SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku
Omar, Perak.
Percentage of Assessment: 20%
Submission Date: 2nd July 2015
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements for the chosen building.
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab etc.
 All first floor to fourth floor slabs and beams
 Roof slabs and beams
Notes:
 Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.

Assessment Criteria
Refer to matrix attached.
Teaching Objectives
 To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
 To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
 Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
 Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
 Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
 Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission
Each section is to submit to the group leader in the following sequence:
 Billing ( handwritten )
 Query list
 Taking off list
 Dimension sheets
The Leader of each group is to collect from all the group members and attach the front cover page with the
names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges
the rest in the following sequence:
 Billing ( to insert in front of BQ and hand written )
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab etc.
 First floor slabs to fourth floor slabs and beams.
 Roof slabs and beams

More Related Content

What's hot

Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016Michael Street
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building shahidibn hussain
 
NAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CVNAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CVNAJIB MAMAIRI
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Shze Hwa Lee
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-queryJeanne Hoo
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Flenny Wong
 

What's hot (9)

Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
 
Cv with photo
Cv with photoCv with photo
Cv with photo
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
nkp
nkpnkp
nkp
 
New Resume for Hays
New Resume for HaysNew Resume for Hays
New Resume for Hays
 
NAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CVNAJIB ADOMA MAMAIRI CV
NAJIB ADOMA MAMAIRI CV
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
4) ext walls-element-revised-query
4) ext walls-element-revised-query4) ext walls-element-revised-query
4) ext walls-element-revised-query
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)
 

Similar to bqs Assignment no.2

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Lin Hui
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - MeasurementKai Yun Pang
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degreeLam Wee
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFLillian June
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdfhitusp
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for buildingHimani762003
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1Darshiini Vig
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notesDr.K.Mohan Das
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIALNat Rice
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiJaspreet singh
 
estimating and costing introduction ppt.pptx
estimating and costing  introduction ppt.pptxestimating and costing  introduction ppt.pptx
estimating and costing introduction ppt.pptxAshishJadhav655553
 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)Arvindhan Balasingam
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimationDhavalMithaiwala
 

Similar to bqs Assignment no.2 (20)

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - Measurement
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degree
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEF
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notes
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
muslim project ppt.pptx
muslim project ppt.pptxmuslim project ppt.pptx
muslim project ppt.pptx
 
estimating and costing introduction ppt.pptx
estimating and costing  introduction ppt.pptxestimating and costing  introduction ppt.pptx
estimating and costing introduction ppt.pptx
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)B. structure project 2 brief august 2016 (updated)
B. structure project 2 brief august 2016 (updated)
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 

More from Felix Vong

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MSFelix Vong
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Felix Vong
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-reportFelix Vong
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015Felix Vong
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Felix Vong
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqsFelix Vong
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqsFelix Vong
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqsFelix Vong
 
bqs Building materials presentation 2
bqs Building materials presentation 2bqs Building materials presentation 2
bqs Building materials presentation 2Felix Vong
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignmentFelix Vong
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Epc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleEpc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleFelix Vong
 
Epc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkEpc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkFelix Vong
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1Felix Vong
 
Psychology final journal 2.1
Psychology final journal 2.1Psychology final journal 2.1
Psychology final journal 2.1Felix Vong
 
Psy journal 2 1.2
Psy journal 2 1.2Psy journal 2 1.2
Psy journal 2 1.2Felix Vong
 
Power bank presentation
Power bank presentationPower bank presentation
Power bank presentationFelix Vong
 

More from Felix Vong (20)

Royal properties sdn bhd MS
Royal properties sdn bhd MSRoyal properties sdn bhd MS
Royal properties sdn bhd MS
 
Individual assignment brief ct3-2015
Individual assignment brief ct3-2015Individual assignment brief ct3-2015
Individual assignment brief ct3-2015
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015CT2 group-assignment-brief (video)+2015
CT2 group-assignment-brief (video)+2015
 
Individual assignment brief ct2-2014
Individual assignment brief ct2-2014Individual assignment brief ct2-2014
Individual assignment brief ct2-2014
 
Presentation
PresentationPresentation
Presentation
 
Ct project 1 bqs
Ct project 1 bqsCt project 1 bqs
Ct project 1 bqs
 
Ct1 assignment bqs
Ct1 assignment  bqsCt1 assignment  bqs
Ct1 assignment bqs
 
Assignment brief for site report bqs
Assignment brief for site report bqsAssignment brief for site report bqs
Assignment brief for site report bqs
 
bqs Building materials presentation 2
bqs Building materials presentation 2bqs Building materials presentation 2
bqs Building materials presentation 2
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignment
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Epc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun TempleEpc presentation 1.1 Taman Ayun Temple
Epc presentation 1.1 Taman Ayun Temple
 
Epc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara ParkEpc 2.1 Lembah Kiara Park
Epc 2.1 Lembah Kiara Park
 
School of-architecture-group 1.1
School of-architecture-group 1.1School of-architecture-group 1.1
School of-architecture-group 1.1
 
Psychology final journal 2.1
Psychology final journal 2.1Psychology final journal 2.1
Psychology final journal 2.1
 
Psy journal 2 1.2
Psy journal 2 1.2Psy journal 2 1.2
Psy journal 2 1.2
 
Psy 2 essay
Psy 2 essayPsy 2 essay
Psy 2 essay
 
Power bank presentation
Power bank presentationPower bank presentation
Power bank presentation
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 

bqs Assignment no.2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku Omar, Perak. Percentage of Assessment: 20% Submission Date: 2nd July 2015 Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building.  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab etc.  All first floor to fourth floor slabs and beams  Roof slabs and beams Notes:  Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.  Assessment Criteria Refer to matrix attached. Teaching Objectives  To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.
  • 2.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to:  Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works.  Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works.  Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works.  Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each section is to submit to the group leader in the following sequence:  Billing ( handwritten )  Query list  Taking off list  Dimension sheets The Leader of each group is to collect from all the group members and attach the front cover page with the names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges the rest in the following sequence:  Billing ( to insert in front of BQ and hand written )  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab etc.  First floor slabs to fourth floor slabs and beams.  Roof slabs and beams