PROJECT ON CONSTRUCTION MANAGEMENT
GROUP MEMBERS
1. EHSANULLAH (001)
2. QAZI NABEEL (144)
3. ANAS AHMED ABIDI(080)
4. ZUHAIR NADEEM(072)
5. MUHAMMAD JAWAD HASSAN(117)
6. MUHAMMAD ARIF SIDDIQUE KHAN(043)
7. AGHA BABAR ALI(078)
PROJECT INTERNAL
(ENGR. SYED FARAZ JAFRI)
PROJECT EXTERNAL
(ENGR.UMAR FAROOQ)
PROJECT INTERNAL & EXTERNAL
PROJECT DETAILS
CLIENT AL-GHAZI TRACTORS
DESIGN CONSULTANT NES-PAK.
MAIN CONTRACTOR TAHIR ENTERPRISES
ARCHITECT NES-PAK
LOCATION DEFENCE PHASE-1 PLOT 102-B
TOTAL COVERED AREA 4240 SQ FT
SRART DATE 31 DECEMBER 2013
EXPECTED FINISH DATE 31 MAY 2015
DURATION 15 MONTHS
PURPOSE OFFICE BUILDING
PARKING AREA 1 BASEMENT (FOR 22 CARS)
NUMBER OF STORIES 2 BASEMENT+ 4 FLOORS
PROJECT OBJECTIVES
 To evaluate working drawings and prepare BOQ
 Preparation of bar bending schedule
 Perform rate analysis
 To evaluate productivity and duration of various activities
 To study the effectiveness of site safety and quality in a
success of construction project
 To identify causes of delay and disputes on construction
project.
 Planning and scheduling of all construction activities on
primavera p6e.
PROJECT SCOPE
 To provide overall co-ordination and project team management.
 To perform project budgeting, scheduling, cost accounting and
reporting.
 To ensure the quality standard keeping in view the cost.
 Managing time within the whole project.
 Efficient use of computer softwares.
 Construction planning and resource allocation and optimization.
 To get familiar with responsibilities and tasks of a civil engineer.
 To observe the site safety.
Principles of Management
 Division of work
 Discipline
 Unity of command
 Unity in Direction
 Centralization of power to do work
 Change individual interest into organizational interest
 Authority and responsibility should always be together
 Equality, stability and motivation
5M’s of Management
In the management literature, five M’s of management called
as:
 Money
 Material
 Man power
 Machinery
 Methodology
METHODOLOGY
PROJECT MILESTONES
We have successfully achieved the following milestones
 Evaluated working drawings.
 Prepared bar bending schedule and BOQ.
 Performed rate analysis.
 Evaluated productivity and duration of various activities.
 Studied the effectiveness of site safety and quality in a success of
construction project.
 Identify causes of delay and disputes on construction project.
 Planned and scheduled all construction activities on primavera p6e.
Selection Of Project (WHY?)
We have selected the project due to the following reasons.
 First of all the reason we selected the project in construction
management was due to our interest and better understanding
provided by teachers about the management in the field of civil
engineering.
 The topic which we have selected for final year project show our
interest about cost evaluation of construction project and how to
control project cost through better resource allocation & optimization
and also to get awareness about job site safety and quality issues
related to construction project.
Site Visit And Data Collection
Frequently visited site for
 Collection of data such as working drawings.
 Observing Different construction activities on site.
 Discussing problems with external.
 Getting awareness about sequence of work required to plan and
schedule the project.
 To observe and understand safety and quality parameters.
Preparation and Submission of
Synopsis
Synopsis was submitted to our internal in the month of February 2015
which included
 Project title
 Project details
 Project technical information
 3c’s of project
 Objectives and scope of project
 Time frame
Rate Analysis and Workout
Productivity
 All Rates and productivity (except productivity of machinery) are taken
from NES-PAK Contract section 12th floor PNIC Building opp. Shahra-
e-Faisal, with cooperation of GM of Contract section Engr. Nasir Jamal.
 Some Rates and productivity were provided by our Site supervisor of
AL Ghazi Office Building Associate Engr. MR Fahad
 Productivity of machinery was found from internet by pdf manuals of
manufacturers of respective machineries.
Preparation Of Bar bending schedule and BOQ
 We prepared BBS and BOQ by following working drawings
(Ground Floor, 1st Floor, 2nd Floor, 3rd Floor and Basement 1)
S.# WBS NAME Shuttering
(sq. ft)
Volume
(Cu. Ft)
Reinforcement
(kg)
Plastering
(sq. ft)
1 Beams 3125 1157 3783 2702
2 Columns 877.1 325.68 1641.6 877.1
3 Walls 8177
4 Slab 4172.1 3184.3 5700 9074.8
Basement 2
Activity Concreting Reinforcement
(Kg)
Plastering Blocks
Sand
(cft.)
Cement
(bags)
Crush
(Cft.)
Sand
(cft)
Cement
(bags)
Beams 496
cft
199
bags
992cft 3783 kgs 135 cft 27 bags
Columns 207.5 83 415 2280 64.3 cft 13
Slabs 1365 546 2730 5700 461 92
Walls 625.4 125 9875
Substructure
work
S.# WBS Name Shuttering Volume Reinforcement
1 Pile 88970(Excavation)
5242.21 (pouring)
22500 kg
2 Back Filling 10000 cft
3 Pile Cap 5164 13700 18650 kg
4 Column up to
Plinth
785 cft 4270 kg
Study and observation of site safety
and quality
 The biggest concern which we observed at the site that for engineers
and supervisors personal protection equipment's (PPE ) were given and
other safety precautions were followed but for the laborers the
equipment's (PPE) was not properly provided due various delays
occurred because of accidents.
 Through sites visits we observed that proper quality control procedures
were implemented to get the required quality construction and in
quality assurance teams were assigned to check that all the design
specifications and codes were followed according to standards.
Planning and scheduling of al-ghazi
project on primavera P6
 Planning and scheduling on P6 was started at 4 December 2014 and
was successfully completed on 7 Jan 2015
 Budgeted total cost of project which we estimated by P6 is Rs 38907213
PROJECT S CURVE
Activity usage profile
What we Learnt?/Conclusion
 This construction management project gave us a better understanding about the site sense
and skills required to execute the task properly within limited cost & given time at the site.
 We have computed the bill of quantities and learnt about cost estimation of various
activities of the project. We worked out and understood the bar bending schedule of the project.
 We also performed the rate analysis to get familiar with cost evaluation of construction projects.
 We studied the effectiveness of jobsite safety program in a project success and observed that if safety
standards and precautions are strictly carried out on site then the chances of site accidents
can be avoided up to great extent as well time delays in the project as a result of accidents can also be
controlled.
 We also observed that quality assurance & control on site leads to reliable and economical
construction in many aspects.
 We evaluated productivity and duration of various activities and resources of our project.
 Planning and scheduling of all construction activities was performed on primavera p6e and learnt to
effectively utilize available resources for a various activities of project and control their cost using
primavera P6e
 After working on the management software Primavera P6e, We learnt the satisfactory level of software
towards handling and working and were able to understand the user friendliness of the software.
References
 [1] Rizwan U. Farooqui, Farrukh Arif and S.F.A. Rafeeqi (August
2008) (Safety Performance in Construction Industry of Pakistan,
First International Conference on Construction in Developing
Countries (ICCIDC–I). Advancing and Integrating Construction
Education, Research & Practice” August 4-5, 2008, Karachi,
Pakistan).
 [2] Pratibha Joshi,Promila Sharma ,T.C. Thakur and Amit Khatter
,IJAERS/Vol. I/ Issue III/April-June, 2012/30-34 (Safety in
Construction Line: Important Issue For Risk Identification and
Prevention), International Journal of Advanced Engineering
Research and Studies E-ISSN2249–8974. AdressDepartment of
Resource Management, G.B.Pant Univ. of Agri. & Tech.,
Pantnagar- 263145, Uttrakhand, India.
 [3] Zubair Ahmed Memon, Kanya Lal Khatri, and Allah Bux
Memon, Mehran University Research Journal of Engineering &
Technology, Volume 32, No. 2, April, 2013 [ISSN 02547821],(
Identifying the Critical Factors Affecting Safety Program
Performance for Construction Projects within Pakistan
Construction Industry)
 [4] Jafri, S.F., "Construction Safety and Promotion, Conceptual
Approach Based on the Labor Law of Pakistan", Journal of
Mechanical and Civil Engineering, Volume 1, No. 2, pp. 24-27, July-
August, 2012.
 [5] Syed Faraz Jafri1, Zubair Iqbal Rao2, Khawaja Sheeraz(Policy
Formulation of Construction Safety associated with Labor
Requirements - Substantial Approach for the Metropolitan City,
Karachi, Pakistan), IOSR Journal of Mechanical and Civil
Engineering (IOSRJMCE) ISSN : 2278-1684 Volume 1, Issue 1
(May-June 2012), PP 01-06 www.iosrjournals.org
 [6] ILOSafety and health in construction: An ILO code of practice
Geneva, International Labour Office, 1992/Code of practice/,
/Occupational safety/, /Occupational health/, /Construction
industry/.08.10.1 ISBN 92-2-107104-9
 http://tenrox.com/glossary/organization-breakdown-structure-obs/
 http://www.brighthubpm.com/templates-forms/2645-what-is-a-work-
breakdown-structure/#
 http://www.workbreakdownstructure.com/
 https://www.projectsmart.co.uk/project-management-methodology-
explained.php
 http://www.designingbuildings.co.uk/wiki/Risk_in_building_design_
and_construction.
 http://www.tandfonline.com/doi/pdf/10.1080/16111699.2006.9636126.
 http://www.scribd.com/mobile/doc/14565333/Risk-Assessment-and-
Management-inConstruction-Projects-Full-Thesis#scribd.
final year presentation revised

More Related Content

What's hot

What's hot (20)

RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CarlCharlie_FinalResume
CarlCharlie_FinalResumeCarlCharlie_FinalResume
CarlCharlie_FinalResume
 
CV 2016
CV 2016CV 2016
CV 2016
 
Krishna Updated Resume
Krishna Updated ResumeKrishna Updated Resume
Krishna Updated Resume
 
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
CV 15-08-16 M.K.Narayana _ Seaport Technology & Engineering -
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
Resume latest
Resume latestResume latest
Resume latest
 
B_Naik-CV1
B_Naik-CV1B_Naik-CV1
B_Naik-CV1
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
Rohitkaps
RohitkapsRohitkaps
Rohitkaps
 
RESUME_sushil__latest_
RESUME_sushil__latest_RESUME_sushil__latest_
RESUME_sushil__latest_
 
CV latestone
CV  latestone   CV  latestone
CV latestone
 
Nikhil T - coating inspector
Nikhil T - coating inspectorNikhil T - coating inspector
Nikhil T - coating inspector
 
Mohamad Seth Farabi - Resume
Mohamad Seth Farabi - ResumeMohamad Seth Farabi - Resume
Mohamad Seth Farabi - Resume
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 

Viewers also liked

How to choose a final year project ?
How to choose a final year project ?How to choose a final year project ?
How to choose a final year project ?Vestas
 
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...dna1992
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Selva Prakash
 
Project management using primavera project planner
Project management using primavera project plannerProject management using primavera project planner
Project management using primavera project plannerSoUl_ReApEr
 
Presentation on Comparative study Of concrete using Recycled coarse aggregates
Presentation on Comparative study Of concrete using Recycled coarse aggregatesPresentation on Comparative study Of concrete using Recycled coarse aggregates
Presentation on Comparative study Of concrete using Recycled coarse aggregatesShanu Aggarwal
 
Recycled concrete aggregate
Recycled concrete aggregateRecycled concrete aggregate
Recycled concrete aggregatesarojkhadka059
 
Civil department presentation
Civil department presentationCivil department presentation
Civil department presentationthilinaakalanka
 
Recycled Aggregate Concrete
Recycled Aggregate Concrete  Recycled Aggregate Concrete
Recycled Aggregate Concrete NEELANJAN SARKAR
 
Use of Waste Materials As a replacement of Coarse Aggregate in Concrete Mix
Use of Waste Materials As a replacement of  Coarse Aggregate in Concrete MixUse of Waste Materials As a replacement of  Coarse Aggregate in Concrete Mix
Use of Waste Materials As a replacement of Coarse Aggregate in Concrete MixNitin Yadav
 
reuse and recycle of construction material
reuse and recycle of construction materialreuse and recycle of construction material
reuse and recycle of construction materialRakesh Rahar
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorialKetut Swandana
 

Viewers also liked (15)

How to choose a final year project ?
How to choose a final year project ?How to choose a final year project ?
How to choose a final year project ?
 
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...
Final Project Presentation - COMPREHENSIVE ANALYSIS OF CORROSION ON THE INTER...
 
Steps for making presentation of final year project
Steps for making presentation of final year projectSteps for making presentation of final year project
Steps for making presentation of final year project
 
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
Final review ppt project EFFECTIVENESS OF USING RECYCLED COARSE AGGREGATES IN...
 
Project management using primavera project planner
Project management using primavera project plannerProject management using primavera project planner
Project management using primavera project planner
 
Presentation on Comparative study Of concrete using Recycled coarse aggregates
Presentation on Comparative study Of concrete using Recycled coarse aggregatesPresentation on Comparative study Of concrete using Recycled coarse aggregates
Presentation on Comparative study Of concrete using Recycled coarse aggregates
 
Recycled concrete aggregate
Recycled concrete aggregateRecycled concrete aggregate
Recycled concrete aggregate
 
Green concrete
Green concreteGreen concrete
Green concrete
 
Civil department presentation
Civil department presentationCivil department presentation
Civil department presentation
 
Recycled Aggregate Concrete
Recycled Aggregate Concrete  Recycled Aggregate Concrete
Recycled Aggregate Concrete
 
Use of Waste Materials As a replacement of Coarse Aggregate in Concrete Mix
Use of Waste Materials As a replacement of  Coarse Aggregate in Concrete MixUse of Waste Materials As a replacement of  Coarse Aggregate in Concrete Mix
Use of Waste Materials As a replacement of Coarse Aggregate in Concrete Mix
 
reuse and recycle of construction material
reuse and recycle of construction materialreuse and recycle of construction material
reuse and recycle of construction material
 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorial
 

Similar to final year presentation revised

Industrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdIndustrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdSk Md Nayar
 
Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Raja
 
Construction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformConstruction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformProfessor Kabir Sadeghi
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...IRJET Journal
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSIRJET Journal
 
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...IRJET Journal
 
IRJET - Investigating the Effectiveness of Construction Practices in Dela...
IRJET -  	  Investigating the Effectiveness of Construction Practices in Dela...IRJET -  	  Investigating the Effectiveness of Construction Practices in Dela...
IRJET - Investigating the Effectiveness of Construction Practices in Dela...IRJET Journal
 
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET Journal
 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningIRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 

Similar to final year presentation revised (20)

Industrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures LtdIndustrial Training On Construction At Simplex Infrastructures Ltd
Industrial Training On Construction At Simplex Infrastructures Ltd
 
Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)Fawad Pervez Raja (PM)
Fawad Pervez Raja (PM)
 
Construction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformConstruction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum Platform
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Engr salman cv
Engr salman cvEngr salman cv
Engr salman cv
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...IRJET-  	  Optimization of Time and Cost of Building Construction using Fast ...
IRJET- Optimization of Time and Cost of Building Construction using Fast ...
 
CV - Sunil Sharma
CV - Sunil SharmaCV - Sunil Sharma
CV - Sunil Sharma
 
Rakesh CV (4)
Rakesh CV (4)Rakesh CV (4)
Rakesh CV (4)
 
Analysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABSAnalysis and Design of Commercial Building using ETABS
Analysis and Design of Commercial Building using ETABS
 
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
IRJET - Investigating the Effectiveness of Construction Practices in Dela...
IRJET -  	  Investigating the Effectiveness of Construction Practices in Dela...IRJET -  	  Investigating the Effectiveness of Construction Practices in Dela...
IRJET - Investigating the Effectiveness of Construction Practices in Dela...
 
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...IRJET-  	  Analysis, Design and Estimation of Multi- Storied Residential Buil...
IRJET- Analysis, Design and Estimation of Multi- Storied Residential Buil...
 
Eng. Whameed-CV
Eng. Whameed-CVEng. Whameed-CV
Eng. Whameed-CV
 
John Okusolubo Resume 2015
John Okusolubo Resume 2015John Okusolubo Resume 2015
John Okusolubo Resume 2015
 
A Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout PlanningA Framework to optimize Construction Site Layout Planning
A Framework to optimize Construction Site Layout Planning
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 

final year presentation revised

  • 1.
  • 2.
  • 3. PROJECT ON CONSTRUCTION MANAGEMENT GROUP MEMBERS 1. EHSANULLAH (001) 2. QAZI NABEEL (144) 3. ANAS AHMED ABIDI(080) 4. ZUHAIR NADEEM(072) 5. MUHAMMAD JAWAD HASSAN(117) 6. MUHAMMAD ARIF SIDDIQUE KHAN(043) 7. AGHA BABAR ALI(078) PROJECT INTERNAL (ENGR. SYED FARAZ JAFRI) PROJECT EXTERNAL (ENGR.UMAR FAROOQ) PROJECT INTERNAL & EXTERNAL
  • 4. PROJECT DETAILS CLIENT AL-GHAZI TRACTORS DESIGN CONSULTANT NES-PAK. MAIN CONTRACTOR TAHIR ENTERPRISES ARCHITECT NES-PAK LOCATION DEFENCE PHASE-1 PLOT 102-B TOTAL COVERED AREA 4240 SQ FT SRART DATE 31 DECEMBER 2013 EXPECTED FINISH DATE 31 MAY 2015 DURATION 15 MONTHS PURPOSE OFFICE BUILDING PARKING AREA 1 BASEMENT (FOR 22 CARS) NUMBER OF STORIES 2 BASEMENT+ 4 FLOORS
  • 5. PROJECT OBJECTIVES  To evaluate working drawings and prepare BOQ  Preparation of bar bending schedule  Perform rate analysis  To evaluate productivity and duration of various activities  To study the effectiveness of site safety and quality in a success of construction project  To identify causes of delay and disputes on construction project.  Planning and scheduling of all construction activities on primavera p6e.
  • 6. PROJECT SCOPE  To provide overall co-ordination and project team management.  To perform project budgeting, scheduling, cost accounting and reporting.  To ensure the quality standard keeping in view the cost.  Managing time within the whole project.  Efficient use of computer softwares.  Construction planning and resource allocation and optimization.  To get familiar with responsibilities and tasks of a civil engineer.  To observe the site safety.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14. Principles of Management  Division of work  Discipline  Unity of command  Unity in Direction  Centralization of power to do work  Change individual interest into organizational interest  Authority and responsibility should always be together  Equality, stability and motivation
  • 15. 5M’s of Management In the management literature, five M’s of management called as:  Money  Material  Man power  Machinery  Methodology
  • 17. PROJECT MILESTONES We have successfully achieved the following milestones  Evaluated working drawings.  Prepared bar bending schedule and BOQ.  Performed rate analysis.  Evaluated productivity and duration of various activities.  Studied the effectiveness of site safety and quality in a success of construction project.  Identify causes of delay and disputes on construction project.  Planned and scheduled all construction activities on primavera p6e.
  • 18. Selection Of Project (WHY?) We have selected the project due to the following reasons.  First of all the reason we selected the project in construction management was due to our interest and better understanding provided by teachers about the management in the field of civil engineering.  The topic which we have selected for final year project show our interest about cost evaluation of construction project and how to control project cost through better resource allocation & optimization and also to get awareness about job site safety and quality issues related to construction project.
  • 19. Site Visit And Data Collection Frequently visited site for  Collection of data such as working drawings.  Observing Different construction activities on site.  Discussing problems with external.  Getting awareness about sequence of work required to plan and schedule the project.  To observe and understand safety and quality parameters.
  • 20. Preparation and Submission of Synopsis Synopsis was submitted to our internal in the month of February 2015 which included  Project title  Project details  Project technical information  3c’s of project  Objectives and scope of project  Time frame
  • 21. Rate Analysis and Workout Productivity  All Rates and productivity (except productivity of machinery) are taken from NES-PAK Contract section 12th floor PNIC Building opp. Shahra- e-Faisal, with cooperation of GM of Contract section Engr. Nasir Jamal.  Some Rates and productivity were provided by our Site supervisor of AL Ghazi Office Building Associate Engr. MR Fahad  Productivity of machinery was found from internet by pdf manuals of manufacturers of respective machineries.
  • 22. Preparation Of Bar bending schedule and BOQ  We prepared BBS and BOQ by following working drawings (Ground Floor, 1st Floor, 2nd Floor, 3rd Floor and Basement 1) S.# WBS NAME Shuttering (sq. ft) Volume (Cu. Ft) Reinforcement (kg) Plastering (sq. ft) 1 Beams 3125 1157 3783 2702 2 Columns 877.1 325.68 1641.6 877.1 3 Walls 8177 4 Slab 4172.1 3184.3 5700 9074.8 Basement 2 Activity Concreting Reinforcement (Kg) Plastering Blocks Sand (cft.) Cement (bags) Crush (Cft.) Sand (cft) Cement (bags) Beams 496 cft 199 bags 992cft 3783 kgs 135 cft 27 bags Columns 207.5 83 415 2280 64.3 cft 13 Slabs 1365 546 2730 5700 461 92 Walls 625.4 125 9875
