– By Far the Most Accurate Rule of Thumb – Takes the ASBC into account
61
Rule of Thumb Sweet Spots?
 Rule of thumb conclusions vary significantly from method to
method.
 Most rules of thumb do not take ground conditions into account.
 Rules of thumb Do Not address pad and mat material, design or
construction.
 Rules of thumb assume pads and mats are designed and
constructed in a way that meets or exceeds the bearing, flex and
shear strength needed.
 They only output estimated pad area.
62
Rule of Thumb Evaluation Conclusions
DICA Advice –
Avoid use a pad sizing method that does not take defined
ground conditions and actual outrigger loads into account.
63
Rule of Thumb Evaluation Conclusions
Sizing Advice
64
What Outrigger Pads and Crane Mats Must Do:
• “The must spread the load from the float/pontoon over a large enough
area that the bearing pressure to the ground surface is acceptable.”
• “Provide support to the crane that is stiff enough that the crane will not go
out of level as the loads from the crane change during lifting operations.”
David Duerr P.E., 2DM and Associates Inc.
65
Sizing Advice
66
Simple Sizing:
“To keep things simple, you may decide for your fleet of outrigger based cranes
that, knowing the ground capacity and the max loadings each crane could put
down, each crane must always use a particular size mat. That would guarantee
keeping within the permissibles at all times and avoid having to recalculate every
time.”
Keith Anderson P.E., Bechtel
Sizing Advice
Sizing Advice
1. Know the Maximum Outrigger Reaction Forces for your
Equipment.
2. Size the Area Your Pads Based On Defined Ground Conditions.
3. Ensure the Pad You Choose has the Strength and Rigidity you
need to Not Fail, and to Distribute the Load.
4. Consult with your Outrigger Pad or Crane Mat Manufacturer
 Specifically for proprietary materials and construction
67
DICA 3 Step Fitting Process
1. Identify the Equipment Data Points
 Crane capacity
 Outrigger Float dimensions
 Maximum Outrigger Reaction Force
2. Determine the Pad Strength & Stiffness (thickness)
necessary to Support & Spread the load.
3. Determine the Mat Area Needed Based On:
 Outrigger Reaction Force to be FIT for
 Soil Bearing Capacity to be FIT for
68
69
Example:
• MORF= 428,000 Lbs. Outrigger floats 2’ x 2’ = 4 sq. ft. Pressure = 743 Psi
• Allowable Ground Bearing Capacity = 5,500 Psf
• Mat Area Needed = 78 sq. ft. (428,000 / 5,500 = 78 sq. ft.)
• Crush Rating 1,000 Psi > 743 Psi
• 10.5’ x 7.5’ = 78 sq. ft. mat with proper material, strength, bending and rigidity
properties
Sizing Advice - Example
Liebherr LTM 1350-6.1 350 Ton Crane
Know your limitations:
Know what Outrigger Load and Ground Bearing Pressure the mats are
designed for.
70
Sizing Advice
71
Larger Areas, Require More Rigidity
72
Recommended Resources
73
David Duerr, P.E. - 2DM Associates
 Book – Mobile Crane Support Handbook
 Paper – Effective Bearing Length of Crane Mats
 Presentation - Crane Mats & Ground Bearing Issues
Lawrence & Jay Shapiro
 Book - Cranes & Derricks, Fourth Edition
J. Keith Anderson, P.E. - Bechtel
 Book – Rigging Engineering Basics, First Edition
Ron Kohner, P.E. - Landmark Engineering Services, LTD
 ABC’s of Foundation Loading Under Cranes
This is 100% Preventable
74
Thank You
75

More Related Content

What's hot

Rigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh RajputRigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh RajputGaurav Singh Rajput
 
Liftingproedure
LiftingproedureLiftingproedure
LiftingproedureZhai Rull
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedurePavan Noel
 
Working with and around our equipment1
Working with and around our equipment1Working with and around our equipment1
Working with and around our equipment1Sheena Baker
 
Forklift training - refresher course
Forklift training - refresher courseForklift training - refresher course
Forklift training - refresher courseEric Lestock Kay
 
Lifting Equipment Inspection
Lifting Equipment InspectionLifting Equipment Inspection
Lifting Equipment InspectionSchilling s
 
Rigging safety 7
Rigging safety 7Rigging safety 7
Rigging safety 7vtsiri
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Riggingfcarlson
 
Lifting plan for bypass stack installation
Lifting plan for bypass stack installationLifting plan for bypass stack installation
Lifting plan for bypass stack installationShah Jalal
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1Sreenath Pokkadavath
 

What's hot (20)

Rigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh RajputRigging | Rigging Safety | Gaurav Singh Rajput
Rigging | Rigging Safety | Gaurav Singh Rajput
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
Lifting Safety
Lifting SafetyLifting Safety
Lifting Safety
 
Rigging Presentation
Rigging PresentationRigging Presentation
Rigging Presentation
 
Rigging Engineering Basic
Rigging Engineering BasicRigging Engineering Basic
Rigging Engineering Basic
 
Lifting & procedure
Lifting & procedureLifting & procedure
Lifting & procedure
 
Working with and around our equipment1
Working with and around our equipment1Working with and around our equipment1
Working with and around our equipment1
 
Basic riggingworkbook
Basic riggingworkbookBasic riggingworkbook
Basic riggingworkbook
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Forklift training - refresher course
Forklift training - refresher courseForklift training - refresher course
Forklift training - refresher course
 
Operating practices
Operating practicesOperating practices
Operating practices
 
Lifting Equipment Inspection
Lifting Equipment InspectionLifting Equipment Inspection
Lifting Equipment Inspection
 
Below the hook
Below the hook Below the hook
Below the hook
 
Rigging safety 7
Rigging safety 7Rigging safety 7
Rigging safety 7
 
Crane Safety & Rigging
Crane Safety & RiggingCrane Safety & Rigging
Crane Safety & Rigging
 
Lifting plan for bypass stack installation
Lifting plan for bypass stack installationLifting plan for bypass stack installation
Lifting plan for bypass stack installation
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
LIFTING OPERATIONS BEST PRACTICES - SEMINAR 1
 

Viewers also liked

3 D Lift Plan Slide Show
3 D Lift Plan Slide Show3 D Lift Plan Slide Show
3 D Lift Plan Slide Showcbweiss
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer methodcoolidiot07
 
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallRetaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallDr.Youssef Hammida
 
Lifting plan
Lifting planLifting plan
Lifting plantnsv22
 

Viewers also liked (7)

2015 CRW - Uncovering the Root and Causes of Crane Accidents
 2015 CRW - Uncovering the Root and Causes of Crane Accidents  2015 CRW - Uncovering the Root and Causes of Crane Accidents
2015 CRW - Uncovering the Root and Causes of Crane Accidents
 
Lift Plan
Lift PlanLift Plan
Lift Plan
 
3 D Lift Plan Slide Show
3 D Lift Plan Slide Show3 D Lift Plan Slide Show
3 D Lift Plan Slide Show
 
Rcc box culvert methodology and designs including computer method
Rcc box culvert   methodology and designs including computer methodRcc box culvert   methodology and designs including computer method
Rcc box culvert methodology and designs including computer method
 
2017 STS - Berard 2016 HAULING JOBS OF THE YEAR
2017 STS - Berard 2016 HAULING JOBS OF THE YEAR2017 STS - Berard 2016 HAULING JOBS OF THE YEAR
2017 STS - Berard 2016 HAULING JOBS OF THE YEAR
 
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wallRetaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
Retaining walls (الجدران الاستنادية)-steel sheet piles - sheet piles wall
 
Lifting plan
Lifting planLifting plan
Lifting plan
 

Similar to 2015 CRW - Setting Up for Success

Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2Steffones K
 
Pile &amp; pier_foundation_analysis_&amp;_design
Pile &amp; pier_foundation_analysis_&amp;_designPile &amp; pier_foundation_analysis_&amp;_design
Pile &amp; pier_foundation_analysis_&amp;_designMohamad Binesh
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft systemSafdar Ali
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdfPradeepPokhrel5
 
Excavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHMExcavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHMAtlantic Training, LLC.
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfJunaidMughal34
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"Remedy Geotechnics Ltd
 
UNIT- 4 Traffic English Engineering (1).pptx
UNIT- 4  Traffic English Engineering (1).pptxUNIT- 4  Traffic English Engineering (1).pptx
UNIT- 4 Traffic English Engineering (1).pptxvigneshk7697
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.pptDagmawiGenanaw
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.pptHARIDASSC0788
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHApoorv Dhawan
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio testAsok999
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana missSHAMJITH KM
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputGaurav Singh Rajput
 

Similar to 2015 CRW - Setting Up for Success (20)

Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Pile &amp; pier_foundation_analysis_&amp;_design
Pile &amp; pier_foundation_analysis_&amp;_designPile &amp; pier_foundation_analysis_&amp;_design
Pile &amp; pier_foundation_analysis_&amp;_design
 
addition consideration in pile
addition consideration in pileaddition consideration in pile
addition consideration in pile
 
Designing a shaft system
Designing a shaft systemDesigning a shaft system
Designing a shaft system
 
publication_1580218342.pdf
publication_1580218342.pdfpublication_1580218342.pdf
publication_1580218342.pdf
 
Excavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHMExcavation, Trenching, and Soil Mechanics by FHM
Excavation, Trenching, and Soil Mechanics by FHM
 
Basic soils presentation
Basic soils presentation Basic soils presentation
Basic soils presentation
 
CE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdfCE Lec Slides, Const Machinery.pdf
CE Lec Slides, Const Machinery.pdf
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"
 
UNIT- 4 Traffic English Engineering (1).pptx
UNIT- 4  Traffic English Engineering (1).pptxUNIT- 4  Traffic English Engineering (1).pptx
UNIT- 4 Traffic English Engineering (1).pptx
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCH
 
Rigging
RiggingRigging
Rigging
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio test
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana miss
 
Emin sg chance sistema anclaje
Emin sg chance sistema anclajeEmin sg chance sistema anclaje
Emin sg chance sistema anclaje
 
Plate load test
Plate load testPlate load test
Plate load test
 
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh RajputJob Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
 

More from Specialized Carriers & Rigging Association

2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...Specialized Carriers & Rigging Association
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...Specialized Carriers & Rigging Association
 

More from Specialized Carriers & Rigging Association (20)

2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business2019 CRW: How the Latest Regulations Impact Your Business
2019 CRW: How the Latest Regulations Impact Your Business
 
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
2019 CRW - Understanding Ground Bearing Capacities (Mike Walsh presentation)
 
2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert2019 CRW - Insurance Q&A: Ask the Industry Expert
2019 CRW - Insurance Q&A: Ask the Industry Expert
 
2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing2019 CRW - How to Use Data to Revitalize Your Marketing
2019 CRW - How to Use Data to Revitalize Your Marketing
 
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
2019 CRW - Tech Trends in Crane & Rigging (David Thorton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
2019 CRW - Tech Trends in Crane & Rigging (Ted Blanton presentation)
 
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
2019 CRW - Tech Trends in Crane & Rigging (Tawnia Weiss presentation)
 
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
2019 CRW - Inside Scoop: How Crane Operator Certification and Evaluation is R...
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
 
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
2019 CRW - Understanding Ground Bearing Capacities (Jeff Steiner presentation)
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
2019 CRW - Navigating the Haze of Legalized Marijuana in the Construction Ind...
 
2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)2019 CRW: Sample ELD Policy (Dave Osiecki session)
2019 CRW: Sample ELD Policy (Dave Osiecki session)
 
2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)2019 CRW: PC Guidance Article (Dave Osiecki session)
2019 CRW: PC Guidance Article (Dave Osiecki session)
 
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
2019 CRW: Clearinghouse Policy Update (Dave Osiecki session)
 
2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting2019 CRW Tower Crane Committee Meeting
2019 CRW Tower Crane Committee Meeting
 
2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting2019 CRW Safety Education & Training Committee Meeting
2019 CRW Safety Education & Training Committee Meeting
 
2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting2019 CRW Labor Committee Meeting
2019 CRW Labor Committee Meeting
 
2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting2019 CRW Governing Committee Meeting
2019 CRW Governing Committee Meeting
 

Recently uploaded

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 

Recently uploaded (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

2015 CRW - Setting Up for Success

  • 1. Outrigger Pads for Mobile Cranes Rules – Standards Rules of Thumb Sizing Recommendations Setting Up For Success
  • 2. Objectives  Disclaimer  Share information to assist you in making better decisions  Agree on Basic Definitions  Identify the Rules & Standards that apply to:  Ground Conditions  Blocking Cribbing & Pads  Identify & evaluate different industry “Rules of Thumb”  Sizing Advice 2
  • 3. Focus on Outrigger Enabled Equipment 3
  • 5. Pad, Mat, Blocking, Cribbing, 5
  • 6. Mobile Crane Applicable Rules & Standards 6 OSHA • 1926 Subpart CC Section1402 • Definitions ASME B30.5 Mobile & Locomotive Cranes • 3.2.1.5 • Moving the Load • 3.4.6 • Footing
  • 7. What's Important to Note About OSHA Regulations BASIC RULE: You must not assemble or use a crane unless ground conditions are firm, drained, and graded to a sufficient extent so that, in conjunction (if necessary) with the use of supporting materials (such as blocking, mats, cribbing, or marsh buggies), the equipment manufacturer's specifications for adequate support and degree of level of the equipment are met. 7
  • 8. What's Important to Note About OSHA Regulations OSHA does not have a rule regulating the construction, design, or materials used as foundation support. (pads, mats, blocking or cribbing) 8
  • 9. 9 Abbreviated Inspection Checklist 1. Determine the adequacy of ground conditions beneath the equipment set up area such as the support/foundation matting, cribbing, blocking, etc. https://www.osha.gov/OshDoc/Directive_pdf/CPL_02-01-057.pdf
  • 10. OSHA 1402 Ground Conditions “Summarized” 10  Equipment must stay within manufactures specifications for support and level.  Use supporting materials (blocking, mats, cribbing) to accomplish this  Controlling entity is responsible for ground conditions.  Including underground hazards  If there is not a controlling entity, then the responsibility shifts to the employer.  Crane company & operator are responsible for evaluating the ground conditions. They must notify others of inadequate ground conditions before beginning or continuing operations.
  • 11. ASME B30.5-2011 11 3.2.1.5 Moving the Load (i) When outrigger floats are used, they shall be attached to the outriggers. Blocking under outrigger floats, when required, shall meet the following requirements: (1) sufficient strength to prevent crushing, bending, or shear failure. (2) such thickness, width, and length, as to completely support the float, transmit the load to the supporting surface, and prevent shifting, toppling, or excessive settlement under load.
  • 12. Not Sufficient Strength (Physical Failure) 12
  • 13. Not sufficient rigidity (Functional Failure) 13
  • 14. 14 ASME B30.5-2011 3.2.1.5 Moving the Load Blocking under outrigger floats, when required, shall meet the following requirements: (3) Use of blocking only under the outer bearing surface of the extended outrigger beam
  • 15. 15 http://www.elcosh.org/document/1488/748/d000104/selection.html (3) use of blocking only under the outer bearing surface of the extended outrigger beam
  • 16. 5-3.1.3.3 Responsibilities of Crane Operators. (b) knowing what types of site conditions could adversely affect the operation of the crane and consulting with the lift director concerning the possible presence of those conditions. 16 ASME B30.5-2011
  • 17. 17 Know Your Ground Conditions (Waikato)
  • 18. Industry Rules of Thumb 18
  • 19. Industry Rules of Thumb • Estimating Outrigger Reaction Force • Estimating Ground Strength • Estimating Pad Sizing 19
  • 20. Outrigger Reaction Force = Pressure 20 PRESSURE (PSF)
  • 21. Common Outrigger Load Rules of Thumb Capacity x 85% Rated Capacity (lbs.) of the Crane x 85% = Outrigger Reaction Force International - (Referenced in European and Australian standards) (Total Crane Mass (lbs.) + Load(lbs.)) x 65% = Outrigger Reaction Force 21
  • 22. Outrigger Load Rules of Thumb Example Grove RT890E Capacity x 85% 180,000 x 85% = 153,000 Lbs International (Mass + Load) x 65% = Outrigger Reaction Force (117,235 + 180,000) = 297,235 x 65% = 193,200 Lbs Difference = 40,200 Lbs 22
  • 23. Outrigger Load Rules of Thumb Example 23
  • 24. Outrigger Load Rules of Thumb Example Grove GMK 5276 • Rated Capacity = 220 Tons, 440,000 Lbs • Total crane mass = 150,000 Lbs Capacity x 85% Example – • 440,000 lbs. x 85% = 374,000 lbs. 24
  • 25. Outrigger Load Rules of Thumb Example Grove GMK 5276 • Rated Capacity = 220 Tons, 440,000 Lbs • Total crane mass = 150,000 Lbs International Example – • (Total Crane Mass + Load) x 65% • 150,000 Lbs + 440,000 Lbs = 590,000 Lbs • 590,000 Lbs x 65% = 383,500 Lbs 25
  • 26. Outrigger Load Rules of Thumb Example 26
  • 27. Outrigger Load Rules of Thumb Example What is the Maximum Outrigger Reaction Force (MORF) for your crane?  Crane manufactures provide this information  Newer software solutions from manufacturers & others  Manitowoc - Compu-Crane  Liebherr - Liccon Software  Link Belt – Technical specifications  Tadano – Online request tool?  3-D Lift Plan 27
  • 28. 28 Grove GMK5275 220 Ton Crane Full Cwt
  • 29. Outrigger Load Rules of Thumb Example Grove GMK 5275 220 Ton Crane Compu-Crane Output 29
  • 30. Know What Lifts Generate the Highest Pressures Picks=126k (126psi) vs. 875 (104psi) 30
  • 31. Outrigger Load Rules of Thumb DICA Advice – Don’t use a rule of thumb to determine the maximum outrigger reaction force. Know the Maximum Outrigger Reaction Force of your crane. Why – MORF drives the Strength Requirements of your Pad 31
  • 32. Ground Strength Rules of Thumb 32
  • 33. Bearing Capacity of Soils Determining the bearing strength of the ground and soils is an extremely complex combination of science, engineering and art. Seek the advice of a geotechnical engineer. 33
  • 34. Bearing Capacity of Soils Ultimate bearing capacity (UGBC) is the theoretical maximum pressure which can be supported without failure. Allowable bearing capacity (AGBC) is what is used in geotechnical design, and is the ultimate bearing capacity divided by a factor of safety.  In the case of temporary structures the typical FOS = 1.5 - 2 34
  • 35. Ground Bearing Capacity – Shear Failure 35
  • 36. How To Prevent Shear Failure Improve the Ground  Compaction  Bring in rock or other dense inorganic materials to increase ground bearing capacity  Remove un-compacted surface layers  If wet, allow time for moisture to evaporate 36
  • 37. How To Prevent Shear Failure Reduce the Pressures Imposed into the Ground Increasing the contact area to the ground using load spreading tools such as Pads, Mats, Blocking, Cribbing 37
  • 38. How To Prevent Shear Failure “It might make sense to do some of both…”  Keith Anderson. Rigging Engineering Basics, 1st edition 38
  • 39. Ground Strength Rules of Thumb Visual Analysis – • Reference a generally accepted Ground Bearing Pressure Chart based on the soil type and condition Roll Tests • Know the Pressure exerted by the tires of your crane. • Measure the compaction of the ground under the tires • Develop a plan to identify the ground strength based on ground compaction 39
  • 40. Generally Accepted Ground Bearing Pressures 40 Shapiro Cranes & Derricks, fourth edition
  • 41. Know Your Ground Conditions Dynamic Cone Penetrometer The DCP procedure is currently standardized by ASTM D 6951-03. (Good for depths up to 6’) 41
  • 42. Ground Strength Rules of Thumb - Dangers Little Jack Horner Sat in a corner, eating his Christmas pie, he put in his thumb, & pulled out a plumb, & said, what a good lad am I!‘ 42
  • 43. Ground Strength Rules of Thumb DICA Advice – • Use Caution at All Times • Understand Specific Site Information from the Controlling Entity • Reference Geotechnical Information Whenever Possible • Monitor the Ground During All Operations 43
  • 44. Ground Strength Rules of Thumb DICA Advice – Know what Ground Strength Your Pads are Designed For Why – Ground Strength is Key to Determining Pad Area 44
  • 45. Pad Sizing Rules of Thumb 45
  • 46. Pad Sizing Rules of Thumb 3x The Area Area of the Float x 3 = Area of Matting Shapiro Method Capacity of the crane in Tons / 5 = Area of Matting Duerr - Simple Mat Sizing (Capacity x 1,100) / Soil Bearing Capacity = Area of Matting Square Root Method √ capacity / 4 = Area of Matting 46
  • 47. Other Pad Sizing Methods Equalization Method (soil bearing capacity method) Outrigger Load/ ASBC = Area of Matting Duerr – Effective Bearing Length of Crane Mats Evaluation of the material being used to meet the matting objective. 47
  • 48. Sizing Methods Evaluated • 3x The Area • Shapiro Method • Duerr - Simple Mat Sizing (SMS) • Square Root Method • Equalization (Soil Bearing Capacity) Method 48
  • 49. Crane Specific Rule of Thumb Evaluation Assumptions • Crane MORF is the Load to be fit for • Weight of the mat is not included in the calculations. • Steel pads generally add 50 – 100 Psf • Pad size results are rounded up to the nearest foot. • Allowable Ground Bearing Capacity of 5,000 Psf is used, when applicable. 49
  • 50. Generally Accepted Ground Bearing Pressures 50 Shapiro Cranes & Derricks, fourth edition
  • 51. Grove RT650 E 50 Ton Crane 51
  • 52. Link-Belt 3140 140 Ton Crane 52
  • 53. Grove GMK6350 350 Ton Crane 53
  • 54. Confused, Don’t Use Any Pads 54
  • 55. Outrigger Pad Sizing Rules of Thumb Analysis 54 Total Cranes Evaluated  Not every crane was evaluated in every method due to unconfirmed data. 3 Different Crane Manufactures  Grove, Link-Belt, Tadano Range in Lifting Capacity from 8.5 Tons – 300 Tons (Defined Bands)  < 50 Ton Cranes = 11  > 50 and < 100 Ton Cranes = 16  > 100 and < 200 Ton Cranes = 12  > 200 Ton Cranes = 6 55
  • 56. Outrigger Pad Sizing Rules of Thumb 56
  • 57. Outrigger Pad Sizing Rules of Thumb 57
  • 58. ROT Analysis – Soft Ground (2,500 Psf) Avoid using a ROT in Soft Ground Conditions 58
  • 59. Outrigger Pad Sizing Rules of Thumb 59
  • 60. Outrigger Pad Sizing Rules of Thumb 60
  • 61. 3x The Area – – Cranes < 100 tons, where ASBC > 5,000 Psf – Small Cranes on Stable, Strong Ground Shapiro Method – Cranes up to 200 Tons, where the ASBC ~ 5,000 Psf – +/- Changes in actual ASBC Significantly Alter the Results Square Root Method – Cranes up to 200 Tons, where the ASBC ~ 5,000 Psf – +/- Changes in actual ASBC Significantly Alter the Results Duerr - Simple Mat Sizing (SMS) – Cranes from 50 – 200 Tons in All ASBC – By Far the Most Accurate Rule of Thumb – Takes the ASBC into account 61 Rule of Thumb Sweet Spots?
  • 62.  Rule of thumb conclusions vary significantly from method to method.  Most rules of thumb do not take ground conditions into account.  Rules of thumb Do Not address pad and mat material, design or construction.  Rules of thumb assume pads and mats are designed and constructed in a way that meets or exceeds the bearing, flex and shear strength needed.  They only output estimated pad area. 62 Rule of Thumb Evaluation Conclusions
  • 63. DICA Advice – Avoid use a pad sizing method that does not take defined ground conditions and actual outrigger loads into account. 63 Rule of Thumb Evaluation Conclusions
  • 65. What Outrigger Pads and Crane Mats Must Do: • “The must spread the load from the float/pontoon over a large enough area that the bearing pressure to the ground surface is acceptable.” • “Provide support to the crane that is stiff enough that the crane will not go out of level as the loads from the crane change during lifting operations.” David Duerr P.E., 2DM and Associates Inc. 65 Sizing Advice
  • 66. 66 Simple Sizing: “To keep things simple, you may decide for your fleet of outrigger based cranes that, knowing the ground capacity and the max loadings each crane could put down, each crane must always use a particular size mat. That would guarantee keeping within the permissibles at all times and avoid having to recalculate every time.” Keith Anderson P.E., Bechtel Sizing Advice
  • 67. Sizing Advice 1. Know the Maximum Outrigger Reaction Forces for your Equipment. 2. Size the Area Your Pads Based On Defined Ground Conditions. 3. Ensure the Pad You Choose has the Strength and Rigidity you need to Not Fail, and to Distribute the Load. 4. Consult with your Outrigger Pad or Crane Mat Manufacturer  Specifically for proprietary materials and construction 67
  • 68. DICA 3 Step Fitting Process 1. Identify the Equipment Data Points  Crane capacity  Outrigger Float dimensions  Maximum Outrigger Reaction Force 2. Determine the Pad Strength & Stiffness (thickness) necessary to Support & Spread the load. 3. Determine the Mat Area Needed Based On:  Outrigger Reaction Force to be FIT for  Soil Bearing Capacity to be FIT for 68
  • 69. 69 Example: • MORF= 428,000 Lbs. Outrigger floats 2’ x 2’ = 4 sq. ft. Pressure = 743 Psi • Allowable Ground Bearing Capacity = 5,500 Psf • Mat Area Needed = 78 sq. ft. (428,000 / 5,500 = 78 sq. ft.) • Crush Rating 1,000 Psi > 743 Psi • 10.5’ x 7.5’ = 78 sq. ft. mat with proper material, strength, bending and rigidity properties Sizing Advice - Example Liebherr LTM 1350-6.1 350 Ton Crane
  • 70. Know your limitations: Know what Outrigger Load and Ground Bearing Pressure the mats are designed for. 70 Sizing Advice
  • 71. 71
  • 72. Larger Areas, Require More Rigidity 72
  • 73. Recommended Resources 73 David Duerr, P.E. - 2DM Associates  Book – Mobile Crane Support Handbook  Paper – Effective Bearing Length of Crane Mats  Presentation - Crane Mats & Ground Bearing Issues Lawrence & Jay Shapiro  Book - Cranes & Derricks, Fourth Edition J. Keith Anderson, P.E. - Bechtel  Book – Rigging Engineering Basics, First Edition Ron Kohner, P.E. - Landmark Engineering Services, LTD  ABC’s of Foundation Loading Under Cranes
  • 74. This is 100% Preventable 74