Environmental
Impact Assessment
*Introduction
Economic, social and environmental
change is inherent to development. Whilst
development aims to bring about positive
change it can lead to conflicts.
In the past, the promotion of economic
growth as the motor for increased well-
being was the main development thrust
with little sensitivity to adverse social or
environmental impacts.
The need to avoid adverse impacts and to
ensure long term benefits led to the
concept of sustainability.
Main functions
• To predict problems
• To find ways to
avoid them
• To enhance positive
effects
*Definition of Environmental
Impact Assessment
Environmental impact assessment (EIA) can be
defined as the systematic identification and
evaluation of the potential impacts (effects) of
proposed projects, plans, programs, or legislative
actions relative to the physical, chemical, biological,
cultural, and socioeconomic components of the total
environment.
Canter, 1986
• The primary
purpose of the EIA
process is to
encourage the
consideration of the
environmental
issues in planning
and decision-
making and to
ultimately arrive at
actions that are
more
environmentally
compatible
International
Association of
Impact Assessment
• EIA is the
systematic process
to identify the
future
consequences of a
current or proposed
action.
United
Nations
• EIA as an
assessment of
impacts of a
planned activity on
the environment.
United Kingdom
• EIA as a technique and a
process by which
information about
environmental effects of
a project is collected,
both by the developer
and from other sources,
and taken into account
by the planning authority
in forming the judgment
on whether the
development should
proceed.
US Environmental
Protection Agency
• EIA as a systematic,
reproducible, and
interdisciplinary
evaluation of potential
effects of proposed
action and its practical
alternatives on the
physical, biological,
cultural, and
socioeconomic attributes
of a particular
geographic area.
Government of India
• EIA as a process of
identifying, predicting,
evaluating and
mitigating the
biophysical, social and
other relevant effects of
development proposals
prior to major decisions
being taken and
commitments made.
These studies integrate
the environmental
concerns of development
activities into the
decision-making
process.
*List out the need for EIA?
To disclose significant environmental effects of
proposed projects to decision-makers and the
public.
ii) To identify ways to avoid or reduce
environmental damage.
iii) To prevent adverse environmental impacts
by requiring implementation of feasible
alternatives or mitigation measures.
History & Evolution of EIA
EIA Principles
Environmental Clearance
Environmental clearance or the ‘go ahead’ signal is granted by the
Impact Assessment Agency in the Ministry of Environment and
Forests, Government of India.
All projects that require clearance from central government can be
broadly categorized into the following:-
(1) Industries ..Unit 1 notesEnvironmental Clearance.docx
(2) Mining
(3) Thermal power plants
(4) River valley projects
(5) Infrastructure and CRZ (Coastal Regulation Zone)
(6) Nuclear power projects
EIA Project Cycle
*EIA processes in sequences of
application
Environmental Impact Assessment 11
*Screening
*important to establish
mechanisms by identifying
projects which requires EIA,
and this process of selection
of project is referred to as
"Screening“
Environmental Impact Assessment 13
Screening
Project Scoping
*Scoping is to determine what
should be the coverage or
scope of the EIA study for a
project proposal as having
potentially significant
environmental impacts.
Environmental Impact Assessment 14
*Baseline Data Collection
*Baseline information is
important reference point
for conducting EIA.
*The term "baseline" refers to
the collection of background
information on the
biophysical, social and
economic settings proposed
project area.
Baseline data are collected for
two main purposes:
*to provide a description of the
status and trends of
environmental factors (e.g., air
pollutant concentrations)
against which predicted
changes can be compared and
evaluated in terms of
importance, and
*to provide a means of
detecting actual change by
monitoring once a project has
been initiated
Environmental Impact Assessment 15
*EIA Flow Chart
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptx
Environemental Impact Assessment.pptx

More Related Content

Similar to Environemental Impact Assessment.pptx

manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfChandanLawrence
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAikinsOsei1
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Deepika Verma
 
Why is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfWhy is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfJagriti Agarwal
 
Introduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxIntroduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxAlmawYetnayet
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfJagriti Agarwal
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxSubhajitNandi15
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentVinod Burdak
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptxMonirulIslamEstiak
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentNasiru Ibrahim Barda
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIlakiya Tamil
 

Similar to Environemental Impact Assessment.pptx (20)

manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
Auditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of GhanaAuditing the extractive industry-the case of Ghana
Auditing the extractive industry-the case of Ghana
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)Environmental Impact Assessment(EIA)
Environmental Impact Assessment(EIA)
 
Why is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdfWhy is an environmental impact assessment important.pdf
Why is an environmental impact assessment important.pdf
 
Eia sem 40_02
Eia sem 40_02Eia sem 40_02
Eia sem 40_02
 
Introduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptxIntroduction to Environmental Impact Assessment.pptx
Introduction to Environmental Impact Assessment.pptx
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdf
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptxENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)2.pptx
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental Management_LEC04.pptx
Environmental Management_LEC04.pptxEnvironmental Management_LEC04.pptx
Environmental Management_LEC04.pptx
 
Evs eia
Evs eiaEvs eia
Evs eia
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
Contemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessmentContemporary issues in environmental impact assessment
Contemporary issues in environmental impact assessment
 
EIA presentation.pptx
EIA presentation.pptxEIA presentation.pptx
EIA presentation.pptx
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 

Environemental Impact Assessment.pptx

  • 2. *Introduction Economic, social and environmental change is inherent to development. Whilst development aims to bring about positive change it can lead to conflicts. In the past, the promotion of economic growth as the motor for increased well- being was the main development thrust with little sensitivity to adverse social or environmental impacts. The need to avoid adverse impacts and to ensure long term benefits led to the concept of sustainability. Main functions • To predict problems • To find ways to avoid them • To enhance positive effects
  • 3. *Definition of Environmental Impact Assessment Environmental impact assessment (EIA) can be defined as the systematic identification and evaluation of the potential impacts (effects) of proposed projects, plans, programs, or legislative actions relative to the physical, chemical, biological, cultural, and socioeconomic components of the total environment.
  • 4. Canter, 1986 • The primary purpose of the EIA process is to encourage the consideration of the environmental issues in planning and decision- making and to ultimately arrive at actions that are more environmentally compatible International Association of Impact Assessment • EIA is the systematic process to identify the future consequences of a current or proposed action. United Nations • EIA as an assessment of impacts of a planned activity on the environment.
  • 5. United Kingdom • EIA as a technique and a process by which information about environmental effects of a project is collected, both by the developer and from other sources, and taken into account by the planning authority in forming the judgment on whether the development should proceed. US Environmental Protection Agency • EIA as a systematic, reproducible, and interdisciplinary evaluation of potential effects of proposed action and its practical alternatives on the physical, biological, cultural, and socioeconomic attributes of a particular geographic area. Government of India • EIA as a process of identifying, predicting, evaluating and mitigating the biophysical, social and other relevant effects of development proposals prior to major decisions being taken and commitments made. These studies integrate the environmental concerns of development activities into the decision-making process.
  • 6. *List out the need for EIA? To disclose significant environmental effects of proposed projects to decision-makers and the public. ii) To identify ways to avoid or reduce environmental damage. iii) To prevent adverse environmental impacts by requiring implementation of feasible alternatives or mitigation measures.
  • 9. Environmental Clearance Environmental clearance or the ‘go ahead’ signal is granted by the Impact Assessment Agency in the Ministry of Environment and Forests, Government of India. All projects that require clearance from central government can be broadly categorized into the following:- (1) Industries ..Unit 1 notesEnvironmental Clearance.docx (2) Mining (3) Thermal power plants (4) River valley projects (5) Infrastructure and CRZ (Coastal Regulation Zone) (6) Nuclear power projects
  • 11. *EIA processes in sequences of application Environmental Impact Assessment 11
  • 12.
  • 13. *Screening *important to establish mechanisms by identifying projects which requires EIA, and this process of selection of project is referred to as "Screening“ Environmental Impact Assessment 13 Screening
  • 14. Project Scoping *Scoping is to determine what should be the coverage or scope of the EIA study for a project proposal as having potentially significant environmental impacts. Environmental Impact Assessment 14
  • 15. *Baseline Data Collection *Baseline information is important reference point for conducting EIA. *The term "baseline" refers to the collection of background information on the biophysical, social and economic settings proposed project area. Baseline data are collected for two main purposes: *to provide a description of the status and trends of environmental factors (e.g., air pollutant concentrations) against which predicted changes can be compared and evaluated in terms of importance, and *to provide a means of detecting actual change by monitoring once a project has been initiated Environmental Impact Assessment 15
  • 16.