Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
20161130 - Booosting Circular Demolition @Erasmus MC Rotterdam - Re-manufacturing group 2
1. - 1 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Assignment
Re-manufacture group 2 is asked to split in two groups, of which each group is asked to identify
the treats and opportunities of the re-manufacture process in order to reuse:
1a) the steel window frame of building H (Dijkzicht, 1960)
1b) The steel structure of building Hs (2005)
The existing building components and elements are presented on the next page(s).
At the end of the workshop group two is asked to present the findings of both cases in a pitch
of 2-3 minutes to the other groups, see page 7.
1st
2nd
3rd
4th
5th
6th
-1st
Hs
RE-MANUFACTURE GROUP 2 | Re-manufacturing of a load-bearing structure
incl. floor (sub-group 1) and steel frame facade system (sub-group 2)
2. - 2 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Amount of window frames
Outside 592x
Inside 592x
Total 1184x
Technical specification - facade frame Building H (1960)
3. - 3 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Technical specification - facade frame Building H (1960)
4. - 4 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Technical specification - Steel structure (2005)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5. - 5 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Technical specification - Steel structure (2005)
6. - 6 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
installations
Floor level
+ 2700
Technical specification - Steel structure (2005)
7. - 7 -
CIRCULAR DEMOLITION OF THE HOSPITAL BUILDINGS ERASMUS MC
30th
November 2016
Re-manufacture steel facade
Re-manufacture steel structure
Opportunities:
Treats:
Opportunities:
Treats: