2. CLEAN ENERGY & the TRANSIT INDUSTRY
•
CE has been fueling transit buses since 1997
•
Today CE fuels over 6,500 transit buses daily for 42 Public Transit Agencies
•
CE provided over 93,000,000 GGE to the transit industry in 2013
•
We are the nation’s leading provider of DBOM services for transit and other transportation sectors
•
In recognizing the needs in the industry for compliant repair facilities, Clean Energy created a facilities modification business unit that has performed over two dozen projects since 2012.
4. FACILITY MODIFICATION SERVICES – Full Facility
Classified Zones
CNG: 18” on underside of ceiling
LNG: 18” on underside of ceiling + 18” above finished floor surfaces
Heating
No open flames or surface temperatures greater than 750°F
Monitoring
Methane Detection / Alarms (Visual & Audible)
Air Exchanges
Normal Operations & When a Leak is Detected
Upgrades
Control System, Warning Devices, Ventilation, Heating, and Electrical re-location
6. Facility Assessment / Site Details
• Electrical System Capacity • Heating System Design • Roof and Wall Construction • Mechanical Exhaust and Supply for Ventilation • Preliminary Design Drawings • Value Engineering
Engineering Design
• Develop Detailed Construction Documents
• Complete Permitting through Local Jurisdiction
Construction
• Construction Administration • Experienced Supervisors and Craftsmen • Pre-qualified Sub-contractors
FACILITY MODIFICATION- Process
7. Get advice from inside the industry!
“Design – Build” vs. “Design – Bid – Build”
Best scenario: Package the station & facility modification together
REMEMBER…
8. Full or partial shop modifications
New NGV Easy Bay™ low-cost, retractable fabric barrier (available Q4 2014)
Tension Fabric Structure (Fully Code Compliant)
FACILITY MODIFICATIONS – Menu of Services
12. For More Information Contact:
Wally Dubno
O: (949) 437-1327
wally.dubno@cleanenergyfuels.com
Click to download our NGV Easy Bay information sheet
TM