Prepared by: Khushbu B. Bhojak
Diversion Headworks
Definition: A diversion head-works is a structure constructed across a river
for the purpose of raising water level in the river so that it can be diverted
into the off taking canals. It is also known as canal head works.
 Purposes of diversion headworks:
 It raises the water level on its upstream side so that commanded area can
be increased.
 It regulates the supply of water into canals.
 It controls the entry of silt into the canals.
 It provides some storage of water for a short period.
 It reduces fluctuations in the level of supply in the river.
 There are two types of diversion headworks;
Temporary: They are temporary in nature and required to be constructed after
flood.
Permanent. It consists of permanent concrete (masonry) structure. E.g Weir and
Barrage
Diversion Headworks
Diversion Headworks
Location of Diversion Headworks
The location of the diversion headworks depends on the stages of
flow in the river. Most of the large rivers in our country have the
following four stages.
1. Rocky stage or Hilly stage (Mountainous stage)
2. Boulder stage
3. Trough or alluvial stage
4. Delta stage
Rocky stage or Hilly stage (Mountainous stage)
In this stage river is in the hills. The bed slope and velocities are high. It is generally not
suitable for the location of a diversion headworks.
 Advantages:
 A sound rocky foundation is usually available at the site. Thus cost of construction of
weir is less.
 High heads are available for hydroelectric work.
 Due to high velocities of flow, there are no chances of the supply channel getting silted.
 Disadvantages:
 The discharge in the river is low because of small catchment.
 The land in the hilly area is not suitable for agriculture
 The ground has a steep slope and therefore a number of canal falls are required.
 The weir constructed in the mountainous stage would be located away from the
commanded area of the canal and therefore the idle length of the canal would be large.
 the water in this region does not contain silt and thus devoid of fertilizing materials.
 The river is usually very flashy and there is sudden rise and fall of the water level.
 The number of cross drainage works on the canals is usually very large.
Boulder Stage
From the rocky stage the river passes on to the boulder stage. It is also called sub-mountainous
stage. In this stage the bed and banks of the river are composed of boulders and gravels. The
width of river is small and the river has well-defined boundaries. The bed slope and velocity are
less than those in the rocky stage. There is large subsoil flow in this region.
 Advantages:
 The length of weir is generally shorter in boulder stage.
 Because the banks are high, the cost of river training works is low.
 Construction materials such as stone, aggregates, sand, gravel are locally available.
 Since the ground slope is quite steep, the falls on the canals can be utilized for hydropower
generation.
 The silt charge is less and the associated problems of excessive silt are small.
 Disadvantages:
 There is a large loss of stored water due to sub soil flow at the site of diversion headworks.
 Idle length of canal is more.
 More cross drainage works are required.
 In the head reaches of canal, seepage losses are high.
 The demand of irrigation water is low because the land is not fertile.
Trough or Alluvial stage
From the boulder stage the river passes on to the alluvial plain created by itself. In this stage the
cross section of river is made up of alluvial sand and silt. The bed slope and velocity are small.
 Advantages:
 Sub soil flow is comparatively less.
The land is fertile demand of irrigation water is high.
 The site is near the commanded area and hence the length of the canal is small.
 The seepage losses are less in the canal.
Less number of cross drainage works required.
 The water contains silt which has manurial value.
 Disadvantages:
The river section is quite wide and hence the length of the weir structure is large.
 Construction material is usually not available locally.
 The cost of headworks is usually more due to poor foundation
 Because of meandering tendency more river training works are required.
 There is problem of silt in the canal.
Delta stage
From the trough stage the river passes on to the delta stage as it approaches the
ocean.
The delta stage is not suitable for location of a diversion headworks because the river
section is excessively wide, and the river has a shifting tendency.
There is no suitable compact commanded area.
Since the water table is also high, there is not much need of irrigation.
Therefore the choice is usually between the locations of diversion headworks in the boulder
stage and in the trough stage.
Components of Diversion headworks
1.Weir or barrage
2. Scouring sluices or Under sluices
3. Divide wall
4. fish ladder
5. Canal head regulator
6. Silt excluder
7. Marginal bunds and Guide banks
Weir
The weir is a solid construction placed across the river to raise the water level in the river
and divert the water into the canal.
Based on materials of construction, design features and types of soil foundation the weir may
be of different types. Such as:
1.Vertical drop weir
2. Rock fill weirs
3. Concrete weir with sloping glacis
Vertical drop weirs
A vertical drop weir consists of a masonry wall with a vertical (or nearly vertical)
downstream face and a horizontal concrete floor. The shutters are provided at the crest,
which are dropped during flood so as to reduce afflux. The water is pounded up to the
shutters during the rest of the period.
The weir floor is designed as gravity section. Immediately at the upstream end of the floor a
block protection and at the downstream end a graded inverted filter are provided. Launching
aprons are provided at the u/s and d/s ends of floor to safeguard against scouring action.
This type of weir is suitable for hard clay foundation as well as consolidated gravel
foundation, and where the drop is small.. Such weirs are obsolete now a days.
Vertical drop weirs
Rock fill weirs
It consists of a main masonry weir wall and a number of core walls. The space between the
core walls is filled with the fragments of rock called rock fill. The rock fill is usually given a
slope of 1 in 4 on u/s and a slope of 1 in 20 on d/s.
A rock fill weir requires a lot of rock fragments and is economical only when a huge
quantity of rock fill is easily available near the weir site. It is suitable for fine sand
foundation. Such weirs are more or less obsolete now a days.
Concrete weir with sloping glacis
Concrete weir with sloping glacis are of relatively recent origin. The crest has glacis (sloping
floors) in u/s as well as d/s. There are sheet piles (or cut off walls) driven up to the
maximum scour depth at the u/s and d/s end of the concrete floor. Some times an
intermediate pile is also driven at the beginning of the u/s glacis or at the end of the d/s
glacis.
There is a concrete block protection in the continuation of the concrete floor both at the u/s
and d/s side. On the u/s of the u/s concrete block protection as well as on the d/s of the
d/s block protection, there is talus. This type of weir may be constructed in pervious
foundations and are commonly adopted these days.
Barrage
The function of barrage is similar to that of weir, but the heading up of water is effected by
the gates alone.
During the floods, the gates are raised to clear off the high flood level. When the flood
recedes, the gates are lowered and the flow is obstructed, thus raising the water level at the
u/s of the barrage.
Barrage
Under sluices
 The under sluices are the openings provided in the weir wall with their crest at lower
level.. These openings are provided with adjustable gates. The weir proper is constructed
in the middle portion of the diversion headworks an at the ends under sluices are provided
adjacent to the canal head regulators. If canal takes off only from one side, the under sluice
section is provided near that end only.
 There is a divide wall between the weir proper and the under sluice section to separate the
two portions and to avoid cross flows.
 The under sluice section is similar to the sloping weir section, but its crest is at a lower
level. Most of the dry weather flow passes through the under sluices because of the lower
bed level.
 Since relatively clear water is supplied to the canal, some silt gets deposited in the pocket
just u/s of the head regulator near the under sluice. The deposited silt is periodically
washed through the under sluices.
Under Sluice
Under sluices
Functions of under sluices:
 They maintain a clear and well defined river channel in front of the head regulator.
 They are used to scour away the silt deposited in front of the head regulator.
 They pass low floods without dropping the weir crest shutters.
 They control the silt entry into the canal
 They provide greater waterway for floods, thus lowering the flood levels.
Capacity of under sluices:
 The under sluices should be able to pass dry weather flow and low floods for which the
crest shutters on the weir proper need not e dropped.
 The width of pocket in front of the under sluices should be quite large to induce the
settlement of the suspended silt if a silt excluder is provided in the under sluices portion.
 The capacity of the under sluices is usually kept at least twice the maximum discharge in the
off taking canal to ensure good scouring capacity for removing the deposited silt.
 The crest level of the under sluices is generally kept at the average bed level of the river.
 The crest level of proper weir (or barrage) section is usually kept 1.0 to 1.50 m higher than
the crest level of under sluices.
Components of diversion head works
Divide wall
A Divide wall is a long masonry or concrete wall protected on all sides by stone or concrete
blocks, constructed at right angles to the axis of the weir to separate the weir proper section
and the under sluices section. If there are under sluices at both the sides, there are two divide
walls.
The divide wall extends on the u/s side up to a distance little beyond the beginning of the
canal head regulator and on the down stream side up to the end of the launching apron of
under sluices.
Functions of divide wall:
It separates the floor of the scouring sluices from that of the weir proper which is at a higher
level.
 It provides a silt pocket in front of the canal head regulator so that silt gets deposited in it
and relatively clear water enters the canal.
 It isolates the pocket upstream of the head regulator to facilitate scouring operation.
 It prevents formation of cross currents and the flow parallel to the weir axis.
 It provides a straight approach through the pocket and thus helps to concentrate scouring
action of the under sluices for washing out the silt deposited in the pocket.
 It serves as one side of the fish ladder.
Fish Ladder
 A fish ladder is a passage provided adjacent to the divide wall, on the weir side, for the fish
to travel from the upstream to the down stream of the weir and also in the reverse direction.
 In north Indian rivers, the fish generally travel from the cold water in hills to warmer water
in plains during winter. In the months of May and June, they move in the reverse direction in
search of clear water.
 It has been established that most types of fish can travel upstream against a flow velocity of
