           What is an EIA?
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment


“process for identifying the likely consequences
for the biophysical environment and for man’s
health and welfare of implementing particular
activities and for conveying information at a stage
where it can materially affect the decision, to
those for sanctioning the proposals.” (Wathern,
1992)
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

That is a very long way to say
The purpose of EIA is to:

Helps the decision making process by providing
information about the consequences of development

Promotes sustainable development by identifying
environmentally sound practice and mitigation
measures for developments
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Some History
In 1969 the US Federal government passed
the National Environmental Policy Act
(NEPA).

Federal Agencies had to consider the natural
environment in any land use planning

This gave the environment the same status
as economic priorities
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Some History
Within 20 years other countries had also
included EIA’s as part of their planning policy.

Canada 1973,

Columbia 1974,

Netherlands 1981

UK in 1988.
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

So what is an EIA?
Confusingly:

It is the process of examining the impacts of a
development on the environment

But it is also used to mean the document that is the
result of the examination
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

What are EIA’s used for?
                                                Google Earth 2010
Often part of a National planning
process for large scale
developments

Developments that need an EIA
differ from country to country



                                    Maasvlate Port development, rotterdam,
                                     Netherlands - Extending the worlds
                                      second largest port needed an EIA
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Which developments?               Do wind-farms need an EIA?
                                     Google Earth 2010
Major new road networks

Airport and port developments

Building power stations

Building dams and reservoirs

Quarrying

Large scale housing projects
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

How does an EIA work?
The EIA needs to be structured with a set of clear
aims

It has to occur during the planning, design and
authorisation stage of any development.

It needs to be comprehensive, addressing all
potential impacts
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

How does an EIA work?
There needs to focus on the potentially significant
issues

There needs to be consultation and public
participation throughout the EIA process.

The findings of the EIA should be part of the final
decision process
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

How does an EIA work?


While it is often mainly
concerned with the natural
environment the effect on man
should also be considered.
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Stages of an EIA                       N=dÉåÉê~äáëÉÇ=bf^=éêçÅÉëë=ÑäçïÅÜ~êí


                                                                                         Proposal
                                                                                         Identification




Is an EIA needed and which impacts                                                         Screening




need to be considered(SCREENING)                        EIA Requiered



                                                            Scoping
                                                                                         Initial
                                                                                         environmental
                                                                                         examination
                                                                                                                           No EIA



                                                                                                                    *Public involvement




Identifying impacts (SCOPING)
                                                       Impact analysis


                                                                                                            *Public involvement typically
                                                           Mitigation                                       occurs at these point. It may
                                                           and impact                                       also occur at any other stage
                                                           managment                                        of the EIA Process




Predicting the scale of potential
                                                           EIA Report




                                     Resubmit                Review                                                 *Public involvement




impacts                              Redesign          Decision-making



                                                                                                Information from this process
                                            Not approved                  Approved              contributes to effective future EIA




Limiting the effect of impacts to                                       Implementation
                                                                        and follow up



acceptable limits (MITIGATION)         båîáêçåãÉåí~ä=fãé~Åí=^ëëÉëëãÉåí
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

What do you need to know?
Baseline data - what are the
conditions like now

What effects do different phases of
a project cause

Who or what is likely to be
affected
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Phases of an EIA
Baseline data

This can be thought off as a
project description

What are conditions like now

What does the project plan to
do
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Phases of an EIA
Description of project

Physical characteristics - land
use both during construction
and operation

Production process

Waste products
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Phases of an EIA
Alternatives

What different approaches
exist?

