SlideShare a Scribd company logo
1 of 18
Download to read offline
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
T . Z
COMPANY :
REV NO : -
DATE :
DESIGN CALCULATION REPORT
Section (1) Panels Arrangement
PREPARED BY :
11-Apr-22
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Design Calculation Results (SECTION 1)
SUMMARY
EXTERNAL STABILITY
Sliding
Case I F.S = 3.17 > 1.50 OK
Case II F.S = 3.82 > 1.50 OK
Case III F.S = 4.24 > 1.50 OK
Case IV F.S = 3.01 > 1.50 OK
Case V F.S = 3.82 > 1.50 OK
Overturning
Case I F.S = 7.01 > 2.00 OK
Case II F.S = 7.53 > 2.00 OK
Case III F.S = 8.48 > 2.00 OK
Case IV F.S = 3.82 > 2.00 OK
Case V F.S = 7.53 > 2.00 OK
Bearing Capacity
Case I q = 110.71 kN/m2
Case II q = 173.98 kN/m2
Control
Case III q = 118.19 kN/m2
Case IV q = 128.60 kN/m2
Case V q = 173.98 kN/m2
INTERNAL STABILITY
Pullout Resistance
Layer 1 Tmax = 9.77 kN per strip < 16.20 kN OK
Layer 2 Tmax = 13.05 kN per strip < 21.75 kN OK
Layer 3 Tmax = 16.77 kN per strip < 28.28 kN OK
Layer 4 Tmax = 18.73 kN per strip < 33.97 kN OK
Tensile Resistance
Layer 1 Tmax = 18.82 kN per strip < 33.51 kN OK
Layer 2 Tmax = 22.99 kN per strip < 33.51 kN OK
Layer 3 Tmax = 26.68 kN per strip < 33.51 kN OK
Layer 4 Tmax = 30.20 kN per strip < 33.51 kN OK
Pullout Resistance
Layer 1 Tmax = 14.56 kN per strip < 18.00 kN OK
Layer 2 Tmax = 18.17 kN per strip < 24.17 kN OK
Layer 3 Tmax = 22.58 kN per strip < 31.42 kN OK
Layer 4 Tmax = 25.22 kN per strip < 37.74 kN OK
Tensile Resistance
Layer 1 Tmax = 23.61 kN per strip < 44.67 kN OK
Layer 2 Tmax = 28.11 kN per strip < 44.67 kN OK
Layer 3 Tmax = 32.49 kN per strip < 44.67 kN OK
Layer 4 Tmax = 36.70 kN per strip < 44.67 kN OK
Pullout Resistance
Layer 1 Tmax = 12.13 kN per strip < 18.00 kN OK
Layer 2 Tmax = 16.59 kN per strip < 24.17 kN OK
Layer 3 Tmax = 20.31 kN per strip < 31.42 kN OK
Layer 4 Tmax = 22.27 kN per strip < 37.74 kN OK
Tensile Resistance
Layer 1 Tmax = 22.97 kN per strip < 44.67 kN OK
Layer 2 Tmax = 29.21 kN per strip < 44.67 kN OK
Layer 3 Tmax = 32.90 kN per strip < 44.67 kN OK
Layer 4 Tmax = 36.42 kN per strip < 44.67 kN OK
Seismic
Impact
Seismic
Impact
Static
Seismic
Impact
Static
Static
Seismic
Impact
Static
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Wall Information
Section name = SECTION 1
Wall Height H = 4.52 m
Reinforcing fill length L = 4.50 m
B = 4.64 m
Reinforced Soil Unit Weight ϒsoil = 21.00 kN/m3
Reinforcement fill φ = 34.00 Degree
Retained Soil Unit Weight ϒsoil = 21.00 kN/m3
Retained fill φ = 34.00 Degree
Foundation Soil Unit Weight ϒfoundation = 19.00 kN/m3
Foundation internal friction angle φ = 30.00 Degree
Foundation cohesion c = 0.00 kN/m2
Nr = 22.40
Traffic surcharge q = 13.00 kN/m2
Panel
First strip location = 1.88 m
Location of slab bottom = 1.10 m
Vertical sapcing of strip Sv = 0.75 m
Panel width b = 1.50 m
Panel height h = 1.50 m
Panel thickness t = 0.14 m
Strip width b = 50.00 mm
Stritp thickness t = 4.00 mm
Horizontal spacing of strip (1st
Layer) Sh = 0.50 m
Horizontal spacing of strip Sh = 0.75 m
Steel reinforcement strength fy = 448.00 Mpa
Load Factor, ϒ (LRFD 11.5.5)
Typical application
Bearing Resistance
Vertical ϒEV = 1.35
Horizontal ϒEH = 1.5
Sliding and Eccentricity
Vertical ϒEV = 1
Horizontal ϒEH = 1.5
Live Load Surcharge on MSE Wall
Bearing and reinforcement tensile Resistance ϒLS = 1.75
Sliding, eccentricity and reinforcement pullout resistance
ϒLS = 1.75
Resistance Factor, φ (LRFD Table 11.5.6-1)
Mechanically Stabilized Earth Walls
Pullout resistance of tensile reinforcement
Static loading = 0.9
MSE WALL DESIGN CALCULATION REPORT
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Load Cases
Vertical
Load
Horizontal
Load
Live
Load
Load Factor ϒ (LRFD 11.5.5) ϒEV ϒEH ϒLS
Case I Strength I 1.00 1.50 -
Case II Strength II 1.35 1.50 1.75
Case III Service I 1.00 1.00 1.00
Resistance Factor φP φT
Case IV Static loading 0.90 0.75
Case V Combined static and impact loading 1.00 1.00
I. External Stability
Static Mass Stability
Vertical loads
Reinforced Soil
V1 = ϒsoil H L
= 21.00 x 4.52 x 4.50
= 427.14 kN/m
Case I V1 = 427.14 x 1
V1 = 427.14 kN/m
Case II V1 = 427.14 x 1.35
V1 = 576.64 kN/m
Case III V1 = 427.14 x 1
V1 = 427.14 kN/m
Forces acting on the MSE Wall
Forces :
V1 = ϒsoil H L
V2 = qs L
F1 = 0.5 ϒ H2 Ka
F2 = qs H Kaf
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Moment arm of V1 = 2.25 m
MV1 = 427.14 x 2.25
MV1 = 961.065 kN-m/m
Case I MV1 = 961.065 KN-m/m
Case II MV1 = 1297.44 KN-m/m
Case III MV1 = 961.07 KN-m/m
Traffic surcharge
V2 = q L
V2 = 13.00 x 4.5
V2 = 58.50 kN/m
Factored V2 = 58.50 x 1.75
Factored V2 = 102.38 kN/m
Moment arm of V2 = 2.25 m
MV2 = 58.50 x 2.25
MV2 = 131.63 kN-m/m
Factored MV2 = 102.38 x 2.25
Factored MV2 = 230.34 kN-m/m
Case I ∑V = 427.14 kN/m
Case II ∑V = 679.01 kN/m
Case III ∑V = 485.64 kN/m
Case I ∑Mv = 961.07 kN-m/m
Case II ∑Mv = 1527.78 kN-m/m
Case III ∑Mv = 1092.69 kN-m/m
Horizontal loads
ka = tan(45 - φ/2)2
For retained ka = 0.28
For surcharge kaf = 0.28
Retained Soil
F1 = 0.5 ϒsoil H2
Ka
= 60.65 kN/m
Case I F1 = 90.97 kN/m
Case II F1 = 90.97 kN/m
Case III F1 = 60.65 kN/m
Moment arm of F1 = 1.51 m
Case I MF1 = 137.07 kN-m/m
Case II MF1 = 137.07 kN-m/m
Case III MF1 = 91.38 kN-m/m
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Traffic surcharge
F2 = q H Kaf
F2 = 16.61 kN/m
Factored F2 = 29.07 kN/m
Moment arm of F2 = 2.26 m
MF2 = 37.54 kN-m/m
Factored MF2 = 65.70 kN-m/m
Case I ∑F = 90.97 kN/m
Case II ∑F = 120.04 kN/m
Case III ∑F = 77.26 kN/m
Case I ∑MF = 137.07 kN-m/m
Case II ∑MF = 202.77 kN-m/m
Case III ∑MF = 128.92 kN-m/m
Sliding (LRFD 11.10.5.3)
Sliding F.S = ∑V x tanφ
∑F
Case I F.S = 3.17 > 1.5 OK
Case II F.S = 3.82 > 1.5 OK
Case III F.S = 4.24 > 1.5 OK
Overturning (LRFD 11.10.5.3)
Overturning F.S = ∑Mv
∑MF
Case I = 7.01 ≥ 2 OK
Case II = 7.53 ≥ 2 OK
Case III = 8.48 ≥ 2 OK
Bearing Capacity at Base
Eccentricity e = L - ∑Mv-∑Mf
2 ∑V
Case I e = 0.32 m ≤ 0.77 m OK
Case II e = 0.30 m ≤ 0.75 m OK
Case III e = 0.27 m ≤ 0.75 m OK
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
σv = ∑V
L-2e
Case I σv = 110.71 kN/m2
Case II σv = 173.98 kN/m2
Case III σv = 118.19 kN/m2
11.4.2 (f) qult = cf Nc + 0.5 (L-2e) ϒf Nr
qult = 844.62 kN/m2
F.S = qult
σv
= 7.63 > 1.5 OK
Sliding at base of first grid
F1 at first grid F1 = 0.5 ϒb d2
Ka
= 50.12 kN/m
F2 = q d ka
= 15.88 kN/m
∑F = 66.00 kN/m
F.S = ϒb d L tanφ C
∑F
= 4.17 > 1.5 OK
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
II. Internal Stability
Distance from Top Steel Strip Tributary Spacing
d1 = 1.88 m V1 = 1.18 m
d2 = 2.63 m V2 = 0.75 m
d3 = 3.38 m V3 = 0.75 m
d4 = 4.13 m V4 = 0.77 m
Force developed in the reinforcement
Static Load
Compute Kr (LRFD Figure 11.10.6.2.1-3)
At Z = 0 Kr = 0.48
Under Z = 6 m Kr = 0.34
MSE Wall Panel Arrangement for Section 1
LRFD 11.4.3.Fig 29
Variation of stress ratio with depth in MSE Wall
Friction
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Layer 1
Vertical Stress
1 Reinforced Soil
Kr = 0.44
σv = ϒsoil H
= 39.48 kN/m2
Case I σv = 39.48 kN/m2
Case II σv = 53.30 kN/m2
Case III σv = 39.48 kN/m2
=
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Case I ∑σv = 39.48 kN/m2
Case II ∑σv = 76.05 kN/m2
Case III ∑σv = 52.48 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv kr
Case I σh = 26.06 kN/m2
Case II σh = 50.19 kN/m2
Case III σh = 23.09 kN/m2
At per strip At = 0.38 m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 9.77 kN per strip < 16.20 kN OK
For Tensile Tmax = 18.82 kN per strip < 33.51 kN OK
Layer 2
Vertical Stress
1 Reinforced Soil
Kr = 0.42
σv = ϒsoil H
= 55.23 kN/m2
Case I σv = 55.23 kN/m2
Case II σv = 74.56 kN/m2
Case III σv = 55.23 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
BP 5
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Case I ∑σv = 55.23 kN/m2
Case II ∑σv = 97.31 kN/m2
Case III ∑σv = 68.23 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv kr
Case I σh = 23.20 kN/m2
Case II σh = 40.87 kN/m2
Case III σh = 28.66 kN/m2
At per strip At = 0.56 m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 13.05 kN per strip < 21.75 kN OK
For Tensile Tmax = 22.99 kN per strip < 33.51 kN OK
Layer 3
Vertical Stress
1 Reinforced Soil
Kr = 0.40
σv = ϒsoil H
= 70.98 kN/m2
Case I σv = 70.98 kN/m2
Case II σv = 95.82 kN/m2
Case III σv = 70.98 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Case I ∑σv = 70.98 kN/m2
Case II ∑σv = 118.57 kN/m2
Case III ∑σv = 83.98 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv kr
Case I σh = 29.81 kN/m2
Case II σh = 47.43 kN/m2
Case III σh = 33.59 kN/m2
At per strip At = 0.56 m2
BP 5
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 16.77 kN per strip < 28.28 kN OK
For Tensile Tmax = 26.68 kN per strip < 33.51 kN OK
Layer 4
Vertical Stress
1 Reinforced Soil
Kr = 0.38
σv = ϒsoil H
= 86.73 kN/m2
Case I = 86.73 kN/m2
Case II = 117.09 kN/m2
Case III = 86.73 kN/m2
2 Traffic Surcharge
σv = 13.00 kN/m2
σv = 22.75 kN/m2
Case I ∑σv = 86.73 kN/m2
Case II ∑σv = 139.84 kN/m2
Case III ∑σv = 99.73 kN/m2
Horizontal Stress
σh = ϒp (σv kr + Δσh)
σh = σv kr
Case I σh = 33.30 kN/m2
Case II σh = 53.70 kN/m2
Case III σh = 38.30 kN/m2
At per strip At = 0.56 m2
Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2.
Tmax = σh Sv
For Pullout Tmax = 18.73 kN per strip < 33.97 kN OK
For Tensile Tmax = 30.20 kN per strip < 33.51 kN OK
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Resistance in friction of one strip against soil (LRFD Equation 11.10.6.3.2-1)
At Z = 0 F*
= 1.80
Under Z = 6 m F*
= 0.67
LRFD Figure 11.10.6.3.2-1
Default Values for the Pullout Friction Factor, F*
α = 1
C = 2.00 for strip
Rc = 0.10 For 3 strip per panel
Rc = 0.07 For 2 strip per panel
Pullout calculation at each reinforcement level
Le ≥ Tmax ≥ 1 m
φ F* α σv C Rc
Layer 1
F*
= 1.45
Le = 1.83 m ≥ 1 m
Take Le = 1.83 m
Layer 2
F*
= 1.3
Le = 2.67 m ≥ 1 m
Take Le = 2.67 m
Layer 3
F*
= 1.16
Le = 2.70 m ≥ 1 m
Take Le = 2.70 m
Layer 4
F*
= 1.02
Le = 2.85 m ≥ 1 m
Take Le = 2.85 m
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Calculate L A at each layer
for H/2 from bottom LA = 0.6 (H1 - d) for inextensible reinforcement
for H/2 from top LA = 0.3 H1 for inextensible reinforcement
LA1 = 1.36 m
LA2 = 1.13 m
LA3 = 0.68 m
LA4 = 0.23 m
LRFD Figure 11.10.6.3.1-1
Location of Potential Failure Surface for Internal Stability Design of MSE Walls
Calculate L T at each layer
Layer 1 LT1 = 3.18 m < 4.50 m OK
Layer 2 LT2 = 3.80 m < 4.50 m OK
Layer 3 LT3 = 3.38 m < 4.50 m OK
Layer 4 LT4 = 3.08 m < 4.50 m OK
Allowable Tensile Strength
Design Life = 100 years
For Corrosion Losses Ec = En - Es
Loss of galvanizing = 0.015 mm/yr for first 2 year
= 0.004 mm/yr for subsequent years
Zinc coating lift = 16.00 years
Loss of carbon steel = 0.012 mm/yr after zinc depletion
Ec = 1.99 mm
Ac = 99.72 mm2
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Tal = AC FY
Case V φTall = 44.67 kN
Case IV φTall = 33.51 kN
Pullout Resistance Strength
C11.10.6.3.2 P = F*
α σv Le C b
Layer 1 Case V φP = 18.00 kN
Case IV φP = 16.20 kN
Layer 2 Case V φP = 24.17 kN
Case IV φP = 21.75 kN
Layer 3 Case V φP = 31.42 kN
Case IV φP = 28.28 kN
Layer 4 Case V φP = 37.74 kN
Case IV φP = 33.97 kN
Connection Strength
Strip width b = 60 mm
Stritp thickness t = 4 mm
Yield Strength Fy = 345 Mpa
C11.10.6.3.2 Tac = AC FY
Case V φTac = 63.48 kN > 44.67 kN OK
Case IV φTac = 47.61 kN > 33.51 kN OK
III. External Stability with Seismic
Peak Ground Acceleration a0/g = 0.46
11.6.5.2.1 Horizontal acceleration coefficient
kh = 0.5 Kho
= 0.23
ζ = Arc tan(Kh)
= 12.95
kae = cos2
(φ - ζ)
cos ( ζ ) cos (ζ + δ) (1 + √(sin(φ + δ) sin(φ - ζ - δ)/cos (ζ + δ) cosδ))2
kae = 0.871
0.950 x 2.114
= 0.434
11.6.5.3-2 Horizontal Seismic Thrust PAE = 0.5 KAE ϒ H2
= 93.06 kN/m
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Moment arm of PAE = 1.51 m
Moment MAE = 140.22 KN-m
Horizontal Inertia Force PIR = 0.5 Kh ϒ H2
= 49.34 kN/m
Moment arm of PIR = 2.26 m
Moment MIR = 111.51 KN-m
∑MF = 251.72 KN-m
Sliding (LRFD 11.10.5.3)
Sliding F.S = ∑V x tanφ
∑F
Rv = 427.14 kN/m
Moment arm of Pv = 2.25 m
Moment Mv = 961.07 KN-m
Rh = 95.87 kN/m
F.S = 3.01 > 1.5 OK
Overturning (LRFD 11.10.5.3)
Overturning F.S = ∑Mv
∑MF
= 3.82 > 2 OK
Bearing Capacity at Base
Eccentricity e = L - ∑Mv-∑Mf
2 ∑V
= 0.59 < 0.75 OK
σv = ∑V
L - 2e
σv = 128.60 kN/m2
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
qult = cf Nc + 0.5 (L-2e) ϒf Nr
qult = 706.78 kN/m2
F.S = qult
σv
= 5.50 > 1.5 OK
IV. Internal Stability with Seismic
PI = Kh Wa
= 22.20 kN/m
Tmd = Pi Lei / ∑Lei
Layer 1 Tmd = 4.78 kN per strip
Layer 2 Tmd = 5.12 kN per strip
Layer 3 Tmd = 5.81 kN per strip
Layer 4 Tmd = 6.49 kN per strip
Ttotal = Tmax + Tmd
Layer 1 For Pullout Ttotal = 14.56 kN per strip < 18.00 kN OK
For Tensile Ttotal = 23.61 kN per strip < 44.67 kN OK
Layer 2 For Pullout Ttotal = 18.17 kN per strip < 24.17 kN OK
For Tensile Ttotal = 28.11 kN per strip < 44.67 kN OK
Layer 3 For Pullout Ttotal = 22.58 kN per strip < 31.42 kN OK
For Tensile Ttotal = 32.49 kN per strip < 44.67 kN OK
Layer 4 For Pullout Ttotal = 25.22 kN per strip < 37.74 kN OK
For Tensile Ttotal = 36.70 kN per strip < 44.67 kN OK
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
V. Impact Load
Width of slab b = 2.1 m
Depth of slab h = 1.1 m
Eccetricity of traffic barrier e = 0.12 m
Slab Length L = 6 m
11.10.10.2 Static impact Load P = 44.48 kN
Earth pressure F1 = 0.5 Ka ϒ h2
Case I F1 = 3.59 kN/m
Case II F1 = 4.85 kN/m
Traffic surcharge F2 = Ka q h
Case I F2 = 4.04 kN/m
Case II F2 = 7.08 kN/m
PH1 = 7.41 kN/m
Case I ∑ F 11.01 kN/m
Case II ∑ F = 19.34 kN/m
Horizontal pressure due to traffic barrier
L1 = (cr + bf - 2e') (tan 45 + φ/2)
= 3.50 m
Δσhmax = 2 ∑F / L1
Case I Δσhmax = 6.29 kN/m2
Case II Δσhmax = 11.06 kN/m2
PROJECT :
PREPARED BY :
DATE :
T.Z.S.K
4/11/2022
Tmax = σh Sv
Layer 1
For Pullout Tmax = 12.13 kN per strip < 18.00 kN OK
For Tensile Tmax = 22.97 kN per strip < 44.67 kN OK
Layer 2
For Pullout Tmax = 16.59 kN per strip < 24.17 kN OK
For Tensile Tmax = 29.21 kN per strip < 44.67 kN OK
Layer 3
For Pullout Tmax = 20.31 kN per strip < 31.42 kN OK
For Tensile Tmax = 32.90 kN per strip < 44.67 kN OK
Layer 4
For Pullout Tmax = 22.27 kN per strip < 37.74 kN OK
For Tensile Tmax = 36.42 kN per strip < 44.67 kN OK

More Related Content

What's hot

Individual calculation
Individual calculation Individual calculation
Individual calculation Jamie Lee
 
Mechanics of materials lecture 02 (nadim sir)
Mechanics of materials lecture 02 (nadim sir)Mechanics of materials lecture 02 (nadim sir)
Mechanics of materials lecture 02 (nadim sir)mirmohiuddin1
 
Dynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualDynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualSchneiderxds
 
Answers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanicsAnswers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanicsasghar123456
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentescarlos
 
Shear Force and Bending Moment Diagram
Shear Force and Bending Moment DiagramShear Force and Bending Moment Diagram
Shear Force and Bending Moment DiagramAmos David
 
91751123 solucionario-capitulo-13-paul-e-tippens
91751123 solucionario-capitulo-13-paul-e-tippens91751123 solucionario-capitulo-13-paul-e-tippens
91751123 solucionario-capitulo-13-paul-e-tippensMaitriSamayoa
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsTyler Edgington
 

What's hot (10)

Individual calculation
Individual calculation Individual calculation
Individual calculation
 
Mechanics of materials lecture 02 (nadim sir)
Mechanics of materials lecture 02 (nadim sir)Mechanics of materials lecture 02 (nadim sir)
Mechanics of materials lecture 02 (nadim sir)
 
Dynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualDynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manual
 
Answers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanicsAnswers assignment 4 real fluids-fluid mechanics
Answers assignment 4 real fluids-fluid mechanics
 
Diseno y-calculo-de-puentes
Diseno y-calculo-de-puentesDiseno y-calculo-de-puentes
Diseno y-calculo-de-puentes
 
Shear Force and Bending Moment Diagram
Shear Force and Bending Moment DiagramShear Force and Bending Moment Diagram
Shear Force and Bending Moment Diagram
 
SFD & BMD
SFD & BMDSFD & BMD
SFD & BMD
 
Spaceengine2
Spaceengine2Spaceengine2
Spaceengine2
 
91751123 solucionario-capitulo-13-paul-e-tippens
91751123 solucionario-capitulo-13-paul-e-tippens91751123 solucionario-capitulo-13-paul-e-tippens
91751123 solucionario-capitulo-13-paul-e-tippens
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
 

Similar to MSE Wall Design Calculation.pdf

Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Dr.Costas Sachpazis
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODE
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODECOMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODE
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODEIRJET Journal
 
