SlideShare a Scribd company logo
1 of 16
Download to read offline
Name : B.N. Neranja
TENDERING DOCUMENTATION
PRESENTATION REPORT
PAGE 1
ACKNOWLEDGMENT
We express our sincere thanks to everyone who was helped us.
PAGE 2
CONTENTS
1. Introduction of Tendering
2. Principles of Tendering
3. Types of Tendering
4. Tendering Process
5. Tender Documents
PAGE 3
AIM OF THE PROJECT
The aim of the project is study and get better knowledge about “Tender,
Tendering process and Tender Documents” and presented it in the classroom,
by using presentations. Also this helps to act as a team work.
PAGE 4
GROUP MEMBERS
 B.N. Neranja (C)
 S.A.C.M. Subasinghe
 T.M.C.R.B. Thennakoon
 H.M.D.N. Herath
 D.A.S. Jayathilaka
PAGE 5
1. INTRODUCTION
The construction industry in both developed and developing countries may be viewed
as that sector of the economics which, through planning, design, construction
maintain, repair and operation, transform various resources into constructed facilities.
The types of public and private facilities produced range from residential and non-
residential buildings to heavy construction, and also these physical facilities play a
critical and highly visible role in the process of development. For this type of
construction projects, mainly, there are three group are participated. They are client,
consultant and contractor. Under this people, there are lots of stake holders; people
who are connected with the project directly or indirectly are working.
On the construction activities, crores of rupees are spent. Therefore, money is the main
factor of a construction project. Therefore, the client is looking for a select a best,
suitable and cheapener contractor for his works. For that, the acceptable and best
method is tendering method. Tendering is the formal, documental, structural process,
where the tender undertake to enter into a formal agreement with the client. There are
lot of things we have to understand about tendering. If we are going to work with
tendering process, we must have a better knowledge about tendering system. If not, we
will fail with the project, and also as a company and as quantity surveyor. Therefore,
we found lots of information about this topic and we got helps from internet and also
books like book of tendering printed by ICTAD. We would like to thanks Mr. Piumal
Amarasinghe, Lecturer in Quantity Surveying Practice for his advices. We did a
presentation before and this is the report of it. We make this report clearly as we can to
understand get knowledge about tendering to anyone who read this.
PAGE 6
TENDERING
WHAT IS TENDER?
DEFINITION
 Tendering is the process of choosing the best and cheapest company to supply
goods and services by asking several companies to make offers for supplying
the goods and services.
 Tender is an offer which incorporates the sum of money, time and other
conditions required to carry out the contract obligations in order to complete a
project or a part of it consisting of specified works.
PAGE 7
2. PRINCIPLES OF TENDERING
The purpose of these principles for Tendering is to provide a framework for the
effective, consistent and efficient management of tendering practices throughout any
construction project. The principles set out in this document can be equally applied to
any industry involving the delivery of a new product or service. Successful projects have
generally started with the use of best practice tendering processes.
These are the basic principles of tendering process,
• All aspects of the tendering process must be conducted with honestly at all
levels of the industry.
• A clear understanding of the rights and obligations of both parties.
• Parties must confirm to all legal obligations.
• Parties must clearly identify ownership.
• Parties must not submit tenders without a firm goal.
• Parties must not engage in any practice which gives improper advantage.
• Condition of tendering must be the same for tender on any particular project.
• Clients must clearly specify their requirements in the tender document and
indicate criteria for evaluation.
• All the information provided in the course of tendering must be protect.
PAGE 8
3. TYPES OF TENDERING
The majority builders still obtain much of their work by system of tendering. There are
three principle method of choosing a contractor. They are,
1. Open Tendering
2. Selective Tendering
3. Negotiated Tendering
1. Open Tendering
This usually takes the form of an advertisements in a national or local
newspapers inviting contractors to apply for tendering competition for carrying
out the work. The main characteristic of which are given usually the deposit is
required in order to discourage frivolous applications. The deposit is returnable
on submission of a tender. In this method allows any contractor to submit a
tender to an advertised project.
 Process
 Client advertises openly in the press or the trade publications inviting
contractors to apply for the project
 Contractor that is able to undertake the project would request a tender
document
 After receiving the tender from the architect, the contractor may be
required to give a deposit and to ensure a bona fide tender. This is done
to filter out the contractors who are not interested in submitting a tender.
Advantages
 Keep competition from large number of applicant.
 Possibility to get competitive price.
 No chance for favourism.
 Provide opportunities to new comers, unknown contractors to enter to the
market.
Disadvantages
 Time and cost taken to review the large number of applicant.
 The cost of tendering accumulated to the industry and general cost to the
industry is high.
 Difficult to evaluate and select best one from wide range of applicant.
PAGE 9
2. Selective Tendering
Contractor apply to be included on an approved list maintain by an employing
body often an architectural practice, local authority or statutory body. These
organizations have extensive knowledge and experience of individual
contractors and regularly review contractor performs and approval list from
such list. There are able to select contractors most suited to the contract the
number invited will according to the value of the contract.
 Note
 Compile a list of preferred builders for the project.
 Based on builders established skill. Reliability and proven
competence for the type of work given.
 Each contractor is bend ask to provide a tender.
Advantages
 Cost of tendering is reduced.
 Time consuming for the tender evaluation is reduced.
 Allow only capable and approved firms are to be tender.
 Provide limited competition and easy to screen and select.
Disadvantages
 Let’s competition forces high tender sum.
 Opportunities for collusion among competitors and mislead the time.
 Mis opportunities. ( new comers)
 Industry complain those who have not short listed.
PAGE 10
3. Negotiated Tendering
In this process only well reputed contractors are been negotiated by inviting
them to submit their tenders. Client can contractors determine the perimeters for
negotiation before commencement of the project. The maintenance of positive
relationship during the negotiation process in essential.
Why client went to negotiate?
 Business relationship
 Contractor, finance project ( client find difficult to finance then negotiate
with the builders who is willing to finance the project)
 Continuation of contract
 Special circumstances ( only one contractor available to work )
 Special expertise of equipment
 Wish to take advantages of the builder’s specialized knowledge at the
design stage.
 To have quick start
Advantages
 Expected quality and functions can be achieve more.
 Speed up the entire project.
 The project objective and definition may be managed. (builders involvement of
the design stage)
Disadvantages
 Non-competition forces for high tender sum.
 Less formality make course more contract administration inquiries.
 Lack accountability.
PAGE 11
4. TENDERING PROCESS
Tendering process can be divided in to six stages. These stages are shown in below
picture.
Stage 1: Preparation
 Final completion of drawings, specification, measurement / take-off process.
 Choose conditions of contract.
 Parties involved: architect, engineers, QS, client, project manager
Stage 2: Approval to tender
 Discussion and decision on type of tender to be used.
 Selection of tender:
 Open
 Selective
 Negotiate
 Parties involved: client, consultant, project manager.
Stage 1:
PREPARATION
Stage 2:
APPROVAL
TO TENDER
Stage 3:
DOCUMENTATION
Stage 4:
INVITATION
Stage 5:
PROCESSING
Stage 6:
AWARD
CONTRACT
PAGE 12
STAGE 3: TENDER DOCUMENTATION
 Letter of invitation to tender
 Letter of acceptance
 Bills of quantities
 Relevant drawings
 Schedule of rates
Stage 4: Invitation
 Based on selection of tendering methods
 Open / competitive / bid tender – produce tender notice
 Selective – shot listed contractors will be invited to tender if they wish
 Negotiated – only one contractor is approached- direct entry to project
Stage 5: Processing
 Received tender submitted by contractor
 Tender assessment / evaluation
 Completed tenders are received
 Arithmetical check
 Reasonable tender sum
 Reasonable completion time
 Capabilities of tenderers under considerations
 Tender recommendation / report – tender board
Stage 6: Award contract
 Pre-award meeting with contractors – validation of lowest complying bid
 Validate lowest bid - Pre-contract meeting with contractor for contract signing
 Approval by tender board / treasury (tender exceeds RM10 mill.) – an
acceptance of tender form is issued to tenderer , signed by the authorized officer
PAGE 13
5. TENDER DOCUMENTS
Tender documents are prepared to seek tenders (offers).
Also tender document help to maintain & protect the relationship between client &
contractor.
Documents of tender
1. Invitation for bid
2. Instruction to bidder
3. Standard forms
4. Condition of contract
5. Form of tender
6. Bidding data
7. Contract data
8. Specifications / general and special
9. Bills of quantities (BOQ) with pricing preambles
10.Drawings
11.Schedules of additional information
 Sample copy of letter of acceptance
 Sample copy of bank guarantee for performance bond
 Schedule of day work rates
 Sample copy of bank guarantee for advance payment
 Subsoil investigation report
 Special/particular specifications
Notice to Tenderers
This document contains a Project Summary, a listing of Tender Documents, key
dates, validity period, contact details, number of copies required and details of
tender submission location and timing.
Conditions of Tendering
This document details the overall Tender Process including the Delivery
Method, Probity issues, Communication issues, the Criteria for Selection and
the Evaluation Process.
PAGE 14
Tender Form & Schedules
These documents request specific information from the Tenderers concerning the
works. For example, Tenders are generally required to provide an overall cost, a
breakdown of this cost, a program, details of manpower, plant and equipment,
personnel, subcontractors and methodologies. The Tender Form is a formal statement
of the Tenderer’s offer to supply services in accordance with the Tender Documents.
Conditions of Contract
This document contains the General Conditions of Contract which sets out the
contractual basis for carrying out the works. In addition, the Special Conditions are
sometimes included which are unique to the client and/or project.
Specification
Depending on the type of Delivery Method chosen, this document may be a Project
Brief or a detailed Specification of the works. These documents set out the
performance and technical criteria for the project.
Drawings
The number and standard of drawings provided.
The main tender document – BOQ
Item
No.
Description Unit Quantity Rate Amount
PAGE 15
CONCLUSION
We can conclude that tendering process and work with tendering method is a system
or process that should use advisably, intelligently. Basically, these things are the job,
duty and responsibilities of the Quantity Surveyor. As a Quantity Surveyor, we should
have a better knowledge about tendering. If not, it is directly affect to the client,
company and also our job of quantity surveying. If we use tendering method correctly
and select a suitable contractor for the project, it will helps to build the project at the
due time, with efficiently, quality and also can save money. For succeed these hopes
of the client, best way is use the tendering to select suitable contractor. In this
presentation and process of making this report, we got more knowledge about
tendering. And also, we tried our best to describe these information as correctly.
THANK YOU ..

More Related Content

What's hot

CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
Pundlik Rathod
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 

What's hot (20)

Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Contracts
ContractsContracts
Contracts
 
Tendering
TenderingTendering
Tendering
 
Purpose of Valuation
Purpose of ValuationPurpose of Valuation
Purpose of Valuation
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
estimation,its types and methods
estimation,its types and methodsestimation,its types and methods
estimation,its types and methods
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 
Tender calling procedure
Tender calling procedureTender calling procedure
Tender calling procedure
 

Viewers also liked (7)

Labour laws in india
Labour laws in indiaLabour laws in india
Labour laws in india
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Jaipur building bye laws
Jaipur building bye lawsJaipur building bye laws
Jaipur building bye laws
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Bye laws
Bye lawsBye laws
Bye laws
 
PPT on "Labour Laws in India"
PPT on "Labour Laws in India"PPT on "Labour Laws in India"
PPT on "Labour Laws in India"
 

Similar to Tendering documentation

Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
Muneesh Methwani
 

Similar to Tendering documentation (20)

Tender and Bidding in Construction Projects
Tender and Bidding in Construction ProjectsTender and Bidding in Construction Projects
Tender and Bidding in Construction Projects
 
Professional practce assignment report
Professional practce assignment reportProfessional practce assignment report
Professional practce assignment report
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender document
 
Chapter -Two (3).pdf
Chapter -Two (3).pdfChapter -Two (3).pdf
Chapter -Two (3).pdf
 
Tender
TenderTender
Tender
 
Tenders
TendersTenders
Tenders
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Business negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain managementBusiness negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain management
 
Tender
TenderTender
Tender
 
PP Seminar
PP SeminarPP Seminar
PP Seminar
 
eeec ppt001.pptx
eeec ppt001.pptxeeec ppt001.pptx
eeec ppt001.pptx
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
CH-3-Introduction.pptx
CH-3-Introduction.pptxCH-3-Introduction.pptx
CH-3-Introduction.pptx
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Tenders, their types and process
Tenders, their types and processTenders, their types and process
Tenders, their types and process
 
Mesurement presentation pavaruban
Mesurement presentation pavarubanMesurement presentation pavaruban
Mesurement presentation pavaruban
 
Unit 5 Tendering
Unit 5 Tendering Unit 5 Tendering
Unit 5 Tendering
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 

Tendering documentation

  • 1. Name : B.N. Neranja TENDERING DOCUMENTATION PRESENTATION REPORT
  • 2. PAGE 1 ACKNOWLEDGMENT We express our sincere thanks to everyone who was helped us.
  • 3. PAGE 2 CONTENTS 1. Introduction of Tendering 2. Principles of Tendering 3. Types of Tendering 4. Tendering Process 5. Tender Documents
  • 4. PAGE 3 AIM OF THE PROJECT The aim of the project is study and get better knowledge about “Tender, Tendering process and Tender Documents” and presented it in the classroom, by using presentations. Also this helps to act as a team work.
  • 5. PAGE 4 GROUP MEMBERS  B.N. Neranja (C)  S.A.C.M. Subasinghe  T.M.C.R.B. Thennakoon  H.M.D.N. Herath  D.A.S. Jayathilaka
  • 6. PAGE 5 1. INTRODUCTION The construction industry in both developed and developing countries may be viewed as that sector of the economics which, through planning, design, construction maintain, repair and operation, transform various resources into constructed facilities. The types of public and private facilities produced range from residential and non- residential buildings to heavy construction, and also these physical facilities play a critical and highly visible role in the process of development. For this type of construction projects, mainly, there are three group are participated. They are client, consultant and contractor. Under this people, there are lots of stake holders; people who are connected with the project directly or indirectly are working. On the construction activities, crores of rupees are spent. Therefore, money is the main factor of a construction project. Therefore, the client is looking for a select a best, suitable and cheapener contractor for his works. For that, the acceptable and best method is tendering method. Tendering is the formal, documental, structural process, where the tender undertake to enter into a formal agreement with the client. There are lot of things we have to understand about tendering. If we are going to work with tendering process, we must have a better knowledge about tendering system. If not, we will fail with the project, and also as a company and as quantity surveyor. Therefore, we found lots of information about this topic and we got helps from internet and also books like book of tendering printed by ICTAD. We would like to thanks Mr. Piumal Amarasinghe, Lecturer in Quantity Surveying Practice for his advices. We did a presentation before and this is the report of it. We make this report clearly as we can to understand get knowledge about tendering to anyone who read this.
  • 7. PAGE 6 TENDERING WHAT IS TENDER? DEFINITION  Tendering is the process of choosing the best and cheapest company to supply goods and services by asking several companies to make offers for supplying the goods and services.  Tender is an offer which incorporates the sum of money, time and other conditions required to carry out the contract obligations in order to complete a project or a part of it consisting of specified works.
  • 8. PAGE 7 2. PRINCIPLES OF TENDERING The purpose of these principles for Tendering is to provide a framework for the effective, consistent and efficient management of tendering practices throughout any construction project. The principles set out in this document can be equally applied to any industry involving the delivery of a new product or service. Successful projects have generally started with the use of best practice tendering processes. These are the basic principles of tendering process, • All aspects of the tendering process must be conducted with honestly at all levels of the industry. • A clear understanding of the rights and obligations of both parties. • Parties must confirm to all legal obligations. • Parties must clearly identify ownership. • Parties must not submit tenders without a firm goal. • Parties must not engage in any practice which gives improper advantage. • Condition of tendering must be the same for tender on any particular project. • Clients must clearly specify their requirements in the tender document and indicate criteria for evaluation. • All the information provided in the course of tendering must be protect.
  • 9. PAGE 8 3. TYPES OF TENDERING The majority builders still obtain much of their work by system of tendering. There are three principle method of choosing a contractor. They are, 1. Open Tendering 2. Selective Tendering 3. Negotiated Tendering 1. Open Tendering This usually takes the form of an advertisements in a national or local newspapers inviting contractors to apply for tendering competition for carrying out the work. The main characteristic of which are given usually the deposit is required in order to discourage frivolous applications. The deposit is returnable on submission of a tender. In this method allows any contractor to submit a tender to an advertised project.  Process  Client advertises openly in the press or the trade publications inviting contractors to apply for the project  Contractor that is able to undertake the project would request a tender document  After receiving the tender from the architect, the contractor may be required to give a deposit and to ensure a bona fide tender. This is done to filter out the contractors who are not interested in submitting a tender. Advantages  Keep competition from large number of applicant.  Possibility to get competitive price.  No chance for favourism.  Provide opportunities to new comers, unknown contractors to enter to the market. Disadvantages  Time and cost taken to review the large number of applicant.  The cost of tendering accumulated to the industry and general cost to the industry is high.  Difficult to evaluate and select best one from wide range of applicant.
  • 10. PAGE 9 2. Selective Tendering Contractor apply to be included on an approved list maintain by an employing body often an architectural practice, local authority or statutory body. These organizations have extensive knowledge and experience of individual contractors and regularly review contractor performs and approval list from such list. There are able to select contractors most suited to the contract the number invited will according to the value of the contract.  Note  Compile a list of preferred builders for the project.  Based on builders established skill. Reliability and proven competence for the type of work given.  Each contractor is bend ask to provide a tender. Advantages  Cost of tendering is reduced.  Time consuming for the tender evaluation is reduced.  Allow only capable and approved firms are to be tender.  Provide limited competition and easy to screen and select. Disadvantages  Let’s competition forces high tender sum.  Opportunities for collusion among competitors and mislead the time.  Mis opportunities. ( new comers)  Industry complain those who have not short listed.
  • 11. PAGE 10 3. Negotiated Tendering In this process only well reputed contractors are been negotiated by inviting them to submit their tenders. Client can contractors determine the perimeters for negotiation before commencement of the project. The maintenance of positive relationship during the negotiation process in essential. Why client went to negotiate?  Business relationship  Contractor, finance project ( client find difficult to finance then negotiate with the builders who is willing to finance the project)  Continuation of contract  Special circumstances ( only one contractor available to work )  Special expertise of equipment  Wish to take advantages of the builder’s specialized knowledge at the design stage.  To have quick start Advantages  Expected quality and functions can be achieve more.  Speed up the entire project.  The project objective and definition may be managed. (builders involvement of the design stage) Disadvantages  Non-competition forces for high tender sum.  Less formality make course more contract administration inquiries.  Lack accountability.
  • 12. PAGE 11 4. TENDERING PROCESS Tendering process can be divided in to six stages. These stages are shown in below picture. Stage 1: Preparation  Final completion of drawings, specification, measurement / take-off process.  Choose conditions of contract.  Parties involved: architect, engineers, QS, client, project manager Stage 2: Approval to tender  Discussion and decision on type of tender to be used.  Selection of tender:  Open  Selective  Negotiate  Parties involved: client, consultant, project manager. Stage 1: PREPARATION Stage 2: APPROVAL TO TENDER Stage 3: DOCUMENTATION Stage 4: INVITATION Stage 5: PROCESSING Stage 6: AWARD CONTRACT
  • 13. PAGE 12 STAGE 3: TENDER DOCUMENTATION  Letter of invitation to tender  Letter of acceptance  Bills of quantities  Relevant drawings  Schedule of rates Stage 4: Invitation  Based on selection of tendering methods  Open / competitive / bid tender – produce tender notice  Selective – shot listed contractors will be invited to tender if they wish  Negotiated – only one contractor is approached- direct entry to project Stage 5: Processing  Received tender submitted by contractor  Tender assessment / evaluation  Completed tenders are received  Arithmetical check  Reasonable tender sum  Reasonable completion time  Capabilities of tenderers under considerations  Tender recommendation / report – tender board Stage 6: Award contract  Pre-award meeting with contractors – validation of lowest complying bid  Validate lowest bid - Pre-contract meeting with contractor for contract signing  Approval by tender board / treasury (tender exceeds RM10 mill.) – an acceptance of tender form is issued to tenderer , signed by the authorized officer
  • 14. PAGE 13 5. TENDER DOCUMENTS Tender documents are prepared to seek tenders (offers). Also tender document help to maintain & protect the relationship between client & contractor. Documents of tender 1. Invitation for bid 2. Instruction to bidder 3. Standard forms 4. Condition of contract 5. Form of tender 6. Bidding data 7. Contract data 8. Specifications / general and special 9. Bills of quantities (BOQ) with pricing preambles 10.Drawings 11.Schedules of additional information  Sample copy of letter of acceptance  Sample copy of bank guarantee for performance bond  Schedule of day work rates  Sample copy of bank guarantee for advance payment  Subsoil investigation report  Special/particular specifications Notice to Tenderers This document contains a Project Summary, a listing of Tender Documents, key dates, validity period, contact details, number of copies required and details of tender submission location and timing. Conditions of Tendering This document details the overall Tender Process including the Delivery Method, Probity issues, Communication issues, the Criteria for Selection and the Evaluation Process.
  • 15. PAGE 14 Tender Form & Schedules These documents request specific information from the Tenderers concerning the works. For example, Tenders are generally required to provide an overall cost, a breakdown of this cost, a program, details of manpower, plant and equipment, personnel, subcontractors and methodologies. The Tender Form is a formal statement of the Tenderer’s offer to supply services in accordance with the Tender Documents. Conditions of Contract This document contains the General Conditions of Contract which sets out the contractual basis for carrying out the works. In addition, the Special Conditions are sometimes included which are unique to the client and/or project. Specification Depending on the type of Delivery Method chosen, this document may be a Project Brief or a detailed Specification of the works. These documents set out the performance and technical criteria for the project. Drawings The number and standard of drawings provided. The main tender document – BOQ Item No. Description Unit Quantity Rate Amount
  • 16. PAGE 15 CONCLUSION We can conclude that tendering process and work with tendering method is a system or process that should use advisably, intelligently. Basically, these things are the job, duty and responsibilities of the Quantity Surveyor. As a Quantity Surveyor, we should have a better knowledge about tendering. If not, it is directly affect to the client, company and also our job of quantity surveying. If we use tendering method correctly and select a suitable contractor for the project, it will helps to build the project at the due time, with efficiently, quality and also can save money. For succeed these hopes of the client, best way is use the tendering to select suitable contractor. In this presentation and process of making this report, we got more knowledge about tendering. And also, we tried our best to describe these information as correctly. THANK YOU ..