about 3 to 3.5 m/s. If no fish ladder is provided at the weir site and only a gap is left, even
the strongest fish will not be able to travel upstream.
 In a fish ladder, the head is gradually dissipated so as to provide smooth flow at sufficient
low velocity. Suitable baffles ( or Staggering devices) are provided in the fish passage to
reduce the flow velocity.
Fish Ladder
The plan and section of fish ladder is shown in figure:
 It consists of an inclined chute, (or channel) with a slope not exceeding 1 in 10.
 The difference of water levels on the upstream and downstream of the weir, which is usually up to 5
or 6 m, is split up in steps by means of baffle walls constructed across the chute.
 The compartment of bays of fish ladder should be sufficiently large so that the fish do not collide with
the sides of the bay when ascending.
 Grooved gates are provided at the entrance and at the exit of the fish ladder for closing it.
 The water supply to the fish ladder should be adequate for the fish to travel at all times.
(b) Section A-A
Silt Excluder
 Silt excluder is a device by which silt is
excluded from water entering the canal.
It is constructed in the bed in front of the
head regulator at right angles to the axis
of canal (or parallel to the axis of head
regulator)
 A silt excluder is consists of a number of
rectangular tunnels resting on the floor of
the under sluice pocket. The bottom of
the tunnels is formed by the floor of the
under sluice pocket. The top level of the
roof of the tunnels is kept same as the
level of the crest (or sill) of the canal head
regulator.
 The tunnels are of different lengths. The
tunnel nearest to the crest of the canal
head regulator is of the same length as the
width of the canal head regulator. The
length of the tunnels gradually decreases
as the distance of the head regulator
increases.
Silt Excluder
 This arrangement separates the water into two clear layers. The top layer (above the
roof of the under tunnels) enters the head regulator while the bottom layer, containing
relatively heavier silt charge goes to the under sluices and discharges to the d/s of the
river.
 The capacity of these tunnels is kept about 20% of the canal discharge, and the tunnels
are so designed that a minimum velocity of 2 to 3 m/s is maintained.
 Thus the required cross sectional area can be obtained by dividing the discharge by the
velocity.
Guide banks and Marginal Bunds
Guide banks: The guide banks are
provided on both sides of the diversion
head works in alluvial soils to guide the
flow so as to confine it in a reasonable
width of the river. It force the river into a
restricted channel, and thus, ensuring a
smooth and an almost axial flow.
It controls the velocity of flow near the
structure near the site and thus protects
the barrage from the effect of scouring
and erosion.
It provides a straight approach towards
the barrage.
It controls the tendency of changing the
course (path) of the river.
Guide banks and Marginal Bunds
Marginal Bunds: The marginal bunds are
earthen embankments which are constructed
parallel to the river bank on one or both the
banks according to the condition. The top
width is generally 3 m to 4 m. The side slope
on the river side is generally 1.5: 1 and that on
the country side is 2:1.
 It prevents the flood water or storage water
from entering the surrounding area which may
be submerged or may be water logged.
 It retains the flood water or storage water
within a specified section.
 It protects the towns and villages from
destruction during the heavy flood.
 It protects valuable agricultural lands.
Construction of these bunds would be justified
only, when the value of land saved is more than
the cost of the marginal bunds.
Canal Head Regulator
A structure which is constructed at the head of the
canal to regulate flow of water in the off taking
canal is known as canal head regulator. It consists
of a number of piers which divide the total width
of the canal into a number of spans which are
known as bays. They are operated by gates
provided for regulation of flow into the canal. The
crest level is usually kept about 1.2 to 1.5 m
higher than that of the under sluices. However, if
a silt excluder is provided, the crest level is
further raised by at least 0.75 m. The span
between the piers is usually kept between 8 to 12
m for large canal.
Canal Head Regulator
The axis of the head regulator usually makes an angle of 900
to 1200
with the axis of the weir
Canal Head Regulator
 The gates are operated form the top by suitable mechanical device. A platform is provided
on the top of the piers for the facility of operating the gates. Again some piers are
constructed on the down stream side of the canal head to support the roadway. The
maximum height of these gated openings will be equal to the difference of Pond Level and
Crest Level of the regulator. But during high floods, the water level in the river would be
much higher than pond level, and the flood water may spill over the gates. To prevent such
spilling of flood water into the canal, an RCC breast wall between the pond and HFL, and
spanning between adjacent piers is always provided. 
Gate
Canal Head Regulator
Functions of Canal Head Regulator:
 It regulates the supply of water entering the canal
 It prevents the river-floods from entering the canal
 The entry of silt into the canal is controlled by keeping the crest of the head regulator
higher than the crest of the under-sluices.
 Silt gets deposited in the pocket, and only the clear water enters the regulator bays. The
deposited silt can be easily scoured out periodically, and removed through the under-sluice
openings.

More Related Content

What's hot (20)

Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Spillways
SpillwaysSpillways
Spillways
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Canal outlets
Canal outletsCanal outlets
Canal outlets
 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
 
Spillways
SpillwaysSpillways
Spillways
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Canal of design
Canal of designCanal of design
Canal of design
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 

Viewers also liked

Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Ajjay Kumar Gupta
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha missSHAMJITH KM
 
Irrigation Enineering Introduction
Irrigation Enineering IntroductionIrrigation Enineering Introduction
Irrigation Enineering IntroductionLatif Hyder Wadho
 
Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheDr Vikas Chothe
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesRotary International
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...India Water Portal
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic enggineringkindu melese
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in ArchitectureSneha Nagarajan
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details Gilbert Bautista
 
3 star hotel
3  star hotel3  star hotel
3 star hotelusman6789
 

Viewers also liked (20)

Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 
Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18Best Small Business Ideas in India to Start Business for 2017-18
Best Small Business Ideas in India to Start Business for 2017-18
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha miss
 
Irrigation Enineering Introduction
Irrigation Enineering IntroductionIrrigation Enineering Introduction
Irrigation Enineering Introduction
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
Menstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas ChotheMenstrual education for girls- Dr. Vikas Chothe
Menstrual education for girls- Dr. Vikas Chothe
 
Rating curve design,practice and problems
Rating curve design,practice and problemsRating curve design,practice and problems
Rating curve design,practice and problems
 
An Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives SlidesAn Ethiopian Success Story: How Partnerships Save Lives Slides
An Ethiopian Success Story: How Partnerships Save Lives Slides
 
Design of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti villageDesign of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti village
 
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
Design of Bandhara / Weir Dam gates using plastic materials_Design Directions...
 
Final project for haydroulic engginering
Final project for haydroulic enggineringFinal project for haydroulic engginering
Final project for haydroulic engginering
 
weirs
weirsweirs
weirs
 
Types of Irrigation
Types of IrrigationTypes of Irrigation
Types of Irrigation
 
Plumbing in Architecture
Plumbing in ArchitecturePlumbing in Architecture
Plumbing in Architecture
 
Module 6 module 4 draft sanitary and plumbing layout and details
Module 6   module 4 draft sanitary and plumbing layout and details Module 6   module 4 draft sanitary and plumbing layout and details
Module 6 module 4 draft sanitary and plumbing layout and details
 
Floor finish
Floor finishFloor finish
Floor finish
 
3 star hotel
3  star hotel3  star hotel
3 star hotel
 
2. menstrual hygiene management
2. menstrual hygiene management2. menstrual hygiene management
2. menstrual hygiene management
 

Similar to Diversion headworks

Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxqureshixahoor
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal holegajendra
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636saibabu48
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKSMood Naik
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Saqib Imran
 
Diversion of headwork
Diversion of headwork Diversion of headwork
Diversion of headwork Jay Khoradiya
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01saibabu48
 
Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02saibabu48
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfShrutiLotliker
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineeringBittuRajkumar
 

Similar to Diversion headworks (20)

Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptx
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
Diversion of headwork
Diversion of headwork Diversion of headwork
Diversion of headwork
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01
 
Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02Diversionheadworkm3 120625052707-phpapp02
Diversionheadworkm3 120625052707-phpapp02
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdf
 
Dams
DamsDams
Dams
 
Krishna
KrishnaKrishna
Krishna
 
hydraulic structures in civil engineering
hydraulic structures in civil engineeringhydraulic structures in civil engineering
hydraulic structures in civil engineering
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

Diversion headworks

  • 1. Subject: Irrigation Engineering Module: III DIVERSION HEADWORKS Prepared by: Khushbu B. Bhojak
  • 2. Diversion Headworks Definition: A diversion head-works is a structure constructed across a river for the purpose of raising water level in the river so that it can be diverted into the off taking canals. It is also known as canal head works.  Purposes of diversion headworks:  It raises the water level on its upstream side so that commanded area can be increased.  It regulates the supply of water into canals.  It controls the entry of silt into the canals.  It provides some storage of water for a short period.  It reduces fluctuations in the level of supply in the river.  There are two types of diversion headworks; Temporary: They are temporary in nature and required to be constructed after flood. Permanent. It consists of permanent concrete (masonry) structure. E.g Weir and Barrage
  • 4.
  • 6. Location of Diversion Headworks The location of the diversion headworks depends on the stages of flow in the river. Most of the large rivers in our country have the following four stages. 1. Rocky stage or Hilly stage (Mountainous stage) 2. Boulder stage 3. Trough or alluvial stage 4. Delta stage
  • 7. Rocky stage or Hilly stage (Mountainous stage) In this stage river is in the hills. The bed slope and velocities are high. It is generally not suitable for the location of a diversion headworks.  Advantages:  A sound rocky foundation is usually available at the site. Thus cost of construction of weir is less.  High heads are available for hydroelectric work.  Due to high velocities of flow, there are no chances of the supply channel getting silted.  Disadvantages:  The discharge in the river is low because of small catchment.  The land in the hilly area is not suitable for agriculture  The ground has a steep slope and therefore a number of canal falls are required.  The weir constructed in the mountainous stage would be located away from the commanded area of the canal and therefore the idle length of the canal would be large.  the water in this region does not contain silt and thus devoid of fertilizing materials.  The river is usually very flashy and there is sudden rise and fall of the water level.  The number of cross drainage works on the canals is usually very large.
  • 8. Boulder Stage From the rocky stage the river passes on to the boulder stage. It is also called sub-mountainous stage. In this stage the bed and banks of the river are composed of boulders and gravels. The width of river is small and the river has well-defined boundaries. The bed slope and velocity are less than those in the rocky stage. There is large subsoil flow in this region.  Advantages:  The length of weir is generally shorter in boulder stage.  Because the banks are high, the cost of river training works is low.  Construction materials such as stone, aggregates, sand, gravel are locally available.  Since the ground slope is quite steep, the falls on the canals can be utilized for hydropower generation.  The silt charge is less and the associated problems of excessive silt are small.  Disadvantages:  There is a large loss of stored water due to sub soil flow at the site of diversion headworks.  Idle length of canal is more.  More cross drainage works are required.  In the head reaches of canal, seepage losses are high.  The demand of irrigation water is low because the land is not fertile.
  • 9. Trough or Alluvial stage From the boulder stage the river passes on to the alluvial plain created by itself. In this stage the cross section of river is made up of alluvial sand and silt. The bed slope and velocity are small.  Advantages:  Sub soil flow is comparatively less. The land is fertile demand of irrigation water is high.  The site is near the commanded area and hence the length of the canal is small.  The seepage losses are less in the canal. Less number of cross drainage works required.  The water contains silt which has manurial value.  Disadvantages: The river section is quite wide and hence the length of the weir structure is large.  Construction material is usually not available locally.  The cost of headworks is usually more due to poor foundation  Because of meandering tendency more river training works are required.  There is problem of silt in the canal.
  • 10. Delta stage From the trough stage the river passes on to the delta stage as it approaches the ocean. The delta stage is not suitable for location of a diversion headworks because the river section is excessively wide, and the river has a shifting tendency. There is no suitable compact commanded area. Since the water table is also high, there is not much need of irrigation. Therefore the choice is usually between the locations of diversion headworks in the boulder stage and in the trough stage.
  • 11. Components of Diversion headworks 1.Weir or barrage 2. Scouring sluices or Under sluices 3. Divide wall 4. fish ladder 5. Canal head regulator 6. Silt excluder 7. Marginal bunds and Guide banks
  • 12. Weir The weir is a solid construction placed across the river to raise the water level in the river and divert the water into the canal. Based on materials of construction, design features and types of soil foundation the weir may be of different types. Such as: 1.Vertical drop weir 2. Rock fill weirs 3. Concrete weir with sloping glacis
