IndII Support under Phase 1 - summary

• MTEF, budgeting and sector performance:
  – Budgeting process, strategy linkage to long-term plan, KPI, action plan
• Road network development and planning (Bipran-AECOM):
  – NR Masterplan, road corridor plans for E Sumatra & N Java
  – BPJT capacity, institutional options and toll road program
• Road program delivery (Bintek-Cardno):
  – Extending design life, life-cycle costs, axle load limits, performance-based
    contracts, project management, routine maintenance delivery
• Road sector policy issues:
  – South Africa visit: SANRAL MTEF, road management, business model
• Sub-national roads:
  – Pilot on road management surveys, programming and routine maintenance
• Road safety:
  – Blackspot program prepared, design manual produced

                                                                                   2
Challenges for the road sector - MTEF
• Infrastructure is a critical constraint to growth
  – low competitiveness ranking for road infrastructure provision
• Poor connectivity
  – Main corridor times 60-100 percent longer than neighbours
• Low cost effectiveness of road asset management
  – while condition is fairly good, deterioration is rapid
  – high annual costs, equivalent to new road every 5 years
  – fragmented contracts; weak construction industry.
• Changed resource environment
  – 6-fold increase in funding in 6 years, 95+% budget execution
  – Value for money?? - average cost up, but output flat
• Weak linkages to national development plan
  – lacks targets on connectivity, efficiency and effectiveness

                                                                    3
Phase 1 – Road Program implementation

• Strong direction & interaction with Bintek and Balai
• Revision to Pavement Design Guide:
      • Long-life designs (low maintenance)
      • Catalog approach for greater reliability
        (based on detailed analysis and life-cycle costs)
      • Strong foundation and drainage for long life
      • Overloading incorporated in design
      • Flexible, rigid, reconstructed and recycled pavements
• Larger package size improves cost and quality
• Balai want automated road surveys for better data
• Options for management of routine maintenance
• Economic justification for raising legal axle load limit
                                                                4
Phase 1 – Road Network Development
  Connectivity:
  • low connectivity compared to regional neighbours, but no target
  • how do we measure performance and set targets?
  • need to measure, report and forecast travel times
  • link RENSTRA workplan to connectivity target and
  national long-term plan          Normalized Trip Times on Economic Corridor Arterial
                                                                             Roads – 2011 Estimates

                                                                                    Trip time hr/100 km*
High land transport costs – low                                       0.0     1.0         2.0       3.0        4.0        5.0        6.0

connectivity of economic centres                      Trans-Sumatra




                                                  1
                                                                                                          Target Service level
                                                         Trans-Java                                       1-1.5 hr/100 km
                                                  2
                                      Vietnam
                                      Indonesia         Kalimantan
                                                  3


                                      China
                                                           Sulawesi
                                                  4




                                      Thailand
                                      Malaysia             Bali-NTT
                                                  5




                                                      Papua-Maluku
                                                  6




0.00      1.00        2.00     3.00
       Trip time (hr/100 km)                                                                               * Corridor distance shorter
                                                                  Road Trip Time        Nautical Add-on    than Arterial road distance
                                                  Source: IndII estimates from bus schedules and DGH data, April 2012


                                                                                                                                         5
DGH Masterplan for Road Infrastructure 2010-14
                                                                Road Length, km
                                                     -     2,000 4,000 6,000 8,000 10,000
Road development program -
                                           Sumatra
  Incremental widening to                                        3,690
  minimum width standard                      Java       1,430
• Budget IDR 7 trillion/yr              Kalimantan         2,780
• Covers 47% of network in 5 yr
                                          Sulawesi             3,160
                                                                                        Total Length
• Increments to 4.5, 6 or 7 m width
                                              NTT        987                            Improved
But comes at high cost:                                                                 length
                                      Maluku-Papua       1,905
• No distance saving, little speed
                                                  Width standard of national arterial roads,
  improvement                                  after DGH road development program 2010-14

• Investment repeated in 5-10 yrs
                                                                   7m
• High cost = 30-40% of full                                      width
                                                                  14%
  construction for 20-yr life
                                                          6 m width       4.5 m width
• Defers achieving modern asset                              33%              53%


• Compounds land issues
                                                                                                       6
Corridor planning approach for long-term
             development
                                                                                                                 Nunukan



                                                                                               Malinau
 Corridor plan evaluates options when
 generating project pipeline and                                                                     Tj. Selor

 investment profile for Economic
                              Aruk
 Corridor:
                                                       Ng Badau
 staged over 5, 10,                        Enttikong
                                                                  Putusibau


 15 & 20 year periods
                               Pontianak   Tayan
                                                                                                                 Samarinda



                                                                                                          Balikpapan
                                                                              Palangkaraya



Strategic Options
(1) Widen existing road                                     Banjarmasin
(2) Realign & rebuild – “road renewal”; digambarkan dengan garis putus-putus
                          Jalan yang belum terbangun
                                                                                             Road standard
(3) Highway on future expressway                                                                   Expressway
    location                                                                                       >= 7 m
                                                                                                   6m
(4) Expressway in new location                                                                     4.5 – 6 m
                                                                                                   Not Connected
                                                                                                   Sea Port
                                                                                                                             7
Corridor plan (trans-Sumatra example):
  detailed multi-year program & standard




                                           8
Corridor plan – strip map presentation:
       Trans-Sumatra - Corridor Plan for Staged Development of
                 Capacity in Parallel Facilities over long-term 20-yr period

ARTERIAL NATIONAL ROAD WIDTH
Width m 14                                                                                                 2019
   Road Width

                 10               2024
                                                                                                                                                        2014
                  7
                  6
                  5                                                                                                                                           2010
                      101       102        103      104     105          106         107     108    109             110         111          112        113

                B Aceh
                   B Aceh                        Medan
                                                   Medan                                     Pekanbaru
                                                                                                Pekanba                                            Lampung
                                                                                                                                             Palembg Lampung

Length km      644                                  694                                             754                                      443                        0
Total distance 2536                                 1892                                            1198                                     443



                   EXPRESSWAY
                   Dual C'way


                                                                                                                                                              Renstra period color code
                                                                                                                                                              Baseline
                                                                                                                                                              2010-2014
                                                                                                                                                              2015-2019
                                                                                                                                                              2020-2024
                                                                                                                                                              2025-2029
                                  101      102     103     104     105         106     107    108   109       110         111         112      113
                                  B Aceh                   Medan                                    Pekanba                           Palembg Lampung

                                           2029                                2019                           2024                          2019
                   Length km   460                         564                                      610                               380               0
                   Distance km 2014                        1554                                     990                               380


                                                                                                                                                                                  9
Corridor Plan Output - Trans-Sumatra Example:
                               Linkage of Development Outcomes and Financing Plan
                                              – Long-term 20-yr Period



                          Connectivity:                                                        80          Financing Plan




                                                            5-Year Spending estimate (IDR T)
                   Travel Time from South to                                                   70
                                                                                                                                          1,5
                             North                                                             60
                                                                                                                             7
                                                                                               50
                   70
                   60                                                                          40
                                                                                                                                   58,6
TRAVEL TIME (hr)




                   50                                                                          30                     47,9
                                                                                                                                                           0
                   40                                                                          20
                                                                                                                                                    20,2
                   30                              B Aceh                                      10
                                                                                                          2,6              1,7 3          3,6
                                                                                                                3 3                             3          0
                   20                              Medan                                       0    1,8
                                                   Pekanb
                   10                                                                                     R1          R2           R3               R4
                                                   Palem                                                              RENSTRA PERIOD
                    0                              Boukh
                        2010 2015 2020 2025 2030                                       Rd Presv           Rd Widening        Exwy GOI     Exwy PrivSec




                                                                                                                                                               10
Forecast of Forward Funding Requirements
  (demonstration only, from study data)
• Public funding of IDR 42-56 trillion/yr required 2015-29
• Only IDR 4 trillion/yr (16%) attractive to private sector
• Road development requires IDR 19 trillion/yr – in renewal
• Road preservation 20-30% less due to stronger roads
                                  70
                                                  Forecast Funding Requirements
                                  60
   Annual Funding Requirement,
     IDR trillion (2011 prices)




                                  50

                                  40
                                                                                         Expressway - private funding
                                  30
                                                                                         Expressway - public funding
                                  20                                                     Arterial road development

                                  10                                                     Road preservation
                                                                                         Road management
                                  0
                                       2005-09   2010-14   2015-19   2020-24   2025-29
                                                                                                                        11
Priorities for Phase 2 support
Based on DGH priorities and Phase 1 findings, key areas include:
• Preparation of long-term national road master-plan:
  – Connectivity in main economic corridors
  – Expressway development, project pipeline and financing
  – Modernisation of arterial road network
• Better road performance and lower annual costs
  – extend life of road assets – expected and actual
• Better budget allocation and accountability
  – Improved asset management and systems
• Strategic priorities for RENSTRA and funding requirement
• Staff performance, capability and accountability

