CHAPTER EIGHT 
Scheduling 
Resources 
and Costs 
McGraw-Hill/Irwin 
Copyright © 2011 by The McGraw-Hill Companies, Inc. All 
rights reserved.
8–3 
TTTThhhheeee RRRReeeessssoooouuuurrrrcccceeee PPPPrrrroooobbbbllleleeemmmm 
• Resources and Priorities 
–Project network times are not a schedule 
until resources have been assigned. 
• The implicit assumption is that resources will be available 
in the required amounts when needed. 
• Adding new projects requires making realistic judgments 
of resource availability and project durations. 
–Cost estimates are not a budget 
until they have been time-phased.
8–4 
PPPPrrrroooojjjejeeecccctttt PPPPlllalaaannnnnnnniiininnngggg PPPPrrrroooocccceeeessssssss 
FIGURE 8.1
8–5 
TTTThhhheeee RRRReeeessssoooouuuurrrrcccceeee PPPPrrrroooobbbbllleleeemmmm ((((ccccoooonnnntttt’’’d’ddd)))) 
• Resource Smoothing (or Leveling) 
–Involves attempting to even out varying demands 
on resources by using slack (delaying noncritical 
activities) to manage resource utilization when 
resources are adequate over the life of the project. 
• Resource-Constrained Scheduling 
–The duration of a project may be increased by 
delaying the late start of some of its activities if 
resources are not adequate to meet peak demands.
8–6 
TTTTyyyyppppeeeessss ooooffff PPPPrrrroooojjjejeeecccctttt CCCCoooonnnnssssttttrrrraaaaiiininnnttttssss 
• Technical or Logic Constraints 
–Constraints related to the networked sequence 
in which project activities must occur. 
• Physical Constraints 
–Activities that cannot occur in parallel or are affected by 
contractual or environmental conditions. 
• Resource Constraints 
– The absence, shortage, or unique interrelationship and 
interaction characteristics of resources that require a particular 
sequencing of project activities 
• Kinds of Resource Constraints 
–People, materials, equipment
8–7 
CCCCoooonnnnssssttttrrrraaaaiiininnntttt EEEExxxxaaaammmmppppllleleeessss 
FIGURE 8.2
8–8 
Classification CCClllaaassssssiiifffiiicccaaatttiiiooonnn ooooffff A AAA SSSScccchhhheeeedddduuuullliliininnngggg PPPPrrrroooobbbbllleleeemmmm 
• Classification of Problem 
–Using a priority matrix will help determine if 
the project is time or resource constrained. 
• Time-Constrained Project 
–Must be completed by an imposed date. 
• Time is fixed, resources are flexible: additional resources 
are required to ensure project meets schedule. 
• Resource-Constrained Project 
–Is one in which the level of resources available 
cannot be exceeded. 
• Resources are fixed, time is flexible: inadequate resources 
will delay the project.
8–9 
RRRReeeessssoooouuuurrrrcccceeee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss 
• Limiting Assumptions 
–Splitting activities is not allowed—once an 
activity is started, it is carried to completion. 
–Level of resources used for an activity cannot 
be changed. 
• Risk Assumptions 
–Activities with the most slack pose the least risk. 
–Reduction of flexibility does not increase risk. 
–The nature of an activity (easy, complex) doesn’t 
increase risk.
8–10 
Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) 
• Time-Constrained Projects 
–Must be completed by an imposed date. 
–Require use of leveling techniques that focus 
on balancing or smoothing resource demands. 
–Use positive slack (delaying noncritical activities) 
to manage resource utilization over the duration 
of the project. 
• Peak resource demands are reduced. 
• Resources over the life of the project are reduced. 
• Fluctuation in resource demand is minimized.
8–11 
BBoottaanniiccaall 
GGaarrddeenn 
BBoottaanniiccaall 
GGaarrddeenn 
FIGURE 8.3
8–12 
Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) 
• Resource Demand Leveling Techniques 
for Time-Constrained Projects 
–Advantages 
• Peak resource demands are reduced. 
• Resources over the life of the project are reduced. 
• Fluctuation in resource demand is minimized. 
–Disadvantages 
• Loss of flexibility that occurs from reducing slack. 
• Increases in the criticality of all activities.
8–13 
Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) 
• Resource-Constrained Projects 
– Resources are limited in quantity or availability. 
– Activities are scheduled using heuristics 
(rules-of-thumb) that focus on: 
1. Minimum slack 
2. Smallest (least) duration 
3. Lowest activity identification number 
– The parallel method is used to apply heuristics 
• An iterative process starting at the first time period 
of the project and scheduling period-by-period the start 
of any activities using the three priority rules.
8–27 
TThhee IImmppaaccttss ooff RReessoouurrccee--CCoonnssttrraaiinneedd 
The Impacts ooff RReessoouurrccee--CCoonnssttrraaiinneedd 
SScchheedduulliinngg 
SScchheedduulliinngg 
• Reduces delay but reduces flexibility. 
• Increases criticality of events. 
• Increases scheduling complexity. 
• May make the traditional critical path 
no longer meaningful. 
• Can break sequence of events. 
• May cause parallel activities to become 
sequential and critical activities with slack 
to become noncritical.
8–28 
SSSSppppllliliititttttttiiininnngggg 
• Splitting 
– A scheduling technique use to get a better project 
schedule and/or increase resource utilization. 
• Involves interrupting work on an activity to employ the 
resource on another activity, then returning the resource 
to finish the interrupted work. 
• Is feasible when startup and shutdown costs are low. 
• Is considered the major reason why projects fail to meet 
schedule.
8–29 
SSSSppppllliliititttttttiiininnngggg A AAAccccttttiiivivvviiititttiiieieeessss 
FIGURE 8.11
8–30 
BBBBeeeennnneeeeffffiiititttssss ooooffff SSSScccchhhheeeedddduuuullliliininnngggg RRRReeeessssoooouuuurrrrcccceeeessss 
• Leaves time for consideration 
of reasonable alternatives: 
–Cost-time tradeoffs 
–Changes in priorities 
• Provides information for time-phased 
work package budgets to assess: 
–Impact of unforeseen events 
–Amount of flexibility in available resources
8–31 
MMMMuuuullltltttiiipippprrrroooojjjejeeecccctttt RRRReeeessssoooouuuurrrrcccceeee SSSScccchhhheeeedddduuuullleleeessss 
• Multiproject Scheduling Problems 
1. Overall project slippage 
• Delay on one project create delays for other projects 
1. Inefficient resource application 
• The peaks and valleys of resource demands create 
scheduling problems and delays for projects. 
1. Resource bottlenecks 
• Shortages of critical resources required for multiple 
projects cause delays and schedule extensions.
8–32 
MMMMuuuullltltttiiipippprrrroooojjjejeeecccctttt RRRReeeessssoooouuuurrrrcccceeee SSSScccchhhheeeedddduuuullleleeessss ((((ccccoooonnnntttt’’’d’ddd)))) 
• Managing Multiproject Scheduling: 
–Create project offices or departments to oversee 
the scheduling of resources across projects. 
–Use a project priority queuing system: first come, 
first served for resources. 
–Centralize project management: treat all projects 
as a part of a “megaproject.” 
–Outsource projects to reduce the number 
of projects handled internally.
8–33 
DDiirreecctt LLaabboorr BBuuddggeett 
DDiirreecctt LLaabboorr BBuuddggeett 
RRoolllluupp (($$000000)) 
RRoolllluupp (($$000000)) 
FIGURE 8.12
8–35 
Two Time-Phased Work TTTwwwooo TTTiimimmeee---PPPhhhaaassseeeddd WWWooorrrkkk PPPPaaaacccckkkkaaaaggggeeeessss ( (((LLLLaaaabbbboooorrrr C CCCoooossssttt t O OOOnnnnllylylyy)))) 
FIGURE 8.14
8–36 
Patient PPPaaatttiiieeennnttt EEEEnnnnttttrrrryyyy PPPPrrrroooojjjejeeecccctttt NNNNeeeettttwwwwoooorrrrkkkk 
FIGURE 8.15
8–37 
Patient Entry Time-Phased PPPaaatttiieieennnttt EEEnnntttrrryyy TTTiimimmeee---PPPhhhaaassseeeddd W WWWoooorrrrkkkk P PPPaaaacccckkkkaaaaggggeeeessss A AAssssssssiigigiggnnnneeeedddd 
FIGURE 8.16
8–38 
CEBOO Project Monthly CCCEEEBBBOOOOOO PPPrrrooojjejeecccttt MMMooonnnttthhhllylyy CCCCaaaasssshhhh F FFFllololoowwww S SSStttataaattteteeemmmmeeeennnntttt 
FIGURE 8.17
8–39 
CEBOO Project Weekly CCCEEEBBBOOOOOO PPPrrrooojjejeecccttt WWWeeeeeekkkllylyy RRRReeeessssoooouuuurrrrcccceeee U UUUssssaaaaggggeeee S SSScccchhhheeeedddduuuullelelee 
FIGURE 8.18
8–40 
KKKKeeeeyyyy TTTTeeeerrrrmmmmssss 
Heuristic 
Planned value (PV) 
Resource-constrained projects 
Smoothing 
Splitting 
Time-constrained projects 
Time-phased budget baseline

