Failing
membrane
evident by leaks
into parkade.
Signs of rust
were minimal
with no spalling.
Optimum time
to replace the
membrane.
Concrete stair
riser failure.
Creates tripping
hazard. To be
replaced.
Planters and soil removals completed.
Next, dismantle playground equipment
and remove concrete topping.
Excessive thickness of the topping slab
without a separation or drain mat on the
membrane made removals more difficult
than expected.
Typical 4” thick topping was 7” average
thickness.
Existing membrane under the concrete
topping was still flexible but did show
some locations of oxidation and cracking
as shown.
Membrane was a seamless liquid
polymer modified asphalt with a good
bond.
Unexpected
poor
construction
detail of
downspout tie
in through the
structural slab.
Cast iron pipe
was broken at all
locations.
Poor drainage
on the structural
slab meant the
need for
additional
drains.
Deck concrete topping removed.
All loose membrane removed.
Structural deck surface washed and
ready for new drains.
16 new drains were installed using
proper cast pipe and Watts 4” drains
with bi-level drainage for the membrane
and surface runoff.
16 new drains were installed with double
reinforced tie in details.
Problematic with a failed membrane
system. Water has ingressed under the
occupant units and now is trying to
egress back out.
Waiting for it to dry out is not an option
but resolved with special techniques.
Application of the Bakor 790-11 liquid
rubberized asphalt membrane reinforced
with a polyester sheet before a top coat
is placed.
Application of Bakor drain boards to
ensure drainage under the concrete
topping and eliminate ice lens lifting of
the topping and hydraulic cracking of the
topping slab.
BASF polyurethane coating applied to
vertical surface to protect membrane tie
in edge.
New hydro conduit installed for new
lighting system.
New fiber reinforced concrete is placed on top the drain
mat.
Front entrance redone (straightened &
wider). Landscaping to be completed.
Stairs reconstructed and painted.
New electrical complete to replace the old
as wiring was not to code and corroded.
Landscaping is completed with new
Gardenscape wall and turf.
Soil area changed to turf. Redwood cedars
removed to brighten up area and help limit
moss growth.
External Links (360 views)
» BEFORE PICTURE
» AFTER PICTURE

More Related Content

What's hot

Types Of Porous Pavements Final
Types Of Porous Pavements FinalTypes Of Porous Pavements Final
Types Of Porous Pavements Finalmayhew50
 
A New Look at Pervious Concrete
A New Look at Pervious Concrete A New Look at Pervious Concrete
A New Look at Pervious Concrete Dale Fisher
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
PROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEPROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEG.Ajith Kumar
 
Cape Rachado Site A Analysis
Cape Rachado Site A AnalysisCape Rachado Site A Analysis
Cape Rachado Site A AnalysisJoe Onn Lim
 
Critical Importance of Site Design
Critical Importance of Site DesignCritical Importance of Site Design
Critical Importance of Site DesignDale Fisher
 
Factors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis methodFactors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis methodErankajKumar
 
Pervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsPervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsSean Van Delist
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concreteSanjipta Behera
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelterJoe Onn Lim
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93NikHil NicK's
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationAvinash Kumar Gupta
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicalsAvinash Kumar Gupta
 
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI PERVIOUS CONCRETE REPORT by DEEPAK TIWARI
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI Deepak_Tiwari19
 

What's hot (20)

Types Of Porous Pavements Final
Types Of Porous Pavements FinalTypes Of Porous Pavements Final
Types Of Porous Pavements Final
 
A New Look at Pervious Concrete
A New Look at Pervious Concrete A New Look at Pervious Concrete
A New Look at Pervious Concrete
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Roof Treatment
Roof TreatmentRoof Treatment
Roof Treatment
 
PROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEPROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETE
 
Rehabilitation methods
Rehabilitation methodsRehabilitation methods
Rehabilitation methods
 
Cape Rachado Site A Analysis
Cape Rachado Site A AnalysisCape Rachado Site A Analysis
Cape Rachado Site A Analysis
 
Critical Importance of Site Design
Critical Importance of Site DesignCritical Importance of Site Design
Critical Importance of Site Design
 
Factors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis methodFactors to considered in foundation design and numerical based on bis method
Factors to considered in foundation design and numerical based on bis method
 
Pervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the DetailsPervious Concrete: Getting Down to the Details
Pervious Concrete: Getting Down to the Details
 
Waterproofing Systems
Waterproofing SystemsWaterproofing Systems
Waterproofing Systems
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concrete
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 
Rc ccracks_repair(rev) 93
 Rc ccracks_repair(rev) 93 Rc ccracks_repair(rev) 93
Rc ccracks_repair(rev) 93
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitation
 
Pervious concrete
Pervious concretePervious concrete
Pervious concrete
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicals
 
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI PERVIOUS CONCRETE REPORT by DEEPAK TIWARI
PERVIOUS CONCRETE REPORT by DEEPAK TIWARI
 
Coolidge dam jan05 casehis f
Coolidge dam jan05 casehis fCoolidge dam jan05 casehis f
Coolidge dam jan05 casehis f
 

Similar to 3100 Ozada Ave parkade roof membrane

Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRPdewcraig
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionVladimir Popovic
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationVladimir Popovic
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketingAditya Sanyal
 
AJN Waterproofing Q&A
AJN Waterproofing Q&AAJN Waterproofing Q&A
AJN Waterproofing Q&Aajnwater
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundationABIRAMI G
 
Infratructure defect
Infratructure defectInfratructure defect
Infratructure defecteighteen9ty
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4amCeline Tan
 
Presentation distress of rigid pavement.pptx
Presentationdistress of rigid pavement.pptxPresentationdistress of rigid pavement.pptx
Presentation distress of rigid pavement.pptxuniversity of technology
 
AJN Waterproofing Q&A
AJN Waterproofing Q&AAJN Waterproofing Q&A
AJN Waterproofing Q&Aajnwater
 
AJN Waterproofing Q&A 2011
AJN Waterproofing Q&A 2011AJN Waterproofing Q&A 2011
AJN Waterproofing Q&A 2011ajnwater
 
Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415Ingrid Bush
 
Geotextile application to civil engineering
Geotextile application to civil engineeringGeotextile application to civil engineering
Geotextile application to civil engineeringTEJASKRIYA PRADHAN
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207sharad_kadbhane
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building constructionKiran Hadiya
 

Similar to 3100 Ozada Ave parkade roof membrane (20)

Carbon Fiber - FRP
Carbon Fiber - FRPCarbon Fiber - FRP
Carbon Fiber - FRP
 
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstructionLanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
Lanchkhuti - Oragvis gele rc ws tank 2,000m3 reconstruction
 
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitationLanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
Lanchkhuti - Lashis gele rs ws tank 500m3 rehabilitation
 
Grouting, guniting, jacketing
Grouting, guniting, jacketingGrouting, guniting, jacketing
Grouting, guniting, jacketing
 
AJN Waterproofing Q&A
AJN Waterproofing Q&AAJN Waterproofing Q&A
AJN Waterproofing Q&A
 
Rehabilitation of foundation
Rehabilitation of foundationRehabilitation of foundation
Rehabilitation of foundation
 
Infratructure defect
Infratructure defectInfratructure defect
Infratructure defect
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4am
 
porous and previous roads
porous and previous roadsporous and previous roads
porous and previous roads
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
Presentation distress of rigid pavement.pptx
Presentationdistress of rigid pavement.pptxPresentationdistress of rigid pavement.pptx
Presentation distress of rigid pavement.pptx
 
AJN Waterproofing Q&A
AJN Waterproofing Q&AAJN Waterproofing Q&A
AJN Waterproofing Q&A
 
AJN Waterproofing Q&A 2011
AJN Waterproofing Q&A 2011AJN Waterproofing Q&A 2011
AJN Waterproofing Q&A 2011
 
Project Spotlight_PR0415
Project Spotlight_PR0415Project Spotlight_PR0415
Project Spotlight_PR0415
 
Geotextile application to civil engineering
Geotextile application to civil engineeringGeotextile application to civil engineering
Geotextile application to civil engineering
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 
Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207Group 2 brick masonry- 0506,1706,3006,5207
Group 2 brick masonry- 0506,1706,3006,5207
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
 

Recently uploaded

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 

3100 Ozada Ave parkade roof membrane

  • 1. Failing membrane evident by leaks into parkade. Signs of rust were minimal with no spalling. Optimum time to replace the membrane. Concrete stair riser failure. Creates tripping hazard. To be replaced.
  • 2. Planters and soil removals completed. Next, dismantle playground equipment and remove concrete topping.
  • 3. Excessive thickness of the topping slab without a separation or drain mat on the membrane made removals more difficult than expected. Typical 4” thick topping was 7” average thickness.
  • 4. Existing membrane under the concrete topping was still flexible but did show some locations of oxidation and cracking as shown. Membrane was a seamless liquid polymer modified asphalt with a good bond.
  • 5. Unexpected poor construction detail of downspout tie in through the structural slab. Cast iron pipe was broken at all locations. Poor drainage on the structural slab meant the need for additional drains.
  • 6. Deck concrete topping removed. All loose membrane removed. Structural deck surface washed and ready for new drains.
  • 7. 16 new drains were installed using proper cast pipe and Watts 4” drains with bi-level drainage for the membrane and surface runoff.
  • 8. 16 new drains were installed with double reinforced tie in details.
  • 9. Problematic with a failed membrane system. Water has ingressed under the occupant units and now is trying to egress back out. Waiting for it to dry out is not an option but resolved with special techniques.
  • 10. Application of the Bakor 790-11 liquid rubberized asphalt membrane reinforced with a polyester sheet before a top coat is placed.
  • 11. Application of Bakor drain boards to ensure drainage under the concrete topping and eliminate ice lens lifting of the topping and hydraulic cracking of the topping slab. BASF polyurethane coating applied to vertical surface to protect membrane tie in edge. New hydro conduit installed for new lighting system.
  • 12. New fiber reinforced concrete is placed on top the drain mat.
  • 13. Front entrance redone (straightened & wider). Landscaping to be completed.
  • 15. New electrical complete to replace the old as wiring was not to code and corroded. Landscaping is completed with new Gardenscape wall and turf.