                                                              12
Proposed activities for Phase 2 National roads



Policy

Planning

Program delivery

                                            13
1. Advisory support on road sector policy
   - DG, Directors
Aims
• Improving sector and institutional performance
• Effective legal, regulatory & financing provisions
• Effectiveness of IndII support to DGH & road sector
Sub-activities:
• Dialog with GOI – MPW, MOF, Bappenas, CMEA, MoT
• Revisions to Road Law
• Expressway financing and issues
• Institutional structure and organizational performance
• Management and financing
• Sub-national road role, road preservation fund
• IndII road program effectiveness
                                                           14
2. Support on Planning Road Development
- Bipran, BPJT
Aims:
• Plan road development to meet connectivity goals
• Strategy for modernising arterial road network
• Improve delivery & financing of expressway network
Main outputs:
• Long-term development strategy for road infrastructure
• 20-yr pipeline of investment projects in economic corridors
• Expressway masterplan and PPP-VGF demonstration
• Road renewal policy to modernise arterial road network
Performance measures:
• Connectivity (travel time) in main corridors
• Accessibility in eastern region (km/km2)
                                                           15
2. Support on Planning Road Development:
Sub-activities
• Procedures for planning development of road network
  – Advisory support in Bipran: long-term planning of connectivity &
    capacity in corridors, road renewal policy, medium-term pipeline, KPI
    for network, staff competencies and training
• Planning & capacity for developing expressway network
  – Update expressway master-plan, include staging
  – BPJT advisory support, VGF financing mechanisms, capacity-building,
    review of packages, institutional options
• Preparation of corridor plans for Java and Sumatra
  – Refine corridor plans & extend to arterial corridors, prepare 2015-19
    project pipeline, guidance on expressway packages
• Preparation of corridor plans & pipeline for east region
  – Survey, analyse and prepare plans for 4 main corridors in Kal, Sul,
    Bali-NTT, M-Papua; 2015-19 pipeline; review needs for other NAR
• Preparation of medium- and long-term plans
  – Assist preparation of 2015-19 RENSTRA and 2015-24 long-term plan
                                                                          16
3. Improving performance of national road
   program implementation (Bintek, balai)
Aims:
• To extend asset life through improved design
• To build capacity for asset management in balai
  implementation offices
• To improve delivery and quality of construction and
  maintenance
Performance measures:
• Expected life and actual life of major works
• Contract package length
• Average preservation costs/km/yr
• Road and bridge condition
• Percentage of arterial road renewed
                                                        17
3. Improving the performance of national
   road program implementation (cont)
• Implementation of new design code
  – Longer life, better foundation & drainage, concrete
• Application of road renewal policy
  – Programming, design & implementation of road renewal along
    arterial corridors coordinated with long-term network plan
• Development of improved asset management tools
  – Automated surveys, practical life-cycle programming tool with
    strip-map report to replace IRMS, performance indicator reports
• Improved project management, skills & performance
  – Satker and PPK strengthened in contract packaging, procurement
    and supervision
  – Further use of performance-based and maintenance contracts
• Piloting of asset management & project management
  – 2 balai in 2013, then progressively to other balai 2014-15.
                                                                  18
3. Improving the performance of national
   road program implementation (cont)

• Improved public participation
  – Use of program reports in local consultation, public disclosure of
    program and project information (perhaps through CoST)
• Improved performance and incentives for contractors
  – Support for action plan of Bp Konstruksi to improve certification
    and performance evaluation, strengthen LPJK and accountability




                                                                    19
Interim activities – July-December 2012
• Bintek support:
  – Training of balai on new pavement design manual, calibration of
    structural tests, preparation of drainage design manual, baseline
    survey of KPI
• DG, Bipran support:
  – Preparing & convening national symposium on road network
    development and financing, with GOI & international participants
• Bipran support:
  – Baseline surveys of connectivity in main trunk routes; review
    status of new toll road packages; preparation for main activity
• Detailed preparation and procurement of IndII DGH
  activities



                                                                      20
IndII-2 in DGH:
Key concepts to note
• Expressway as class of public road, not toll road
• New public financing model (VGF) in PPP
  – Availability- or performance-based, quarterly payment, toll optional
• Long-term corridor plan selects road standard and timing
  of renewal
• Road renewal policy
  – Defers betterment until full realignment & construction planned
  – Gains long life, safe, modern highway
• Asset management and programming function for
  preservation transferred to balai, with graphical tool
• Costs reduced by extending expected and actual life
• Independence between supervision and contractor
• Monitor outcomes – KPI on travel time, age, costs
                                                                    21
Timeline for Phase 2 on national roads

      Month                  Activity
    Jan-12    DGH workshop on future direction,
              Ongoing IndII-DGH discussions
    Apr-12    IndII consultation on strategy with
              AusAID
    Jul-12    - Activity proposals drafted
              - Activities discussed with DGH
              - Policy adviser (John Lee) arrives
    Aug-12    - Activity designs finalised,
                procurement starts;
              - Interim activities start
    Oct-12    Symposium on road development
              planning and financing
    Jan-13    Expected start of main Planning
              and Implementation activities
    Jan-14    Mid-term review
    Dec-14    Main activities end
                                                    22
Conclusion
• The activities are designed to support DGH in delivering
  its program
• Core support will be provided through individual advisers
  working as partner to Directorate staff in DGH offices
• Consultant teams will be coordinated by the advisers and
  work closely with DGH staff in central and balai offices
• The teams will be most effective if working space can be
  made available in DGH offices
• Your input to the activity design is important – especially
  in the next two months Jul-Aug
                        Terima kasih
                                                           23
4. Sub-national roads:
   Incentivising road management
        Objectives                         Implementation and Outcomes
    Strengthening central    Component 1: Preparation of Grant Design and Interim
     and provincial           Support for Critical Elements to expedite program,
     agencies on asset        (implemented second half of 2012)
     management for sub-      Component 2: Consultants for project management and
     national roads (SNR)     implementation of grant program over 5 years, 2014-2018;

    Improving participation     Creation of SNR project management unit in DGH
     by private sector and
                                 Establishment of transport forums
     the public – to improve
     communication and           TA and training in planning and implementation of
     agency performance           maintenance & rehabilitation, and PBC
    Implementation of pilot     Incentives for increased budget allocation, for
     output-based road            contracting out works and performance-based contracts
     maintenance and
     rehabilitation program      Staged pilot, starting with one province (NTT) increasing
                                  to up to other jurisdictions, based on demonstrated
    Effective delivery of        capability and commitment.
     IndII support for sub-
     national roads


                                                                                          24
5. Improving Road Safety Blackspots and
   Program Management
      Objectives                        Implementation and Outcomes
   Building capability of   Component 1: Interim support: international road safety
    central and regional     specialist supporting RSEU 3 p-months to Jul-12;
    offices for managing     Component 2. Implementation support by Consultant firm for
                             24 months to Jun-14 (2-stage);
    blackspot improvement
                             Component 3. Program management support by International
    programs                 specialist (50% of 30 months).
   Implementation of        Strategic Plan for Road Safety in DGH
    blackspot
    improvements to meet        RSEU, DGH balai and local police trained in managing
    RENSTRA targets              road safety programs,

   Developing and              Support to achieve 150 blackspot improvements to
    monitoring road safety       achieve RENSTRA objectives
    programs in national        Three fact-finding missions provide overseas training and
    police and sub-national      experience to 60 officials
    road agencies
                                Performance and results publicised and build GOI donor
   Effective delivery of        & public support for road safety programs
    IndII support for road
    safety•                     Further road safety programs ready in DGH, INTP and
                                 sub-national DGLT agencies.

                                                                                          25

More Related Content

What's hot

Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ IndiaPlanning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ IndiaWRI Ross Center for Sustainable Cities
 
Planning and Design of Feeder Services and Short Routes - RR Deshpande
Planning and Design of Feeder Services and Short Routes - RR DeshpandePlanning and Design of Feeder Services and Short Routes - RR Deshpande
Planning and Design of Feeder Services and Short Routes - RR DeshpandeWRI Ross Center for Sustainable Cities
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
 
DRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyDRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyTransport Planning
 
Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Railways and Harbours
 
Peering equilibrium multi path routing
Peering equilibrium multi path routingPeering equilibrium multi path routing
Peering equilibrium multi path routingingenioustech
 
19 9255 nautical ad hoc network application edit septian
19 9255 nautical ad hoc network application edit septian19 9255 nautical ad hoc network application edit septian
19 9255 nautical ad hoc network application edit septianIAESIJEECS
 

What's hot (11)

Smith - Review of Energy Infrastructure
Smith - Review of Energy Infrastructure Smith - Review of Energy Infrastructure
Smith - Review of Energy Infrastructure
 
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ IndiaPlanning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
Planning and Design of Feeder Services and Short Routes - BEST and EMBARQ India
 
I021201059064
I021201059064I021201059064
I021201059064
 
Planning and Design of Feeder Services and Short Routes - RR Deshpande
Planning and Design of Feeder Services and Short Routes - RR DeshpandePlanning and Design of Feeder Services and Short Routes - RR Deshpande
Planning and Design of Feeder Services and Short Routes - RR Deshpande
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
DRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport StrategyDRAFT Central Coast Regional Transport Strategy
DRAFT Central Coast Regional Transport Strategy
 
Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4Optimal Contro To Save Fuel I Hha09 Rev4
Optimal Contro To Save Fuel I Hha09 Rev4
 
Peering equilibrium multi path routing
Peering equilibrium multi path routingPeering equilibrium multi path routing
Peering equilibrium multi path routing
 
19 9255 nautical ad hoc network application edit septian
19 9255 nautical ad hoc network application edit septian19 9255 nautical ad hoc network application edit septian
19 9255 nautical ad hoc network application edit septian
 
L046066577
L046066577L046066577
L046066577
 
Nov 2010 mha report
Nov 2010 mha reportNov 2010 mha report
Nov 2010 mha report
 

Viewers also liked (6)

8 ind ii role rli final id r1
8 ind ii role rli final id r18 ind ii role rli final id r1
8 ind ii role rli final id r1
 
1Resume
1Resume1Resume
1Resume
 
расписание дня
расписание днярасписание дня
расписание дня
 
News letter janeiro de 2009 ESEB CONSULTORIA
News letter janeiro de 2009 ESEB CONSULTORIANews letter janeiro de 2009 ESEB CONSULTORIA
News letter janeiro de 2009 ESEB CONSULTORIA
 
Ghandi p bill paterson ppt v 3
Ghandi p bill paterson ppt v 3Ghandi p bill paterson ppt v 3
Ghandi p bill paterson ppt v 3
 
1 issues and priorities rli final id.pptx r1
1 issues and priorities rli final id.pptx r11 issues and priorities rli final id.pptx r1
1 issues and priorities rli final id.pptx r1
 

Similar to Ind ii2 national roads program proposal to dgh 09jul12 plus concepts

Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey EricssonDeepak Pandey
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
Western Cape Broadband Briefing to Cape Chamber ICT Committee
Western Cape Broadband Briefing to Cape Chamber ICT CommitteeWestern Cape Broadband Briefing to Cape Chamber ICT Committee
Western Cape Broadband Briefing to Cape Chamber ICT CommitteeNirvesh Sooful
 
Review of lbm vs ebm, tsering 017
Review of lbm vs ebm, tsering 017Review of lbm vs ebm, tsering 017
Review of lbm vs ebm, tsering 017Tseringodrub Gurung
 
Comesa investment teaser 2011
Comesa investment teaser 2011Comesa investment teaser 2011
Comesa investment teaser 2011Parti Djibouti
 
Nitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta
 
Learnings from a programme business case
Learnings from a programme business case Learnings from a programme business case
Learnings from a programme business case JumpingJaq
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET Journal
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesRailways and Harbours
 

Similar to Ind ii2 national roads program proposal to dgh 09jul12 plus concepts (20)

Final transisi pakgandhi_newyear
Final transisi pakgandhi_newyearFinal transisi pakgandhi_newyear
Final transisi pakgandhi_newyear
 
Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6
 
Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6Lokesh_Srivastava_CV_6
Lokesh_Srivastava_CV_6
 
MUHAMMAD FARRUKH_LTE
MUHAMMAD FARRUKH_LTEMUHAMMAD FARRUKH_LTE
MUHAMMAD FARRUKH_LTE
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
The Need For Rail And Ports Integration Pmaesa
The Need For Rail And Ports Integration PmaesaThe Need For Rail And Ports Integration Pmaesa
The Need For Rail And Ports Integration Pmaesa
 
Western Cape Broadband Briefing to Cape Chamber ICT Committee
Western Cape Broadband Briefing to Cape Chamber ICT CommitteeWestern Cape Broadband Briefing to Cape Chamber ICT Committee
Western Cape Broadband Briefing to Cape Chamber ICT Committee
 
Review of lbm vs ebm, tsering 017
Review of lbm vs ebm, tsering 017Review of lbm vs ebm, tsering 017
Review of lbm vs ebm, tsering 017
 
Comesa investment teaser 2011
Comesa investment teaser 2011Comesa investment teaser 2011
Comesa investment teaser 2011
 
cv Updated M.Anwar
cv Updated M.Anwarcv Updated M.Anwar
cv Updated M.Anwar
 
2 service standards gn final
2 service standards gn final2 service standards gn final
2 service standards gn final
 
Nitin Gupta_2016_resume
Nitin Gupta_2016_resumeNitin Gupta_2016_resume
Nitin Gupta_2016_resume
 
Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
Learnings from a programme business case
Learnings from a programme business case Learnings from a programme business case
Learnings from a programme business case
 
Presentation
PresentationPresentation
Presentation
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
Upgrading and Extending Passenger Services
Upgrading and Extending Passenger ServicesUpgrading and Extending Passenger Services
Upgrading and Extending Passenger Services
 
Archana Mishra Resume
Archana Mishra ResumeArchana Mishra Resume
Archana Mishra Resume
 

More from Indonesia Infrastructure Initiative

Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...Indonesia Infrastructure Initiative
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaIndonesia Infrastructure Initiative
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyIndonesia Infrastructure Initiative
 

More from Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Recently uploaded

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 

Recently uploaded (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 

Ind ii2 national roads program proposal to dgh 09jul12 plus concepts

  • 1. IndII Support to DGH on National Roads – - Road sector achievements and future program DGH, 9 July 2012
  • 2. IndII Support under Phase 1 - summary • MTEF, budgeting and sector performance: – Budgeting process, strategy linkage to long-term plan, KPI, action plan • Road network development and planning (Bipran-AECOM): – NR Masterplan, road corridor plans for E Sumatra & N Java – BPJT capacity, institutional options and toll road program • Road program delivery (Bintek-Cardno): – Extending design life, life-cycle costs, axle load limits, performance-based contracts, project management, routine maintenance delivery • Road sector policy issues: – South Africa visit: SANRAL MTEF, road management, business model • Sub-national roads: – Pilot on road management surveys, programming and routine maintenance • Road safety: – Blackspot program prepared, design manual produced 2
  • 3. Challenges for the road sector - MTEF • Infrastructure is a critical constraint to growth – low competitiveness ranking for road infrastructure provision • Poor connectivity – Main corridor times 60-100 percent longer than neighbours • Low cost effectiveness of road asset management – while condition is fairly good, deterioration is rapid – high annual costs, equivalent to new road every 5 years – fragmented contracts; weak construction industry. • Changed resource environment – 6-fold increase in funding in 6 years, 95+% budget execution – Value for money?? - average cost up, but output flat • Weak linkages to national development plan – lacks targets on connectivity, efficiency and effectiveness 3
  • 4. Phase 1 – Road Program implementation • Strong direction & interaction with Bintek and Balai • Revision to Pavement Design Guide: • Long-life designs (low maintenance) • Catalog approach for greater reliability (based on detailed analysis and life-cycle costs) • Strong foundation and drainage for long life • Overloading incorporated in design • Flexible, rigid, reconstructed and recycled pavements • Larger package size improves cost and quality • Balai want automated road surveys for better data • Options for management of routine maintenance • Economic justification for raising legal axle load limit 4
  • 5. Phase 1 – Road Network Development Connectivity: • low connectivity compared to regional neighbours, but no target • how do we measure performance and set targets? • need to measure, report and forecast travel times • link RENSTRA workplan to connectivity target and national long-term plan Normalized Trip Times on Economic Corridor Arterial Roads – 2011 Estimates Trip time hr/100 km* High land transport costs – low 0.0 1.0 2.0 3.0 4.0 5.0 6.0 connectivity of economic centres Trans-Sumatra 1 Target Service level Trans-Java 1-1.5 hr/100 km 2 Vietnam Indonesia Kalimantan 3 China Sulawesi 4 Thailand Malaysia Bali-NTT 5 Papua-Maluku 6 0.00 1.00 2.00 3.00 Trip time (hr/100 km) * Corridor distance shorter Road Trip Time Nautical Add-on than Arterial road distance Source: IndII estimates from bus schedules and DGH data, April 2012 5
  • 6. DGH Masterplan for Road Infrastructure 2010-14 Road Length, km - 2,000 4,000 6,000 8,000 10,000 Road development program - Sumatra Incremental widening to 3,690 minimum width standard Java 1,430 • Budget IDR 7 trillion/yr Kalimantan 2,780 • Covers 47% of network in 5 yr Sulawesi 3,160 Total Length • Increments to 4.5, 6 or 7 m width NTT 987 Improved But comes at high cost: length Maluku-Papua 1,905 • No distance saving, little speed Width standard of national arterial roads, improvement after DGH road development program 2010-14 • Investment repeated in 5-10 yrs 7m • High cost = 30-40% of full width 14% construction for 20-yr life 6 m width 4.5 m width • Defers achieving modern asset 33% 53% • Compounds land issues 6
  • 7. Corridor planning approach for long-term development Nunukan Malinau Corridor plan evaluates options when generating project pipeline and Tj. Selor investment profile for Economic Aruk Corridor: Ng Badau staged over 5, 10, Enttikong Putusibau 15 & 20 year periods Pontianak Tayan Samarinda Balikpapan Palangkaraya Strategic Options (1) Widen existing road Banjarmasin (2) Realign & rebuild – “road renewal”; digambarkan dengan garis putus-putus Jalan yang belum terbangun Road standard (3) Highway on future expressway Expressway location >= 7 m 6m (4) Expressway in new location 4.5 – 6 m Not Connected Sea Port 7
  • 8. Corridor plan (trans-Sumatra example): detailed multi-year program & standard 8
  • 9. Corridor plan – strip map presentation: Trans-Sumatra - Corridor Plan for Staged Development of Capacity in Parallel Facilities over long-term 20-yr period ARTERIAL NATIONAL ROAD WIDTH Width m 14 2019 Road Width 10 2024 2014 7 6 5 2010 101 102 103 104 105 106 107 108 109 110 111 112 113 B Aceh B Aceh Medan Medan Pekanbaru Pekanba Lampung Palembg Lampung Length km 644 694 754 443 0 Total distance 2536 1892 1198 443 EXPRESSWAY Dual C'way Renstra period color code Baseline 2010-2014 2015-2019 2020-2024 2025-2029 101 102 103 104 105 106 107 108 109 110 111 112 113 B Aceh Medan Pekanba Palembg Lampung 2029 2019 2024 2019 Length km 460 564 610 380 0 Distance km 2014 1554 990 380 9
  • 10. Corridor Plan Output - Trans-Sumatra Example: Linkage of Development Outcomes and Financing Plan – Long-term 20-yr Period Connectivity: 80 Financing Plan 5-Year Spending estimate (IDR T) Travel Time from South to 70 1,5 North 60 7 50 70 60 40 58,6 TRAVEL TIME (hr) 50 30 47,9 0 40 20 20,2 30 B Aceh 10 2,6 1,7 3 3,6 3 3 3 0 20 Medan 0 1,8 Pekanb 10 R1 R2 R3 R4 Palem RENSTRA PERIOD 0 Boukh 2010 2015 2020 2025 2030 Rd Presv Rd Widening Exwy GOI Exwy PrivSec 10
  • 11. Forecast of Forward Funding Requirements (demonstration only, from study data) • Public funding of IDR 42-56 trillion/yr required 2015-29 • Only IDR 4 trillion/yr (16%) attractive to private sector • Road development requires IDR 19 trillion/yr – in renewal • Road preservation 20-30% less due to stronger roads 70 Forecast Funding Requirements 60 Annual Funding Requirement, IDR trillion (2011 prices) 50 40 Expressway - private funding 30 Expressway - public funding 20 Arterial road development 10 Road preservation Road management 0 2005-09 2010-14 2015-19 2020-24 2025-29 11
  • 12. Priorities for Phase 2 support Based on DGH priorities and Phase 1 findings, key areas include: • Preparation of long-term national road master-plan: – Connectivity in main economic corridors – Expressway development, project pipeline and financing – Modernisation of arterial road network • Better road performance and lower annual costs – extend life of road assets – expected and actual • Better budget allocation and accountability – Improved asset management and systems • Strategic priorities for RENSTRA and funding requirement • Staff performance, capability and accountability 12
  • 13. Proposed activities for Phase 2 National roads Policy Planning Program delivery 13
  • 14. 1. Advisory support on road sector policy - DG, Directors Aims • Improving sector and institutional performance • Effective legal, regulatory & financing provisions • Effectiveness of IndII support to DGH & road sector Sub-activities: • Dialog with GOI – MPW, MOF, Bappenas, CMEA, MoT • Revisions to Road Law • Expressway financing and issues • Institutional structure and organizational performance • Management and financing • Sub-national road role, road preservation fund • IndII road program effectiveness 14
  • 15. 2. Support on Planning Road Development - Bipran, BPJT Aims: • Plan road development to meet connectivity goals • Strategy for modernising arterial road network • Improve delivery & financing of expressway network Main outputs: • Long-term development strategy for road infrastructure • 20-yr pipeline of investment projects in economic corridors • Expressway masterplan and PPP-VGF demonstration • Road renewal policy to modernise arterial road network Performance measures: • Connectivity (travel time) in main corridors • Accessibility in eastern region (km/km2) 15
  • 16. 2. Support on Planning Road Development: Sub-activities • Procedures for planning development of road network – Advisory support in Bipran: long-term planning of connectivity & capacity in corridors, road renewal policy, medium-term pipeline, KPI for network, staff competencies and training • Planning & capacity for developing expressway network – Update expressway master-plan, include staging – BPJT advisory support, VGF financing mechanisms, capacity-building, review of packages, institutional options • Preparation of corridor plans for Java and Sumatra – Refine corridor plans & extend to arterial corridors, prepare 2015-19 project pipeline, guidance on expressway packages • Preparation of corridor plans & pipeline for east region – Survey, analyse and prepare plans for 4 main corridors in Kal, Sul, Bali-NTT, M-Papua; 2015-19 pipeline; review needs for other NAR • Preparation of medium- and long-term plans – Assist preparation of 2015-19 RENSTRA and 2015-24 long-term plan 16
  • 17. 3. Improving performance of national road program implementation (Bintek, balai) Aims: • To extend asset life through improved design • To build capacity for asset management in balai implementation offices • To improve delivery and quality of construction and maintenance Performance measures: • Expected life and actual life of major works • Contract package length • Average preservation costs/km/yr • Road and bridge condition • Percentage of arterial road renewed 17
  • 18. 3. Improving the performance of national road program implementation (cont) • Implementation of new design code – Longer life, better foundation & drainage, concrete • Application of road renewal policy – Programming, design & implementation of road renewal along arterial corridors coordinated with long-term network plan • Development of improved asset management tools – Automated surveys, practical life-cycle programming tool with strip-map report to replace IRMS, performance indicator reports • Improved project management, skills & performance – Satker and PPK strengthened in contract packaging, procurement and supervision – Further use of performance-based and maintenance contracts • Piloting of asset management & project management – 2 balai in 2013, then progressively to other balai 2014-15. 18
  • 19. 3. Improving the performance of national road program implementation (cont) • Improved public participation – Use of program reports in local consultation, public disclosure of program and project information (perhaps through CoST) • Improved performance and incentives for contractors – Support for action plan of Bp Konstruksi to improve certification and performance evaluation, strengthen LPJK and accountability 19
  • 20. Interim activities – July-December 2012 • Bintek support: – Training of balai on new pavement design manual, calibration of structural tests, preparation of drainage design manual, baseline survey of KPI • DG, Bipran support: – Preparing & convening national symposium on road network development and financing, with GOI & international participants • Bipran support: – Baseline surveys of connectivity in main trunk routes; review status of new toll road packages; preparation for main activity • Detailed preparation and procurement of IndII DGH activities 20
  • 21. IndII-2 in DGH: Key concepts to note • Expressway as class of public road, not toll road • New public financing model (VGF) in PPP – Availability- or performance-based, quarterly payment, toll optional • Long-term corridor plan selects road standard and timing of renewal • Road renewal policy – Defers betterment until full realignment & construction planned – Gains long life, safe, modern highway • Asset management and programming function for preservation transferred to balai, with graphical tool • Costs reduced by extending expected and actual life • Independence between supervision and contractor • Monitor outcomes – KPI on travel time, age, costs 21
  • 22. Timeline for Phase 2 on national roads Month Activity Jan-12 DGH workshop on future direction, Ongoing IndII-DGH discussions Apr-12 IndII consultation on strategy with AusAID Jul-12 - Activity proposals drafted - Activities discussed with DGH - Policy adviser (John Lee) arrives Aug-12 - Activity designs finalised, procurement starts; - Interim activities start Oct-12 Symposium on road development planning and financing Jan-13 Expected start of main Planning and Implementation activities Jan-14 Mid-term review Dec-14 Main activities end 22
  • 23. Conclusion • The activities are designed to support DGH in delivering its program • Core support will be provided through individual advisers working as partner to Directorate staff in DGH offices • Consultant teams will be coordinated by the advisers and work closely with DGH staff in central and balai offices • The teams will be most effective if working space can be made available in DGH offices • Your input to the activity design is important – especially in the next two months Jul-Aug Terima kasih 23
  • 24. 4. Sub-national roads: Incentivising road management Objectives Implementation and Outcomes  Strengthening central Component 1: Preparation of Grant Design and Interim and provincial Support for Critical Elements to expedite program, agencies on asset (implemented second half of 2012) management for sub- Component 2: Consultants for project management and national roads (SNR) implementation of grant program over 5 years, 2014-2018;  Improving participation  Creation of SNR project management unit in DGH by private sector and  Establishment of transport forums the public – to improve communication and  TA and training in planning and implementation of agency performance maintenance & rehabilitation, and PBC  Implementation of pilot  Incentives for increased budget allocation, for output-based road contracting out works and performance-based contracts maintenance and rehabilitation program  Staged pilot, starting with one province (NTT) increasing to up to other jurisdictions, based on demonstrated  Effective delivery of capability and commitment. IndII support for sub- national roads 24
  • 25. 5. Improving Road Safety Blackspots and Program Management Objectives Implementation and Outcomes  Building capability of Component 1: Interim support: international road safety central and regional specialist supporting RSEU 3 p-months to Jul-12; offices for managing Component 2. Implementation support by Consultant firm for 24 months to Jun-14 (2-stage); blackspot improvement Component 3. Program management support by International programs specialist (50% of 30 months).  Implementation of Strategic Plan for Road Safety in DGH blackspot improvements to meet  RSEU, DGH balai and local police trained in managing RENSTRA targets road safety programs,  Developing and  Support to achieve 150 blackspot improvements to monitoring road safety achieve RENSTRA objectives programs in national  Three fact-finding missions provide overseas training and police and sub-national experience to 60 officials road agencies  Performance and results publicised and build GOI donor  Effective delivery of & public support for road safety programs IndII support for road safety•  Further road safety programs ready in DGH, INTP and sub-national DGLT agencies. 25