More Related Content

What's hot

Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
Hayat Denzi
 
Defining The Project
Defining The ProjectDefining The Project
Defining The Project
Earl Tongol
 
Chapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.pptChapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.ppt
AhmadTawfigAlRadaide
 

What's hot (20)

Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
Chap003
Chap003Chap003
Chap003
 
project planning-estimation
project planning-estimationproject planning-estimation
project planning-estimation
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
 
Defining The Project
Defining The ProjectDefining The Project
Defining The Project
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project management
Project managementProject management
Project management
 
project management
project managementproject management
project management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Risk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk ManagementRisk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Chapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.pptChapter 1 Introduction to Project Management.ppt
Chapter 1 Introduction to Project Management.ppt
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
project management
project managementproject management
project management
 
What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK
 

Viewers also liked (20)

Chap006
Chap006Chap006
Chap006
 
Chap002
Chap002Chap002
Chap002
 
Chap001
Chap001Chap001
Chap001
 
Chap004
Chap004Chap004
Chap004
 
Chap007
Chap007Chap007
Chap007
 
Chap003
Chap003Chap003
Chap003
 
Chap012
Chap012Chap012
Chap012
 
Chap015
Chap015Chap015
Chap015
 
Chap005
Chap005Chap005
Chap005
 
Chap010
Chap010Chap010
Chap010
 
Chap016-Oversight
Chap016-OversightChap016-Oversight
Chap016-Oversight
 
Chap004 (1)
Chap004 (1)Chap004 (1)
Chap004 (1)
 
Chap010
Chap010Chap010
Chap010
 
Chap007
Chap007Chap007
Chap007
 
Chap014
Chap014Chap014
Chap014
 
Chap001 (1)
Chap001 (1)Chap001 (1)
Chap001 (1)
 
Chap002
Chap002Chap002
Chap002
 
Chap001
Chap001Chap001
Chap001
 
Chap002
Chap002Chap002
Chap002
 
Chap004
Chap004Chap004
Chap004
 

Similar to Chap008

Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
TecnicoItca
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
Raj J Das
 
Chapter EightScheduling Resources and Costs© 2021 McGraw-H
Chapter EightScheduling Resources and Costs© 2021 McGraw-HChapter EightScheduling Resources and Costs© 2021 McGraw-H
Chapter EightScheduling Resources and Costs© 2021 McGraw-H
JinElias52
 

Similar to Chap008 (20)

Scheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.pptScheduling-Resources-and-Costs.ppt
Scheduling-Resources-and-Costs.ppt
 
Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...Scheduling resources and costs is a crucial aspect of project management that...
Scheduling resources and costs is a crucial aspect of project management that...
 
PM-Chapter8-1.pptx
PM-Chapter8-1.pptxPM-Chapter8-1.pptx
PM-Chapter8-1.pptx
 
Chap008.ppt
Chap008.pptChap008.ppt
Chap008.ppt
 
Chapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.pptChapter-8-Post-Mid.ppt
Chapter-8-Post-Mid.ppt
 
PM Session 6
PM Session 6PM Session 6
PM Session 6
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.ppt
 
Allocating resources
Allocating resourcesAllocating resources
Allocating resources
 
Project management
Project managementProject management
Project management
 
projectmanagement-123765482.pdf
projectmanagement-123765482.pdfprojectmanagement-123765482.pdf
projectmanagement-123765482.pdf
 
ch09s.ppt
ch09s.pptch09s.ppt
ch09s.ppt
 
Resource Planning
Resource PlanningResource Planning
Resource Planning
 
Techniques of OR.pptx
Techniques of OR.pptxTechniques of OR.pptx
Techniques of OR.pptx
 
Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Chapter EightScheduling Resources and Costs© 2021 McGraw-H
Chapter EightScheduling Resources and Costs© 2021 McGraw-HChapter EightScheduling Resources and Costs© 2021 McGraw-H
Chapter EightScheduling Resources and Costs© 2021 McGraw-H
 
Allocating Resources To The Project
Allocating Resources To The ProjectAllocating Resources To The Project
Allocating Resources To The Project
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
4) PTM & PCM .pptx
4) PTM & PCM .pptx4) PTM & PCM .pptx
4) PTM & PCM .pptx
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Chap008

  • 1. CHAPTER EIGHT Scheduling Resources and Costs McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
  • 2. 8–3 TTTThhhheeee RRRReeeessssoooouuuurrrrcccceeee PPPPrrrroooobbbbllleleeemmmm • Resources and Priorities –Project network times are not a schedule until resources have been assigned. • The implicit assumption is that resources will be available in the required amounts when needed. • Adding new projects requires making realistic judgments of resource availability and project durations. –Cost estimates are not a budget until they have been time-phased.
  • 4. 8–5 TTTThhhheeee RRRReeeessssoooouuuurrrrcccceeee PPPPrrrroooobbbbllleleeemmmm ((((ccccoooonnnntttt’’’d’ddd)))) • Resource Smoothing (or Leveling) –Involves attempting to even out varying demands on resources by using slack (delaying noncritical activities) to manage resource utilization when resources are adequate over the life of the project. • Resource-Constrained Scheduling –The duration of a project may be increased by delaying the late start of some of its activities if resources are not adequate to meet peak demands.
  • 5. 8–6 TTTTyyyyppppeeeessss ooooffff PPPPrrrroooojjjejeeecccctttt CCCCoooonnnnssssttttrrrraaaaiiininnnttttssss • Technical or Logic Constraints –Constraints related to the networked sequence in which project activities must occur. • Physical Constraints –Activities that cannot occur in parallel or are affected by contractual or environmental conditions. • Resource Constraints – The absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities • Kinds of Resource Constraints –People, materials, equipment
  • 7. 8–8 Classification CCClllaaassssssiiifffiiicccaaatttiiiooonnn ooooffff A AAA SSSScccchhhheeeedddduuuullliliininnngggg PPPPrrrroooobbbbllleleeemmmm • Classification of Problem –Using a priority matrix will help determine if the project is time or resource constrained. • Time-Constrained Project –Must be completed by an imposed date. • Time is fixed, resources are flexible: additional resources are required to ensure project meets schedule. • Resource-Constrained Project –Is one in which the level of resources available cannot be exceeded. • Resources are fixed, time is flexible: inadequate resources will delay the project.
  • 8. 8–9 RRRReeeessssoooouuuurrrrcccceeee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss • Limiting Assumptions –Splitting activities is not allowed—once an activity is started, it is carried to completion. –Level of resources used for an activity cannot be changed. • Risk Assumptions –Activities with the most slack pose the least risk. –Reduction of flexibility does not increase risk. –The nature of an activity (easy, complex) doesn’t increase risk.
  • 9. 8–10 Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) • Time-Constrained Projects –Must be completed by an imposed date. –Require use of leveling techniques that focus on balancing or smoothing resource demands. –Use positive slack (delaying noncritical activities) to manage resource utilization over the duration of the project. • Peak resource demands are reduced. • Resources over the life of the project are reduced. • Fluctuation in resource demand is minimized.
  • 10. 8–11 BBoottaanniiccaall GGaarrddeenn BBoottaanniiccaall GGaarrddeenn FIGURE 8.3
  • 11. 8–12 Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) • Resource Demand Leveling Techniques for Time-Constrained Projects –Advantages • Peak resource demands are reduced. • Resources over the life of the project are reduced. • Fluctuation in resource demand is minimized. –Disadvantages • Loss of flexibility that occurs from reducing slack. • Increases in the criticality of all activities.
  • 12. 8–13 Resource RRReeesssooouuurrrccceee A AAAllllllloloooccccaaaattttiiioiooonnnn MMMMeeeetttthhhhooooddddssss ((((ccccoooonnnntttt’’’d’ddd)))) • Resource-Constrained Projects – Resources are limited in quantity or availability. – Activities are scheduled using heuristics (rules-of-thumb) that focus on: 1. Minimum slack 2. Smallest (least) duration 3. Lowest activity identification number – The parallel method is used to apply heuristics • An iterative process starting at the first time period of the project and scheduling period-by-period the start of any activities using the three priority rules.
  • 13. 8–27 TThhee IImmppaaccttss ooff RReessoouurrccee--CCoonnssttrraaiinneedd The Impacts ooff RReessoouurrccee--CCoonnssttrraaiinneedd SScchheedduulliinngg SScchheedduulliinngg • Reduces delay but reduces flexibility. • Increases criticality of events. • Increases scheduling complexity. • May make the traditional critical path no longer meaningful. • Can break sequence of events. • May cause parallel activities to become sequential and critical activities with slack to become noncritical.
  • 14. 8–28 SSSSppppllliliititttttttiiininnngggg • Splitting – A scheduling technique use to get a better project schedule and/or increase resource utilization. • Involves interrupting work on an activity to employ the resource on another activity, then returning the resource to finish the interrupted work. • Is feasible when startup and shutdown costs are low. • Is considered the major reason why projects fail to meet schedule.
  • 15. 8–29 SSSSppppllliliititttttttiiininnngggg A AAAccccttttiiivivvviiititttiiieieeessss FIGURE 8.11
  • 16. 8–30 BBBBeeeennnneeeeffffiiititttssss ooooffff SSSScccchhhheeeedddduuuullliliininnngggg RRRReeeessssoooouuuurrrrcccceeeessss • Leaves time for consideration of reasonable alternatives: –Cost-time tradeoffs –Changes in priorities • Provides information for time-phased work package budgets to assess: –Impact of unforeseen events –Amount of flexibility in available resources
  • 17. 8–31 MMMMuuuullltltttiiipippprrrroooojjjejeeecccctttt RRRReeeessssoooouuuurrrrcccceeee SSSScccchhhheeeedddduuuullleleeessss • Multiproject Scheduling Problems 1. Overall project slippage • Delay on one project create delays for other projects 1. Inefficient resource application • The peaks and valleys of resource demands create scheduling problems and delays for projects. 1. Resource bottlenecks • Shortages of critical resources required for multiple projects cause delays and schedule extensions.
  • 18. 8–32 MMMMuuuullltltttiiipippprrrroooojjjejeeecccctttt RRRReeeessssoooouuuurrrrcccceeee SSSScccchhhheeeedddduuuullleleeessss ((((ccccoooonnnntttt’’’d’ddd)))) • Managing Multiproject Scheduling: –Create project offices or departments to oversee the scheduling of resources across projects. –Use a project priority queuing system: first come, first served for resources. –Centralize project management: treat all projects as a part of a “megaproject.” –Outsource projects to reduce the number of projects handled internally.
  • 19. 8–33 DDiirreecctt LLaabboorr BBuuddggeett DDiirreecctt LLaabboorr BBuuddggeett RRoolllluupp (($$000000)) RRoolllluupp (($$000000)) FIGURE 8.12
  • 20. 8–35 Two Time-Phased Work TTTwwwooo TTTiimimmeee---PPPhhhaaassseeeddd WWWooorrrkkk PPPPaaaacccckkkkaaaaggggeeeessss ( (((LLLLaaaabbbboooorrrr C CCCoooossssttt t O OOOnnnnllylylyy)))) FIGURE 8.14
  • 21. 8–36 Patient PPPaaatttiiieeennnttt EEEEnnnnttttrrrryyyy PPPPrrrroooojjjejeeecccctttt NNNNeeeettttwwwwoooorrrrkkkk FIGURE 8.15
  • 22. 8–37 Patient Entry Time-Phased PPPaaatttiieieennnttt EEEnnntttrrryyy TTTiimimmeee---PPPhhhaaassseeeddd W WWWoooorrrrkkkk P PPPaaaacccckkkkaaaaggggeeeessss A AAssssssssiigigiggnnnneeeedddd FIGURE 8.16
  • 23. 8–38 CEBOO Project Monthly CCCEEEBBBOOOOOO PPPrrrooojjejeecccttt MMMooonnnttthhhllylyy CCCCaaaasssshhhh F FFFllololoowwww S SSStttataaattteteeemmmmeeeennnntttt FIGURE 8.17
  • 24. 8–39 CEBOO Project Weekly CCCEEEBBBOOOOOO PPPrrrooojjejeecccttt WWWeeeeeekkkllylyy RRRReeeessssoooouuuurrrrcccceeee U UUUssssaaaaggggeeee S SSScccchhhheeeedddduuuullelelee FIGURE 8.18
  • 25. 8–40 KKKKeeeeyyyy TTTTeeeerrrrmmmmssss Heuristic Planned value (PV) Resource-constrained projects Smoothing Splitting Time-constrained projects Time-phased budget baseline