  • 13. Vertical drop weirs A vertical drop weir consists of a masonry wall with a vertical (or nearly vertical) downstream face and a horizontal concrete floor. The shutters are provided at the crest, which are dropped during flood so as to reduce afflux. The water is pounded up to the shutters during the rest of the period. The weir floor is designed as gravity section. Immediately at the upstream end of the floor a block protection and at the downstream end a graded inverted filter are provided. Launching aprons are provided at the u/s and d/s ends of floor to safeguard against scouring action. This type of weir is suitable for hard clay foundation as well as consolidated gravel foundation, and where the drop is small.. Such weirs are obsolete now a days.
  • 15. Rock fill weirs It consists of a main masonry weir wall and a number of core walls. The space between the core walls is filled with the fragments of rock called rock fill. The rock fill is usually given a slope of 1 in 4 on u/s and a slope of 1 in 20 on d/s. A rock fill weir requires a lot of rock fragments and is economical only when a huge quantity of rock fill is easily available near the weir site. It is suitable for fine sand foundation. Such weirs are more or less obsolete now a days.
  • 16. Concrete weir with sloping glacis Concrete weir with sloping glacis are of relatively recent origin. The crest has glacis (sloping floors) in u/s as well as d/s. There are sheet piles (or cut off walls) driven up to the maximum scour depth at the u/s and d/s end of the concrete floor. Some times an intermediate pile is also driven at the beginning of the u/s glacis or at the end of the d/s glacis. There is a concrete block protection in the continuation of the concrete floor both at the u/s and d/s side. On the u/s of the u/s concrete block protection as well as on the d/s of the d/s block protection, there is talus. This type of weir may be constructed in pervious foundations and are commonly adopted these days.
  • 17. Barrage The function of barrage is similar to that of weir, but the heading up of water is effected by the gates alone. During the floods, the gates are raised to clear off the high flood level. When the flood recedes, the gates are lowered and the flow is obstructed, thus raising the water level at the u/s of the barrage.
  • 19. Under sluices  The under sluices are the openings provided in the weir wall with their crest at lower level.. These openings are provided with adjustable gates. The weir proper is constructed in the middle portion of the diversion headworks an at the ends under sluices are provided adjacent to the canal head regulators. If canal takes off only from one side, the under sluice section is provided near that end only.  There is a divide wall between the weir proper and the under sluice section to separate the two portions and to avoid cross flows.  The under sluice section is similar to the sloping weir section, but its crest is at a lower level. Most of the dry weather flow passes through the under sluices because of the lower bed level.  Since relatively clear water is supplied to the canal, some silt gets deposited in the pocket just u/s of the head regulator near the under sluice. The deposited silt is periodically washed through the under sluices.
  • 21. Under sluices Functions of under sluices:  They maintain a clear and well defined river channel in front of the head regulator.  They are used to scour away the silt deposited in front of the head regulator.  They pass low floods without dropping the weir crest shutters.  They control the silt entry into the canal  They provide greater waterway for floods, thus lowering the flood levels. Capacity of under sluices:  The under sluices should be able to pass dry weather flow and low floods for which the crest shutters on the weir proper need not e dropped.  The width of pocket in front of the under sluices should be quite large to induce the settlement of the suspended silt if a silt excluder is provided in the under sluices portion.  The capacity of the under sluices is usually kept at least twice the maximum discharge in the off taking canal to ensure good scouring capacity for removing the deposited silt.  The crest level of the under sluices is generally kept at the average bed level of the river.  The crest level of proper weir (or barrage) section is usually kept 1.0 to 1.50 m higher than the crest level of under sluices.
  • 23. Divide wall A Divide wall is a long masonry or concrete wall protected on all sides by stone or concrete blocks, constructed at right angles to the axis of the weir to separate the weir proper section and the under sluices section. If there are under sluices at both the sides, there are two divide walls. The divide wall extends on the u/s side up to a distance little beyond the beginning of the canal head regulator and on the down stream side up to the end of the launching apron of under sluices. Functions of divide wall: It separates the floor of the scouring sluices from that of the weir proper which is at a higher level.  It provides a silt pocket in front of the canal head regulator so that silt gets deposited in it and relatively clear water enters the canal.  It isolates the pocket upstream of the head regulator to facilitate scouring operation.  It prevents formation of cross currents and the flow parallel to the weir axis.  It provides a straight approach through the pocket and thus helps to concentrate scouring action of the under sluices for washing out the silt deposited in the pocket.  It serves as one side of the fish ladder.
  • 24. Fish Ladder  A fish ladder is a passage provided adjacent to the divide wall, on the weir side, for the fish to travel from the upstream to the down stream of the weir and also in the reverse direction.  In north Indian rivers, the fish generally travel from the cold water in hills to warmer water in plains during winter. In the months of May and June, they move in the reverse direction in search of clear water.  It has been established that most types of fish can travel upstream against a flow velocity of about 3 to 3.5 m/s. If no fish ladder is provided at the weir site and only a gap is left, even the strongest fish will not be able to travel upstream.  In a fish ladder, the head is gradually dissipated so as to provide smooth flow at sufficient low velocity. Suitable baffles ( or Staggering devices) are provided in the fish passage to reduce the flow velocity.
  • 25. Fish Ladder The plan and section of fish ladder is shown in figure:  It consists of an inclined chute, (or channel) with a slope not exceeding 1 in 10.  The difference of water levels on the upstream and downstream of the weir, which is usually up to 5 or 6 m, is split up in steps by means of baffle walls constructed across the chute.  The compartment of bays of fish ladder should be sufficiently large so that the fish do not collide with the sides of the bay when ascending.  Grooved gates are provided at the entrance and at the exit of the fish ladder for closing it.  The water supply to the fish ladder should be adequate for the fish to travel at all times. (b) Section A-A
  • 26. Silt Excluder  Silt excluder is a device by which silt is excluded from water entering the canal. It is constructed in the bed in front of the head regulator at right angles to the axis of canal (or parallel to the axis of head regulator)  A silt excluder is consists of a number of rectangular tunnels resting on the floor of the under sluice pocket. The bottom of the tunnels is formed by the floor of the under sluice pocket. The top level of the roof of the tunnels is kept same as the level of the crest (or sill) of the canal head regulator.  The tunnels are of different lengths. The tunnel nearest to the crest of the canal head regulator is of the same length as the width of the canal head regulator. The length of the tunnels gradually decreases as the distance of the head regulator increases.
  • 27. Silt Excluder  This arrangement separates the water into two clear layers. The top layer (above the roof of the under tunnels) enters the head regulator while the bottom layer, containing relatively heavier silt charge goes to the under sluices and discharges to the d/s of the river.  The capacity of these tunnels is kept about 20% of the canal discharge, and the tunnels are so designed that a minimum velocity of 2 to 3 m/s is maintained.  Thus the required cross sectional area can be obtained by dividing the discharge by the velocity.
  • 28. Guide banks and Marginal Bunds Guide banks: The guide banks are provided on both sides of the diversion head works in alluvial soils to guide the flow so as to confine it in a reasonable width of the river. It force the river into a restricted channel, and thus, ensuring a smooth and an almost axial flow. It controls the velocity of flow near the structure near the site and thus protects the barrage from the effect of scouring and erosion. It provides a straight approach towards the barrage. It controls the tendency of changing the course (path) of the river.
  • 29. Guide banks and Marginal Bunds Marginal Bunds: The marginal bunds are earthen embankments which are constructed parallel to the river bank on one or both the banks according to the condition. The top width is generally 3 m to 4 m. The side slope on the river side is generally 1.5: 1 and that on the country side is 2:1.  It prevents the flood water or storage water from entering the surrounding area which may be submerged or may be water logged.  It retains the flood water or storage water within a specified section.  It protects the towns and villages from destruction during the heavy flood.  It protects valuable agricultural lands. Construction of these bunds would be justified only, when the value of land saved is more than the cost of the marginal bunds.
  • 30. Canal Head Regulator A structure which is constructed at the head of the canal to regulate flow of water in the off taking canal is known as canal head regulator. It consists of a number of piers which divide the total width of the canal into a number of spans which are known as bays. They are operated by gates provided for regulation of flow into the canal. The crest level is usually kept about 1.2 to 1.5 m higher than that of the under sluices. However, if a silt excluder is provided, the crest level is further raised by at least 0.75 m. The span between the piers is usually kept between 8 to 12 m for large canal.
  • 31. Canal Head Regulator The axis of the head regulator usually makes an angle of 900 to 1200 with the axis of the weir
  • 32. Canal Head Regulator  The gates are operated form the top by suitable mechanical device. A platform is provided on the top of the piers for the facility of operating the gates. Again some piers are constructed on the down stream side of the canal head to support the roadway. The maximum height of these gated openings will be equal to the difference of Pond Level and Crest Level of the regulator. But during high floods, the water level in the river would be much higher than pond level, and the flood water may spill over the gates. To prevent such spilling of flood water into the canal, an RCC breast wall between the pond and HFL, and spanning between adjacent piers is always provided.  Gate
  • 33. Canal Head Regulator Functions of Canal Head Regulator:  It regulates the supply of water entering the canal  It prevents the river-floods from entering the canal  The entry of silt into the canal is controlled by keeping the crest of the head regulator higher than the crest of the under-sluices.  Silt gets deposited in the pocket, and only the clear water enters the regulator bays. The deposited silt can be easily scoured out periodically, and removed through the under-sluice openings.