    Water Management System at Chaibasa Cement Works presented by A.K.Srivastava - Presentation Transcript

    1. Water Management System at CCW Venue :CII- Godrej GBC Hyderabad Date :16.12.2008 Name of the Presenter :A.K. Srivastava Head Plant Operations Chaibasa Cement Works This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written approval from ACC Limited. This material was used during an oral presentation; it is not a complete record of the discussion.
    2. Company Profile Established in 1947. Part of ACC/ Holcim, a national and global l d ti l d l b l leader Expansion & modernization in 2005. 1.2 MTPA integrated cement plant Situated i “K lh Si d in “Kolhan region i – A hard core tribal belt” , 80 Km. from Jamshedpur. QMS & EMS established as per IS/ISO 9001 & 14001. OHSMS established as per Reliable and respected Holcim OH&S pyramid. 2 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    3. Process Details Highly sophisticated and modern plant with state of the art technology. Semi d process (up to 23% enriched slurry feed in VRM) S i dry ( t i h d l f di Raw mat. extraction Raw material preparation Pyro processing Raw meal preparation Shipping Cement Grinding Shipping 3 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    4. Roadmap for meeting the Environment goals 2008 2009 2010 2011 Stack emissions 50 30 30 30 (mg/nm3) Fugitive Emission SPM 5000 4000 3000 2000 (µg/nm3) Kg of CO2/ ton of 650 634 618 602 Cementitious Material CEMS Installation on 1 kiln Kiln Stack Water Consumption -30% -20% -15% -10% Environment Road Map Power Consumption 88.7 86.4 84.3 82.2 KWh / ton Tonnage of alternative 8400 14024 15150 22201 fuels & raw mat. (tons) Thermal Substitution 0.53 1.43 1.62 1.99 Rate (%) AFR Installation 0.95 2.8 5.0 0.5 Capex Rs. Cr Total GAV (Savings) Rs. 0.29 3.47 4.30 5.89 Cr 4 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    5. Water Conservation Initiatives Annual Water Investmen Year of Savings t made Payback Sl. Water conservation Implemen period No. initiatives tation Rs. R (months) m3 Rs. Lakhs Lakhs Strengthening of water monitoring system by g y y 1 installation of water 2005-06 - - 2.22 - meters at source points Recycling of Effluent by rerouting of reject pit 2 2006-07 165000 4.85 2 5 discharge to abandoned mine pit Zero effluent d h ffl discharge by providing 3 sedimentation tanks 2007-08 330000 9.7 12.1 15 and reutilization of effluent ffl 5 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    6. Specific Water Consumption 3.00 3 00 2.50 2.40 2.28 2.02 2.00 5% m3/MT 1.50 1.21 1.00 0.70 0.50 0.00 0 00 0.00 0 00 0.00 2004 – 05 2005 – 06 2006 – 07 2007 – 08 Benchmark 6 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    7. Road map to achieve global benchmark Objective & targets Plan of Action Expected Technical justification Date of Completion Strengthening of water Installation of Dec. 2009 Water recycled from reject pit is monitoring system at water meters at collected in mines abandoned pit user end user end (A block) for further use in plant, this reutilized water is again counted as fresh water due to lack of monitoring system. At present, water meters are installed only at sources and we are unable to take initiatives department wise. d t t i To achieve specific installation of Dec. 2011 At present water consumption in water consumption 700 modernized floatation process is about 950 ltr./ MT of Clinker from Filtration Floatation ltr. per tonnes of clinker. By present level of 1519 Plant (FFP) (FFP). implementing this proposed ltr./ MTof Clinker project dry cake will be fed to VRM and 130 ltr. water per tonnes of clinker will be consumed in this process. 7 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    8. Sustainability Indices 8 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    9. Environment Performance Index (PEP) Systematic monitoring and evaluation of environmental performance Identification of strengths and weaknesses (self-assessment) Supporting tool in (environmental) business planning Environmental programs, CAPEX projects, budgeting etc. Database for communication purposes Group and Group company internal benchmarking 85 Enval Performance Indicator Atmospheric Emission: PM 80 80 75 76 75 73 70 66 EPI (% ) 65 62 60 55 50 2005 2006 2007 2008 2007 2006 Year CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 9 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    10. Commitment towards reduction in GHG Emission Our objective is to reduce by the year 2010 the average specific net CO2 emission by 20 % from the reference year 1990, l l 1990 calculated per WBCSD CO2 protocol. d l Clinker Factor Specific Net CO2 Emission 75.0 75 0 73 900.0 900 0 876.0 880.0 Kg. CO2/ MT of Cem. Mat. 69.5 70.0 860.0 840.0 65.0 65 0 820.0 804.0 % 800.0 60.3 800.0 60.0 781.0 780.0 55.9 55.0 55.0 55.0 760.0 . 