DIVERSION HEAD WORKS
• The works which are constructed at the head of the
canal , in order to divert the river water towards the
canal , so as to ensure regulated continuous supply
of silt free water with certain minimum head into
that canal is called as diversion head works.
• These are constructed on a river where adequate
flow of river water is available throughout the year.
• If the storage on upstream of diversion head works
is significant, it is called storage weir
• If it is constructed on downstream of dam for
purpose of diverting water from upstream side of
dam into canal, it is called pick up weir.
.
LOCATION OF DIVERSION HEAD WORK:-
It should be near the command area. The site which gives economical arrangement
is usually selected.
SITE SELECTION :-
1) Good foundation should be available.
2) The site should be such that weir can be aligned at right angle to the
diversion of water in the river.
3) The site should be such that there should be sufficient space for location of
head regulator and other component of the diversion headwork.
4) The overall cost should be less.
5) Proper approach way should be nearby site.
6) On the upstream side where water is retained, should not include costly
land.
7) While construction of weir or barrages river should be available near the
site.
8) The material and labours should be available nearby site.
9) The river should be perennial.
10)The river should have non erodible as well as non submersible banks.
11)The site should be narrow and well defined.
COMPONENT PARTS OF A DIVERRSION HEADWORK
1. Weir or barrage 2. Undersluices 3. Divide wall
4. Fish ladder 5. Canal head regulator
6. pocket or approach channel 7. Silt excluders/ Silt prevention
devices 8. River training works (Marginal bunds and guide banks)
Weir & Barrage:-
• Weir: It is an impervious .barrier constructedacross
a river to raise its water level on its upstream side
and divert the water into the canal taking off from
its upstream side.
Weir afflux chances are more in floods.
• Barrage: If storage of water is done by gates and
very small portion or nil portion of water is stored
by raised crest then the barrier is called as barrage.
Barrage is a gate controlled weir. The heading up of
water is effected by the gates alone.
Barrage afflux chances are reduced by gates.
.
TYPES OF WEIR:-
• 1) gravity weir 2) non gravity weir
• 1) gravity weir
• Depending on material and design features, gravity weirs are subdivided
into following types-
• (i)Vertical drop weir.
• (ii) Sloping weir
• a. Rock fill weirs.
• b. Concrete weirs
• Weirs are also classified as follows :
• (1) According to use and function.
• (a) Storage weir. (b) Pick up weir.
• (c) Diversion weir. (d)Waste weir.
• (2) According to control of surface flow.
• (3) According to the design of floors.
• (4) According to constructional material
• a) Masonry weir
• b) Rockfill weir
• c) Concrete weir
• Gravity weir:- when the weight of weir balances uplift pressure
caused by the head of water seep
.ingbelow weir it is called asgravity
weir.
• Non gravity weir:- in non gravity weir the uplift pressure is
largely resisted by weight of concrete slab with the weight of divide
piers.
i) Vertical Drop Weir:
This type of weir consists of horizontal floor and masonry crest with
vertical or nearby vertical downstream face and the shutters are
provided at the crest. Most of the.storage is done by raised crest and
some storage by shutters provided over the crest.
ii) Rock Fill Weir
It is also called as dry stone slope weir. It is suitable for fine sandy
foundation. stone are mainly used for construction of such type of
weir and hence requires large quantities of stone
iii) Concrete Weir:
These are suitable for permeable.foundations. In such weirs sheet
piles are provided on both upstream and downstream floors in order
to destroy the energy of water
.
According to use and function
a) Storage Weir :
It is high weir constructed for storing water. It is also called as
diversion weir. In such weirs shutters may or may not be provided.
b) Pick Up Weir :
These are constructed when command area is far away from reservoir
either due to rolling topography or because the land is not cultivable
and if there is broken or rolling topography on one or both banks of
parent river in which construction of canal may be costly.
• A solid weir usually with crest gates constructed in concrete or stone
masonry located at some distance downstream of dam forming a
large reservoir to raise the water .levelup to FSL of canal is known
as pickup weir .
Situations: It is proposed in the following situations-
i) In case of broken or rolling topography on one or both banks of the
parent river where canal construction is costly.