Building structure
Building structure Building structure
Building structure yenweizheng
 
Building Structure
Building Structure Building Structure
Building Structure Nicole Foo
 
B.structure report
B.structure reportB.structure report
B.structure reportjiuaN59
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Make Mannan
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Make Mannan
 
individual part
individual part individual part
individual part KC Wong
 
Building structures final
Building structures finalBuilding structures final
Building structures finalJamie Lee
 
SI33_Evaluation_Temp_Support_Jet_Imping
SI33_Evaluation_Temp_Support_Jet_ImpingSI33_Evaluation_Temp_Support_Jet_Imping
SI33_Evaluation_Temp_Support_Jet_ImpingKevin Wilson
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...Hossam Shafiq II
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 

Similar to MSE Wall Design Calculation.pdf (20)

Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
 
Rcc box culvert
Rcc box culvertRcc box culvert
Rcc box culvert
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODE
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODECOMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODE
COMPARISON BETWEEN VARIOUS STEEL SECTION BY USING IS CODE AND EURO CODE
 
Building structure
Building structure Building structure
Building structure
 
Building Structure
Building Structure Building Structure
Building Structure
 
Puentes
PuentesPuentes
Puentes
 
B.structure report
B.structure reportB.structure report
B.structure report
 
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
Numerical problem on bearing capacity is code terzaghi water table (usefulsea...
 
Margen izquierdo ok
Margen izquierdo okMargen izquierdo ok
Margen izquierdo ok
 
Metalicas
MetalicasMetalicas
Metalicas
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
 
individual part
individual part individual part
individual part
 
Steel warehouse design report
Steel warehouse design reportSteel warehouse design report
Steel warehouse design report
 
Building structures final
Building structures finalBuilding structures final
Building structures final
 
SI33_Evaluation_Temp_Support_Jet_Imping
SI33_Evaluation_Temp_Support_Jet_ImpingSI33_Evaluation_Temp_Support_Jet_Imping
SI33_Evaluation_Temp_Support_Jet_Imping
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
 
Column
ColumnColumn
Column
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Precast driven pile 450 x450
Precast driven pile 450 x450Precast driven pile 450 x450
Precast driven pile 450 x450
 

Recently uploaded

VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...Amil baba
 

Recently uploaded (20)

young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
 

MSE Wall Design Calculation.pdf

  • 1. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 T . Z COMPANY : REV NO : - DATE : DESIGN CALCULATION REPORT Section (1) Panels Arrangement PREPARED BY : 11-Apr-22
  • 2. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Design Calculation Results (SECTION 1) SUMMARY EXTERNAL STABILITY Sliding Case I F.S = 3.17 > 1.50 OK Case II F.S = 3.82 > 1.50 OK Case III F.S = 4.24 > 1.50 OK Case IV F.S = 3.01 > 1.50 OK Case V F.S = 3.82 > 1.50 OK Overturning Case I F.S = 7.01 > 2.00 OK Case II F.S = 7.53 > 2.00 OK Case III F.S = 8.48 > 2.00 OK Case IV F.S = 3.82 > 2.00 OK Case V F.S = 7.53 > 2.00 OK Bearing Capacity Case I q = 110.71 kN/m2 Case II q = 173.98 kN/m2 Control Case III q = 118.19 kN/m2 Case IV q = 128.60 kN/m2 Case V q = 173.98 kN/m2 INTERNAL STABILITY Pullout Resistance Layer 1 Tmax = 9.77 kN per strip < 16.20 kN OK Layer 2 Tmax = 13.05 kN per strip < 21.75 kN OK Layer 3 Tmax = 16.77 kN per strip < 28.28 kN OK Layer 4 Tmax = 18.73 kN per strip < 33.97 kN OK Tensile Resistance Layer 1 Tmax = 18.82 kN per strip < 33.51 kN OK Layer 2 Tmax = 22.99 kN per strip < 33.51 kN OK Layer 3 Tmax = 26.68 kN per strip < 33.51 kN OK Layer 4 Tmax = 30.20 kN per strip < 33.51 kN OK Pullout Resistance Layer 1 Tmax = 14.56 kN per strip < 18.00 kN OK Layer 2 Tmax = 18.17 kN per strip < 24.17 kN OK Layer 3 Tmax = 22.58 kN per strip < 31.42 kN OK Layer 4 Tmax = 25.22 kN per strip < 37.74 kN OK Tensile Resistance Layer 1 Tmax = 23.61 kN per strip < 44.67 kN OK Layer 2 Tmax = 28.11 kN per strip < 44.67 kN OK Layer 3 Tmax = 32.49 kN per strip < 44.67 kN OK Layer 4 Tmax = 36.70 kN per strip < 44.67 kN OK Pullout Resistance Layer 1 Tmax = 12.13 kN per strip < 18.00 kN OK Layer 2 Tmax = 16.59 kN per strip < 24.17 kN OK Layer 3 Tmax = 20.31 kN per strip < 31.42 kN OK Layer 4 Tmax = 22.27 kN per strip < 37.74 kN OK Tensile Resistance Layer 1 Tmax = 22.97 kN per strip < 44.67 kN OK Layer 2 Tmax = 29.21 kN per strip < 44.67 kN OK Layer 3 Tmax = 32.90 kN per strip < 44.67 kN OK Layer 4 Tmax = 36.42 kN per strip < 44.67 kN OK Seismic Impact Seismic Impact Static Seismic Impact Static Static Seismic Impact Static
  • 3. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Wall Information Section name = SECTION 1 Wall Height H = 4.52 m Reinforcing fill length L = 4.50 m B = 4.64 m Reinforced Soil Unit Weight ϒsoil = 21.00 kN/m3 Reinforcement fill φ = 34.00 Degree Retained Soil Unit Weight ϒsoil = 21.00 kN/m3 Retained fill φ = 34.00 Degree Foundation Soil Unit Weight ϒfoundation = 19.00 kN/m3 Foundation internal friction angle φ = 30.00 Degree Foundation cohesion c = 0.00 kN/m2 Nr = 22.40 Traffic surcharge q = 13.00 kN/m2 Panel First strip location = 1.88 m Location of slab bottom = 1.10 m Vertical sapcing of strip Sv = 0.75 m Panel width b = 1.50 m Panel height h = 1.50 m Panel thickness t = 0.14 m Strip width b = 50.00 mm Stritp thickness t = 4.00 mm Horizontal spacing of strip (1st Layer) Sh = 0.50 m Horizontal spacing of strip Sh = 0.75 m Steel reinforcement strength fy = 448.00 Mpa Load Factor, ϒ (LRFD 11.5.5) Typical application Bearing Resistance Vertical ϒEV = 1.35 Horizontal ϒEH = 1.5 Sliding and Eccentricity Vertical ϒEV = 1 Horizontal ϒEH = 1.5 Live Load Surcharge on MSE Wall Bearing and reinforcement tensile Resistance ϒLS = 1.75 Sliding, eccentricity and reinforcement pullout resistance ϒLS = 1.75 Resistance Factor, φ (LRFD Table 11.5.6-1) Mechanically Stabilized Earth Walls Pullout resistance of tensile reinforcement Static loading = 0.9 MSE WALL DESIGN CALCULATION REPORT
  • 4. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Load Cases Vertical Load Horizontal Load Live Load Load Factor ϒ (LRFD 11.5.5) ϒEV ϒEH ϒLS Case I Strength I 1.00 1.50 - Case II Strength II 1.35 1.50 1.75 Case III Service I 1.00 1.00 1.00 Resistance Factor φP φT Case IV Static loading 0.90 0.75 Case V Combined static and impact loading 1.00 1.00 I. External Stability Static Mass Stability Vertical loads Reinforced Soil V1 = ϒsoil H L = 21.00 x 4.52 x 4.50 = 427.14 kN/m Case I V1 = 427.14 x 1 V1 = 427.14 kN/m Case II V1 = 427.14 x 1.35 V1 = 576.64 kN/m Case III V1 = 427.14 x 1 V1 = 427.14 kN/m Forces acting on the MSE Wall Forces : V1 = ϒsoil H L V2 = qs L F1 = 0.5 ϒ H2 Ka F2 = qs H Kaf
  • 5. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Moment arm of V1 = 2.25 m MV1 = 427.14 x 2.25 MV1 = 961.065 kN-m/m Case I MV1 = 961.065 KN-m/m Case II MV1 = 1297.44 KN-m/m Case III MV1 = 961.07 KN-m/m Traffic surcharge V2 = q L V2 = 13.00 x 4.5 V2 = 58.50 kN/m Factored V2 = 58.50 x 1.75 Factored V2 = 102.38 kN/m Moment arm of V2 = 2.25 m MV2 = 58.50 x 2.25 MV2 = 131.63 kN-m/m Factored MV2 = 102.38 x 2.25 Factored MV2 = 230.34 kN-m/m Case I ∑V = 427.14 kN/m Case II ∑V = 679.01 kN/m Case III ∑V = 485.64 kN/m Case I ∑Mv = 961.07 kN-m/m Case II ∑Mv = 1527.78 kN-m/m Case III ∑Mv = 1092.69 kN-m/m Horizontal loads ka = tan(45 - φ/2)2 For retained ka = 0.28 For surcharge kaf = 0.28 Retained Soil F1 = 0.5 ϒsoil H2 Ka = 60.65 kN/m Case I F1 = 90.97 kN/m Case II F1 = 90.97 kN/m Case III F1 = 60.65 kN/m Moment arm of F1 = 1.51 m Case I MF1 = 137.07 kN-m/m Case II MF1 = 137.07 kN-m/m Case III MF1 = 91.38 kN-m/m
  • 6. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Traffic surcharge F2 = q H Kaf F2 = 16.61 kN/m Factored F2 = 29.07 kN/m Moment arm of F2 = 2.26 m MF2 = 37.54 kN-m/m Factored MF2 = 65.70 kN-m/m Case I ∑F = 90.97 kN/m Case II ∑F = 120.04 kN/m Case III ∑F = 77.26 kN/m Case I ∑MF = 137.07 kN-m/m Case II ∑MF = 202.77 kN-m/m Case III ∑MF = 128.92 kN-m/m Sliding (LRFD 11.10.5.3) Sliding F.S = ∑V x tanφ ∑F Case I F.S = 3.17 > 1.5 OK Case II F.S = 3.82 > 1.5 OK Case III F.S = 4.24 > 1.5 OK Overturning (LRFD 11.10.5.3) Overturning F.S = ∑Mv ∑MF Case I = 7.01 ≥ 2 OK Case II = 7.53 ≥ 2 OK Case III = 8.48 ≥ 2 OK Bearing Capacity at Base Eccentricity e = L - ∑Mv-∑Mf 2 ∑V Case I e = 0.32 m ≤ 0.77 m OK Case II e = 0.30 m ≤ 0.75 m OK Case III e = 0.27 m ≤ 0.75 m OK
  • 7. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 σv = ∑V L-2e Case I σv = 110.71 kN/m2 Case II σv = 173.98 kN/m2 Case III σv = 118.19 kN/m2 11.4.2 (f) qult = cf Nc + 0.5 (L-2e) ϒf Nr qult = 844.62 kN/m2 F.S = qult σv = 7.63 > 1.5 OK Sliding at base of first grid F1 at first grid F1 = 0.5 ϒb d2 Ka = 50.12 kN/m F2 = q d ka = 15.88 kN/m ∑F = 66.00 kN/m F.S = ϒb d L tanφ C ∑F = 4.17 > 1.5 OK
  • 8. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 II. Internal Stability Distance from Top Steel Strip Tributary Spacing d1 = 1.88 m V1 = 1.18 m d2 = 2.63 m V2 = 0.75 m d3 = 3.38 m V3 = 0.75 m d4 = 4.13 m V4 = 0.77 m Force developed in the reinforcement Static Load Compute Kr (LRFD Figure 11.10.6.2.1-3) At Z = 0 Kr = 0.48 Under Z = 6 m Kr = 0.34 MSE Wall Panel Arrangement for Section 1 LRFD 11.4.3.Fig 29 Variation of stress ratio with depth in MSE Wall Friction
  • 9. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Layer 1 Vertical Stress 1 Reinforced Soil Kr = 0.44 σv = ϒsoil H = 39.48 kN/m2 Case I σv = 39.48 kN/m2 Case II σv = 53.30 kN/m2 Case III σv = 39.48 kN/m2 = 2 Traffic Surcharge σv = 13.00 kN/m2 σv = 22.75 kN/m2 Case I ∑σv = 39.48 kN/m2 Case II ∑σv = 76.05 kN/m2 Case III ∑σv = 52.48 kN/m2 Horizontal Stress σh = ϒp (σv kr + Δσh) σh = σv kr Case I σh = 26.06 kN/m2 Case II σh = 50.19 kN/m2 Case III σh = 23.09 kN/m2 At per strip At = 0.38 m2 Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2. Tmax = σh Sv For Pullout Tmax = 9.77 kN per strip < 16.20 kN OK For Tensile Tmax = 18.82 kN per strip < 33.51 kN OK Layer 2 Vertical Stress 1 Reinforced Soil Kr = 0.42 σv = ϒsoil H = 55.23 kN/m2 Case I σv = 55.23 kN/m2 Case II σv = 74.56 kN/m2 Case III σv = 55.23 kN/m2 2 Traffic Surcharge σv = 13.00 kN/m2 σv = 22.75 kN/m2 BP 5
  • 10. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Case I ∑σv = 55.23 kN/m2 Case II ∑σv = 97.31 kN/m2 Case III ∑σv = 68.23 kN/m2 Horizontal Stress σh = ϒp (σv kr + Δσh) σh = σv kr Case I σh = 23.20 kN/m2 Case II σh = 40.87 kN/m2 Case III σh = 28.66 kN/m2 At per strip At = 0.56 m2 Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2. Tmax = σh Sv For Pullout Tmax = 13.05 kN per strip < 21.75 kN OK For Tensile Tmax = 22.99 kN per strip < 33.51 kN OK Layer 3 Vertical Stress 1 Reinforced Soil Kr = 0.40 σv = ϒsoil H = 70.98 kN/m2 Case I σv = 70.98 kN/m2 Case II σv = 95.82 kN/m2 Case III σv = 70.98 kN/m2 2 Traffic Surcharge σv = 13.00 kN/m2 σv = 22.75 kN/m2 Case I ∑σv = 70.98 kN/m2 Case II ∑σv = 118.57 kN/m2 Case III ∑σv = 83.98 kN/m2 Horizontal Stress σh = ϒp (σv kr + Δσh) σh = σv kr Case I σh = 29.81 kN/m2 Case II σh = 47.43 kN/m2 Case III σh = 33.59 kN/m2 At per strip At = 0.56 m2 BP 5
  • 11. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2. Tmax = σh Sv For Pullout Tmax = 16.77 kN per strip < 28.28 kN OK For Tensile Tmax = 26.68 kN per strip < 33.51 kN OK Layer 4 Vertical Stress 1 Reinforced Soil Kr = 0.38 σv = ϒsoil H = 86.73 kN/m2 Case I = 86.73 kN/m2 Case II = 117.09 kN/m2 Case III = 86.73 kN/m2 2 Traffic Surcharge σv = 13.00 kN/m2 σv = 22.75 kN/m2 Case I ∑σv = 86.73 kN/m2 Case II ∑σv = 139.84 kN/m2 Case III ∑σv = 99.73 kN/m2 Horizontal Stress σh = ϒp (σv kr + Δσh) σh = σv kr Case I σh = 33.30 kN/m2 Case II σh = 53.70 kN/m2 Case III σh = 38.30 kN/m2 At per strip At = 0.56 m2 Traffic Load are NEGLECTED in pullout calculation as per AASHTO LRFD 11.10.6.3.2. Tmax = σh Sv For Pullout Tmax = 18.73 kN per strip < 33.97 kN OK For Tensile Tmax = 30.20 kN per strip < 33.51 kN OK
  • 12. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Resistance in friction of one strip against soil (LRFD Equation 11.10.6.3.2-1) At Z = 0 F* = 1.80 Under Z = 6 m F* = 0.67 LRFD Figure 11.10.6.3.2-1 Default Values for the Pullout Friction Factor, F* α = 1 C = 2.00 for strip Rc = 0.10 For 3 strip per panel Rc = 0.07 For 2 strip per panel Pullout calculation at each reinforcement level Le ≥ Tmax ≥ 1 m φ F* α σv C Rc Layer 1 F* = 1.45 Le = 1.83 m ≥ 1 m Take Le = 1.83 m Layer 2 F* = 1.3 Le = 2.67 m ≥ 1 m Take Le = 2.67 m Layer 3 F* = 1.16 Le = 2.70 m ≥ 1 m Take Le = 2.70 m Layer 4 F* = 1.02 Le = 2.85 m ≥ 1 m Take Le = 2.85 m
  • 13. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Calculate L A at each layer for H/2 from bottom LA = 0.6 (H1 - d) for inextensible reinforcement for H/2 from top LA = 0.3 H1 for inextensible reinforcement LA1 = 1.36 m LA2 = 1.13 m LA3 = 0.68 m LA4 = 0.23 m LRFD Figure 11.10.6.3.1-1 Location of Potential Failure Surface for Internal Stability Design of MSE Walls Calculate L T at each layer Layer 1 LT1 = 3.18 m < 4.50 m OK Layer 2 LT2 = 3.80 m < 4.50 m OK Layer 3 LT3 = 3.38 m < 4.50 m OK Layer 4 LT4 = 3.08 m < 4.50 m OK Allowable Tensile Strength Design Life = 100 years For Corrosion Losses Ec = En - Es Loss of galvanizing = 0.015 mm/yr for first 2 year = 0.004 mm/yr for subsequent years Zinc coating lift = 16.00 years Loss of carbon steel = 0.012 mm/yr after zinc depletion Ec = 1.99 mm Ac = 99.72 mm2
  • 14. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Tal = AC FY Case V φTall = 44.67 kN Case IV φTall = 33.51 kN Pullout Resistance Strength C11.10.6.3.2 P = F* α σv Le C b Layer 1 Case V φP = 18.00 kN Case IV φP = 16.20 kN Layer 2 Case V φP = 24.17 kN Case IV φP = 21.75 kN Layer 3 Case V φP = 31.42 kN Case IV φP = 28.28 kN Layer 4 Case V φP = 37.74 kN Case IV φP = 33.97 kN Connection Strength Strip width b = 60 mm Stritp thickness t = 4 mm Yield Strength Fy = 345 Mpa C11.10.6.3.2 Tac = AC FY Case V φTac = 63.48 kN > 44.67 kN OK Case IV φTac = 47.61 kN > 33.51 kN OK III. External Stability with Seismic Peak Ground Acceleration a0/g = 0.46 11.6.5.2.1 Horizontal acceleration coefficient kh = 0.5 Kho = 0.23 ζ = Arc tan(Kh) = 12.95 kae = cos2 (φ - ζ) cos ( ζ ) cos (ζ + δ) (1 + √(sin(φ + δ) sin(φ - ζ - δ)/cos (ζ + δ) cosδ))2 kae = 0.871 0.950 x 2.114 = 0.434 11.6.5.3-2 Horizontal Seismic Thrust PAE = 0.5 KAE ϒ H2 = 93.06 kN/m
  • 15. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Moment arm of PAE = 1.51 m Moment MAE = 140.22 KN-m Horizontal Inertia Force PIR = 0.5 Kh ϒ H2 = 49.34 kN/m Moment arm of PIR = 2.26 m Moment MIR = 111.51 KN-m ∑MF = 251.72 KN-m Sliding (LRFD 11.10.5.3) Sliding F.S = ∑V x tanφ ∑F Rv = 427.14 kN/m Moment arm of Pv = 2.25 m Moment Mv = 961.07 KN-m Rh = 95.87 kN/m F.S = 3.01 > 1.5 OK Overturning (LRFD 11.10.5.3) Overturning F.S = ∑Mv ∑MF = 3.82 > 2 OK Bearing Capacity at Base Eccentricity e = L - ∑Mv-∑Mf 2 ∑V = 0.59 < 0.75 OK σv = ∑V L - 2e σv = 128.60 kN/m2
  • 16. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 qult = cf Nc + 0.5 (L-2e) ϒf Nr qult = 706.78 kN/m2 F.S = qult σv = 5.50 > 1.5 OK IV. Internal Stability with Seismic PI = Kh Wa = 22.20 kN/m Tmd = Pi Lei / ∑Lei Layer 1 Tmd = 4.78 kN per strip Layer 2 Tmd = 5.12 kN per strip Layer 3 Tmd = 5.81 kN per strip Layer 4 Tmd = 6.49 kN per strip Ttotal = Tmax + Tmd Layer 1 For Pullout Ttotal = 14.56 kN per strip < 18.00 kN OK For Tensile Ttotal = 23.61 kN per strip < 44.67 kN OK Layer 2 For Pullout Ttotal = 18.17 kN per strip < 24.17 kN OK For Tensile Ttotal = 28.11 kN per strip < 44.67 kN OK Layer 3 For Pullout Ttotal = 22.58 kN per strip < 31.42 kN OK For Tensile Ttotal = 32.49 kN per strip < 44.67 kN OK Layer 4 For Pullout Ttotal = 25.22 kN per strip < 37.74 kN OK For Tensile Ttotal = 36.70 kN per strip < 44.67 kN OK
  • 17. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 V. Impact Load Width of slab b = 2.1 m Depth of slab h = 1.1 m Eccetricity of traffic barrier e = 0.12 m Slab Length L = 6 m 11.10.10.2 Static impact Load P = 44.48 kN Earth pressure F1 = 0.5 Ka ϒ h2 Case I F1 = 3.59 kN/m Case II F1 = 4.85 kN/m Traffic surcharge F2 = Ka q h Case I F2 = 4.04 kN/m Case II F2 = 7.08 kN/m PH1 = 7.41 kN/m Case I ∑ F 11.01 kN/m Case II ∑ F = 19.34 kN/m Horizontal pressure due to traffic barrier L1 = (cr + bf - 2e') (tan 45 + φ/2) = 3.50 m Δσhmax = 2 ∑F / L1 Case I Δσhmax = 6.29 kN/m2 Case II Δσhmax = 11.06 kN/m2
  • 18. PROJECT : PREPARED BY : DATE : T.Z.S.K 4/11/2022 Tmax = σh Sv Layer 1 For Pullout Tmax = 12.13 kN per strip < 18.00 kN OK For Tensile Tmax = 22.97 kN per strip < 44.67 kN OK Layer 2 For Pullout Tmax = 16.59 kN per strip < 24.17 kN OK For Tensile Tmax = 29.21 kN per strip < 44.67 kN OK Layer 3 For Pullout Tmax = 20.31 kN per strip < 31.42 kN OK For Tensile Tmax = 32.90 kN per strip < 44.67 kN OK Layer 4 For Pullout Tmax = 22.27 kN per strip < 37.74 kN OK For Tensile Tmax = 36.42 kN per strip < 44.67 kN OK