Why choose this one?
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Phases of an EIA
Impact identification (scoping and
screening)
Consider all potential environmental
impacts whether good or bad
Detail those impacts that are
potentially significant
Comprehensive but focused
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Phases of an EIA
Impact on
Ecosystems
People
Resources
and their interactions
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Impact Assessment Techniques
Systematic and comprehensive but also flexible enough
to respond to changing conditions

Be able to arrange large amounts of data often from
different sources in a meaningful way

Based on quantitative evaluation that is both accurate
and objective
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Impact Assessment Techniques
Checklists of impacts:

General set of criteria

Often designed for certain
types of project

Can be very thorough if
designed well
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Impact Assessment Techniques
Impact matrices

Combine a checklist of
environmental conditions and a list
activities that may have an effect

Cause and effect between the
environmental feature and the
activity can be individually identified
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Impact Assessment Techniques
Cost and benefit analysis

This outlines the value both positive
and negative of each impact

Can be very difficult to add a “cost”
value to ecosystems
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Evaluation Techniques




Evaluation techniques compare
various possible scenarios and
analyse the consequences
Topic: 2.7 Measuring changes in
the system
2.7.3: Environmental Impact Assessment

Evaluation Techniques
Magnitude: What scale will the impact have?

Extent: How big an area does the impact affect: Site only, Local
or regional.

Duration: How long will the impact be for: Short, Medium or
Long term.

Using Magnitude, extent and duration together it is possible to
analyse the impacts from various scenarios for most projects.

More Related Content

What's hot

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)Lucasrukona
 
EIA, objectives and rules
EIA, objectives and rulesEIA, objectives and rules
EIA, objectives and rulesKinza Irshad
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessmentAnirban Mandal
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationMizanur R. Shohel
 

What's hot (20)

EIA Process
EIA ProcessEIA Process
EIA Process
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
EIA, objectives and rules
EIA, objectives and rulesEIA, objectives and rules
EIA, objectives and rules
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
 
Environmental Audit
Environmental AuditEnvironmental Audit
Environmental Audit
 
Eia screening
Eia screeningEia screening
Eia screening
 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
EIA TECHNIQUES.pptx
EIA TECHNIQUES.pptxEIA TECHNIQUES.pptx
EIA TECHNIQUES.pptx
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Eia
EiaEia
Eia
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessment
 
Strategic Environmental Assessment Methodology
Strategic Environmental Assessment MethodologyStrategic Environmental Assessment Methodology
Strategic Environmental Assessment Methodology
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
 

Viewers also liked

Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
 
Model for the environmental impact assessment of neighbourhoods - Damien Trigaux
Model for the environmental impact assessment of neighbourhoods - Damien TrigauxModel for the environmental impact assessment of neighbourhoods - Damien Trigaux
Model for the environmental impact assessment of neighbourhoods - Damien TrigauxDS2BE
 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.pptApoorva Mathur
 
Environmental management
Environmental managementEnvironmental management
Environmental managementAthulya Anil
 
Environmental management
Environmental managementEnvironmental management
Environmental managementSamyuktha Samy
 
Indonesia’s deforestation: Setting reference emission levels and understandin...
Indonesia’s deforestation: Setting reference emission levels and understandin...Indonesia’s deforestation: Setting reference emission levels and understandin...
Indonesia’s deforestation: Setting reference emission levels and understandin...CIFOR-ICRAF
 
Deforestation indonesia
Deforestation indonesiaDeforestation indonesia
Deforestation indonesiaDavid Santoso
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable InfrastructurePhil Clark
 
Inquiry Optimization Technique for a Topic Map Database
Inquiry Optimization Technique for a Topic Map DatabaseInquiry Optimization Technique for a Topic Map Database
Inquiry Optimization Technique for a Topic Map Databasetmra
 
Financial management project
Financial management projectFinancial management project
Financial management projectsukesh gowda
 
MIS: Project Management Systems
MIS: Project Management SystemsMIS: Project Management Systems
MIS: Project Management SystemsJonathan Coleman
 
Types+of+mis(functional)
Types+of+mis(functional)Types+of+mis(functional)
Types+of+mis(functional)Naveen rai
 
IS & Digital Business Transformation applied to Civil and Industrial Engineer...
IS & Digital Business Transformation applied to Civil and Industrial Engineer...IS & Digital Business Transformation applied to Civil and Industrial Engineer...
IS & Digital Business Transformation applied to Civil and Industrial Engineer...Lucas de Haro
 
Environmental Analysis
Environmental  AnalysisEnvironmental  Analysis
Environmental AnalysisElijah Ezendu
 
Green Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureGreen Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureOSAEDA
 
Advantages and disadvantages of technology
Advantages and disadvantages of technologyAdvantages and disadvantages of technology
Advantages and disadvantages of technologyregine isabedra
 

Viewers also liked (20)

Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Model for the environmental impact assessment of neighbourhoods - Damien Trigaux
Model for the environmental impact assessment of neighbourhoods - Damien TrigauxModel for the environmental impact assessment of neighbourhoods - Damien Trigaux
Model for the environmental impact assessment of neighbourhoods - Damien Trigaux
 
Alastair Driver's drivers for better catchment management
Alastair Driver's drivers for better catchment management Alastair Driver's drivers for better catchment management
Alastair Driver's drivers for better catchment management
 
Environment impact assessment.ppt
Environment impact assessment.pptEnvironment impact assessment.ppt
Environment impact assessment.ppt
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
Indonesia’s deforestation: Setting reference emission levels and understandin...
Indonesia’s deforestation: Setting reference emission levels and understandin...Indonesia’s deforestation: Setting reference emission levels and understandin...
Indonesia’s deforestation: Setting reference emission levels and understandin...
 
Environmental Management Systems
Environmental Management SystemsEnvironmental Management Systems
Environmental Management Systems
 
Deforestation indonesia
Deforestation indonesiaDeforestation indonesia
Deforestation indonesia
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable Infrastructure
 
Inquiry Optimization Technique for a Topic Map Database
Inquiry Optimization Technique for a Topic Map DatabaseInquiry Optimization Technique for a Topic Map Database
Inquiry Optimization Technique for a Topic Map Database
 
Financial management project
Financial management projectFinancial management project
Financial management project
 
MIS: Project Management Systems
MIS: Project Management SystemsMIS: Project Management Systems
MIS: Project Management Systems
 
Types+of+mis(functional)
Types+of+mis(functional)Types+of+mis(functional)
Types+of+mis(functional)
 
Environmental stress
Environmental stressEnvironmental stress
Environmental stress
 
IS & Digital Business Transformation applied to Civil and Industrial Engineer...
IS & Digital Business Transformation applied to Civil and Industrial Engineer...IS & Digital Business Transformation applied to Civil and Industrial Engineer...
IS & Digital Business Transformation applied to Civil and Industrial Engineer...
 
Environmental Analysis
Environmental  AnalysisEnvironmental  Analysis
Environmental Analysis
 
Green Buildings & Sustainable Infrastructure
Green Buildings & Sustainable InfrastructureGreen Buildings & Sustainable Infrastructure
Green Buildings & Sustainable Infrastructure
 
Advantages and disadvantages of technology
Advantages and disadvantages of technologyAdvantages and disadvantages of technology
Advantages and disadvantages of technology
 

Similar to Environmental Impact Assessment

Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentNasiru Ibrahim Barda
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAikinsOsei1
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptxKalaimani
 
Environmental assessment
Environmental assessmentEnvironmental assessment
Environmental assessmentWaheed Hassan
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfssusereef268
 
Exploring CEQA and the Air Quality Benefits of Good Land Use
Exploring CEQA and the Air Quality Benefits of Good Land UseExploring CEQA and the Air Quality Benefits of Good Land Use
Exploring CEQA and the Air Quality Benefits of Good Land Usegbeltalliance
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIlakiya Tamil
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
EIA_Basic_Concepts 2019.ppt
EIA_Basic_Concepts 2019.pptEIA_Basic_Concepts 2019.ppt
EIA_Basic_Concepts 2019.pptmejoh1
 

Similar to Environmental Impact Assessment (20)

Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
Evs eia
Evs eiaEvs eia
Evs eia
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
4th EIA PROCESS.pptx
4th EIA PROCESS.pptx4th EIA PROCESS.pptx
4th EIA PROCESS.pptx
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptxEnvironemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
 
EIA
EIAEIA
EIA
 
Environmental assessment
Environmental assessmentEnvironmental assessment
Environmental assessment
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
 
