SlideShare a Scribd company logo
1 of 40
Download to read offline
December 2012

Bringing Exceptional Management
and Exploration Expertise to a
Proven Mineral Environment



                          TSX-V: SA
SouthernArcMinerals.com   OTCQX: SOACF
Cautionary Note


Some of the statements contained in this presentation are forward-looking statements, such as estimates and
statements that describe future plans, objectives or goals, including words to the effect that Southern Arc
Minerals Inc. implies a stated condition or that it forecasts certain results could occur. Because forward-looking
statements address future events and conditions, by their very nature they involve inherent risks and
uncertainties. Actual results relating to, among other things, reserves, resources, results of exploration,
reclamation and other post-closure costs, capital costs and mine production costs could differ materially from
those currently forecast in such statements by reason of factors such as changes in general economic conditions
and conditions in the financial markets, changes in demand and prices for the minerals, litigation, legislative,
environmental and other judicial, regulatory, technological and operational difficulties encountered in connection
with mining activities, labour relations matters, costs and changing foreign exchange rates. This list is not
exhaustive of the factors that may affect any of forward-looking statements. These and other factors should be
considered carefully and readers should not place undue reliance on Southern Arc Minerals Inc. statements.
Drilling information in this presentation has been compiled under the supervision of Southern Arc’s Executive
Vice President, Andrew Rowe B. App. Sc. Geology, MAusIMM. Mr. Rowe has over 18 years of international mineral
exploration experience throughout SE and Central Asia and Australia. During this time he has held such positions
as Chief Geologist – Feasibility Studies, Senior Geologist and Consulting Geologist. The technical information in
this document has also been reviewed by Southern Arc’s President & Chief Operating Officer, Dr. Mike Andrews,
PhD, FAusIMM, who has sufficient experience relevant to the style of mineralization under consideration and
qualifies as a Qualified Person as defined by National Instrument 43-101. All assaying of samples was undertaken
by the ITS laboratory in Jakarta. ITS is one of the world’s largest product and commodity testing, inspection and
certification organizations. The Jakarta laboratory is ISO 17025 accredited and employs a Laboratory Information
Management System (LIMS) for sample tracking, quality control and reporting.

                                                                                                                     2
Investment Highlights


Properties
  • Exploring one of the most prospective regions in the world
  • Flagship property shows district-scale potential for gold, potential porphyries
  • No-cost JV on strategic “area play” property
  • Actively looking for new gold-focused opportunities
People
  • Management, directors and advisors with the experience and connections to
    successfully advance properties
Partnerships
  • Strategic shareholders, partnership with Vale
Capital
  • Financial flexibility with ~$18 M in working capital and no debt (Nov 2012)
Catalysts
  • News flow from exploration activity
  • West Lombok NI 43-101 compliant resource estimate targeted for mid-2013
                                                                                      3
Share Structure


  Shares          Options        Warrants      Fully Diluted
109,214,510      9,300,000          0          118,544,510


 •   Directors, management and insiders control ~20%
 •   52-week trading range $0.20 – $0.99
 •   Average trading volume (3 months): ~60,000 shares/day




                                                               4
Indonesia’s Main Deposits & Mines




                                    5
Southern Arc’s Properties




                            6
West Lombok


90% Southern Arc
10% Indonesian Regency Government



                                    7
West Lombok Project

                    13km by 7km structural corridor of mineralization

•   Deforested grassland,
    accessible by road
•   Previously explored by
    Newmont
•   Prospective for both
    epithermal gold and copper-
    gold porphyry mineralization




      West Lombok property                                              8
Exploration Activity in 2012


Advanced understanding of porphyry
Cu-Au mineralization
•   Airborne magnetic and radiometric
    survey at 50-metre spacings
•   Porphyry prospectivity study identified 17
    new porphyry exploration targets
•   Drilled a number of porphyry targets in SE
    and NE sections of property
•   Detailed surface mapping and channel
    sampling identified new areas with
    surface porphyry mineralization




                                                          9
Exploration Activity in 2012


Continued to extend and explore
gold epithermal mineralization
•   Exploration drilling on Pelangan
    mineralized structural breccia (MSB)
    structures in NW corner of property
•   Detailed mapping and channel
    sampling identified new MSB outcrops
    adjacent to Mencanggah and Pelangan
•   Confirmed relationship of MSB
    epithermal systems as surface
    manifestation of underlying porphyry
    systems
•   Coordinated with SRK on drill hole
    planning, drill logging, data handling
    and modelling methods
                                                           10
Drill Program Underway


•   Drill program prepared in consultation
    with SRK Consulting (Canada) Inc.
     • Bising  infill and expand zone of
       mineralization adjacent to wide intercepts
     • Tibu Serai  test down-dip from areas
       identified with rock-chip samples
•   Drill Phase A holes at Bising and Tibu Serai
     Board review / report results  refocus
    exploration as appropriate
•   NI 43-101 resource estimate for portions
    of the property targeted for mid-2013




                                                    11
Mencanggah Prospect


•    19km cumulative strike length of Au-
     bearing epithermal breccias with
     indications of near-surface porphyry Cu-
     Au mineralization
•    Rock channel samples include 7m @ 53.3
     g/t Au, 5m @ 12.2 g/t Au and 66m @ 1.1
     g/t Au 1
•    Phase 1 drilling completed 8,920m in 35
     holes
•    Significant-grade intersections include
     4.75m @ 15.6 g/t Au (including 2.0m @
     36.1 g/t Au and 1.6m @ 11.0 g/t Au), and
     39.0m @ 1.8 g/t Au (including 0.3m @
     89.0 g/t Au) 1

    1. See Significant Drill Results and Cautionary Note.                  12
Mencanggah Prospect – Bising


•     Surface channel sampling has returned high-grade intervals and very wide
      intervals of low-grade mineralization
•     Drilled eight holes in 2011 to test main epithermal structural body, its
      extensions, and intersections with crossing structures  identified 500-metre
      long zone of mineralization
•     Current drill program
       • Three rigs mobilized
       • Plan to drill ten Phase A holes
       • Infill and expand zone of mineralization adjacent to MCG028 (51.3m @
         1.5 g/t Au), MCG030 (39.0m @ 1.8 g/t Au), MCG032 (37.8m @ 1.0 g/t Au) 1
       • Drill Phase A  review/report results  refocus program as appropriate




    1. See Significant Drill Results and Cautionary Note.                             13
Mencanggah Prospect – Bising
Infill and expand mineralized zones




                                      14
Mencanggah Prospect – Tibu Serai
                         Test down-dip from surface samples



•   Low silver-to-gold ratios in rock
    chip samples are a proven vector
    to higher gold grades in
    epithermal gold mineralization on
    West Lombok property
•   Test down-dip with seven Phase A
    holes  review / report results 
    refocus program as appropriate




                                                              15
Pelangan Prospect


•   5km cumulative strike length of Au-
    bearing mineralization outcropping at
    surface
•   4,130m Phase 1 drilling included 10m
    @ 13.4 g/t Au and 17m @ 5.73 g/t Au1
•   11,867m of Phase 2 drilling completed,
    significant-grade intersections including
    17.4m @ 19.4 g/t Au1
•   Drilling in 2012 tested strike length and
    depth of Au-Ag mineralization, high-
    grade shoots
•   Will consider next exploration focus
    once Phase A at Bising and Tibu Serai is
    complete
     1. See Significant Drill Results and Cautionary Note.               16
Pelangan Prospect – Raja
Three high-grade shoots




                           17
Selodong Prospect


•   Multiple Cu-Au targets defined
    by geochemistry, geophysics
    and alteration mapping
•   Seven targets tested in Phase 1
    exploration (17,859m) with
    significant near-surface Cu-Au
    porphyry mineralization
      •   166m @ 0.52% Cu and
          0.85 g/t Au1
      •   102m @ 0.50% Cu and
          1.05 g/t Au1
•   Indications of porphyry Cu-Au
    district-scale mineralization
•   Next phase of drilling will focus
    on new targets identified by
    porphyry prospectivity study
                                        1. See Significant Drill Results and Cautionary Note.
                                                                                                18
Sumbawa
              Island

Taliwang – Sale Pending
East Elang – Southern Arc / Vale S.A.



                                        19
Taliwang Project
                                                     Southern Arc 90% / Regency Government 10%


•        Adjacent to Newmont’s world-class Batu Hijau
         Cu-Au mine (17.2 M oz Au/14.1 B lb Cu)1
•        31,200 hectares highly prospective for Au, Ag,
         Cu with three main prospects:
          • 1km x 1.5km Au-Ag bearing epithermal
            vein system confirmed by 56 drill holes
          • 5km-long NE trending high-sulphidation
            alteration zone, paralleling the Batu Hijau
            mineralized trend
          • Sedimentary Au-hosted targets


•        Accepted offer to sell in December 2012 
         more details to follow when agreements are
         finalized

    1.   Newmont press release February 24, 2011 references independent JORC estimate for
         Batu Hijau deposit. Proximity to the Batu Hijau mine does not guarantee that Southern
         Arc will have similar mineralization on its properties.                                 20
East Elang Project
                                             Southern Arc / Vale Joint Venture Agreement


•   Adjacent to Newmont’s Elang
    deposit (25 M oz Au/16 B lb Cu)1
•   Vale must fund through to bankable
    feasibility study to earn 75%
    interest2
•   Structure and alteration suggest that
    Elang mineralized trend may
    continue onto Southern Arc’s East
    Elang property
•   Awaiting receipt of forestry permit
    before commencing regional
    exploration to identify targets for
    detailed prospect follow up
•   Applied to have IUP back dated to
    allow for adequate exploration time
       1. Newmont press release February 24, 2011 references independent JORC estimate from June 2010 for Elang deposit. Proximity to the
          Batu Hijau mine and Elang deposit does not guarantee that Southern Arc will have similar mineralization on its properties.
       2. See Vale Joint Venture Agreement.                                                                                                 21
Exploration Activity in East Elang District




                                              22
Experienced Team


 Cumulative 65 years of Indonesian
 exploration experience



                                     23
Executives and Directors


John Proust
                                Dr. Mike Andrews

Chairman & Chief Executive Officer          President & Chief Operating Officer
One of the original founders of Southern    Geologist with more than 30 years of research
Arc. Certified Director. Resource sector    and exploration experience in Indonesia and
expert in financing, mergers and            Australasia. Principal in the discovery,
acquisitions, corporate restructuring and   exploration and development of the Way
corporate governance.                       Linggo gold-silver mine in Indonesia.

