SlideShare a Scribd company logo
1 of 31
Quality Tracking Solution Through JIRA
Imagine a Dashboard with all Quality Parameters?




Dashboard gives a snapshot of important metrics, which a Quality Head can use to monitor &
control Quality Processes.
Quality Process Flow in a Typical Manufacturing
                                  Environment




Create and Assign an Issue        QC Person can either
    to the Production              reopen the issue or
                                                             Quality Head closes the
 department head (either       approve. If reopened again
                                                                      Issue.
     Internal or From           the issue will be assigned
        Customer).              to the department head.



                               Approval or Reopen by the
                                Production Department
 Allocate the issue to the
                                 Head. If Reopened the
  respective personnel
                               report is again assigned to
                                    the personnel.




 Personnel changes the           Personnel Resolves the
   status to “work In            process and fills the 8D
       Progress”                          form.
Create & Assign Issues




All Issues are created by the Quality Personnel.
Create & Assign Issues




The Quality Personnel will assign the project to the respective Department Head.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Allocation of an Issue




The Created Issue will get listed in the Inbox of the Assigned User.
Allocation of an Issue




The User can Open and view the Issue Form.
Allocation of an Issue




The Department Head assigns the issue to a respective production personnel.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Opening & Assigning an Issue as In-Progress




The Issue assigned by the department head will get listed in the Inbox of the Assigned personnel.
Opening & Assigning an Issue as In-Progress




The Personnel has to change the status as In-Progress before resolving the Issue.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Resolving an Issue and Filling 8D Form.




The Issue assigned by the department head will get listed in the Inbox of the Assigned personnel.
Resolving an Issue and Filling 8D Form.




After resolving the issue the production personnel fills the 8D Corrective Action Report.
Resolving an Issue and Filling 8D Form.




The Production Personnel can reopen the resolved issue before Approval from department head.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Approving an Issue by the Department Head




The Resolved Issue will get listed in the Inbox of the Department Head.
Approving an Issue by the Department Head




During the Department Head Approval the Department Head can view and alter the 8D Report.
Approving an Issue by the Department Head




During the Department Head Approval the Department Head can view and alter the 8D Report.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Approving an Issue by the Quality Department




The Approved Issue will get listed in the Inbox of the Quality Department with the status Head
Approval..
Approving an Issue by the Quality Department




The Approved Issue has to be again approved by Quality Department.
Approving an Issue by the Quality Department




The Approved Issue has to be again approved by Quality Department.
Quality Process Flow




Create and Assign an Issue      QC Person can either
    to the Production            reopen the issue or
                                                           Quality Head closes the
 department head (either     approve. If reopened again
                                                                    Issue.
     Internal or From         the issue will be assigned
        Customer).            to the department head.



                             Approval or Reopen by the
                              Production Department
 Allocate the issue to the
                               Head. If Reopened the
  respective personnel
                             report is again assigned to
                                  the personnel.




 Personnel changes the         Personnel Resolves the
   status to “work In          process and fills the 8D
       Progress”                        form.
Closing an Issue




The Issue Approved by Quality Department has to be closed by the Quality Head.
Closing an Issue




The Issue Approved by Quality Department has to be closed by the Quality Head.
Closing an Issue




The Issue Approved by Quality Department has to be closed by the Quality Head.
Better insight into Quality

• Gain real-time access to all Quality Issues (Internal or
  Customer initiated) through a Dashboard driven system.
• Helps in tracking, monitoring and controlling all Quality
  aspects of the Organization.
• Can be extended to allow Customer access into such system,
  if required.
• Give employees quick insight into predefined views of data
  tailored to their roles.
About CETAS
  CETAS is a Team Of Seasoned IT Professionals
  with a 100 Plus Years of total experience in
  the Enterprise Application Space ..
• We Offer ….
  –   Enterprise Application Consulting Services
  –   Product Engineering Services
  –   Application Development Services
  –   Application Maintenance & Migration Services
Thank You
 Cetas Information Technology Pvt. Ltd
Phase 2, Plot No 21,22, 9th Cross Street,
          Wood Creek County
 St. Thomas Mount, Chennai -600 016
          www.Cetastech.com
   Enquires : Sales@cetastech.com

More Related Content

What's hot

The 7 minute accessibility assessment and app rating system
The 7 minute accessibility assessment and app rating systemThe 7 minute accessibility assessment and app rating system
The 7 minute accessibility assessment and app rating systemAidan Tierney
 
Learn IBM's Secrets: How can digital badges improve your training metrics?
Learn IBM's Secrets: How can digital badges improve your training metrics?Learn IBM's Secrets: How can digital badges improve your training metrics?
Learn IBM's Secrets: How can digital badges improve your training metrics?Training Industry Conference & Expo
 
Executive Dashboard Report For Agile Projects
Executive Dashboard Report For Agile ProjectsExecutive Dashboard Report For Agile Projects
Executive Dashboard Report For Agile ProjectsOpenAgile Romania
 
The Business Analyst Role: Agile vs. Waterfall
The Business Analyst Role: Agile vs. WaterfallThe Business Analyst Role: Agile vs. Waterfall
The Business Analyst Role: Agile vs. WaterfallEnterprise Knowledge
 
Training - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanTraining - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanSudipta Lahiri
 
Lightening Talk: definition of ready
Lightening Talk: definition of readyLightening Talk: definition of ready
Lightening Talk: definition of readyAgileee
 
BABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsBABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsCBAP Master
 
Team Topologies - Des organisations pour une architecture émergente
Team Topologies - Des organisations pour une architecture émergenteTeam Topologies - Des organisations pour une architecture émergente
Team Topologies - Des organisations pour une architecture émergenteRomain Vailleux
 
Designing your kanban board to map your process
Designing your kanban board to map your processDesigning your kanban board to map your process
Designing your kanban board to map your processYu Liang
 
The Agile Adoption Roadmap (Keynote by Tim Abbott)
The Agile Adoption Roadmap  (Keynote by Tim Abbott)The Agile Adoption Roadmap  (Keynote by Tim Abbott)
The Agile Adoption Roadmap (Keynote by Tim Abbott)Agile Days Middle East
 
IBM BPM ( Business Process Management ) S/W 소개
IBM BPM ( Business Process Management ) S/W 소개IBM BPM ( Business Process Management ) S/W 소개
IBM BPM ( Business Process Management ) S/W 소개Shaun LEE
 
Agile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesAgile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesLeadingAgile
 
Introduction Au Plm
Introduction Au PlmIntroduction Au Plm
Introduction Au Plmpistesil
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Techedge Group
 
Visual Architecting
Visual Architecting Visual Architecting
Visual Architecting Ruth Malan
 
Agile Project Framework
Agile Project FrameworkAgile Project Framework
Agile Project FrameworkSimone Onofri
 
Ha100 unit 3 hana architecture sp08
Ha100 unit 3 hana architecture sp08Ha100 unit 3 hana architecture sp08
Ha100 unit 3 hana architecture sp08Duskydope Rao
 
Vsevolod Zelenin. How to return project teams back to work.
Vsevolod Zelenin. How to return project teams back to work.Vsevolod Zelenin. How to return project teams back to work.
Vsevolod Zelenin. How to return project teams back to work.Lviv Startup Club
 
Agile DevOps Transformation Strategy
Agile DevOps Transformation StrategyAgile DevOps Transformation Strategy
Agile DevOps Transformation StrategySatish Nath
 

What's hot (20)

The 7 minute accessibility assessment and app rating system
The 7 minute accessibility assessment and app rating systemThe 7 minute accessibility assessment and app rating system
The 7 minute accessibility assessment and app rating system
 
Learn IBM's Secrets: How can digital badges improve your training metrics?
Learn IBM's Secrets: How can digital badges improve your training metrics?Learn IBM's Secrets: How can digital badges improve your training metrics?
Learn IBM's Secrets: How can digital badges improve your training metrics?
 