  • 23. Substructure work S.# WBS Name Shuttering Volume Reinforcement 1 Pile 88970(Excavation) 5242.21 (pouring) 22500 kg 2 Back Filling 10000 cft 3 Pile Cap 5164 13700 18650 kg 4 Column up to Plinth 785 cft 4270 kg
  • 24. Study and observation of site safety and quality  The biggest concern which we observed at the site that for engineers and supervisors personal protection equipment's (PPE ) were given and other safety precautions were followed but for the laborers the equipment's (PPE) was not properly provided due various delays occurred because of accidents.  Through sites visits we observed that proper quality control procedures were implemented to get the required quality construction and in quality assurance teams were assigned to check that all the design specifications and codes were followed according to standards.
  • 25. Planning and scheduling of al-ghazi project on primavera P6  Planning and scheduling on P6 was started at 4 December 2014 and was successfully completed on 7 Jan 2015  Budgeted total cost of project which we estimated by P6 is Rs 38907213
  • 26.
  • 27.
  • 30. What we Learnt?/Conclusion  This construction management project gave us a better understanding about the site sense and skills required to execute the task properly within limited cost & given time at the site.  We have computed the bill of quantities and learnt about cost estimation of various activities of the project. We worked out and understood the bar bending schedule of the project.  We also performed the rate analysis to get familiar with cost evaluation of construction projects.  We studied the effectiveness of jobsite safety program in a project success and observed that if safety standards and precautions are strictly carried out on site then the chances of site accidents can be avoided up to great extent as well time delays in the project as a result of accidents can also be controlled.  We also observed that quality assurance & control on site leads to reliable and economical construction in many aspects.  We evaluated productivity and duration of various activities and resources of our project.  Planning and scheduling of all construction activities was performed on primavera p6e and learnt to effectively utilize available resources for a various activities of project and control their cost using primavera P6e  After working on the management software Primavera P6e, We learnt the satisfactory level of software towards handling and working and were able to understand the user friendliness of the software.
  • 31. References  [1] Rizwan U. Farooqui, Farrukh Arif and S.F.A. Rafeeqi (August 2008) (Safety Performance in Construction Industry of Pakistan, First International Conference on Construction in Developing Countries (ICCIDC–I). Advancing and Integrating Construction Education, Research & Practice” August 4-5, 2008, Karachi, Pakistan).  [2] Pratibha Joshi,Promila Sharma ,T.C. Thakur and Amit Khatter ,IJAERS/Vol. I/ Issue III/April-June, 2012/30-34 (Safety in Construction Line: Important Issue For Risk Identification and Prevention), International Journal of Advanced Engineering Research and Studies E-ISSN2249–8974. AdressDepartment of Resource Management, G.B.Pant Univ. of Agri. & Tech., Pantnagar- 263145, Uttrakhand, India.  [3] Zubair Ahmed Memon, Kanya Lal Khatri, and Allah Bux Memon, Mehran University Research Journal of Engineering & Technology, Volume 32, No. 2, April, 2013 [ISSN 02547821],( Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry)  [4] Jafri, S.F., "Construction Safety and Promotion, Conceptual Approach Based on the Labor Law of Pakistan", Journal of Mechanical and Civil Engineering, Volume 1, No. 2, pp. 24-27, July- August, 2012.  [5] Syed Faraz Jafri1, Zubair Iqbal Rao2, Khawaja Sheeraz(Policy Formulation of Construction Safety associated with Labor Requirements - Substantial Approach for the Metropolitan City, Karachi, Pakistan), IOSR Journal of Mechanical and Civil Engineering (IOSRJMCE) ISSN : 2278-1684 Volume 1, Issue 1 (May-June 2012), PP 01-06 www.iosrjournals.org  [6] ILOSafety and health in construction: An ILO code of practice Geneva, International Labour Office, 1992/Code of practice/, /Occupational safety/, /Occupational health/, /Construction industry/.08.10.1 ISBN 92-2-107104-9  http://tenrox.com/glossary/organization-breakdown-structure-obs/  http://www.brighthubpm.com/templates-forms/2645-what-is-a-work- breakdown-structure/#  http://www.workbreakdownstructure.com/  https://www.projectsmart.co.uk/project-management-methodology- explained.php  http://www.designingbuildings.co.uk/wiki/Risk_in_building_design_ and_construction.  http://www.tandfonline.com/doi/pdf/10.1080/16111699.2006.9636126.  http://www.scribd.com/mobile/doc/14565333/Risk-Assessment-and- Management-inConstruction-Projects-Full-Thesis#scribd.