Andrew Rowe

Executive Vice President
Geologist with more than 20 years of
exploration and project management
experience, including senior positions
with Phelps Dodge, Ivanhoe Mines,
Aurora Gold and Pan Australian Mining.


                                                                                       24
Directors and Advisors


Bob Gallagher                              Mohammed Al-Shahwani
Director
                                  Director

President & CEO of NewGold with 32         CEO of Qatar Mining Company. Involved
years of mining experience, including as   in major resource projects
Vice President of Newmont’s Asia-Pacific   internationally, with extensive corporate
operations, including development of       development experience.
the Batu Hijau mine.
                                           Dr. Steve Garwin
Dr. David Stone                            Senior Technical Advisor

Director
                                  Leading authority on Cu-Au
Doctorate in Civil Engineering with 25     mineralization in Southeast Asia,
years of mining experience and broad       doctorate based on Batu Hijau deposit.
expertise in mining technology and         More than 22 years of exploration
advanced project development.              experience, including as Newmont’s
                                           Chief Geologist.

                                                                                       25
Directors and Advisors


Malcolm Baillie
                         Dr. Alwi Shihab

Commissioner                             Commissioner
Metallurgical engineer with 30 years     Involved with many public companies
of experience in the Indonesian mining   operating in Indonesia. Currently Vice
sector. Leader in government             Chairman, Presidential Task Force for
negotiations, including as Director of   Labour Management. Previously Foreign
Indonesian Mining Association.           Minister for Indonesia and Special Envoy
                                         to Indonesian President for Middle East
Robert Parsons                           investments.
Advisor

Chartered Accountant, former partner     Bryan Disher
of PricewaterhouseCoopers. Serves on     Security Advisor

Advisory Board of Indonesian Mining      Indonesia security and government
Association and International Affairs    relations expert since 1996, with
Committee of PDAC.                       extensive network of connections with
                                         Indonesian officials.
                                                                                 26
Why Invest in Southern Arc?


Properties
  • Exploring one of the most prospective regions in the world
  • Flagship property shows district-scale potential for gold, potential porphyries
  • No-cost JV on strategic “area play” property
  • Actively looking for new gold-focused opportunities
People
  • Management, directors and advisors with the experience and connections to
    successfully advance properties
Partnerships
  • Strategic shareholders, partnership with Vale
Capital
  • Financial flexibility with ~$18 M in working capital and no debt (Nov 2012)
Catalysts
  • News flow from exploration activity
  • West Lombok NI 43-101 compliant resource estimate targeted for mid-2013
                                                                                  27
Appendix




           28
West Lombok Permitting Status




              Forest Types
               • 1.1% Protected Forest1
               • 55.1% Production Forest2
               • 43.8% No Forest Designation3
              Permitting Status
               • IUP license issued
               • MOF permit issued




1.   No open-pit mining allowed. Underground mining allowed with appropriate forestry permit.
2.   Open-pit and underground mining allowed with appropriate forestry permit.
3.   No restriction on mining activities.                                                       29
East Elang Permitting Status


         IUP License
           •   IUP license issued by the Sumbawa Regent on
               December 17, 2010 for a period of seven years
         Forest Types
           •   60.3% Protected Forest1
           •   34.2% Limited Production Forest2
           •   5.5% No Forest Designation3
         Requirements
           •   MOF permit required for exploration activities
               within both Protected and Production
               designated areas
         Status
           • MOF permit issuance in process
           • Requesting that IUP be back-dated to allow for
             adequate exploration time once MOF permit is
             received
1.   No open-pit mining allowed. Underground mining allowed with appropriate forestry permit.
2.   Open-pit and underground mining allowed with appropriate forestry permit.
3.   No restriction on mining activities.                                                       30
Mencanggah Prospect, Bising Target




                                     31
Mencanggah Prospect, Waterfall Target




                                        32
Pelangan Prospect, Raja Target, Long-section
Projection of Drill Hole Mineralized Intervals




                                                 33
Pelangan Prospect, Raja Target




                                 34
Pelangan Phase 1                                                                                                     10.00   32.95   22.95     22.95 m @ 4.1 / 17
HOLE ID    Target      From (m) To (m)     Interval (m)          Intersection ( Au / Ag g/t )   RDG05     Raja                       2.25
                                                                                                                     20.70   22.95           incl. 2.25 m @ 14.6 / 10
                         16.80     23.80                  7.00            7 m @ 4.4                                                  1.00
                                                                                                                     27.20   28.20            and 1 m @ 21.4 / 23
 KDG02    Kayu Putih     19.80     20.80                  1.00        incl. 1 m @ 9.92 &
                                                                                                                     9.95    26.05   16.10     16.1 m @ 2.7 / 23
                         22.80     23.80                  1.00             1 m @ 18             RDG06     Raja
                                                                                                                     10.80   16.50   5.70     incl. 5.7 m @ 5.2 / 30
                         20.50     23.50                  3.00            3 m @ 4.1
 KDG03    Kayu Putih                                                                                                                 19.75
                         20.50     21.50                  1.00          incl.1 m @ 5.9                               35.15   54.90             19.75 m @ 4.6 / 28
                                                                                                                     35.15   37.65   2.50     incl. 2.5 m @ 5.5 / 28
                         2.00      13.40              11.40            11.4m @ 9.6 / 47
                                                                                                RDG07     Raja
 KDG04    Kayu Putih     3.00       4.10                  1.10     incl. 1.1m @ 26.8 / 217                           40.55   44.45   3.90    and 3.9 m @ 13.5 / 22
                         11.40     12.40                  1.00       incl. 1 m @ 71 / 182                            49.50   54.10   4.60     and 4.6 m @ 3.6 / 24
                         17.85     28.95              11.10           11.1 m @ 3.1 / 7.8                             39.70   58.15   18.45      18.45 m @ 1.1 / 4
                         19.95     22.50                  2.55      incl. 2.55 m @ 9 / 16.2     TDG01    Tanjung
 KDG12    Kayu Putih                                                                                                 41.95   43.40   1.45     incl. 1.45 m @ 2.5 / 3
                         68.80     72.90                  4.10         4.1 m @ 5.9 / 8.8
                                                                                                                     54.40   56.00   1.60      and 1.6 m @ 4.1 / 3
                         69.80     70.90                  1.10     incl. 1.1 m @ 18.1 / 24.5
                                                                                                                     32.85   42.90   10.05     10.05 m @ 13.4 / 8
                         22.00     27.00                  5.00          5 m @ 4.2 / 15
 KDG013   Kayu Putih                                                                            TDG02    Tanjung
                         24.90     26.30                  1.40      incl. 1.4 m @ 9.8 / 21                           35.35   37.65   2.30    incl. 2.3 m @ 47.9 / 24

 QDG06      Ratu         28.80     29.80                  1.00         1 m @ 7.36 / 186                              39.90   41.80   1.90      and 1.9 m @ 7.1 / 2

                         6.30      17.00              10.70           10.7 m @ 2.93 / 20                             48.00   56.60   8.60        8.6 m @ 2.7 / 4
                                                                                                TDG03    Tanjung
                         7.50      12.20                  4.70      incl. 4.7 m @ 5.8 / 27                           48.75   51.70   2.95       2.95 m @ 6.1 / 9
 RDG01      Raja
                         61.65     65.10                  3.45        3.45 m @ 4.13 / 64                             32.50   37.10   4.60       4.6 m @ 3.1 / 10
                                                                                                TDG06    Tanjung
                         63.20     64.00                  1.10     incl. 1.1 m @ 7.62 / 129
                                                                                                                     33.55   35.00   1.45     incl. 1.45 @ 5.5 / 10
                         0.00       6.30                  6.30         6.3 m @ 2.5 / 81
                                                                                                                     52.90   62.10   9.20       9.2 m @ 5.9 / 11
                         1.20       2.80                  1.60      incl. 1.6 m @ 5.7 / 50      JDG03      Jati
 RDG03       Raja                                                                                                    55.30   56.55   1.25    incl. 1.25 m @ 24.9 / 7
                         23.20     35.30              12.10           12.1 m @ 2.3 / 16
                         23.20     26.35                  3.15     incl. 3.15 m @ 4.8 / 21.6                         4.80    23.35   18.55       18.55 m @ 1.14

                                                          9.50                                  KDG16   Kayu Putih   21.05   22.5    1.45    incl. 1.45 m @ 6.2 / 55
                         8.35      17.85                               9.5 m @ 6.2 / 41
 RDG04      Raja
                         12.25     15.30                  3.05     incl. 3.05 m @ 14.2 / 61                          76.45   77.35   0.90       0.90m @8.12/11




                                                                                                                                                                        35
Pelangan Phase 2                                                                                          74.6    111.8    37.2       37.2 m @ 2.5 / 14.2
                                                                                      PLD014    Raja
HOLE ID      Target   From (m)    To (m)   Interval (m)    Intersection (Au/Ag g/t)                       90.7     99.9     9.2    incl. 9.2 m @ 4.1 / 24.0
                         56.55     61.4       4.85          4.85 m @ 7.11/18.5                           132.4    138.4     6         6.0 m @ 2.2/13.1
   PLD001     Raja                                                                    PLD017    Raja
                         56.55     57.9       1.35        incl. 1.35 m @ 16.7/17.0                       132.4    133.7     1.3     incl. 1.30 m @ 4.9/11
                         120.15   137.4       17.25         17.25 m @ 5.73/11.7
   PLD002     Raja                                                                                       147.1    152.3     5.2       5.2m @ 4.1/10.3
                         121.6    130.35      8.75        incl. 8.75 m @ 10.51/20.7
                                                                                                         147.7    148.45   0.75    incl. 0.75 m @ 14.0/43.7
                         232.95   249.5       16.55          16.55 m @ 5.5/3.7
                                                                                                         151.75   152.3    0.55    and 0.55 m @ 14.5/5.2
   PLD003     Raja       237.5    245.2        7.7         incl. 7.70 m @ 10.9/6.1    PLD019    Raja
                                                                                                         160.8    174.75   13.95     13.95 m @ 2.7/19.4
                         240.7    245.2        4.5         incl. 4.50 m @ 17.6/8.0
                                                                                                         160.8    163.2     2.4     incl. 2.4 m @ 7.1/34.8
                         110.05   126.2       16.15         16.15 m @ 1.4/12.0
   PLD006     Raja                                                                                       173.75   174.75    1       and 1.0m @ 4.7/40.9
                         110.05   112.5       2.45         incl. 2.45 m @ 4.7/34.0
                                                                                                         101.8    117.6    15.8       15.8m @ 3.6/19.7
                          78.8    118.5       39.7           39.7 m @ 9.4/15.7
                                                                                      PLD022    Raja     111.4     117      5.6     incl. 5.6m @ 7.0/12.6
                          78.5     96.2       17.7        incl. 17.40 m @ 19.4/28.3
   PLD007     Raja
                          88.1    94.25       6.15        incl. 6.15 m @ 37.7/26.0                       115.6     117      1.4    incl. 1.4m @ 18.2/10.9

                         127.7    128.45      0.75          0.75 m @ 22.1/15.4        PLD024    Raja     223.85   225.8    1.95         1.95 m @ 3.3
                         70.35     81.9       11.55         11.55 m @ 9.80/31.1                          167.2    193.4    26.2         26.2 m @ 4.2
                         70.35    73.85        3.5         incl. 3.5 m @ 26.1/96.5    PLD027   Tanjung   167.2    168.5     1.3       incl.1.3 m @ 30.1
   PLD008     Raja
                          93.7    105.5       11.8           11.8 m @ 1.40/9.2                           189.15   192.6    3.45      incl. 3.45 m @ 12.3
                         100.2    102.2         2         incl. 2.00 m @ 3.70/22.6    PLD028    Raja     251.05   252.40    1.35       1.35 m @ 1.0/6.2
                         217.3    225.5        8.2            8.20 m @ 4.4/2.7                           154.70   158.60     3.9         3.90 m @ 3.9
   PLD009     Raja                                                                    PLD031    Raja
                                                                                                         156.40   157.25    0.85     incl. 0.85 m @ 11.5
                         217.3    221.6        4.3         incl. 4.30 m @ 7.5/3.9
                                                                                                          87.20   100.35   13.15        13.15 m @ 1.4
                         127.35   149.4       22.05         22.05 m @ 2.7 / 2.8       PLD032    Raja
                                                                                                         97.05    100.35    3.30      incl. 3.30 m @ 2.3
   PLD010     Raja       140.4    149.4         9          incl. 9.0 m @ 4.6 / 1.6
                         140.8    142.2        1.4         incl. 1.4 m @ 11.5 / 2.3
                         210.2    226.7       16.5          16.5 m @ 3.2 / 16.4
   PLD011     Raja
                         211.5    216.25      4.75        incl. 4.75 m @ 8.2 / 41.9

                                                                                                                                                              36
Mencanggah Phase 1                                                                                   11.7     49.5    37.8     37.8 m @ 1.0/1.4
                                                                                                      19      22       3     incl. 3.0 m @ 2.7/0.8
 HOLE ID   Target    From (m)   To (m)   Interval (m)   Intersection (Au/Ag g/t)
                                                                                                     25.2     30      4.8    incl. 4.8 m @ 4.0/2.5
                        35.6    86.85        51.3         51.3 m @ 1.5 /1.4        MCG032   Bising
                                                                                                     44.2     45.2     1     incl. 1.0 m @ 1.4/1.4
                        38.9    39.2         0.3        incl. 0.3 m @ 2.8 /0.9
                                                                                                     145.6   152.6     7       7.0 m @ 0.3/1.6
                        47.9     52          4.1        incl. 4.1 m @ 2.3 / 0.9
                                                                                                     190.1   198.2    8.1      8.1 m @ 0.4/1.8
                        53.4    58.45        5.1        incl. 5.1 m @ 3.5 /1.1
                                                                                                     134.1   170.55   36.5     36.5 m @ 0.3/1.5
MCG028     Bising       56.4    57.4          1         incl. 1.0 m @ 11.0 /1.0
                                                                                                     150.8   170.55   19.8   incl. 19.8 m @ 0.4/2.0
                        60.2    63.9         3.8         incl. 3.8 m @4.9/0.7
                                                                                                     214.2   224.45   10.3     10.3 m @ 0.3/1.1
                        61.8    62.05        0.3        incl. 0.3 m @40.3/0.6      MCG033   Bising
                                                                                                     220.4   220.7    0.3    incl. 0.3 m @ 1.7/6.5
                        65.6    76.4        10.8        incl. 10.8 m @1.4/2.8
                                                                                                     258.6   261.1    2.6      2.6 m @ 0.4/0.5
                         76     76.4         0.5        incl. 0.5 m @13.4/29.4
                                                                                                     259.1   259.55   0.4    incl. 0.4 m @ 1.4/1.6
                        40.1     83         42.9          42.9 m @ 0.4/2.3                            8.2     15.9    7.7       7.7 m 0.5/5.1
                        47.1    47.7         0.6         incl. 0.6 m @ 3.5/0.9                       10.2     11.6    1.4    incl.1.4 m @ 1.2/23.2
MCG029     Bising       74.6     82          7.4         incl. 7.4 m @ 0.7/3.3
                                                                                                     46.5     55.1    8.6      8.6 m @ 0.4/4.2
                        74.6     75          0.4         incl. 0.4 m @ 2.9/26
                                                                                   MCG034   Bising   151     152.7    1.7      1.7 m @ 0.4/2.1
                         80      81           1          incl. 1.0 m @ 1.0/4.0
                                                                                                     169.7   170.5    0.8      0.8 m @ 0.9/2.7
                         34      73          39           39.0 m @ 1.8/3.1
                                                                                                     182.5   185.7    3.2       3.2 m @ 0.6/2.7
                        38.6     40          1.4         incl. 1.4 m @ 1.1/1.0
                                                                                                     286.7   288.1    1.4       1.4 m @ 0.2/8.6
                        46.5    50.1         3.6         incl. 3.6 m @ 1.7/2.0
MCG030     Bising                                                                                     29     48.45    19.5     19.5 m @ 0.2/0.9
                        56.3     66          9.7         incl. 9.7 m @ 4.9/5.9
                                                                                                     63.5     72.5     9        9.0 m @ 0.7/0.6
                        59.2    59.5         0.3        incl. 0.3 m @ 89/27.6
                                                                                                      65      66.4    1.4     incl. 1.4 m @ 1.7/0.9
                         71      73           2          incl. 2.0 m @ 1.1/5.0     MCG035   Bising
                                                                                                     150.9   154.3    3.4       3.4 m @ 0.4/2.0
MCG031     Bising       34.0    99.7        65.1             65.1 @ 0.52
                                                                                                     163.2   166.5    3.3       3.3 m @ 0.5/1.4
                        74.2    87.0        12.8            Incl. 12.8 @ 1.0
                         37     37.6         0.6                                                     176.7   177.3    0.7       0.7 m @ 2.5/1.4
                                                         incl.0.6 m @ 6.5/2.2
                        74.2    78.6         4.4         incl.4.4 m @ 2.1/7.3
                        74.2    75.1         0.9         incl.0.9 m @ 6.8/27.7
                       156.8    157.5        0.8          0.8 m @ 47.7/13.2
                                                                                                                                                      37
Significant Drill Results


Selodong Phase 1                                                                                                  0      576.95   576.95     576.95m @ 0.12/0.25
 HOLE ID      PROSPECT      From     To (m)   Interval   Intersection(Cu % / Au g/t)                             21.5    135.4    113.9    incl. 113.9m @ 0.06/0.34
                                                                                       SLD013      M BOTEK
                             33.8     476      442.2        442.2m @ 0.28/0.42                                  262.75   369.35   106.6    incl. 106.6m @ 0.18/0.30
  SLD001   MONTONG BOTEK     33.8     200      166.2     incl. 166.2m @ 0.52/0.85                               441.35   493.35    52       incl. 52.0m @ 0.15/0.45
                             33.8    138.8      105      incl. 105.0m @ 0.60/1.04      SLD014      BELIKAT      110.3    187.75   77.45      77.45 m @ 0.13/0.22
                             18.1    402.75   384.65        384.65m @ 0.3/0.4                                     0      208.1    208.1      208.1m @ 0.12/0.22
  SLD002   MONTONG BOTEK
                            118.7    235.9     117.2      incl. 117.2m @ 0.56/0.8      SLD017   MONTONG BOTEK    8.5      21.5     13       incl. 13.0m @ 0.38/0.54
                             33.3    396.8     363.5        363.5m @ 0.3/0.51                                   318.8    330.8     12           12.0m @ -/0.54
  SLD003   MONTONG BOTEK     33.3    283.4     250.1     incl. 250.1m @ 0.35/0.64
                                                                                                                18.15     39.3    21.15      21.15m @ 0.10/0.13
                             33.3    90.45     57.15      incl. 57.15m @ 0.39/1.0      SLD019      KEDARO       193.6    320.05   126.45     126.45m @ 0.16/0.23
                             16.6     56.5     39.9           39.9m @ 0.2/0.3
                                                                                                                195.6    239.6     44       incl. 44.0m @ 0.22/0.34
                            160.25   567.5    407.25       407.25m @ 0.25/0.45
  SLD004      BLONGAS II                                                                                          0      855.1    855.1      855.10m @ 0.10/0.22
                            160.25   352.5    192.25     incl. 192.25m @ 0.36/0.74
                                                                                       SLD023   MONTONG BOTEK    210      452      242     incl. 242.00m @ 0.18/0.41
                            176.55   278.8    102.25     incl. 102.25m @ 0.5/1.05
                                                                                                                 278      378      100       100.00m @ 0.26/0.70
                             2.0     488.15   486.15       486.15m @ 0.22/0.26
                                                                                                                  0      334.35   334.35     334.35m @ 0.17/0.31
                             97.7    169.8     72.1       incl. 72.1m @ 0.38/0.30
  SLD005      BLONGAS II                                                               SLD026     BLONGAS II    222.35   326.35    104      incl. 104.0m @ 0.23/0.5
                            200.4    242.9     42.5       incl. 42.5m @ 0.39/0.57
                                                                                                                278.35   312.35    34       incl. 34.0m @ 0.29/0.29
                            334.6    414.6      80        incl. 80.0m @ 0.19/0.42
                                                                                                                 15.5    190.4    174.9      174.90m @ 0.12/0.25
                             49.8     550      500.2       500.20m @ 0.17/0.30         SLD027      KEDARO
                            200.2    374.9     174.7     incl. 174.70m @ 0.22/0.45                              87.05    141.05    54       incl. 54.0m @ 0.18/0.37
  SLD006      BLONGAS II
                            200.2    258.8     58.6      incl. 58.60m @ 0.32/0.74                                 0      504.65   504.65     504.65m @ 0.13/0.16
                                                                                       SLD029   MONTONG BOTEK   156.7    284.65   127.95   incl. 127.95m @ 0.14/0.26
                            335.8    374.9     39.1       incl. 39.1m @ 0.30/0.53
                            175.5    420.6     245.1        245.1m @ 0.18/0.22                                  404.65   504.65    100      incl. 100.0m @ 0.16/0.2
  SLD007      BLONGAS I     177.5    210.4     32.9       incl. 32.9m @ 0.22/0.36                                98.2    570.8    472.6      472.6m @ 0.16/0.28
                            348.75   411.8     63.05     incl. 63.05m @ 0.26/0.26                               172.2    457.15   284.95   incl. 284.95m @ 0.20/0.3
                                                                                       SLD030     BLONGAS II
                             91.1     181      89.9         89.9m @ 0.16/0.22                                   276.7    377.7     101     incl. 101.00m @ 0.28/0.5
  SLD011    NORTH M BOTEK
                            111.3    136.1     24.8       incl. 24.8m @ 0.24/0.34                               276.7    323.7     47      incl. 47.00m @ 0.34/0.74




                                                                                                                                                                       38
Vale Joint Venture Agreement


Vale International S.A. Option & Joint Venture Agreement
Southern Arc and Vale are exploring the East Elang project (adjacent to Newmont’s
Elang deposit) under an option and joint venture agreement whereby Vale can earn a
75% interest (Southern Arc retaining 25%) by funding project expenditures through to
completion of a bankable feasibility study. To exercise its option, Vale must fully fund
advancement of the East Elang project through to completion of a bankable feasibility
study. Should Vale choose not to exercise its option, Southern Arc will retain its 100%
ownership of the project at no cost.




                                                                                           39
Contact Us
Canadian Office
Rhylin Bailie

Vice President Communications & Investor Relations
NA Toll-free: 1-888-676-5241
Tel: 604-676-5241
info@southernarcminerals.com
Indonesian Office
Mike Andrews
President & Chief Operating Officer
Andrew Rowe
Executive Vice President
62-21-7988-8612
SouthernArcMinerals.com                TSX-V: SA, OTCQX: SOACF
                                                                 40

More Related Content

What's hot

Teknik eksplorasi
Teknik eksplorasiTeknik eksplorasi
Teknik eksplorasi
oilandgas24
 
Earthstone Resources Corporate Presentation
Earthstone Resources Corporate PresentationEarthstone Resources Corporate Presentation
Earthstone Resources Corporate Presentation
AICL Communications
 
59103938 bab-4-klasifikasi-endapan-mineral
59103938 bab-4-klasifikasi-endapan-mineral59103938 bab-4-klasifikasi-endapan-mineral
59103938 bab-4-klasifikasi-endapan-mineral
rramdan383
 

What's hot (20)

Nickel Laterite Deposit.pptx
Nickel Laterite Deposit.pptxNickel Laterite Deposit.pptx
Nickel Laterite Deposit.pptx
 
UNITED NATIONS FRAME WORK CLASSIFICATION (UNFC) AND ITS APPLICATION in the A...
UNITED NATIONS FRAME WORK CLASSIFICATION (UNFC) AND ITS APPLICATIONin the A...UNITED NATIONS FRAME WORK CLASSIFICATION (UNFC) AND ITS APPLICATIONin the A...
UNITED NATIONS FRAME WORK CLASSIFICATION (UNFC) AND ITS APPLICATION in the A...
 
"STAGES IN THE LIFE OF MINE"
"STAGES IN THE LIFE OF MINE""STAGES IN THE LIFE OF MINE"
"STAGES IN THE LIFE OF MINE"
 
Ore deposits
Ore depositsOre deposits
Ore deposits
 
CHROMITE ORE DEPOSITS IN EGYPT
CHROMITE ORE DEPOSITS IN EGYPTCHROMITE ORE DEPOSITS IN EGYPT
CHROMITE ORE DEPOSITS IN EGYPT
 
FELDSPAR BAHAN GALIAN INDUSTRI - BONITA
FELDSPAR BAHAN GALIAN INDUSTRI - BONITAFELDSPAR BAHAN GALIAN INDUSTRI - BONITA
FELDSPAR BAHAN GALIAN INDUSTRI - BONITA
 
Bahan Galian Logam Timah
Bahan Galian Logam TimahBahan Galian Logam Timah
Bahan Galian Logam Timah
 
HYDROTHERMAL MINERAL DEPOSIT.pdf
HYDROTHERMAL MINERAL  DEPOSIT.pdfHYDROTHERMAL MINERAL  DEPOSIT.pdf
HYDROTHERMAL MINERAL DEPOSIT.pdf
 
Ch21
Ch21Ch21
Ch21
 
Teknik eksplorasi
Teknik eksplorasiTeknik eksplorasi
Teknik eksplorasi
 
Earthstone Resources Corporate Presentation
Earthstone Resources Corporate PresentationEarthstone Resources Corporate Presentation
Earthstone Resources Corporate Presentation
 
Mineral exploration
Mineral explorationMineral exploration
Mineral exploration
 
UNFC concept & teminology.ppt
UNFC concept & teminology.pptUNFC concept & teminology.ppt
UNFC concept & teminology.ppt
 
Mineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real WorldMineral Reserve Estimation In The Real World
Mineral Reserve Estimation In The Real World
 
59103938 bab-4-klasifikasi-endapan-mineral
59103938 bab-4-klasifikasi-endapan-mineral59103938 bab-4-klasifikasi-endapan-mineral
59103938 bab-4-klasifikasi-endapan-mineral
 
Endapan phorpiry
Endapan phorpiryEndapan phorpiry
Endapan phorpiry
 
Bab 1-terminologi-bahan-galian
Bab 1-terminologi-bahan-galianBab 1-terminologi-bahan-galian
Bab 1-terminologi-bahan-galian
 
ore dilution and ore recovery
ore dilution and ore recoveryore dilution and ore recovery
ore dilution and ore recovery
 
Underground coal gasification
Underground coal gasificationUnderground coal gasification
Underground coal gasification
 
Ore bearing fluids
Ore bearing fluidsOre bearing fluids
Ore bearing fluids
 

Viewers also liked

Vision,Mission,Strategy and Leadership.
Vision,Mission,Strategy and Leadership.Vision,Mission,Strategy and Leadership.
Vision,Mission,Strategy and Leadership.
Sonia Verma
 
Women entrepreneurship in india by sonia verma
Women entrepreneurship in india by sonia vermaWomen entrepreneurship in india by sonia verma
Women entrepreneurship in india by sonia verma
Sonia Verma
 
Sensation and Perception
Sensation and PerceptionSensation and Perception
Sensation and Perception
Sophia Vadlit
 

Viewers also liked (17)

A-Evropa
A-EvropaA-Evropa
A-Evropa
 
Pictavo Yearbook Software Guide
Pictavo Yearbook Software GuidePictavo Yearbook Software Guide
Pictavo Yearbook Software Guide
 
Nodejs
NodejsNodejs
Nodejs
 
лицей29сент2011педсовет
лицей29сент2011педсоветлицей29сент2011педсовет
лицей29сент2011педсовет
 
Werkloze jongeren hebben litteken voor het leven
Werkloze jongeren hebben litteken voor het levenWerkloze jongeren hebben litteken voor het leven
Werkloze jongeren hebben litteken voor het leven
 
phonegap with angular js for freshers
phonegap with angular js for freshers    phonegap with angular js for freshers
phonegap with angular js for freshers
 
Yearbook Recognition and Dedication Ads
Yearbook Recognition and Dedication AdsYearbook Recognition and Dedication Ads
Yearbook Recognition and Dedication Ads
 
Yearbook Sales
Yearbook SalesYearbook Sales
Yearbook Sales
 
School Yearbook Theme
School Yearbook ThemeSchool Yearbook Theme
School Yearbook Theme
 
High School Yearbook Cover options
High School Yearbook Cover optionsHigh School Yearbook Cover options
High School Yearbook Cover options
 
Yearbook Coverage
Yearbook CoverageYearbook Coverage
Yearbook Coverage
 
Vision,Mission,Strategy and Leadership.
Vision,Mission,Strategy and Leadership.Vision,Mission,Strategy and Leadership.
Vision,Mission,Strategy and Leadership.
 
School Yearbook Staff Monthly Calendar
School Yearbook Staff Monthly CalendarSchool Yearbook Staff Monthly Calendar
School Yearbook Staff Monthly Calendar
 
02 01 아이디어_발상법-김용경[최종]
02 01 아이디어_발상법-김용경[최종]02 01 아이디어_발상법-김용경[최종]
02 01 아이디어_발상법-김용경[최종]
 
Baking
BakingBaking
Baking
 
Women entrepreneurship in india by sonia verma
Women entrepreneurship in india by sonia vermaWomen entrepreneurship in india by sonia verma
Women entrepreneurship in india by sonia verma
 
Sensation and Perception
Sensation and PerceptionSensation and Perception
Sensation and Perception
 

Similar to Southern Arc Minerals Corporate Presentation

1445 spotlightpresentationnt robertsowerbyalligatorenergy english
1445 spotlightpresentationnt robertsowerbyalligatorenergy english1445 spotlightpresentationnt robertsowerbyalligatorenergy english
1445 spotlightpresentationnt robertsowerbyalligatorenergy english
Symposium
 
Antipodes Gold AXG: April Introduction.
Antipodes Gold AXG: April Introduction.Antipodes Gold AXG: April Introduction.
Antipodes Gold AXG: April Introduction.
antipodesgold
 
Terrax Minerals Coporate Presentation
Terrax Minerals Coporate PresentationTerrax Minerals Coporate Presentation
Terrax Minerals Coporate Presentation
Company Spotlight
 
Pdac presentation march2011
Pdac presentation march2011Pdac presentation march2011
Pdac presentation march2011
Foyson Resources
 

Similar to Southern Arc Minerals Corporate Presentation (20)

Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013Republic Gold managing director's presentation to AGM Nov 2013
Republic Gold managing director's presentation to AGM Nov 2013
 
30.10.2012 Exploring and developing copper in Mongolia, Joe Burke
30.10.2012 Exploring and developing copper in Mongolia, Joe Burke30.10.2012 Exploring and developing copper in Mongolia, Joe Burke
30.10.2012 Exploring and developing copper in Mongolia, Joe Burke
 
10.29-31.2012, PRESENTATION, Exploring and Developing Copper in Mongolia, Joe...
10.29-31.2012, PRESENTATION, Exploring and Developing Copper in Mongolia, Joe...10.29-31.2012, PRESENTATION, Exploring and Developing Copper in Mongolia, Joe...
10.29-31.2012, PRESENTATION, Exploring and Developing Copper in Mongolia, Joe...
 
5 Large-Scale Mining and project cycle - Geoff Lowe Iimda
5 Large-Scale Mining and project cycle - Geoff Lowe Iimda5 Large-Scale Mining and project cycle - Geoff Lowe Iimda
5 Large-Scale Mining and project cycle - Geoff Lowe Iimda
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.
 
TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016
 
NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022NMR Investor Presentation - August 2022
NMR Investor Presentation - August 2022
 
1445 spotlightpresentationnt robertsowerbyalligatorenergy english
1445 spotlightpresentationnt robertsowerbyalligatorenergy english1445 spotlightpresentationnt robertsowerbyalligatorenergy english
1445 spotlightpresentationnt robertsowerbyalligatorenergy english
 
Investor Presentation | Geopacific Resources (ASX: GPR) | Gold Investment Sym...
Investor Presentation | Geopacific Resources (ASX: GPR) | Gold Investment Sym...Investor Presentation | Geopacific Resources (ASX: GPR) | Gold Investment Sym...
Investor Presentation | Geopacific Resources (ASX: GPR) | Gold Investment Sym...
 
2013, PRESENTATION, The Ochiriin Bulag Project, James Passin
2013, PRESENTATION, The Ochiriin Bulag Project, James Passin2013, PRESENTATION, The Ochiriin Bulag Project, James Passin
2013, PRESENTATION, The Ochiriin Bulag Project, James Passin
 
TNR Gold Shotgun Gold Presentation, Alaska - April 2014
TNR Gold Shotgun Gold Presentation, Alaska - April 2014TNR Gold Shotgun Gold Presentation, Alaska - April 2014
TNR Gold Shotgun Gold Presentation, Alaska - April 2014
 
Antipodes Gold AXG: April Introduction.
Antipodes Gold AXG: April Introduction.Antipodes Gold AXG: April Introduction.
Antipodes Gold AXG: April Introduction.
 
TNR Gold: Shotgun Gold Project Presentation January 2015.
TNR Gold: Shotgun Gold Project Presentation January 2015.TNR Gold: Shotgun Gold Project Presentation January 2015.
TNR Gold: Shotgun Gold Project Presentation January 2015.
 
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
 
2015 Broken Hill Resources Investment Symposium - Heathgate Resources - Brett...
2015 Broken Hill Resources Investment Symposium - Heathgate Resources - Brett...2015 Broken Hill Resources Investment Symposium - Heathgate Resources - Brett...
2015 Broken Hill Resources Investment Symposium - Heathgate Resources - Brett...
 
Terrax Minerals Coporate Presentation
Terrax Minerals Coporate PresentationTerrax Minerals Coporate Presentation
Terrax Minerals Coporate Presentation
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014
 
TNR Gold Presentation October 2014
TNR Gold Presentation October 2014TNR Gold Presentation October 2014
TNR Gold Presentation October 2014
 
Pdac presentation march2011
Pdac presentation march2011Pdac presentation march2011
Pdac presentation march2011
 
2023-10-14 Corporate Presentation.pdf
2023-10-14 Corporate Presentation.pdf2023-10-14 Corporate Presentation.pdf
2023-10-14 Corporate Presentation.pdf
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 

Southern Arc Minerals Corporate Presentation

  • 1. December 2012 Bringing Exceptional Management and Exploration Expertise to a Proven Mineral Environment TSX-V: SA SouthernArcMinerals.com OTCQX: SOACF
  • 2. Cautionary Note Some of the statements contained in this presentation are forward-looking statements, such as estimates and statements that describe future plans, objectives or goals, including words to the effect that Southern Arc Minerals Inc. implies a stated condition or that it forecasts certain results could occur. Because forward-looking statements address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual results relating to, among other things, reserves, resources, results of exploration, reclamation and other post-closure costs, capital costs and mine production costs could differ materially from those currently forecast in such statements by reason of factors such as changes in general economic conditions and conditions in the financial markets, changes in demand and prices for the minerals, litigation, legislative, environmental and other judicial, regulatory, technological and operational difficulties encountered in connection with mining activities, labour relations matters, costs and changing foreign exchange rates. This list is not exhaustive of the factors that may affect any of forward-looking statements. These and other factors should be considered carefully and readers should not place undue reliance on Southern Arc Minerals Inc. statements. Drilling information in this presentation has been compiled under the supervision of Southern Arc’s Executive Vice President, Andrew Rowe B. App. Sc. Geology, MAusIMM. Mr. Rowe has over 18 years of international mineral exploration experience throughout SE and Central Asia and Australia. During this time he has held such positions as Chief Geologist – Feasibility Studies, Senior Geologist and Consulting Geologist. The technical information in this document has also been reviewed by Southern Arc’s President & Chief Operating Officer, Dr. Mike Andrews, PhD, FAusIMM, who has sufficient experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101. All assaying of samples was undertaken by the ITS laboratory in Jakarta. ITS is one of the world’s largest product and commodity testing, inspection and certification organizations. The Jakarta laboratory is ISO 17025 accredited and employs a Laboratory Information Management System (LIMS) for sample tracking, quality control and reporting. 2
  • 3. Investment Highlights Properties • Exploring one of the most prospective regions in the world • Flagship property shows district-scale potential for gold, potential porphyries • No-cost JV on strategic “area play” property • Actively looking for new gold-focused opportunities People • Management, directors and advisors with the experience and connections to successfully advance properties Partnerships • Strategic shareholders, partnership with Vale Capital • Financial flexibility with ~$18 M in working capital and no debt (Nov 2012) Catalysts • News flow from exploration activity • West Lombok NI 43-101 compliant resource estimate targeted for mid-2013 3
  • 4. Share Structure Shares Options Warrants Fully Diluted 109,214,510 9,300,000 0 118,544,510 • Directors, management and insiders control ~20% • 52-week trading range $0.20 – $0.99 • Average trading volume (3 months): ~60,000 shares/day 4
  • 7. West Lombok 90% Southern Arc 10% Indonesian Regency Government 7
  • 8. West Lombok Project 13km by 7km structural corridor of mineralization • Deforested grassland, accessible by road • Previously explored by Newmont • Prospective for both epithermal gold and copper- gold porphyry mineralization West Lombok property 8
  • 9. Exploration Activity in 2012 Advanced understanding of porphyry Cu-Au mineralization • Airborne magnetic and radiometric survey at 50-metre spacings • Porphyry prospectivity study identified 17 new porphyry exploration targets • Drilled a number of porphyry targets in SE and NE sections of property • Detailed surface mapping and channel sampling identified new areas with surface porphyry mineralization 9
  • 10. Exploration Activity in 2012 Continued to extend and explore gold epithermal mineralization • Exploration drilling on Pelangan mineralized structural breccia (MSB) structures in NW corner of property • Detailed mapping and channel sampling identified new MSB outcrops adjacent to Mencanggah and Pelangan • Confirmed relationship of MSB epithermal systems as surface manifestation of underlying porphyry systems • Coordinated with SRK on drill hole planning, drill logging, data handling and modelling methods 10
  • 11. Drill Program Underway • Drill program prepared in consultation with SRK Consulting (Canada) Inc. • Bising  infill and expand zone of mineralization adjacent to wide intercepts • Tibu Serai  test down-dip from areas identified with rock-chip samples • Drill Phase A holes at Bising and Tibu Serai  Board review / report results  refocus exploration as appropriate • NI 43-101 resource estimate for portions of the property targeted for mid-2013 11
  • 12. Mencanggah Prospect • 19km cumulative strike length of Au- bearing epithermal breccias with indications of near-surface porphyry Cu- Au mineralization • Rock channel samples include 7m @ 53.3 g/t Au, 5m @ 12.2 g/t Au and 66m @ 1.1 g/t Au 1 • Phase 1 drilling completed 8,920m in 35 holes • Significant-grade intersections include 4.75m @ 15.6 g/t Au (including 2.0m @ 36.1 g/t Au and 1.6m @ 11.0 g/t Au), and 39.0m @ 1.8 g/t Au (including 0.3m @ 89.0 g/t Au) 1 1. See Significant Drill Results and Cautionary Note. 12
  • 13. Mencanggah Prospect – Bising • Surface channel sampling has returned high-grade intervals and very wide intervals of low-grade mineralization • Drilled eight holes in 2011 to test main epithermal structural body, its extensions, and intersections with crossing structures  identified 500-metre long zone of mineralization • Current drill program • Three rigs mobilized • Plan to drill ten Phase A holes • Infill and expand zone of mineralization adjacent to MCG028 (51.3m @ 1.5 g/t Au), MCG030 (39.0m @ 1.8 g/t Au), MCG032 (37.8m @ 1.0 g/t Au) 1 • Drill Phase A  review/report results  refocus program as appropriate 1. See Significant Drill Results and Cautionary Note. 13
  • 14. Mencanggah Prospect – Bising Infill and expand mineralized zones 14
  • 15. Mencanggah Prospect – Tibu Serai Test down-dip from surface samples • Low silver-to-gold ratios in rock chip samples are a proven vector to higher gold grades in epithermal gold mineralization on West Lombok property • Test down-dip with seven Phase A holes  review / report results  refocus program as appropriate 15
  • 16. Pelangan Prospect • 5km cumulative strike length of Au- bearing mineralization outcropping at surface • 4,130m Phase 1 drilling included 10m @ 13.4 g/t Au and 17m @ 5.73 g/t Au1 • 11,867m of Phase 2 drilling completed, significant-grade intersections including 17.4m @ 19.4 g/t Au1 • Drilling in 2012 tested strike length and depth of Au-Ag mineralization, high- grade shoots • Will consider next exploration focus once Phase A at Bising and Tibu Serai is complete 1. See Significant Drill Results and Cautionary Note. 16
  • 17. Pelangan Prospect – Raja Three high-grade shoots 17
  • 18. Selodong Prospect • Multiple Cu-Au targets defined by geochemistry, geophysics and alteration mapping • Seven targets tested in Phase 1 exploration (17,859m) with significant near-surface Cu-Au porphyry mineralization • 166m @ 0.52% Cu and 0.85 g/t Au1 • 102m @ 0.50% Cu and 1.05 g/t Au1 • Indications of porphyry Cu-Au district-scale mineralization • Next phase of drilling will focus on new targets identified by porphyry prospectivity study 1. See Significant Drill Results and Cautionary Note. 18
  • 19. Sumbawa Island Taliwang – Sale Pending East Elang – Southern Arc / Vale S.A. 19
  • 20. Taliwang Project Southern Arc 90% / Regency Government 10% • Adjacent to Newmont’s world-class Batu Hijau Cu-Au mine (17.2 M oz Au/14.1 B lb Cu)1 • 31,200 hectares highly prospective for Au, Ag, Cu with three main prospects: • 1km x 1.5km Au-Ag bearing epithermal vein system confirmed by 56 drill holes • 5km-long NE trending high-sulphidation alteration zone, paralleling the Batu Hijau mineralized trend • Sedimentary Au-hosted targets • Accepted offer to sell in December 2012  more details to follow when agreements are finalized 1. Newmont press release February 24, 2011 references independent JORC estimate for Batu Hijau deposit. Proximity to the Batu Hijau mine does not guarantee that Southern Arc will have similar mineralization on its properties. 20
  • 21. East Elang Project Southern Arc / Vale Joint Venture Agreement • Adjacent to Newmont’s Elang deposit (25 M oz Au/16 B lb Cu)1 • Vale must fund through to bankable feasibility study to earn 75% interest2 • Structure and alteration suggest that Elang mineralized trend may continue onto Southern Arc’s East Elang property • Awaiting receipt of forestry permit before commencing regional exploration to identify targets for detailed prospect follow up • Applied to have IUP back dated to allow for adequate exploration time 1. Newmont press release February 24, 2011 references independent JORC estimate from June 2010 for Elang deposit. Proximity to the Batu Hijau mine and Elang deposit does not guarantee that Southern Arc will have similar mineralization on its properties. 2. See Vale Joint Venture Agreement. 21
  • 22. Exploration Activity in East Elang District 22
  • 23. Experienced Team Cumulative 65 years of Indonesian exploration experience 23
  • 24. Executives and Directors John Proust
 Dr. Mike Andrews
 Chairman & Chief Executive Officer President & Chief Operating Officer One of the original founders of Southern Geologist with more than 30 years of research Arc. Certified Director. Resource sector and exploration experience in Indonesia and expert in financing, mergers and Australasia. Principal in the discovery, acquisitions, corporate restructuring and exploration and development of the Way corporate governance. Linggo gold-silver mine in Indonesia. Andrew Rowe
 Executive Vice President Geologist with more than 20 years of exploration and project management experience, including senior positions with Phelps Dodge, Ivanhoe Mines, Aurora Gold and Pan Australian Mining. 24
  • 25. Directors and Advisors Bob Gallagher Mohammed Al-Shahwani Director
 Director
 President & CEO of NewGold with 32 CEO of Qatar Mining Company. Involved years of mining experience, including as in major resource projects Vice President of Newmont’s Asia-Pacific internationally, with extensive corporate operations, including development of development experience. the Batu Hijau mine. Dr. Steve Garwin Dr. David Stone Senior Technical Advisor
 Director
 Leading authority on Cu-Au Doctorate in Civil Engineering with 25 mineralization in Southeast Asia, years of mining experience and broad doctorate based on Batu Hijau deposit. expertise in mining technology and More than 22 years of exploration advanced project development. experience, including as Newmont’s Chief Geologist. 25
  • 26. Directors and Advisors Malcolm Baillie
 Dr. Alwi Shihab
 Commissioner Commissioner Metallurgical engineer with 30 years Involved with many public companies of experience in the Indonesian mining operating in Indonesia. Currently Vice sector. Leader in government Chairman, Presidential Task Force for negotiations, including as Director of Labour Management. Previously Foreign Indonesian Mining Association. Minister for Indonesia and Special Envoy to Indonesian President for Middle East Robert Parsons investments. Advisor
 Chartered Accountant, former partner Bryan Disher of PricewaterhouseCoopers. Serves on Security Advisor
 Advisory Board of Indonesian Mining Indonesia security and government Association and International Affairs relations expert since 1996, with Committee of PDAC. extensive network of connections with Indonesian officials. 26
  • 27. Why Invest in Southern Arc? Properties • Exploring one of the most prospective regions in the world • Flagship property shows district-scale potential for gold, potential porphyries • No-cost JV on strategic “area play” property • Actively looking for new gold-focused opportunities People • Management, directors and advisors with the experience and connections to successfully advance properties Partnerships • Strategic shareholders, partnership with Vale Capital • Financial flexibility with ~$18 M in working capital and no debt (Nov 2012) Catalysts • News flow from exploration activity • West Lombok NI 43-101 compliant resource estimate targeted for mid-2013 27
  • 28. Appendix 28
  • 29. West Lombok Permitting Status Forest Types • 1.1% Protected Forest1 • 55.1% Production Forest2 • 43.8% No Forest Designation3 Permitting Status • IUP license issued • MOF permit issued 1. No open-pit mining allowed. Underground mining allowed with appropriate forestry permit. 2. Open-pit and underground mining allowed with appropriate forestry permit. 3. No restriction on mining activities. 29
  • 30. East Elang Permitting Status IUP License • IUP license issued by the Sumbawa Regent on December 17, 2010 for a period of seven years Forest Types • 60.3% Protected Forest1 • 34.2% Limited Production Forest2 • 5.5% No Forest Designation3 Requirements • MOF permit required for exploration activities within both Protected and Production designated areas Status • MOF permit issuance in process • Requesting that IUP be back-dated to allow for adequate exploration time once MOF permit is received 1. No open-pit mining allowed. Underground mining allowed with appropriate forestry permit. 2. Open-pit and underground mining allowed with appropriate forestry permit. 3. No restriction on mining activities. 30
  • 33. Pelangan Prospect, Raja Target, Long-section Projection of Drill Hole Mineralized Intervals 33
  • 35. Pelangan Phase 1 10.00 32.95 22.95 22.95 m @ 4.1 / 17 HOLE ID Target From (m) To (m) Interval (m) Intersection ( Au / Ag g/t ) RDG05 Raja 2.25 20.70 22.95 incl. 2.25 m @ 14.6 / 10 16.80 23.80 7.00 7 m @ 4.4 1.00 27.20 28.20 and 1 m @ 21.4 / 23 KDG02 Kayu Putih 19.80 20.80 1.00 incl. 1 m @ 9.92 & 9.95 26.05 16.10 16.1 m @ 2.7 / 23 22.80 23.80 1.00 1 m @ 18 RDG06 Raja 10.80 16.50 5.70 incl. 5.7 m @ 5.2 / 30 20.50 23.50 3.00 3 m @ 4.1 KDG03 Kayu Putih 19.75 20.50 21.50 1.00 incl.1 m @ 5.9 35.15 54.90 19.75 m @ 4.6 / 28 35.15 37.65 2.50 incl. 2.5 m @ 5.5 / 28 2.00 13.40 11.40 11.4m @ 9.6 / 47 RDG07 Raja KDG04 Kayu Putih 3.00 4.10 1.10 incl. 1.1m @ 26.8 / 217 40.55 44.45 3.90 and 3.9 m @ 13.5 / 22 11.40 12.40 1.00 incl. 1 m @ 71 / 182 49.50 54.10 4.60 and 4.6 m @ 3.6 / 24 17.85 28.95 11.10 11.1 m @ 3.1 / 7.8 39.70 58.15 18.45 18.45 m @ 1.1 / 4 19.95 22.50 2.55 incl. 2.55 m @ 9 / 16.2 TDG01 Tanjung KDG12 Kayu Putih 41.95 43.40 1.45 incl. 1.45 m @ 2.5 / 3 68.80 72.90 4.10 4.1 m @ 5.9 / 8.8 54.40 56.00 1.60 and 1.6 m @ 4.1 / 3 69.80 70.90 1.10 incl. 1.1 m @ 18.1 / 24.5 32.85 42.90 10.05 10.05 m @ 13.4 / 8 22.00 27.00 5.00 5 m @ 4.2 / 15 KDG013 Kayu Putih TDG02 Tanjung 24.90 26.30 1.40 incl. 1.4 m @ 9.8 / 21 35.35 37.65 2.30 incl. 2.3 m @ 47.9 / 24 QDG06 Ratu 28.80 29.80 1.00 1 m @ 7.36 / 186 39.90 41.80 1.90 and 1.9 m @ 7.1 / 2 6.30 17.00 10.70 10.7 m @ 2.93 / 20 48.00 56.60 8.60 8.6 m @ 2.7 / 4 TDG03 Tanjung 7.50 12.20 4.70 incl. 4.7 m @ 5.8 / 27 48.75 51.70 2.95 2.95 m @ 6.1 / 9 RDG01 Raja 61.65 65.10 3.45 3.45 m @ 4.13 / 64 32.50 37.10 4.60 4.6 m @ 3.1 / 10 TDG06 Tanjung 63.20 64.00 1.10 incl. 1.1 m @ 7.62 / 129 33.55 35.00 1.45 incl. 1.45 @ 5.5 / 10 0.00 6.30 6.30 6.3 m @ 2.5 / 81 52.90 62.10 9.20 9.2 m @ 5.9 / 11 1.20 2.80 1.60 incl. 1.6 m @ 5.7 / 50 JDG03 Jati RDG03 Raja 55.30 56.55 1.25 incl. 1.25 m @ 24.9 / 7 23.20 35.30 12.10 12.1 m @ 2.3 / 16 23.20 26.35 3.15 incl. 3.15 m @ 4.8 / 21.6 4.80 23.35 18.55 18.55 m @ 1.14 9.50 KDG16 Kayu Putih 21.05 22.5 1.45 incl. 1.45 m @ 6.2 / 55 8.35 17.85 9.5 m @ 6.2 / 41 RDG04 Raja 12.25 15.30 3.05 incl. 3.05 m @ 14.2 / 61 76.45 77.35 0.90 0.90m @8.12/11 35
  • 36. Pelangan Phase 2 74.6 111.8 37.2 37.2 m @ 2.5 / 14.2 PLD014 Raja HOLE ID Target From (m) To (m) Interval (m) Intersection (Au/Ag g/t) 90.7 99.9 9.2 incl. 9.2 m @ 4.1 / 24.0 56.55 61.4 4.85 4.85 m @ 7.11/18.5 132.4 138.4 6 6.0 m @ 2.2/13.1 PLD001 Raja PLD017 Raja 56.55 57.9 1.35 incl. 1.35 m @ 16.7/17.0 132.4 133.7 1.3 incl. 1.30 m @ 4.9/11 120.15 137.4 17.25 17.25 m @ 5.73/11.7 PLD002 Raja 147.1 152.3 5.2 5.2m @ 4.1/10.3 121.6 130.35 8.75 incl. 8.75 m @ 10.51/20.7 147.7 148.45 0.75 incl. 0.75 m @ 14.0/43.7 232.95 249.5 16.55 16.55 m @ 5.5/3.7 151.75 152.3 0.55 and 0.55 m @ 14.5/5.2 PLD003 Raja 237.5 245.2 7.7 incl. 7.70 m @ 10.9/6.1 PLD019 Raja 160.8 174.75 13.95 13.95 m @ 2.7/19.4 240.7 245.2 4.5 incl. 4.50 m @ 17.6/8.0 160.8 163.2 2.4 incl. 2.4 m @ 7.1/34.8 110.05 126.2 16.15 16.15 m @ 1.4/12.0 PLD006 Raja 173.75 174.75 1 and 1.0m @ 4.7/40.9 110.05 112.5 2.45 incl. 2.45 m @ 4.7/34.0 101.8 117.6 15.8 15.8m @ 3.6/19.7 78.8 118.5 39.7 39.7 m @ 9.4/15.7 PLD022 Raja 111.4 117 5.6 incl. 5.6m @ 7.0/12.6 78.5 96.2 17.7 incl. 17.40 m @ 19.4/28.3 PLD007 Raja 88.1 94.25 6.15 incl. 6.15 m @ 37.7/26.0 115.6 117 1.4 incl. 1.4m @ 18.2/10.9 127.7 128.45 0.75 0.75 m @ 22.1/15.4 PLD024 Raja 223.85 225.8 1.95 1.95 m @ 3.3 70.35 81.9 11.55 11.55 m @ 9.80/31.1 167.2 193.4 26.2 26.2 m @ 4.2 70.35 73.85 3.5 incl. 3.5 m @ 26.1/96.5 PLD027 Tanjung 167.2 168.5 1.3 incl.1.3 m @ 30.1 PLD008 Raja 93.7 105.5 11.8 11.8 m @ 1.40/9.2 189.15 192.6 3.45 incl. 3.45 m @ 12.3 100.2 102.2 2 incl. 2.00 m @ 3.70/22.6 PLD028 Raja 251.05 252.40 1.35 1.35 m @ 1.0/6.2 217.3 225.5 8.2 8.20 m @ 4.4/2.7 154.70 158.60 3.9 3.90 m @ 3.9 PLD009 Raja PLD031 Raja 156.40 157.25 0.85 incl. 0.85 m @ 11.5 217.3 221.6 4.3 incl. 4.30 m @ 7.5/3.9 87.20 100.35 13.15 13.15 m @ 1.4 127.35 149.4 22.05 22.05 m @ 2.7 / 2.8 PLD032 Raja 97.05 100.35 3.30 incl. 3.30 m @ 2.3 PLD010 Raja 140.4 149.4 9 incl. 9.0 m @ 4.6 / 1.6 140.8 142.2 1.4 incl. 1.4 m @ 11.5 / 2.3 210.2 226.7 16.5 16.5 m @ 3.2 / 16.4 PLD011 Raja 211.5 216.25 4.75 incl. 4.75 m @ 8.2 / 41.9 36
  • 37. Mencanggah Phase 1 11.7 49.5 37.8 37.8 m @ 1.0/1.4 19 22 3 incl. 3.0 m @ 2.7/0.8 HOLE ID Target From (m) To (m) Interval (m) Intersection (Au/Ag g/t) 25.2 30 4.8 incl. 4.8 m @ 4.0/2.5 35.6 86.85 51.3 51.3 m @ 1.5 /1.4 MCG032 Bising 44.2 45.2 1 incl. 1.0 m @ 1.4/1.4 38.9 39.2 0.3 incl. 0.3 m @ 2.8 /0.9 145.6 152.6 7 7.0 m @ 0.3/1.6 47.9 52 4.1 incl. 4.1 m @ 2.3 / 0.9 190.1 198.2 8.1 8.1 m @ 0.4/1.8 53.4 58.45 5.1 incl. 5.1 m @ 3.5 /1.1 134.1 170.55 36.5 36.5 m @ 0.3/1.5 MCG028 Bising 56.4 57.4 1 incl. 1.0 m @ 11.0 /1.0 150.8 170.55 19.8 incl. 19.8 m @ 0.4/2.0 60.2 63.9 3.8 incl. 3.8 m @4.9/0.7 214.2 224.45 10.3 10.3 m @ 0.3/1.1 61.8 62.05 0.3 incl. 0.3 m @40.3/0.6 MCG033 Bising 220.4 220.7 0.3 incl. 0.3 m @ 1.7/6.5 65.6 76.4 10.8 incl. 10.8 m @1.4/2.8 258.6 261.1 2.6 2.6 m @ 0.4/0.5 76 76.4 0.5 incl. 0.5 m @13.4/29.4 259.1 259.55 0.4 incl. 0.4 m @ 1.4/1.6 40.1 83 42.9 42.9 m @ 0.4/2.3 8.2 15.9 7.7 7.7 m 0.5/5.1 47.1 47.7 0.6 incl. 0.6 m @ 3.5/0.9 10.2 11.6 1.4 incl.1.4 m @ 1.2/23.2 MCG029 Bising 74.6 82 7.4 incl. 7.4 m @ 0.7/3.3 46.5 55.1 8.6 8.6 m @ 0.4/4.2 74.6 75 0.4 incl. 0.4 m @ 2.9/26 MCG034 Bising 151 152.7 1.7 1.7 m @ 0.4/2.1 80 81 1 incl. 1.0 m @ 1.0/4.0 169.7 170.5 0.8 0.8 m @ 0.9/2.7 34 73 39 39.0 m @ 1.8/3.1 182.5 185.7 3.2 3.2 m @ 0.6/2.7 38.6 40 1.4 incl. 1.4 m @ 1.1/1.0 286.7 288.1 1.4 1.4 m @ 0.2/8.6 46.5 50.1 3.6 incl. 3.6 m @ 1.7/2.0 MCG030 Bising 29 48.45 19.5 19.5 m @ 0.2/0.9 56.3 66 9.7 incl. 9.7 m @ 4.9/5.9 63.5 72.5 9 9.0 m @ 0.7/0.6 59.2 59.5 0.3 incl. 0.3 m @ 89/27.6 65 66.4 1.4 incl. 1.4 m @ 1.7/0.9 71 73 2 incl. 2.0 m @ 1.1/5.0 MCG035 Bising 150.9 154.3 3.4 3.4 m @ 0.4/2.0 MCG031 Bising 34.0 99.7 65.1 65.1 @ 0.52 163.2 166.5 3.3 3.3 m @ 0.5/1.4 74.2 87.0 12.8 Incl. 12.8 @ 1.0 37 37.6 0.6 176.7 177.3 0.7 0.7 m @ 2.5/1.4 incl.0.6 m @ 6.5/2.2 74.2 78.6 4.4 incl.4.4 m @ 2.1/7.3 74.2 75.1 0.9 incl.0.9 m @ 6.8/27.7 156.8 157.5 0.8 0.8 m @ 47.7/13.2 37
  • 38. Significant Drill Results Selodong Phase 1 0 576.95 576.95 576.95m @ 0.12/0.25 HOLE ID PROSPECT From To (m) Interval Intersection(Cu % / Au g/t) 21.5 135.4 113.9 incl. 113.9m @ 0.06/0.34 SLD013 M BOTEK 33.8 476 442.2 442.2m @ 0.28/0.42 262.75 369.35 106.6 incl. 106.6m @ 0.18/0.30 SLD001 MONTONG BOTEK 33.8 200 166.2 incl. 166.2m @ 0.52/0.85 441.35 493.35 52 incl. 52.0m @ 0.15/0.45 33.8 138.8 105 incl. 105.0m @ 0.60/1.04 SLD014 BELIKAT 110.3 187.75 77.45 77.45 m @ 0.13/0.22 18.1 402.75 384.65 384.65m @ 0.3/0.4 0 208.1 208.1 208.1m @ 0.12/0.22 SLD002 MONTONG BOTEK 118.7 235.9 117.2 incl. 117.2m @ 0.56/0.8 SLD017 MONTONG BOTEK 8.5 21.5 13 incl. 13.0m @ 0.38/0.54 33.3 396.8 363.5 363.5m @ 0.3/0.51 318.8 330.8 12 12.0m @ -/0.54 SLD003 MONTONG BOTEK 33.3 283.4 250.1 incl. 250.1m @ 0.35/0.64 18.15 39.3 21.15 21.15m @ 0.10/0.13 33.3 90.45 57.15 incl. 57.15m @ 0.39/1.0 SLD019 KEDARO 193.6 320.05 126.45 126.45m @ 0.16/0.23 16.6 56.5 39.9 39.9m @ 0.2/0.3 195.6 239.6 44 incl. 44.0m @ 0.22/0.34 160.25 567.5 407.25 407.25m @ 0.25/0.45 SLD004 BLONGAS II 0 855.1 855.1 855.10m @ 0.10/0.22 160.25 352.5 192.25 incl. 192.25m @ 0.36/0.74 SLD023 MONTONG BOTEK 210 452 242 incl. 242.00m @ 0.18/0.41 176.55 278.8 102.25 incl. 102.25m @ 0.5/1.05 278 378 100 100.00m @ 0.26/0.70 2.0 488.15 486.15 486.15m @ 0.22/0.26 0 334.35 334.35 334.35m @ 0.17/0.31 97.7 169.8 72.1 incl. 72.1m @ 0.38/0.30 SLD005 BLONGAS II SLD026 BLONGAS II 222.35 326.35 104 incl. 104.0m @ 0.23/0.5 200.4 242.9 42.5 incl. 42.5m @ 0.39/0.57 278.35 312.35 34 incl. 34.0m @ 0.29/0.29 334.6 414.6 80 incl. 80.0m @ 0.19/0.42 15.5 190.4 174.9 174.90m @ 0.12/0.25 49.8 550 500.2 500.20m @ 0.17/0.30 SLD027 KEDARO 200.2 374.9 174.7 incl. 174.70m @ 0.22/0.45 87.05 141.05 54 incl. 54.0m @ 0.18/0.37 SLD006 BLONGAS II 200.2 258.8 58.6 incl. 58.60m @ 0.32/0.74 0 504.65 504.65 504.65m @ 0.13/0.16 SLD029 MONTONG BOTEK 156.7 284.65 127.95 incl. 127.95m @ 0.14/0.26 335.8 374.9 39.1 incl. 39.1m @ 0.30/0.53 175.5 420.6 245.1 245.1m @ 0.18/0.22 404.65 504.65 100 incl. 100.0m @ 0.16/0.2 SLD007 BLONGAS I 177.5 210.4 32.9 incl. 32.9m @ 0.22/0.36 98.2 570.8 472.6 472.6m @ 0.16/0.28 348.75 411.8 63.05 incl. 63.05m @ 0.26/0.26 172.2 457.15 284.95 incl. 284.95m @ 0.20/0.3 SLD030 BLONGAS II 91.1 181 89.9 89.9m @ 0.16/0.22 276.7 377.7 101 incl. 101.00m @ 0.28/0.5 SLD011 NORTH M BOTEK 111.3 136.1 24.8 incl. 24.8m @ 0.24/0.34 276.7 323.7 47 incl. 47.00m @ 0.34/0.74 38
  • 39. Vale Joint Venture Agreement Vale International S.A. Option & Joint Venture Agreement Southern Arc and Vale are exploring the East Elang project (adjacent to Newmont’s Elang deposit) under an option and joint venture agreement whereby Vale can earn a 75% interest (Southern Arc retaining 25%) by funding project expenditures through to completion of a bankable feasibility study. To exercise its option, Vale must fully fund advancement of the East Elang project through to completion of a bankable feasibility study. Should Vale choose not to exercise its option, Southern Arc will retain its 100% ownership of the project at no cost. 39
  • 40. Contact Us Canadian Office Rhylin Bailie
 Vice President Communications & Investor Relations NA Toll-free: 1-888-676-5241 Tel: 604-676-5241 info@southernarcminerals.com Indonesian Office Mike Andrews President & Chief Operating Officer Andrew Rowe Executive Vice President 62-21-7988-8612 SouthernArcMinerals.com TSX-V: SA, OTCQX: SOACF 40