The Agile Coaching DNA - Overview
The Agile Coaching DNA -  OverviewThe Agile Coaching DNA -  Overview
The Agile Coaching DNA - Overview
 
Executive Dashboard Report For Agile Projects
Executive Dashboard Report For Agile ProjectsExecutive Dashboard Report For Agile Projects
Executive Dashboard Report For Agile Projects
 
The Business Analyst Role: Agile vs. Waterfall
The Business Analyst Role: Agile vs. WaterfallThe Business Analyst Role: Agile vs. Waterfall
The Business Analyst Role: Agile vs. Waterfall
 
Training - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and KanbanTraining - Introducing Agile, Lean and Kanban
Training - Introducing Agile, Lean and Kanban
 
Lightening Talk: definition of ready
Lightening Talk: definition of readyLightening Talk: definition of ready
Lightening Talk: definition of ready
 
BABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and OutputsBABOK - Tasks, Input and Outputs
BABOK - Tasks, Input and Outputs
 
Team Topologies - Des organisations pour une architecture émergente
Team Topologies - Des organisations pour une architecture émergenteTeam Topologies - Des organisations pour une architecture émergente
Team Topologies - Des organisations pour une architecture émergente
 
Designing your kanban board to map your process
Designing your kanban board to map your processDesigning your kanban board to map your process
Designing your kanban board to map your process
 
The Agile Adoption Roadmap (Keynote by Tim Abbott)
The Agile Adoption Roadmap  (Keynote by Tim Abbott)The Agile Adoption Roadmap  (Keynote by Tim Abbott)
The Agile Adoption Roadmap (Keynote by Tim Abbott)
 
IBM BPM ( Business Process Management ) S/W 소개
IBM BPM ( Business Process Management ) S/W 소개IBM BPM ( Business Process Management ) S/W 소개
IBM BPM ( Business Process Management ) S/W 소개
 
Agile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily ReleasesAgile IT Operatinos - Getting to Daily Releases
Agile IT Operatinos - Getting to Daily Releases
 
Introduction Au Plm
Introduction Au PlmIntroduction Au Plm
Introduction Au Plm
 
Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2Change Control Management in SAP Solution Manager 7.2
Change Control Management in SAP Solution Manager 7.2
 
Visual Architecting
Visual Architecting Visual Architecting
Visual Architecting
 
Agile Project Framework
Agile Project FrameworkAgile Project Framework
Agile Project Framework
 
Ha100 unit 3 hana architecture sp08
Ha100 unit 3 hana architecture sp08Ha100 unit 3 hana architecture sp08
Ha100 unit 3 hana architecture sp08
 
Vsevolod Zelenin. How to return project teams back to work.
Vsevolod Zelenin. How to return project teams back to work.Vsevolod Zelenin. How to return project teams back to work.
Vsevolod Zelenin. How to return project teams back to work.
 
Agile DevOps Transformation Strategy
Agile DevOps Transformation StrategyAgile DevOps Transformation Strategy
Agile DevOps Transformation Strategy
 

Similar to Quality tracking through JIRA

Neusource operation module
Neusource operation moduleNeusource operation module
Neusource operation moduleJai Sethi
 
Lesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentLesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentInformatica
 
Scrum and Kanban guide
Scrum and Kanban guideScrum and Kanban guide
Scrum and Kanban guideRudresh SM
 
Case Status, Case Sub Status, Milestone Webcast Slides
Case Status, Case Sub Status, Milestone Webcast SlidesCase Status, Case Sub Status, Milestone Webcast Slides
Case Status, Case Sub Status, Milestone Webcast Slidesdannyhuang
 
Thezenofscrum1 090221154550 Phpapp01
Thezenofscrum1 090221154550 Phpapp01Thezenofscrum1 090221154550 Phpapp01
Thezenofscrum1 090221154550 Phpapp01Adrian Treacy
 
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...SlideTeam
 

Similar to Quality tracking through JIRA (13)

Neusource operation module
Neusource operation moduleNeusource operation module
Neusource operation module
 
Lesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve ContentLesson 6 - Collaborate And Approve Content
Lesson 6 - Collaborate And Approve Content
 
Kanban Queue
Kanban QueueKanban Queue
Kanban Queue
 
Jira Training
Jira TrainingJira Training
Jira Training
 
57086 19 change_controltechniques
57086 19 change_controltechniques57086 19 change_controltechniques
57086 19 change_controltechniques
 
Job evaluation
Job evaluationJob evaluation
Job evaluation
 
Business case atraxis organizing team
Business case atraxis   organizing teamBusiness case atraxis   organizing team
Business case atraxis organizing team
 
Scrum and Kanban guide
Scrum and Kanban guideScrum and Kanban guide
Scrum and Kanban guide
 
Case Status, Case Sub Status, Milestone Webcast Slides
Case Status, Case Sub Status, Milestone Webcast SlidesCase Status, Case Sub Status, Milestone Webcast Slides
Case Status, Case Sub Status, Milestone Webcast Slides
 
Thezenofscrum1 090221154550 Phpapp01
Thezenofscrum1 090221154550 Phpapp01Thezenofscrum1 090221154550 Phpapp01
Thezenofscrum1 090221154550 Phpapp01
 
The Zen of Scrum
The Zen of ScrumThe Zen of Scrum
The Zen of Scrum
 
agile_flow
agile_flowagile_flow
agile_flow
 
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...Change Control Process Identification Evaluation Engineering Fulfillment Requ...
Change Control Process Identification Evaluation Engineering Fulfillment Requ...
 

More from Cetas Information Technology Pvt Ltd

DynaText - First SMS solution for Dynamics NAV (Formerly Navision)
DynaText - First SMS solution for Dynamics NAV (Formerly Navision)DynaText - First SMS solution for Dynamics NAV (Formerly Navision)
DynaText - First SMS solution for Dynamics NAV (Formerly Navision)Cetas Information Technology Pvt Ltd
 

More from Cetas Information Technology Pvt Ltd (20)

Food Home Delivery Soluitons
Food Home Delivery SoluitonsFood Home Delivery Soluitons
Food Home Delivery Soluitons
 
Navbuild 2013
Navbuild 2013Navbuild 2013
Navbuild 2013
 
Food Ordering Application for Your Restaurant
Food Ordering Application for Your RestaurantFood Ordering Application for Your Restaurant
Food Ordering Application for Your Restaurant
 
LS Hospitality
LS Hospitality LS Hospitality
LS Hospitality
 
Dynamics NAV for Construction & Project Centric Organisation
Dynamics NAV for Construction & Project Centric OrganisationDynamics NAV for Construction & Project Centric Organisation
Dynamics NAV for Construction & Project Centric Organisation
 
Navbuild 2013
Navbuild 2013Navbuild 2013
Navbuild 2013
 
Dynamics NAV Implementation & Support Partner in Bangalore
Dynamics NAV Implementation & Support  Partner in BangaloreDynamics NAV Implementation & Support  Partner in Bangalore
Dynamics NAV Implementation & Support Partner in Bangalore
 
Currents retail
Currents retailCurrents retail
Currents retail
 
Rent IT
Rent ITRent IT
Rent IT
 
DynaText - First SMS solution for Dynamics NAV (Formerly Navision)
DynaText - First SMS solution for Dynamics NAV (Formerly Navision)DynaText - First SMS solution for Dynamics NAV (Formerly Navision)
DynaText - First SMS solution for Dynamics NAV (Formerly Navision)
 
Jewellry Retail Software
Jewellry Retail  SoftwareJewellry Retail  Software
Jewellry Retail Software
 
Navbuild
NavbuildNavbuild
Navbuild
 
Jewellery Retail Software
Jewellery Retail SoftwareJewellery Retail Software
Jewellery Retail Software
 
Task Management Software
Task Management SoftwareTask Management Software
Task Management Software
 
Construction Add On for Navision
Construction Add On for NavisionConstruction Add On for Navision
Construction Add On for Navision
 
Rental software
Rental softwareRental software
Rental software
 
Enterprise Task Management Solution - Q Track
Enterprise Task Management Solution - Q TrackEnterprise Task Management Solution - Q Track
Enterprise Task Management Solution - Q Track
 
NAVBUILD - Navision For Construction
NAVBUILD -  Navision For ConstructionNAVBUILD -  Navision For Construction
NAVBUILD - Navision For Construction
 
CETAS Information Technology Pvt. Ltd
CETAS Information Technology Pvt. LtdCETAS Information Technology Pvt. Ltd
CETAS Information Technology Pvt. Ltd
 
Jewelry Retail Software - Jewel Star
Jewelry Retail Software - Jewel StarJewelry Retail Software - Jewel Star
Jewelry Retail Software - Jewel Star
 

Recently uploaded

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answersdalebeck957
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactisticshameyhk98
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationNeilDeclaro1
 

Recently uploaded (20)

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Basic Intentional Injuries Health Education
Basic Intentional Injuries Health EducationBasic Intentional Injuries Health Education
Basic Intentional Injuries Health Education
 

Quality tracking through JIRA

  • 2. Imagine a Dashboard with all Quality Parameters? Dashboard gives a snapshot of important metrics, which a Quality Head can use to monitor & control Quality Processes.
  • 3. Quality Process Flow in a Typical Manufacturing Environment Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 4. Create & Assign Issues All Issues are created by the Quality Personnel.
  • 5. Create & Assign Issues The Quality Personnel will assign the project to the respective Department Head.
  • 6. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 7. Allocation of an Issue The Created Issue will get listed in the Inbox of the Assigned User.
  • 8. Allocation of an Issue The User can Open and view the Issue Form.
  • 9. Allocation of an Issue The Department Head assigns the issue to a respective production personnel.
  • 10. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 11. Opening & Assigning an Issue as In-Progress The Issue assigned by the department head will get listed in the Inbox of the Assigned personnel.
  • 12. Opening & Assigning an Issue as In-Progress The Personnel has to change the status as In-Progress before resolving the Issue.
  • 13. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 14. Resolving an Issue and Filling 8D Form. The Issue assigned by the department head will get listed in the Inbox of the Assigned personnel.
  • 15. Resolving an Issue and Filling 8D Form. After resolving the issue the production personnel fills the 8D Corrective Action Report.
  • 16. Resolving an Issue and Filling 8D Form. The Production Personnel can reopen the resolved issue before Approval from department head.
  • 17. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 18. Approving an Issue by the Department Head The Resolved Issue will get listed in the Inbox of the Department Head.
  • 19. Approving an Issue by the Department Head During the Department Head Approval the Department Head can view and alter the 8D Report.
  • 20. Approving an Issue by the Department Head During the Department Head Approval the Department Head can view and alter the 8D Report.
  • 21. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 22. Approving an Issue by the Quality Department The Approved Issue will get listed in the Inbox of the Quality Department with the status Head Approval..
  • 23. Approving an Issue by the Quality Department The Approved Issue has to be again approved by Quality Department.
  • 24. Approving an Issue by the Quality Department The Approved Issue has to be again approved by Quality Department.
  • 25. Quality Process Flow Create and Assign an Issue QC Person can either to the Production reopen the issue or Quality Head closes the department head (either approve. If reopened again Issue. Internal or From the issue will be assigned Customer). to the department head. Approval or Reopen by the Production Department Allocate the issue to the Head. If Reopened the respective personnel report is again assigned to the personnel. Personnel changes the Personnel Resolves the status to “work In process and fills the 8D Progress” form.
  • 26. Closing an Issue The Issue Approved by Quality Department has to be closed by the Quality Head.
  • 27. Closing an Issue The Issue Approved by Quality Department has to be closed by the Quality Head.
  • 28. Closing an Issue The Issue Approved by Quality Department has to be closed by the Quality Head.
  • 29. Better insight into Quality • Gain real-time access to all Quality Issues (Internal or Customer initiated) through a Dashboard driven system. • Helps in tracking, monitoring and controlling all Quality aspects of the Organization. • Can be extended to allow Customer access into such system, if required. • Give employees quick insight into predefined views of data tailored to their roles.
  • 30. About CETAS CETAS is a Team Of Seasoned IT Professionals with a 100 Plus Years of total experience in the Enterprise Application Space .. • We Offer …. – Enterprise Application Consulting Services – Product Engineering Services – Application Development Services – Application Maintenance & Migration Services
  • 31. Thank You Cetas Information Technology Pvt. Ltd Phase 2, Plot No 21,22, 9th Cross Street, Wood Creek County St. Thomas Mount, Chennai -600 016 www.Cetastech.com Enquires : Sales@cetastech.com