Exploring CEQA and the Air Quality Benefits of Good Land Use
Exploring CEQA and the Air Quality Benefits of Good Land UseExploring CEQA and the Air Quality Benefits of Good Land Use
Exploring CEQA and the Air Quality Benefits of Good Land Use
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
Chapter-1.ppt
Chapter-1.pptChapter-1.ppt
Chapter-1.ppt
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
IISC 3-4
IISC 3-4IISC 3-4
IISC 3-4
 
EIA_Basic_Concepts 2019.ppt
EIA_Basic_Concepts 2019.pptEIA_Basic_Concepts 2019.ppt
EIA_Basic_Concepts 2019.ppt
 

More from Nigel Gardner

Topic 1.1 Perspectives Part 1.pdf
Topic 1.1 Perspectives Part 1.pdfTopic 1.1 Perspectives Part 1.pdf
Topic 1.1 Perspectives Part 1.pdfNigel Gardner
 
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdf
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdfTopic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdf
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdfNigel Gardner
 
Getting to the Core of Paper 2 - ESS Stream.pdf
Getting to the Core of Paper 2 - ESS Stream.pdfGetting to the Core of Paper 2 - ESS Stream.pdf
Getting to the Core of Paper 2 - ESS Stream.pdfNigel Gardner
 
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...Nigel Gardner
 
Getting to the Core of Paper 2 - ESS.pdf
Getting to the Core of Paper 2 - ESS.pdfGetting to the Core of Paper 2 - ESS.pdf
Getting to the Core of Paper 2 - ESS.pdfNigel Gardner
 
Topic 1.1- Environmental value systems Four Corners.pdf
Topic 1.1- Environmental value systems Four Corners.pdfTopic 1.1- Environmental value systems Four Corners.pdf
Topic 1.1- Environmental value systems Four Corners.pdfNigel Gardner
 
Topic 2.4 Understanding community change
Topic 2.4   Understanding community changeTopic 2.4   Understanding community change
Topic 2.4 Understanding community changeNigel Gardner
 
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1Nigel Gardner
 
ATL skills in the diploma programme - visible not hidden
ATL skills in the diploma programme - visible not hiddenATL skills in the diploma programme - visible not hidden
ATL skills in the diploma programme - visible not hiddenNigel Gardner
 
Topic 2.2 communities and ecosystems photosynthesis and respiration ss
Topic 2.2  communities and ecosystems photosynthesis and respiration ssTopic 2.2  communities and ecosystems photosynthesis and respiration ss
Topic 2.2 communities and ecosystems photosynthesis and respiration ssNigel Gardner
 
Topic 2.1 species and populations (fc)
Topic 2.1  species and populations (fc)Topic 2.1  species and populations (fc)
Topic 2.1 species and populations (fc)Nigel Gardner
 
Topic 1.1 environmental value systems
Topic 1.1  environmental value systems Topic 1.1  environmental value systems
Topic 1.1 environmental value systems Nigel Gardner
 
Topic 1.1 environmental value systems four corners
Topic 1.1  environmental value systems four cornersTopic 1.1  environmental value systems four corners
Topic 1.1 environmental value systems four cornersNigel Gardner
 
Topic 2.4 biomes, zonation and succession in the pyrenees
Topic 2.4   biomes, zonation and succession in the pyreneesTopic 2.4   biomes, zonation and succession in the pyrenees
Topic 2.4 biomes, zonation and succession in the pyreneesNigel Gardner
 
Topic 5.1 introduction to soil systems
Topic 5.1   introduction to soil systemsTopic 5.1   introduction to soil systems
Topic 5.1 introduction to soil systemsNigel Gardner
 
Topic 2.3 Eukaryotes
Topic 2.3   EukaryotesTopic 2.3   Eukaryotes
Topic 2.3 EukaryotesNigel Gardner
 
Topic 2.2 prokaryotes
Topic 2.2   prokaryotesTopic 2.2   prokaryotes
Topic 2.2 prokaryotesNigel Gardner
 
Topic 2 size and emergent properties
Topic 2 size and emergent propertiesTopic 2 size and emergent properties
Topic 2 size and emergent propertiesNigel Gardner
 

More from Nigel Gardner (20)

Topic 1.1 Perspectives Part 1.pdf
Topic 1.1 Perspectives Part 1.pdfTopic 1.1 Perspectives Part 1.pdf
Topic 1.1 Perspectives Part 1.pdf
 
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdf
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdfTopic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdf
Topic 2.4 - Biomes, Zonation and Succession in the Pyrenees.pdf
 
Getting to the Core of Paper 2 - ESS Stream.pdf
Getting to the Core of Paper 2 - ESS Stream.pdfGetting to the Core of Paper 2 - ESS Stream.pdf
Getting to the Core of Paper 2 - ESS Stream.pdf
 
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...
IB Environmental Systems and SocietiesTopic 2 - Energy in an ecosystem - The ...
 
Getting to the Core of Paper 2 - ESS.pdf
Getting to the Core of Paper 2 - ESS.pdfGetting to the Core of Paper 2 - ESS.pdf
Getting to the Core of Paper 2 - ESS.pdf
 
Topic 1.1- Environmental value systems Four Corners.pdf
Topic 1.1- Environmental value systems Four Corners.pdfTopic 1.1- Environmental value systems Four Corners.pdf
Topic 1.1- Environmental value systems Four Corners.pdf
 
Topic 2.4 Understanding community change
Topic 2.4   Understanding community changeTopic 2.4   Understanding community change
Topic 2.4 Understanding community change
 
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1
Topic 2.5: investigating ecosystems - Vegetation Sampling Part 1
 
ATL skills in the diploma programme - visible not hidden
ATL skills in the diploma programme - visible not hiddenATL skills in the diploma programme - visible not hidden
ATL skills in the diploma programme - visible not hidden
 
Topic 2.2 communities and ecosystems photosynthesis and respiration ss
Topic 2.2  communities and ecosystems photosynthesis and respiration ssTopic 2.2  communities and ecosystems photosynthesis and respiration ss
Topic 2.2 communities and ecosystems photosynthesis and respiration ss
 
Topic 2.1 species and populations (fc)
Topic 2.1  species and populations (fc)Topic 2.1  species and populations (fc)
Topic 2.1 species and populations (fc)
 
Topic 1.1 environmental value systems
Topic 1.1  environmental value systems Topic 1.1  environmental value systems
Topic 1.1 environmental value systems
 
Topic 1.1 environmental value systems four corners
Topic 1.1  environmental value systems four cornersTopic 1.1  environmental value systems four corners
Topic 1.1 environmental value systems four corners
 
Topic 2.4 biomes, zonation and succession in the pyrenees
Topic 2.4   biomes, zonation and succession in the pyreneesTopic 2.4   biomes, zonation and succession in the pyrenees
Topic 2.4 biomes, zonation and succession in the pyrenees
 
Topic 5.1 introduction to soil systems
Topic 5.1   introduction to soil systemsTopic 5.1   introduction to soil systems
Topic 5.1 introduction to soil systems
 
Assessment@IBDPp
Assessment@IBDPpAssessment@IBDPp
Assessment@IBDPp
 
Topic 2.3 Eukaryotes
Topic 2.3   EukaryotesTopic 2.3   Eukaryotes
Topic 2.3 Eukaryotes
 
Topic 2.2 prokaryotes
Topic 2.2   prokaryotesTopic 2.2   prokaryotes
Topic 2.2 prokaryotes
 
Topic 2 size and emergent properties
Topic 2 size and emergent propertiesTopic 2 size and emergent properties
Topic 2 size and emergent properties
 
Topic 2 Cell theory
Topic 2 Cell theoryTopic 2 Cell theory
Topic 2 Cell theory
 

Recently uploaded

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 

Recently uploaded (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 

Environmental Impact Assessment

  • 1. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment What is an EIA?
  • 2. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment “process for identifying the likely consequences for the biophysical environment and for man’s health and welfare of implementing particular activities and for conveying information at a stage where it can materially affect the decision, to those for sanctioning the proposals.” (Wathern, 1992)
  • 3. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment That is a very long way to say The purpose of EIA is to: Helps the decision making process by providing information about the consequences of development Promotes sustainable development by identifying environmentally sound practice and mitigation measures for developments
  • 4. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Some History In 1969 the US Federal government passed the National Environmental Policy Act (NEPA). Federal Agencies had to consider the natural environment in any land use planning This gave the environment the same status as economic priorities
  • 5. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Some History Within 20 years other countries had also included EIA’s as part of their planning policy. Canada 1973, Columbia 1974, Netherlands 1981 UK in 1988.
  • 6. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment So what is an EIA? Confusingly: It is the process of examining the impacts of a development on the environment But it is also used to mean the document that is the result of the examination
  • 7. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment What are EIA’s used for? Google Earth 2010 Often part of a National planning process for large scale developments Developments that need an EIA differ from country to country Maasvlate Port development, rotterdam, Netherlands - Extending the worlds second largest port needed an EIA
  • 8. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Which developments? Do wind-farms need an EIA? Google Earth 2010 Major new road networks Airport and port developments Building power stations Building dams and reservoirs Quarrying Large scale housing projects
  • 9. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment How does an EIA work? The EIA needs to be structured with a set of clear aims It has to occur during the planning, design and authorisation stage of any development. It needs to be comprehensive, addressing all potential impacts
  • 10. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment How does an EIA work? There needs to focus on the potentially significant issues There needs to be consultation and public participation throughout the EIA process. The findings of the EIA should be part of the final decision process
  • 11. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment How does an EIA work? While it is often mainly concerned with the natural environment the effect on man should also be considered.
  • 12. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Stages of an EIA N=dÉåÉê~äáëÉÇ=bf^=éêçÅÉëë=ÑäçïÅÜ~êí Proposal Identification Is an EIA needed and which impacts Screening need to be considered(SCREENING) EIA Requiered Scoping Initial environmental examination No EIA *Public involvement Identifying impacts (SCOPING) Impact analysis *Public involvement typically Mitigation occurs at these point. It may and impact also occur at any other stage managment of the EIA Process Predicting the scale of potential EIA Report Resubmit Review *Public involvement impacts Redesign Decision-making Information from this process Not approved Approved contributes to effective future EIA Limiting the effect of impacts to Implementation and follow up acceptable limits (MITIGATION) båîáêçåãÉåí~ä=fãé~Åí=^ëëÉëëãÉåí
  • 13. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment What do you need to know? Baseline data - what are the conditions like now What effects do different phases of a project cause Who or what is likely to be affected
  • 14. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Phases of an EIA Baseline data This can be thought off as a project description What are conditions like now What does the project plan to do
  • 15. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Phases of an EIA Description of project Physical characteristics - land use both during construction and operation Production process Waste products
  • 16. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Phases of an EIA Alternatives What different approaches exist? Why choose this one?
  • 17. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Phases of an EIA Impact identification (scoping and screening) Consider all potential environmental impacts whether good or bad Detail those impacts that are potentially significant Comprehensive but focused
  • 18. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Phases of an EIA Impact on Ecosystems People Resources and their interactions
  • 19. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Impact Assessment Techniques Systematic and comprehensive but also flexible enough to respond to changing conditions Be able to arrange large amounts of data often from different sources in a meaningful way Based on quantitative evaluation that is both accurate and objective
  • 20. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Impact Assessment Techniques Checklists of impacts: General set of criteria Often designed for certain types of project Can be very thorough if designed well
  • 21. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Impact Assessment Techniques Impact matrices Combine a checklist of environmental conditions and a list activities that may have an effect Cause and effect between the environmental feature and the activity can be individually identified
  • 22. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Impact Assessment Techniques Cost and benefit analysis This outlines the value both positive and negative of each impact Can be very difficult to add a “cost” value to ecosystems
  • 23. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Evaluation Techniques Evaluation techniques compare various possible scenarios and analyse the consequences
  • 24. Topic: 2.7 Measuring changes in the system 2.7.3: Environmental Impact Assessment Evaluation Techniques Magnitude: What scale will the impact have? Extent: How big an area does the impact affect: Site only, Local or regional. Duration: How long will the impact be for: Short, Medium or Long term. Using Magnitude, extent and duration together it is possible to analyse the impacts from various scenarios for most projects.