740.0 50.0 720.0 2005 2006 2007 2008 2007 2006 2005 2006 2007 2008 Year Year CCW Performance CCW Target CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 10 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    11. Commitment towards reduction in GHG Emission This reduction will be achieved through improving the four key eco-efficiency parameters: clinker factor specific thermal energy consumption specific electrical energy consumption thermal substitution rate Specific Thermal Energy Consumption Specific Electrical Energy Consumption 1050.0 1050 0 110.0 995.0 106 1000.0 kWh/ MT of Cement 105.0 950.0 KCal/ Kg. of Clinker 900.0 876 100.0 C 850.0 95.0 800.0 91.9 91.42 755.0 750.0 748.8 751 90.0 89.0 750.0 85.6 85 6 85.0 85 0 K 700.0 700 0 85.0 650.0 80.0 600.0 2005 2006 2007 2008 2007 2006 2005 2006 2007 2008 2007 2006 Year Yea Year CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 11 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    12. Water Conservation Initiatives Phase 1st :Strengthening of water monitoring system Phase 2nd :Recycling of Effluent Phase 3rd :Zero effluent discharge 12 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    13. Phase 1st :Strengthening of water monitoring system Objectives Compliance with environmental legal requirements To improve Environmental Performance Indicator (EPI) of the plant Regular monitoring of water consumption Conservation of natural resources Project Mission Installation of water meters at source level Project Organization Client: Mr. A. Roy Choudhary, Vice President Project Manager: Mr. A.K. Srivastava, Manager Engineering Project Member: Mr. S.K. Mazumdar Mr S K Mazumdar, HOD Water Supply Mr. Pradeep Singh, HOD Environment Mr. P.K. Bhattacharya, Asst. Officer, WS 13 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    14. Phase 1st :Strengthening of water monitoring system Identified Risks in planning phase Sr. Identified Risks Remedial Actions No. 1. Unavailability of layout drawings (plant established Study and develop water line layout in the year 1947) 2. Procurement of the water meters in the time frame Adherence with delivery schedule. Attributes Action plan Att ib t & A ti l Planned Actual date Sr. Accomplished Planned date of Actual date of Activity date of of No. by commencement commencement completion completion Study of existing lay out HOD: Water 1. and generate requirement 05.04.2005 05.04.2005 15.04.2005 10.04.2005 Supply for water meters Procurement of water 2. HOD: Purchase 15.04.2005 10.04.2005 30.06.2005 10.08.2005 meters Installation of water HOD: Water 3. 01.07.2005 12.08.2005 31.07.2005 25.09.2005 meters Supply Establishment of system 4. 4 for daily water Mgr. Engee. Mgr Engee 01.08.2005 01 08 2005 01.10.2005 01 10 2005 Cont. Cont Cont. Cont consumption monitoring 14 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    15. Phase 1st :Strengthening of water monitoring system Out come of Team Work Monitoring of water consumption started on daily basis. Monitored water consumption was double than derived from formula on monthly production basis. Source End user Quarry Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active Quarry Pit M Captive P C i Power Plant Check Dam M (River) Floatation Plant Abandoned Quarry Pit Cement (A Block) M Grinding & Packing Plant Domestic 15 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    16. Phase 2nd :Recycling of Effluent Objectives To improve life of reject pit To improve stability of reject pit To improve Environmental Performance Indicator (EPI) of the plant Conservation of natural resources Project Mission Recycling of Effluent by rerouting of reject pit discharge to abandoned mine pit Project Organization Client: Mr. A.K. Srivastava, GM (Tech.) Project Manager: Mr. KRK Prusty, Manager Mining Project Member: Mr. P.K. Nanda, Jt. Manager Mining Mr. Rajesh Kumar, Jt. Manager Mining Mr. Y Kumar, Dy. Mr Y. Kumar Dy Manager CSR 16 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    17. Phase 2nd :Recycling of Effluent Identified Risks in planning phase Sr. Identified Risks Remedial Actions No. 1. During project bund may