ii)In case of command area is too far away from the reservoir may be
due to rolling topography.
iii) In case of land nearby the reservoir is not cultivable.
iv) The command area not near the reservoir.
v) Canal has to run idle.
Vi) Geographically difficult terrain so that the canal alignment is
very costly or impossible.
c) Diversion Weir:
A weir which is constructed for di.vertingthe river water into the canal
is called as diversion weir. Generally it is constructed at 900 to the
flow of river.
D) Waste weir:- it is constructed in continuation of dam . It is
also known as escape channel or a spillway. It allows flood water to
escape and thus ensure safety of the dam.
UNDER SLUICE
Under sluice are opening providedin the body of weir at low level.
These are located at same side from which canal is taking off. The
crest of under sluice is kept lower than crest of weir due to which
water is attracted towards it and thus ensure easy diversion into
canal.
FUNCTIONS OF UNDERSLUICE:-
1) it control entry of silt i.nto canal.
2) it lowers the HFL.
3) it helps in passing low river flood without lifting
shutters.
4) it helps to pass silt on downstream side of weir.
whenever silt is remover the gates of head regulator
are closed and of sluice are opened through these
sluice the silt which is deposited is removed and it
goes on downstream side when all silt is removed
silt gates are closed and regulator gates are opened.
DIVIDE WALL:-
is wall constructed bet.weenunder sluices and the
weir at right angle to the axis of the weir to
divide the river channel.
Function of divide wall:-
1) it separates the under sluices from weir.
2) it also helps in reducing velocity of flow near the
head regulator due to which silt is deposited and
clear water passes in to canal.
3) it prevents vortices means flow in circular
motion.
FISH LADDER
• It is passage provided adjacent to divide wall for the
movement of fish from upstream to downstream
and vice versa.
• It allows free access to fish so that they can travel
from colder water to hot water
• It has been observed that fish moves from old
water to warm water and in monsoon they again
move towards upstream or downstream of the
work.
• These are provided with various fashion like sluice
type in which the baffle wall is in zig zag way over
flow type in which V notches are provided in
staggered arrangement etc.
Silt excluder:-
The device which are constructed at the head of main
canal which prevents entry of silt particles into
canal are called as silt exclusion devices.
Silt ejectors:-
• The structure which is constructed across the canal
to eject silt accumulated in canal section is called
silt ejector.
• Silt ejector consist of tunnel which is connected
parallel to the flow of the canal and then turns 90
degree to eject silt.
• The length of tunnel provided may be different.
These are provided with sufficient slope. So that silt
should not be deposited in its bed.
GUIDE BANK:-
• Guide banks are provided on either side of diversion head work. In alluvial
soil to prevent river from out flankin.gthe work.
The main object of guide banks are:-
1) it prevent oblique approach to the head regulator .
2) it protect regulator from river attack.
3) it increases maximum discharge at all point.
4) it prevent out flanking of structure.
5) it create reasonable water way for a weir.
6) Toseparate flow from the scouring weir which is at lower level than proper
weir.
7) Toseparate the silting packet from scouring sluices
8) Toprevent formation of cross currents to avoid domain effects
9) Tocut off the main portion of the river and provide a comparatively quite
packet in front of the canal head regulator resulting in deposition of silt in
the pocket and enter clear water in canal
Marginal embankment:-
Marginal embankment are provided on either bank
of river upstream of diversion head work to protect
the land and property which is likely to be
submerged during flood.
It helps in :-
1) reduce the intensity of flood.
2) it prevents bed level of the river by silting.
3) it protect land and property which is likely to be
submerged.
SCOURING SLUICE:-
It helps in scour out the deposited bed silt.
HEAD REGULATOR:-
1) It regulates the supply.of water entering in canal.
2) It controls the entry of silt into canal
3) It prevents the river flood entering the canal
Stilling Pond:
In still can be taken outing pond water made stil
where deposition of silt takes place due to
sedimentation and from which silt can be taken out.
1) Toreduce velocity of water.
2) Tosettle down the silt and allow clear water to
the canal.
Diversion headworks
Diversion headworks
Diversion headworks
Diversion headworks
Diversion headworks
Diversion headworks
Diversion headworks

More Related Content

What's hot

What's hot (20)

Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Embankment lecture 2
Embankment lecture 2Embankment lecture 2
Embankment lecture 2
 
DIVERSION HEAD WORK
DIVERSION HEAD WORKDIVERSION HEAD WORK
DIVERSION HEAD WORK
 
Irrigation
IrrigationIrrigation
Irrigation
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
River engineering
River engineeringRiver engineering
River engineering
 
Storage head works
Storage head worksStorage head works
Storage head works
 
Diversion head works ajitha miss
Diversion head works ajitha missDiversion head works ajitha miss
Diversion head works ajitha miss
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Control Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTSControl Of SEEPAGE THROUGH EMBANKMENTS
Control Of SEEPAGE THROUGH EMBANKMENTS
 
Case studies of failures of earthen dams
Case studies of failures of earthen dams Case studies of failures of earthen dams
Case studies of failures of earthen dams
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Reservoir Dam Safety
Reservoir Dam SafetyReservoir Dam Safety
Reservoir Dam Safety
 
Lined canal ppt
Lined canal ppt Lined canal ppt
Lined canal ppt
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
river training work
river training workriver training work
river training work
 
Reservior planning
Reservior    planningReservior    planning
Reservior planning
 

Similar to Diversion headworks

Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636saibabu48
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKSMood Naik
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworksShubham Gautam
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdfMuhammadAjmal326519
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxqureshixahoor
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Saqib Imran
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxDivs97
 
Diversion head work
Diversion head workDiversion head work
Diversion head workDivya Vishnoi
 
Canal headworks
Canal headworksCanal headworks
Canal headworksAtul Hajong
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfShrutiLotliker
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal holegajendra
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01saibabu48
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfShrutiLotliker
 
Chapter 8
Chapter 8Chapter 8
Chapter 8saibabu48
 

Similar to Diversion headworks (20)

Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Wreii unitv-170917082636
Wreii unitv-170917082636Wreii unitv-170917082636
Wreii unitv-170917082636
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
Presenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptxPresenation on Diversion Headworks irrigation.pptx
Presenation on Diversion Headworks irrigation.pptx
 
Design of hydraulic structures ce 413
Design of hydraulic structures ce 413Design of hydraulic structures ce 413
Design of hydraulic structures ce 413
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptx
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
diversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdfdiversionheadworks-150327075328-conversion-gate01.pdf
diversionheadworks-150327075328-conversion-gate01.pdf
 
Diversion Headwork in Canal
 Diversion Headwork in Canal  Diversion Headwork in Canal
Diversion Headwork in Canal
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01Diversionheadworks 150327075328-conversion-gate01
Diversionheadworks 150327075328-conversion-gate01
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdf
 
Dams
DamsDams
Dams
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 

More from brijlata sharma

Introduction+hydrology
Introduction+hydrologyIntroduction+hydrology
Introduction+hydrologybrijlata sharma
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage workbrijlata sharma
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESbrijlata sharma
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESbrijlata sharma
 
Cross drainage works
Cross drainage worksCross drainage works
Cross drainage worksbrijlata sharma
 

More from brijlata sharma (8)

Introduction+hydrology
Introduction+hydrologyIntroduction+hydrology
Introduction+hydrology
 
Embankment dam
Embankment damEmbankment dam
Embankment dam
 
Canal design
Canal designCanal design
Canal design
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
REPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURESREPAIRS AND REHABILITATION OF STRUCTURES
REPAIRS AND REHABILITATION OF STRUCTURES
 
Cross drainage works
Cross drainage worksCross drainage works
Cross drainage works
 
Biodegradation
BiodegradationBiodegradation
Biodegradation
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

Diversion headworks

  • 1. Assi Prof. Brijlata sharma JECRC, Jaipur
  • 2. DIVERSION HEAD WORKS • The works which are constructed at the head of the canal , in order to divert the river water towards the canal , so as to ensure regulated continuous supply of silt free water with certain minimum head into that canal is called as diversion head works. • These are constructed on a river where adequate flow of river water is available throughout the year. • If the storage on upstream of diversion head works is significant, it is called storage weir • If it is constructed on downstream of dam for purpose of diverting water from upstream side of dam into canal, it is called pick up weir.
  • 3. . LOCATION OF DIVERSION HEAD WORK:- It should be near the command area. The site which gives economical arrangement is usually selected. SITE SELECTION :- 1) Good foundation should be available. 2) The site should be such that weir can be aligned at right angle to the diversion of water in the river. 3) The site should be such that there should be sufficient space for location of head regulator and other component of the diversion headwork. 4) The overall cost should be less. 5) Proper approach way should be nearby site. 6) On the upstream side where water is retained, should not include costly land. 7) While construction of weir or barrages river should be available near the site. 8) The material and labours should be available nearby site. 9) The river should be perennial. 10)The river should have non erodible as well as non submersible banks. 11)The site should be narrow and well defined.
  • 4. COMPONENT PARTS OF A DIVERRSION HEADWORK 1. Weir or barrage 2. Undersluices 3. Divide wall 4. Fish ladder 5. Canal head regulator 6. pocket or approach channel 7. Silt excluders/ Silt prevention devices 8. River training works (Marginal bunds and guide banks)
  • 5. Weir & Barrage:- • Weir: It is an impervious .barrier constructedacross a river to raise its water level on its upstream side and divert the water into the canal taking off from its upstream side. Weir afflux chances are more in floods. • Barrage: If storage of water is done by gates and very small portion or nil portion of water is stored by raised crest then the barrier is called as barrage. Barrage is a gate controlled weir. The heading up of water is effected by the gates alone. Barrage afflux chances are reduced by gates.
  • 6. . TYPES OF WEIR:- • 1) gravity weir 2) non gravity weir • 1) gravity weir • Depending on material and design features, gravity weirs are subdivided into following types- • (i)Vertical drop weir. • (ii) Sloping weir • a. Rock fill weirs. • b. Concrete weirs • Weirs are also classified as follows : • (1) According to use and function. • (a) Storage weir. (b) Pick up weir. • (c) Diversion weir. (d)Waste weir. • (2) According to control of surface flow. • (3) According to the design of floors. • (4) According to constructional material • a) Masonry weir • b) Rockfill weir • c) Concrete weir
  • 7. • Gravity weir:- when the weight of weir balances uplift pressure caused by the head of water seep .ingbelow weir it is called asgravity weir. • Non gravity weir:- in non gravity weir the uplift pressure is largely resisted by weight of concrete slab with the weight of divide piers. i) Vertical Drop Weir:
  • 8. This type of weir consists of horizontal floor and masonry crest with vertical or nearby vertical downstream face and the shutters are provided at the crest. Most of the.storage is done by raised crest and some storage by shutters provided over the crest. ii) Rock Fill Weir It is also called as dry stone slope weir. It is suitable for fine sandy foundation. stone are mainly used for construction of such type of weir and hence requires large quantities of stone
  • 9. iii) Concrete Weir: These are suitable for permeable.foundations. In such weirs sheet piles are provided on both upstream and downstream floors in order to destroy the energy of water
  • 10. . According to use and function a) Storage Weir : It is high weir constructed for storing water. It is also called as diversion weir. In such weirs shutters may or may not be provided. b) Pick Up Weir : These are constructed when command area is far away from reservoir either due to rolling topography or because the land is not cultivable and if there is broken or rolling topography on one or both banks of parent river in which construction of canal may be costly.
  • 11. • A solid weir usually with crest gates constructed in concrete or stone masonry located at some distance downstream of dam forming a large reservoir to raise the water .levelup to FSL of canal is known as pickup weir . Situations: It is proposed in the following situations- i) In case of broken or rolling topography on one or both banks of the parent river where canal construction is costly. ii)In case of command area is too far away from the reservoir may be due to rolling topography. iii) In case of land nearby the reservoir is not cultivable. iv) The command area not near the reservoir. v) Canal has to run idle. Vi) Geographically difficult terrain so that the canal alignment is very costly or impossible.
  • 12. c) Diversion Weir: A weir which is constructed for di.vertingthe river water into the canal is called as diversion weir. Generally it is constructed at 900 to the flow of river. D) Waste weir:- it is constructed in continuation of dam . It is also known as escape channel or a spillway. It allows flood water to escape and thus ensure safety of the dam.
  • 13. UNDER SLUICE Under sluice are opening providedin the body of weir at low level. These are located at same side from which canal is taking off. The crest of under sluice is kept lower than crest of weir due to which water is attracted towards it and thus ensure easy diversion into canal.
  • 14.
  • 15. FUNCTIONS OF UNDERSLUICE:- 1) it control entry of silt i.nto canal. 2) it lowers the HFL. 3) it helps in passing low river flood without lifting shutters. 4) it helps to pass silt on downstream side of weir. whenever silt is remover the gates of head regulator are closed and of sluice are opened through these sluice the silt which is deposited is removed and it goes on downstream side when all silt is removed silt gates are closed and regulator gates are opened.
  • 16. DIVIDE WALL:- is wall constructed bet.weenunder sluices and the weir at right angle to the axis of the weir to divide the river channel. Function of divide wall:- 1) it separates the under sluices from weir. 2) it also helps in reducing velocity of flow near the head regulator due to which silt is deposited and clear water passes in to canal. 3) it prevents vortices means flow in circular motion.
  • 17.
  • 18. FISH LADDER • It is passage provided adjacent to divide wall for the movement of fish from upstream to downstream and vice versa. • It allows free access to fish so that they can travel from colder water to hot water • It has been observed that fish moves from old water to warm water and in monsoon they again move towards upstream or downstream of the work. • These are provided with various fashion like sluice type in which the baffle wall is in zig zag way over flow type in which V notches are provided in staggered arrangement etc.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Silt excluder:- The device which are constructed at the head of main canal which prevents entry of silt particles into canal are called as silt exclusion devices. Silt ejectors:- • The structure which is constructed across the canal to eject silt accumulated in canal section is called silt ejector. • Silt ejector consist of tunnel which is connected parallel to the flow of the canal and then turns 90 degree to eject silt. • The length of tunnel provided may be different. These are provided with sufficient slope. So that silt should not be deposited in its bed.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. GUIDE BANK:- • Guide banks are provided on either side of diversion head work. In alluvial soil to prevent river from out flankin.gthe work. The main object of guide banks are:- 1) it prevent oblique approach to the head regulator . 2) it protect regulator from river attack. 3) it increases maximum discharge at all point. 4) it prevent out flanking of structure. 5) it create reasonable water way for a weir. 6) Toseparate flow from the scouring weir which is at lower level than proper weir. 7) Toseparate the silting packet from scouring sluices 8) Toprevent formation of cross currents to avoid domain effects 9) Tocut off the main portion of the river and provide a comparatively quite packet in front of the canal head regulator resulting in deposition of silt in the pocket and enter clear water in canal
  • 31.
  • 32. Marginal embankment:- Marginal embankment are provided on either bank of river upstream of diversion head work to protect the land and property which is likely to be submerged during flood. It helps in :- 1) reduce the intensity of flood. 2) it prevents bed level of the river by silting. 3) it protect land and property which is likely to be submerged. SCOURING SLUICE:- It helps in scour out the deposited bed silt.
  • 33. HEAD REGULATOR:- 1) It regulates the supply.of water entering in canal. 2) It controls the entry of silt into canal 3) It prevents the river flood entering the canal Stilling Pond: In still can be taken outing pond water made stil where deposition of silt takes place due to sedimentation and from which silt can be taken out. 1) Toreduce velocity of water. 2) Tosettle down the silt and allow clear water to the canal.