DRAGLINE: Application.
Further, the choice of stripping unit is influenced
primarily by the system of mining, which is itself
influenced by surface topography, nature and shape of
coal seam, production requirement, nature and depth of
overburden as well as reclamation considerations. The
factors influencing most of the designers to go in for the
deployment of Dragline are due to
 The flexibility of its operation.
 Greater digging depths (compared to a shovel of comparable
cost).
 Greater range which can be well used for multi-seam working.
 It safeguards against spoil pile slides.
 Lowest maintenance Cost per cubic metre.
 High percentage of coal recovery.
 Its cheaper operational cost and
 Low ground pressure (less than 1kg/cm2) exerted makes it
3
FORMULA FOR CALCULATING
THE HEIGHT OF THE BENCH.
t + tan x ( R - W / 4 )
H = ----------------------------
S + tanx / tan y
H= Height of the OB Bench.
t= Thickness of the Seam.
x= Angle of repose OB.
y= Angle of High wall.
S= Swell factor ( 1.25).
R= Effective of Dragline.
W= Width of the cut.
4
DRAGLINE OPERATION AT
OPENCAST PROJECT - I ;R.G
10 20 30 40 50 60 70 80 90
60
5
DRAGLINE: Application.
A BORE HOLE SECTION
SHOWING THE INTERBURDENS
6
OPENCAST MINING WITH
WALKING DRAGLINE.
W - 2000
WALKING
DRAGLINE
7
SALIENT FEATURES
OF DRAGLINE
1. Make : Ramson & Rapier
2. Boom Length : 95.6 Mtrs.
3. Digging radius : 88 Mtrs.
4. Dumping Height : 39.6 Mtrs.
5. Bucket Capacity : 24 M³
6. Base Dia : 16 Mtrs
7.Shoe Length/Width : 17 Mtrs./2.8 Mtrs.
8. Movement of Machine / Step :2.2 Mtrs
9. WT. Of Machine : 2000 Tonnes
10. Total HP :3500 HP ( Swing motors:3 No.s ;
Hoist motors :2 No.s ;
Drag motors :2No.s ; )
11. Annual Target : 4.00 M. M³
12. Material Handled since inception : 67.29 M. M³ ( up to FEB-03 )
8
Use of Draglline:
There are lot of controversies over the actual
and best use of Dragline. Some experts say that the
excavating capacity of traditional equipment for pre-
stripping, should far exceed the excavating capacity
of Dragline. Usually Dragline machine, being the
last equipment to be used immediately above the
bottom most coal seam, has got limited scope of
enhancement on production, even by increase in the
strength of conventional equipment. Initial
development for deployment of Dragline has to be
carried out by shovel-dumper combination and they
are to be continued to be used for pre-stripping or
removal of upper thin seams if any.
9
Use of Draglline:
The other opinion emphasises and banks more
on the operational cost of Dragline, the excavation
cost with Dragline being minimum, tendency is
always to fully use Dragline and therefore would
prefer more excavation capacity in the form of more
number of Draglines. To accommodate more
number of Draglines, these experts like to either the
property in a suitable way for unit work or combine
two to three seams working with multiple Draglines
or by having tandem application with wider cuts etc.
Even though multiple seam operation is being
effected by single Dragline, it may be remembered
that, any mode of operation above the level of
Dragline tub is inefficient. Mines have already come
up with production reaching 10 million tonnes with
as many as four Draglines of different sizes.
10
The advantages offset the
minimal disadvantages like
1) Requirement of bench preparation and
2) Higher capital cost
3) It's limitation to work only bottom most seams.
Advantages:
The greatest advantage of Dragline machine is that,
its cost of overburden removal is the cheapest within its
limitations. Though the machine is huge and requires
special and stringent maintenance, it's operating cost per
cubic metre works out cheaper than any other method.
As earlier said, the machine also has its limitations and is
ideally suited for flat thick seams with extensive property
on strike direction and with uniform thickness of
overburden. The presence of geological disturbances,
multi direction dipping seams or steep seams complicate
its field of operation.
11
Planning of Dragline
Operation:
Once the choice of the machine is made, its
successful operation depends a lot on careful and efficient
planning. Planning takes into account, apart from the best
working of the machine, the correct and systematic
deployment of other traditional equipment for pre
stripping etc. Aspects which require close attention, at the
planning stage itself include:
 Selection of proper machinery mix for allowing the
Dragline, to have uninterrupted work.
 Initial planning of Dragline cuts and the sequence of
operation.
 System for proper evacuation of the coal from the
cuts.
12
Planning of Dragline
Operation:
Drainage, to conduct water away
from coal extraction area and to
prevent ponding. I.e., De-watering
arrangements.
Study of actual operational time of
Dragline.
Study of bank overburden removal
and rehandling operations and to
minimise rehandling.
Fragmentation and blasting aspects
to avoid hard digging conditions.
13
WORKING WITH DRAGLINE
: Steps & Methods
DRAGLINE CUTS PLAN
H
A
U
L
R
O
A
D
CUT-60
CUT-61
CUT-63
CUT-65 CUT-64
CUT-66
CUT-67
CUT-62
BLOCK-A
BLOCK-B
COAL EXCAVATION
14
WORKING WITH DRAGLINE :
Steps & Methods
For any dragline operation two
most important dimensions are
operating radius and the dumping
height, which describe the physical
stacking capability of a particular
machine, the operating radius is
dependant on the positioning of the
machine from the crest and decides
the point of discharge/dumping. In
other words, reach factor decides the
exact place of dumping and can be
obtained from the following
relationship.
Operating radius = Positioning +
Reach factor.
H
T
OR
15
WORKING WITH DRAGLINE :
Steps & Methods
For any dragline operation two
most important dimensions are
operating radius and the dumping
height, which describe the physical
stacking capability of a particular
machine, the operating radius is
dependant on the positioning of the
machine from the crest and decides
the point of discharge/dumping. In
other words, reach factor decides the
exact place of dumping and can be
obtained from the following
relationship.
Operating radius = Positioning +
Reach factor.
H
T
OR
16
WORKING WITH DRAGLINE :
Steps & Methods
General Working Methods of Dragline:
In open pit mining with single
Dragline, the strip/cuts method is adopted
generally. Where the area is divided into
long strips/cuts. The entire quarry area is
divides into a number of cuts as given in
the working plan. Usually the width of the
cuts is constant throughout except for the
boxcut.
17
WORKING WITH DRAGLINE
: Steps & Methods
GENERAL CROSS SECTION
18
WORKING WITH DRAGLINE :
Steps & Methods
The extraction of cuts with Dragline can be done with
various methods like Advance benching. Simple side casting.
Extended bench etc., depending upon the geological conditions
and the depth of the over overburden, but an initial boxcut is an
essential requirement.
Boxcut can be developed with the help of shovel-dumper
combination or Dragline itself. Boxcut derives its name due to
its shape and overburden removed from the cut is carried away
to the regular dumps. Usually boxcut is located such that the
overburden removed from the boxcut is not rehandled, except
under exceptional conditions and therefore better done by
shovel-dumper combination.
19
BLASTING - AN AID TO
DRAGLINE WORKING:
20
BLASTING - AN AID TO
DRAGLINE WORKING:
21
BLASTING - AN AID TO
DRAGLINE WORKING:
22
BLASTING - AN AID TO
DRAGLINE WORKING:
23
WORKING WITH DRAGLINE :
Steps & Methods
PLAN OF
BOX CUT
SECTION
VIEW OF
BOX CUT
24
Advantages of bench extended Method.
 Dagline has more room maneuver resulting in faster
cycle times and safer operations.
 Scheduling easier as each slice takes longer complete.
 Higher production can be concentrated in a cut width
along strike length.
 The extended bench offers a much safer position for
Dragline to work from taken the original high wall.
 Coal recovery is more.
 Reduces the contamination of coal as it is easy to clean
out the coal edge.
Disadvantages are only to schedule.
25
DRAGLINE WORKING:
26
CONCLUSIONS:
CONCLUSIONS: Related to Surveyors
1. We must know the existing technology or
methodology in our company thoroughly.
2. Management has to conduct special training
programs to related technologies of particular
projects.
3. To show the better performance their
involvement to relevant works.
4. To involve in deep discussions about the any
good achievement or any problem faced, a
record maintains necessary for future
reference.
5. Update the knowledge of their system of
works, using electronic optical instruments
i.e.,"Total station" and the data processing
using the computer system related to survey.

More Related Content

Similar to dragline-operation.ppt

Surface miner and its performance (1)
Surface miner and its performance (1)Surface miner and its performance (1)
Surface miner and its performance (1)Safdar Ali
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performanceSafdar Ali
 
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperSHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperDennis McElroy
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with DraglineVR M
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONiQHub
 
Vibratory Finishing SME Tech Paper John Kittredge
Vibratory Finishing SME Tech Paper John Kittredge Vibratory Finishing SME Tech Paper John Kittredge
Vibratory Finishing SME Tech Paper John Kittredge Dave Davidson
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBMindranjanGhosh
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"Remedy Geotechnics Ltd
 
Convert machined surfaces to plateaued surf
Convert machined surfaces to plateaued surfConvert machined surfaces to plateaued surf
Convert machined surfaces to plateaued surfDave Davidson
 
Turning revolution – a surprising take on a mature process
Turning revolution – a surprising take on a mature processTurning revolution – a surprising take on a mature process
Turning revolution – a surprising take on a mature processSandvik Coromant
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram pptArunKumar6667
 
CASING_SOLUTIONS_OBAGI_FIELD_
CASING_SOLUTIONS_OBAGI_FIELD_CASING_SOLUTIONS_OBAGI_FIELD_
CASING_SOLUTIONS_OBAGI_FIELD_Victor Momoh
 

Similar to dragline-operation.ppt (20)

leabert cement machine.
leabert cement machine.leabert cement machine.
leabert cement machine.
 
Surface miner and its performance (1)
Surface miner and its performance (1)Surface miner and its performance (1)
Surface miner and its performance (1)
 
Surface miner and its performance
Surface miner and its performanceSurface miner and its performance
Surface miner and its performance
 
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR WhitepaperSHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
SHATEC Engineering Consultants - Graniterock dba FMG CIR Whitepaper
 
CLAM SHELL BUCKETS
CLAM SHELL BUCKETSCLAM SHELL BUCKETS
CLAM SHELL BUCKETS
 
Working with Dragline
Working with DraglineWorking with Dragline
Working with Dragline
 
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTIONROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
ROLE OF BIT STEERABLE SYSTEM IN PRODUCTION OPTIMIZATION & COST REDUCTION
 
Vibratory Finishing SME Tech Paper John Kittredge
Vibratory Finishing SME Tech Paper John Kittredge Vibratory Finishing SME Tech Paper John Kittredge
Vibratory Finishing SME Tech Paper John Kittredge
 
Performance review of TBM
Performance review of TBMPerformance review of TBM
Performance review of TBM
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"
 
Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)Draglines (fabil & venkatesh)
Draglines (fabil & venkatesh)
 
Convert machined surfaces to plateaued surf
Convert machined surfaces to plateaued surfConvert machined surfaces to plateaued surf
Convert machined surfaces to plateaued surf
 
Rotosolver II
Rotosolver IIRotosolver II
Rotosolver II
 
Mr83 693
Mr83 693Mr83 693
Mr83 693
 
Turning revolution – a surprising take on a mature process
Turning revolution – a surprising take on a mature processTurning revolution – a surprising take on a mature process
Turning revolution – a surprising take on a mature process
 
Report File
Report FileReport File
Report File
 
Vacuum Excavation brief overview of no-dig technology
Vacuum Excavation brief overview of no-dig technologyVacuum Excavation brief overview of no-dig technology
Vacuum Excavation brief overview of no-dig technology
 
Balancing Diagram ppt
Balancing Diagram pptBalancing Diagram ppt
Balancing Diagram ppt
 
CASING_SOLUTIONS_OBAGI_FIELD_
CASING_SOLUTIONS_OBAGI_FIELD_CASING_SOLUTIONS_OBAGI_FIELD_
CASING_SOLUTIONS_OBAGI_FIELD_
 
Chain conveyors
Chain conveyorsChain conveyors
Chain conveyors
 

Recently uploaded

如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一fjjwgk
 
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一ypfy7p5ld
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂Hot Call Girls In Sector 58 (Noida)
 
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一ga6c6bdl
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Roomdivyansh0kumar0
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样umasea
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样whjjkkk
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...shivangimorya083
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualExcavator
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaMalviyaNagarCallGirl
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingEscondido German Auto
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 

Recently uploaded (20)

如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
如何办理(UC毕业证书)堪培拉大学毕业证毕业证成绩单原版一比一
 
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
如何办理(Flinders毕业证)查理斯特大学毕业证毕业证成绩单原版一比一
 
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
꧁༒☬ 7042364481 (Call Girl) In Dwarka Delhi Escort Service In Delhi Ncr☬༒꧂
 
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full NightCall Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
Call Girls Vastrapur 7397865700 Ridhima Hire Me Full Night
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
如何办理迈阿密大学毕业证(UM毕业证)成绩单留信学历认证原版一比一
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kasba 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kasba 👉 8250192130 Available With Room
 
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
办理学位证(MLU文凭证书)哈勒 维滕贝格大学毕业证成绩单原版一模一样
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
(办理学位证)墨尔本大学毕业证(Unimelb毕业证书)成绩单留信学历认证原版一模一样
 
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...Russian  Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
Russian Call Girls Delhi Indirapuram {9711199171} Aarvi Gupta ✌️Independent ...
 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Servicesauth delhi call girls in  Connaught Place🔝 9953056974 🔝 escort Service
sauth delhi call girls in Connaught Place🔝 9953056974 🔝 escort Service
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
 
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop WorkingWhat Could Cause A VW Tiguan's Radiator Fan To Stop Working
What Could Cause A VW Tiguan's Radiator Fan To Stop Working
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 

dragline-operation.ppt

  • 1. 1
  • 2. 2 DRAGLINE: Application. Further, the choice of stripping unit is influenced primarily by the system of mining, which is itself influenced by surface topography, nature and shape of coal seam, production requirement, nature and depth of overburden as well as reclamation considerations. The factors influencing most of the designers to go in for the deployment of Dragline are due to  The flexibility of its operation.  Greater digging depths (compared to a shovel of comparable cost).  Greater range which can be well used for multi-seam working.  It safeguards against spoil pile slides.  Lowest maintenance Cost per cubic metre.  High percentage of coal recovery.  Its cheaper operational cost and  Low ground pressure (less than 1kg/cm2) exerted makes it
  • 3. 3 FORMULA FOR CALCULATING THE HEIGHT OF THE BENCH. t + tan x ( R - W / 4 ) H = ---------------------------- S + tanx / tan y H= Height of the OB Bench. t= Thickness of the Seam. x= Angle of repose OB. y= Angle of High wall. S= Swell factor ( 1.25). R= Effective of Dragline. W= Width of the cut.
  • 4. 4 DRAGLINE OPERATION AT OPENCAST PROJECT - I ;R.G 10 20 30 40 50 60 70 80 90 60
  • 5. 5 DRAGLINE: Application. A BORE HOLE SECTION SHOWING THE INTERBURDENS
  • 6. 6 OPENCAST MINING WITH WALKING DRAGLINE. W - 2000 WALKING DRAGLINE
  • 7. 7 SALIENT FEATURES OF DRAGLINE 1. Make : Ramson & Rapier 2. Boom Length : 95.6 Mtrs. 3. Digging radius : 88 Mtrs. 4. Dumping Height : 39.6 Mtrs. 5. Bucket Capacity : 24 M³ 6. Base Dia : 16 Mtrs 7.Shoe Length/Width : 17 Mtrs./2.8 Mtrs. 8. Movement of Machine / Step :2.2 Mtrs 9. WT. Of Machine : 2000 Tonnes 10. Total HP :3500 HP ( Swing motors:3 No.s ; Hoist motors :2 No.s ; Drag motors :2No.s ; ) 11. Annual Target : 4.00 M. M³ 12. Material Handled since inception : 67.29 M. M³ ( up to FEB-03 )
  • 8. 8 Use of Draglline: There are lot of controversies over the actual and best use of Dragline. Some experts say that the excavating capacity of traditional equipment for pre- stripping, should far exceed the excavating capacity of Dragline. Usually Dragline machine, being the last equipment to be used immediately above the bottom most coal seam, has got limited scope of enhancement on production, even by increase in the strength of conventional equipment. Initial development for deployment of Dragline has to be carried out by shovel-dumper combination and they are to be continued to be used for pre-stripping or removal of upper thin seams if any.
  • 9. 9 Use of Draglline: The other opinion emphasises and banks more on the operational cost of Dragline, the excavation cost with Dragline being minimum, tendency is always to fully use Dragline and therefore would prefer more excavation capacity in the form of more number of Draglines. To accommodate more number of Draglines, these experts like to either the property in a suitable way for unit work or combine two to three seams working with multiple Draglines or by having tandem application with wider cuts etc. Even though multiple seam operation is being effected by single Dragline, it may be remembered that, any mode of operation above the level of Dragline tub is inefficient. Mines have already come up with production reaching 10 million tonnes with as many as four Draglines of different sizes.
  • 10. 10 The advantages offset the minimal disadvantages like 1) Requirement of bench preparation and 2) Higher capital cost 3) It's limitation to work only bottom most seams. Advantages: The greatest advantage of Dragline machine is that, its cost of overburden removal is the cheapest within its limitations. Though the machine is huge and requires special and stringent maintenance, it's operating cost per cubic metre works out cheaper than any other method. As earlier said, the machine also has its limitations and is ideally suited for flat thick seams with extensive property on strike direction and with uniform thickness of overburden. The presence of geological disturbances, multi direction dipping seams or steep seams complicate its field of operation.
  • 11. 11 Planning of Dragline Operation: Once the choice of the machine is made, its successful operation depends a lot on careful and efficient planning. Planning takes into account, apart from the best working of the machine, the correct and systematic deployment of other traditional equipment for pre stripping etc. Aspects which require close attention, at the planning stage itself include:  Selection of proper machinery mix for allowing the Dragline, to have uninterrupted work.  Initial planning of Dragline cuts and the sequence of operation.  System for proper evacuation of the coal from the cuts.
  • 12. 12 Planning of Dragline Operation: Drainage, to conduct water away from coal extraction area and to prevent ponding. I.e., De-watering arrangements. Study of actual operational time of Dragline. Study of bank overburden removal and rehandling operations and to minimise rehandling. Fragmentation and blasting aspects to avoid hard digging conditions.
  • 13. 13 WORKING WITH DRAGLINE : Steps & Methods DRAGLINE CUTS PLAN H A U L R O A D CUT-60 CUT-61 CUT-63 CUT-65 CUT-64 CUT-66 CUT-67 CUT-62 BLOCK-A BLOCK-B COAL EXCAVATION
  • 14. 14 WORKING WITH DRAGLINE : Steps & Methods For any dragline operation two most important dimensions are operating radius and the dumping height, which describe the physical stacking capability of a particular machine, the operating radius is dependant on the positioning of the machine from the crest and decides the point of discharge/dumping. In other words, reach factor decides the exact place of dumping and can be obtained from the following relationship. Operating radius = Positioning + Reach factor. H T OR
  • 15. 15 WORKING WITH DRAGLINE : Steps & Methods For any dragline operation two most important dimensions are operating radius and the dumping height, which describe the physical stacking capability of a particular machine, the operating radius is dependant on the positioning of the machine from the crest and decides the point of discharge/dumping. In other words, reach factor decides the exact place of dumping and can be obtained from the following relationship. Operating radius = Positioning + Reach factor. H T OR
  • 16. 16 WORKING WITH DRAGLINE : Steps & Methods General Working Methods of Dragline: In open pit mining with single Dragline, the strip/cuts method is adopted generally. Where the area is divided into long strips/cuts. The entire quarry area is divides into a number of cuts as given in the working plan. Usually the width of the cuts is constant throughout except for the boxcut.
  • 17. 17 WORKING WITH DRAGLINE : Steps & Methods GENERAL CROSS SECTION
  • 18. 18 WORKING WITH DRAGLINE : Steps & Methods The extraction of cuts with Dragline can be done with various methods like Advance benching. Simple side casting. Extended bench etc., depending upon the geological conditions and the depth of the over overburden, but an initial boxcut is an essential requirement. Boxcut can be developed with the help of shovel-dumper combination or Dragline itself. Boxcut derives its name due to its shape and overburden removed from the cut is carried away to the regular dumps. Usually boxcut is located such that the overburden removed from the boxcut is not rehandled, except under exceptional conditions and therefore better done by shovel-dumper combination.
  • 19. 19 BLASTING - AN AID TO DRAGLINE WORKING:
  • 20. 20 BLASTING - AN AID TO DRAGLINE WORKING:
  • 21. 21 BLASTING - AN AID TO DRAGLINE WORKING:
  • 22. 22 BLASTING - AN AID TO DRAGLINE WORKING:
  • 23. 23 WORKING WITH DRAGLINE : Steps & Methods PLAN OF BOX CUT SECTION VIEW OF BOX CUT
  • 24. 24 Advantages of bench extended Method.  Dagline has more room maneuver resulting in faster cycle times and safer operations.  Scheduling easier as each slice takes longer complete.  Higher production can be concentrated in a cut width along strike length.  The extended bench offers a much safer position for Dragline to work from taken the original high wall.  Coal recovery is more.  Reduces the contamination of coal as it is easy to clean out the coal edge. Disadvantages are only to schedule.
  • 26. 26 CONCLUSIONS: CONCLUSIONS: Related to Surveyors 1. We must know the existing technology or methodology in our company thoroughly. 2. Management has to conduct special training programs to related technologies of particular projects. 3. To show the better performance their involvement to relevant works. 4. To involve in deep discussions about the any good achievement or any problem faced, a record maintains necessary for future reference. 5. Update the knowledge of their system of works, using electronic optical instruments i.e.,"Total station" and the data processing using the computer system related to survey.