be collapsed and lead to Strengthening of bund. flood in near by areas. Dewatering of reject pit. Attributes & Action plan Planned l d Actual date ld Sr. Accomplished Planned date of Actual date of Activity date of of No. by commencement commencement completion completion Strengthening of bund by 1. Mgr. Mining g g 10.10.2006 07.10.2006 15.11.2006 23.11.2006 dumping overburden soil Dewatering of reject pit 2. Mgr. Mining 15.11.2006 23.11.2006 30.11.2006 07.12.2006 through diesel pump Laying of pipe with valves y g pp & strainer in bund for 3. regular dewatering of Mgr. Mining 20.11.2006 27.11.2006 30.11.2006 05.12.2006 clean water through gravity. Development of natural 4. drain for the recirculation Mgr. Mining 20.11.2006 29.11.2006 31.01.2007 20.02.2007 of mine discharge water 17 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    18. Phase 2nd :Recycling of Effluent Source End user Q Quarry y Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active Quarry Pit M Captive Power Plant Check Dam M (River) Floatation oatat o Reject j Abandoned Evaporation/ p / Plant Mine Pit Natural seepage Abandoned Quarry Pit Cement (A Block) M Grinding & Packing Pl t P ki Plant Domestic 18 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    19. Phase 2nd :Recycling of Effluent Out come of Team Work Pit life increased by 1 year. Dewatering pump operation not required ( Rs 10 Lakhs/ annum) Rs. annum). Stability of bund increased. Clean water is being recycled (approximately 2000 KL per day) in ‘A’ block pit for reutilization in cement plant plant. Water Silica 19 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    20. Phase 3rd :Zero effluent discharge Objectives Conservation of natural resources (water & energy) Control of water pollution To improve Environmental Performance Indicator (EPI) of the plant Project Mission To achieve ‘Zero effluent discharge’ Project Organization Client: Mr. I.M. Sharma, Plant Head Project Manager: Mr. A.K. Srivastava, GM (Tech) Project Member: Mr. P Singh, Asst. Manager Environment Mr. Mr J N Prasad Jt Manager Civil Prasad, Jt. Mr. Y Singh, Dy. Manager CR-RM Mr. M Singh, Asst. Engineer CR-RM Mr. P K Bhattacharya, Asst. Officer WS 20 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    21. Phase 3rd :Zero effluent discharge Attributes & Action plan Planned Actual date Sr. Accomplished Planned date of Actual date of Activity date of of No. by y commencement commencement completion completion Dy. Manager & Initial Cleaning & Asst. Engr. CR- 1. 12.09.2007 12.09.2007 30.09.2007 25.09.2007 Arresting leakages RM, Asst. Mgr Env. Construction of effluent collection sump Jt. Mgr. Civil 2. (1mX1mX1m) to collect Asst. Officer 12.09.2007 12.09.2007 30.09.2007 25.09.2007 compressor cooling water WS & pump installation Revamping of old settling Dy. Manager & tank and procurement & 3. CR-RM, Jt. Mgr. 01.10.2007 26.09.2007 31.01.2008 31.01.2008 installation of recycle Civil pump. Minimising water Asst Asst. Officer 4. consumption in Wet WS, Asst. Engr. 12.09.2007 12.09.2007 30.09.2007 30.09.2008 grinding & thickening. CR-RM Recycling effluent in wet Asst. Mgr Env., grinding & stopping river 5. Asst. Officer 01.02.2008 01.02.2008 15.02.2008 15.02.2008 water consumption in the WS same. 21 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    22. Phase 3rd :Zero effluent discharge Source End user Quarry Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active E Quarry Pit M Captive Power Plant ST F F Check Dam M L (River) (Ri ) Floatation Plant ST U Abandoned E Quarry Pit Cement ( (A Block) ) M ST N Grinding & Packing Plant T Domestic 22 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    23. Phase 3rd :Zero effluent discharge Out come of Team Work Conservation of water (approx. 1000 KL per day) Conservation of energy energy. Control of pollution Pump installed to recycle effluent. Pumping facility installed to recycle effluent. 23 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    24. HAND IN HAND - TOGETHER EACH ACHIEVE MORE Thank you for your benign presence & support y y g p pp 24 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
    SlideShare Zeitgeist 2009

    + ArghyamArghyam Nominate

    custom

    91 views, 0 favs, 0 embeds more stats

    This is a presentation from Chaibasa Cement Works,A more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 91
      • 91 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 2
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories