1. Beam 1-2,B (Ground Floor Plan) Teo Vi Vien
Dead load
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load at 1-2,A-B
= 3.6kN/m² x 1.875m/2
=​ ​3.375kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2
=​ ​5.22kN/m
Total dead load
= (1.62 + 8.55 + 3.375 + 5.22)kN/m
=​ ​18.765kN/m
Ultimate dead load
= 18.765kN/m x 1.4
=​ ​26.3kN/m
Live load
Live load at 1-2,A-B
= 1.5kN/m² x 1.875m/2
= 1.41kN/m
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m
Total live load
= (1.41 + 2.175)kN/m
= 3.59kN/m
Ultimate live load
= 3.59kN/m x 1.6
= 5.74kN/m
Total ultimate load
= 26.3kN/m + 5.74kN/m
= 32.04kN/m
Distributed load
= (32.04kN/m x 3.775m)
= 120.95kN ​/2 (UDL)
= 60.48kN ​(Reaction Force) 60.48kN x 1.89m x 1/2 = ​57.15kNm
2. Beam 2-Y,C (Ground Floor Plan) Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Dead load at 2-Y,A-C
= 3.6kN/m² x 4.78m/2
= 8.6kN/m
Dead load 2-Y,C-D
= 3.6 kN/m² x 1.75m/2
= 3.15kN/m
Total dead load
= (8.6 + 3.15 + 1.62)kN/m
= 13.37kN/m
Ultimate dead load
= 13.37kN/m x 1.4
= 18.72kN/m
Live load
Live load at 2-Y,A-C
= 1.5kN/m² x 4.78m/2
= 3.59kN/m
Live load at 2-Y,C-D
= 1.5kN/m² x 1.75m/2
= 1.31kN/m
Total live load
= (3.59 + 1.31)kN/m
= 4.9kN/m
Ultimate live load
= 4.9kN/m x 1.6
= 7.84kN/m
Total ultimate load
= 7.84kN/m + 18.72kN/m
= 26.56kN/m
Distributed load
= (26.56kN/m x 5.2m)
= 138.11kN​ /2 (UDL)
= 69.06kN ​(Reaction Force)
Shear force diagram
69.06kN x 2.6m x 1/2 = ​89.78kNm
3. Beam 2,A-D (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 2-4,A-C
= 3.6kN/m² x 4.775m/2 x 2/3
= 5.73kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2 x 2/3
= 3.48kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.6m/2
= 2.88kN/m
Total dead load at grid A-B
= (1.62 + 8.55 + 5.73)kN/m
= 15.9kN/m
Total dead load at grid B-C
= (1.62 + 8.55 + 5.73 + 3.48)kN/m
= 19.38kN/m
Total dead load at grid C-D
= (1.62 + 8.55 + 2.88)kN/m
= 13.05kN/m
Ultimate dead load of grid A-B
= 15.9kN/m x 1.4
= 22.26kN/m
Ultimate dead load of grid B-C
= 19.38kN/m x 1.4
= 27.13kN/m
Ultimate dead load of grid C-D
= 13.05kN/m x 1.4
= 18.27kN/m
Live load
Live load at 2-4,A-C
= 1.5kN/m² x 4.775m/2 x 2/3
= 2.39kN/m
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2 x 2/3
= 1.45kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.6m/2
= 1.2kN/m
Total live load on grid A-B
= 2.39kN/m
Total live load on grid B-C
= (2.39 + 1.45)kN/m
= 3.84kN/m
Total live load on grid C-D
= 1.2kN/m
Ultimate live load for grid A-B
= 2.39kN/m x 1.6
= 3.824kN/m
Ultimate live load for grid B-C
= 3.84kN/m x 1.6
= 6.144kN/m
Ultimate live load for grid C-D
= 1.2kN/m x 1.6
= 1.92kN/m
Total ultimate load on grid A-B
= (22.26 + 3.824)kN/m
26.08kN/m
Total ultimate load on grid B-C
= (27.13 + 6.144)kN/m
= 33.28kN/m
Total ultimate load on grid C-D
= (18.27 + 1.92)kN/m
= 20.19kN/m
Take point load from 1-2,B
= 60.48kN
Take point load from 2-4,C and 1-2,C
= 69.06kN + 73.19kN
= 142.25kN
Take moment at point A,
48.9kN/m(0.9375m) + 60.48kN/m(1.875m) + 96.51kN/m(3.325m) + 142.25kN/m(4.775m) +
35.33kN/m(5.65m) - DkN/m(6.525m) = 0
6.525D = 1358.998
D = 208.28kN
Take moment at point D,
35.33kN/m(0.875m) + 142.25kN/m(1.75m) + 96.51kN/m(3.2m) + 60.48kN/m(4.65m) +
48.9kN/m(5.59m) - AkN/m(6.525m) = 0
6.525A = 1143.266
A = 175.21kN
Shear area diagram
A = 1/2 x (126.31 + 175.21)kN x 1.875m
= 282.68kNm
B = 1/2 x 65.83kN x 1.978m
= 65.11kNm
C = 1/2 x 30.68kN x 0.921m
= 14.13kNm
D = 1/2 x (172.93 + 208.26)kN x 1.75m
= 333.54kNm
4. Beam U,C-D (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.4m/2
= 2.52kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.75m/2 x 2/3
= 2.1kN/m
Total dead load
= (1.62 + 8.55 + 2.52 + 2.1)kN/m
= 14.79kN/m
Ultimate dead load
= 14.79kN/m x 1.4
= 20.71kN/m
Live load
Live load at 1-U,C-D
= 1.5kN/m² x 1.4m/2
= 1.05kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.75m/2 x 2/3
= 0.875kN/m
Total live load
= (1.05 + 0.875)kN/m
= 1.925kN/m
Ultimate live load
= 1.925kN/m x 1.6
= 3.08kN/m
Total ultimate load
= (20.71 + 3.08) kN/m
= 23.79kN/m
Distributed load
= 23.79kN/m x 1.75m
= 41.63kN​ /2 (UDL)
= 20.82kN ​(Reaction Force/Point Load at 1-2,C) 20.82kN x 0.875m x 1/2 = ​9.11kNm
5. Beam 1-2,C (Ground Floor Plan) Teo Vi Vien
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-2,B-C
= 3.6kN/m² x 2.9m/2
= 5.22kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.4m/2 x 2/3
= 1.68kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 5.22 + 1.68 + 3.15)kN/m
= 20.22kN/m
Ultimate dead load
= 20.22kN/m x 1.4
= 28.3kN/m
Live load
Live load at 1-2,B-C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m
Live load at U-2,C-D
= 1.5kN/m² x 1.4m/2 x 2/3
= 0.7kN/m
Live load at 1-U,C-D
= 1.5kN/m² x 1.75m/2
= 1.31kN/m
Total live load
= (2.175 + 0.7 + 1.31)kN/m
= 4.19kN/m
Ultimate live load
= 4.19kN/m x 1.6
= 6.71kN
Total ultimate load
= (28.3 + 6.71)kN/m
= 35.01kN/m ​x 3.775m
= 132.16kN ​(UDL)
Point load from ​Beam 4. U,C-D
= 20.82kN
Take moment at point 2C,
20.8kN(1.4m) + 132.16kN(1.8875m) - 2CkN(3.775m) = 0
Reaction force at 2C = 73.79kN
Reaction force at 1C
= 20.8kN + 132.16kN - 73.79kN
= 79.17kN
Shear graph area
A = 1/2 x (30.16kN + 79.17kN) x 1.4m = ​76.53kNm
x/2.375 = 9.36/83.15
x = 0.267
B = 1/2 x 9.36kN x 0.267m = ​1.25kNm
C = 1/2 x 73.79kN x 2.108m = ​77.77kNm
6. Beam T-2,D’ Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load T-2,D-D’
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Dead load T-2,D’-E
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Total dead load
= (1.62 + 8.55 + 2.16 + 2.16)kN/m
= 14.49kN/m
Ultimate dead load
= 14.49kN/m x 1.4
= 20.29kN/m
Live load
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load at T-2,D’-E
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Total live load
= (0.9 + 0.9)kN/m
= 1.8kN/m
Ultimate live load
= 1.8kN/m x 1.6
= 2.88kN/m
Total ultimate load
= (20.29 + 2.88)kN/m
= 23.17kN/m
Distributed load
= 23.17kN/m x 2.1m
=48.66kN /2
= 24.33kN (Point load)
Shear area diagram = 24.33kN x 1.05m x 1/2 = ​12.77kNm
7. Beam T,D-E Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at T-2,D-D’
= 3.6kN/m² x 1.2m/2 x 2/3
= 1.44kN/m
Dead load at T-2,D’-E
= 3.6kN/m² x 1.2/2 x 2/3
= 1.44kN/m
Dead load 1-T,D-E
= 3.6kN/m² x 1.5m/2
= 2.7kN/m
Total dead load
= (1.62 + 8.55 + 1.44 + 1.44 + 2.7)kN/m
= 15.75kN/m
Ultimate dead load
= 15.75kN/m x 1.4
= 22.05kN/m
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2 x 2/3
= 0.6kN/m
Live load at T-2,D’-E
= 1.5kN/m² x 1.2m/2 x 2/3
= 0.6kN/m
Live load at 1-T,D-E
= 1.5kN/m² x 1.5m/2
= 1.125kN/m
Total live load
= (0.6 + 0.6 + 1.125)kN/m
= 2.325kN/m
Ultimate live load
= 2.325kN/m x 1.6
= 3.72kN/m
Total ultimate load
= (22.05 + 3.72)kN/m
= 25.77kN/m x 2.7m
= 69.58kN
Point load from beam T-2,D’
= 24.33kN
Take moment at point D,
69.58kN(1.35m) + 24.33kN(1.35m) - DkN(2.7m) = 0
Reaction force at ​D = 46.95kN
Reaction force at E
= 24.32kN + 69.58kN - 46.95kN
= 46.95kN
Shear area diagram
= 1/2 x (46.95 + 12.16)kN x 1.35m
=39.9kNm
8. Beam 1-2,D (Ground Floor Plan) Lim Zanyu
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at U-2,C-D
= 3.6kN/m² x 1.5m/2 x 2/3
= 1.8kN/m
Dead load at 1-U,C-D
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Dead load at T-2,D-D’
= 3.6kN/m² x 1.2m/2
= 2.16kN/m
Dead load at 1-T,D-D’
= 3.6kN/m² x 1.6m/2 x 2/3
= 1.92kN/m
Total dead load at grid 2-U
= (1.62 + 1.8 + 2.16)kN/m = ​5.58kN/m
Total dead load at grid U-T
= (1.62 + 8.55 + 3.15 + 2.16)kN/m = ​15.48kN/m
Total dead load at grid T-1
= (1.62 + 8.55 + 3.15 + 1.92)kN/m = ​15.24kN/m
Ultimate dead load at grid U-2
= 5.58kN/m x 1.4
= 7.81kN/m
Ultimate dead load at grid T-U
= 15.48kN/m x 1.4
= 21.67kN/m
Ultimate dead load at grid 1-T
= 15.24kN/m x 1.4
= 21.34kN/m
Live load
Live load at U-2,CD
= 1.5kN/m² x 1.5m/2 x 2/3
= 0.75kN/m
Live load at 1-U,CD
= 1.5kN/m x 1.75m/2
= 1.31kN/m
Live load at T-2,D-D’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load 1-T,D-D’
= 1.5kN/m² x 1.6m/2 x 2/3
= 0.8kN/m
Total live load at grid 2-U
= (0.75 + 0.9)kN/m
= 1.65kN/m
Total live load at grid U-T
= (1.31 + 0.9)kN/m
= 1.21kN/m
Total live load at grid T-1
= (1.31 + 0.8)kN/m
= 2.11kN/m
Ultimate load at grid U-2
= 1.65kN/m x 1.6
= 2.64kN/m
Ultimate load at grid T-U
= 1.21kN/m x 1.6
= 1.936kN/m
Ultimate load at grid 1-T
= 2.11kN/m x 1.6
= 3.376kN/m
Total ultimate load on grid U-2
= (7.81 + 2.64)kN/m
= 10.45kN/m
Total ultimate load on grid T-U
= (21.67 + 1.936)kN/m
= 23.61kN/m
Total ultimate load on grid 1-T
= (21.34 + 3.376)kN/m
= 24.71kN/m
Point load of grid U-2
= (7.81 + 2.64)kN/m
= 10.45kN/m​ ​x 1.5m
= 15.68kN
Point load of grid T-U
= (21.67 + 1.936)kN/m
= 23.61kN/m x 0.5m
= 11.8kN
Point load of grid 1-T
= (21.34 + 3.376)kN/m
= 24.71kN/m x 1.6m
= 39.54kN/m
Point load from ​Beam 4. U,C-D
= 20.8kN
Reaction force as point load from ​Beam 7. T,D-E
= 46.95kN
Take moment at point A,
15.68kN/m(0.75m) + 20.8kN/m(1.5m) + 11.8kN/m(1.75m) + 46.95kN/m(2m) + 39.54kN/m(2.8m)
- B(3.6m) = 0
3.6B = 268.22kN/m
B = 74.51kN
Take moment at point B,
-39.54kN/m(0.8m) - 46.95kN/m(1.6m) - 11.8kN/m(1.85m) - 20.8kN/m(2.1m) - 15.68kN/m(2.85m)
+ A(3.6m) = 0
3.6A = 216.95kN/m
A = 60.26kN
Shear area diagram
Area A
= 1/2 x (44.58kN + 60.26kN) x 1.5m
= 78.63kNm
Area B
= 1/2 x (11.98kN + 23.78kN) x 0.5m
= 8.94kNm
Area C
= 1/2 x (34.97kN + 74.51kN) x 1.6m
= 87.58kNm
Beam 4-2, E (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 2-4, E-F
= 3.6kN/m² x 5.6m/2
= 10.08kN/m
Dead load 1-X, D-E
= 3.6kN/m² x 2.6m/2
= 4.68kN/m
Total dead load X-4, E
= (1.62 + 8.55 + 10.08) kN/m
= 20.25kN/m
Total dead load 2-X, E
= (1.62 + 8.55 + 10.08 + 4.68) kN/m
= 24.93kN/m
Ultimate dead load X-4, E
=20.25kN/m x 1.4
= 28.35kN/m
Ultimate dead load 2-X, E
= 24.93kN/m x 1.4
= 34.9kN/m
Live load 2-4, E-F
= 1.5kN/m² x 5.6m/2
= 4.2kN/m
Live load 1-X, D-E
= 1.5kN/m² x 2.6m/2
=1.95kN/m
Total live load at X-4, E
= 4.2kN/m
Total live load 2-X, E
= (4.2 + 1.95) kN/m
= 6.15kN/m
Ultimate live load X-4, E
= 4.2kN/m x 1.6
= 6.72kN/m
Ultimate live load 2-X, E
= 6.15kN/m x 1.6
= 9.84kN/m
Total ultimate load X-4, E
= (28.35 + 6.72) kN/m
= 35.07kN/m
Total ultimate load 2-X, E
= (34.9 + 9.84) kN/m
= 44.74kN/m
Point load from beam X, D-E
= ​11.34kN/m
Distributed load X-4, E
= 35.07kN/m x 4m
= 140.28kN
Distribution load 2-X, E
= 44.74kN/m x 1.6m
= 71.58kN/m
Total moment of point 4E
= 140.28kN(2m) + 11.34kN(4m) + 71.58kN(4.8m) - 2E(5.6m)
2E(5.6m) = 669.5kNm
2E reaction force = 119.55kN
4E reaction force
= (140.28 + 11.34 + 71.58 - 119.55) kN
= 103.65kN
Shear graph area
x/4 = 36.63/140.28
x = 1.04m
A = ½ (103.65kN x 2.96m)
= 153.4kNm
B = ½ (36.63kN x 1.04m)
= 19.05kNm
C = ½ (47.97kN+ 119.55kN) x 1.6m
= 134.02kNm
Beam X, D-E (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Dead load at 1-X, D-E
= 3.6kN/m² x 2.6m/2 x ⅔
= 3.12kN/m
Total dead load
= (3.12 + 1.62) kN/m
= 4.74kN/m
Ultimate dead load
= 4.74kN/m x 1.4
= 6.64kN/m
Live load 1-X, D-E
= 1.5kN/m² x 2.6m/2 x ⅔
= 1.3kN/m
Ultimate live load 1-X, D-E
= 1.3kN/m x 1.6
= 2.08kN/m
Total ultimate load
= 6.64kN/m + 2.08kN/m
=8.72kN/m
Distributed load
= 8.72kN/m x 2.6m
= 22.67kN/m​ /2
= 11.34kN
Shear force area
= ½ (11.34kN + 1.3m)
= 6.32kNm
Beam 2 E-E’ (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load 1-2, E-E’
= 3.6kN/m² x 3.4m/2 x ⅔
4.08kN/m
Dead load 2-4, E-F
= 3.6kN/m² x 5.6m/2 x ⅔
= 6.72kN/m
Total dead load
= (1.62 + 8.55 + 4.08 + 6.72) kN/m
= 20.97kN/m
Ultimate dead load
= 20.97kN/m x 1.4
= 29.36kN/m
Live load 1-2, E-E’
= 1.5kN/m² x 3.4m/2 x ⅔
= 1.7kN/m
Live load 2-4, E-F
= 1.5kN/m² x 5.6m/2 x ⅔
= 2.8kN/m
Total live load
= (1.7 + 2.8)kN/m
= 4.5kN/m
Ultimate live load
= 4.5kN/m x 1.6
= 7.2kN/m
Total ultimate load
= (29.36 + 7.2)kN/m
= 36.56kN/m
Distributed load
= 36.56kN/m x 3.4m
= 124.3kN​ / 2
= 62.15kN
Shear force area
= ½ (62.15kN x 1.7m)
= 52.83kNm
Beam T, E’-F (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load T-2, E’-F
= 3.6kN/m² x 2/2 x ⅔
= 2.4kN/m
Total dead load
= (1.62 +8.55 + 2.4) kN/m
= 12.57kN/m
Ultimate dead load
= 12.57kN/m x 1.4
= 17.6kN/m
Live load T-2, E’-F
= 1.5kN/m² x 2/2 x ⅔
= 1kN/m
Ultimate live load
= 1kN/m x 1.6
= 1.6kN/m
Total ultimate load
= (17.6 + 1.6) kN/m
= 19.2kN/m
Distributed load
= 19.2kN/m x 2m
= 38.4kN​ / 2
= 19.2kN/m
Shear force area
= ½ (1m x 19.2kN)
= 9.6kNm
Beam 1-2, E’ (First Floor Plan) Yen Wei Zheng
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load 1-2, E-E’
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Dead load T-2, E’-F
= 3.6kN/m² x 2m/2
= 3.6kN/m
Total dead load T-2, E’
= (1.62 + 8.55 + 6.3 + 3.6)kN/m
= 20.07kN/m
Total dead load 1-T, E’
= (1.62 + 8.55 + 6.3)kN/m
= 16.47kN/m
Ultimate dead load T-2, E’
= 20.07kN/m x 1.4
= 28.1kN/m
Ultimate dead load 1-T, E’
= 16.47kN/m x 1.4
= 23.06kN/m
Live load 1-2, E-E’
= 1.5kN/m x 3.5m/2
= 2.63kN/m
Live load T-2, E’-F
= 1.5kN/m x 2m/2
= 1.5kN/m
Total live load T-2, E’
= (2.63 + 1.5)kN/m
= 4.13kN/m
Ultimate live load T-2, E’
= 4.13kN/m x 1.6
= 6.61kN/m
Ultimate live load 1-1’E’
= 2.63kN/m x 1.6
= 4.21kN/m
Total ultimate load T-2, E’
= (28.1 + 6.61)kN/m
= 34.71kN/m
Total ultimate load 1-T, E’
= (23.06 + 4.21)kN/m
= 27.27kN/m
UDL (T-2, E’) to point load
= 34.71kN/m x 2m
= 69.42kN
UDL (1-T, E’) to point load
= 27.27kN/m x 1.5m
= 40.9kN
Point load from Beam T, E’-F
= 19.2kN
Total moment of point 2E’
= 69.42kN(1m) + 19.2kN(2m) + 40.9kN(2.75m) - 1E’(3.5m)
1E’(3.5m) = 220.3kN
Reaction force 1E’ = 62.94kN
Reaction force 2E’
= (69.42 + 19.2 + 40.9 - 62.94)kN
= 66.58kN
Shear force area
x/2 = 2.84/69.42
x = 0.08m
A = ½ (66.58kN x 1.92m)
= 63.92kNm
B = ½ ( 0.08m x 2.84kN)
= 0.11kNm
C = ½ (22.04kN + 62.94kN) x 1.5m
= 63.74kNm
Beam W-Y, C winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load WY, CD
= 3.6kN/m² x 1.75m/2
= 3.15kN/m
Dead load WY, A’C
= 3.6kN/m² x 2.9m/2
= 5.22kN/m
Total dead load 3Y, C
= (1.62 + 8.55 + 3.15 + 5.22) kN/m
= 18.54kN/m
Total dead load 3W, C
= (1.62 + 3.15 + 5.22) kN/m
= 9.99kN/m
Ultimate dead load 3Y, C
= 18.54kN/m x 1.4
= 26.3kN/m
Ultimate dead load 3W, C
= 9.99kN/m x 1.4
= 13.986kN/m
Live load WY, CD
= 1.5kN/m² x 1.75m/2
= 1.313kN/m
Live load WY, A’C
= 1.5kN/m² x 2.9m/2
= 2.175kN/m²
Total live load
= (1.313 + 2.175)kN/m
= 3.488kN/m
Ultimate live load
= 3.488kN/m x 1.6
= 5.581kN/m
Total ultimate load 3Y, C
= (26.3 + 5.581) kN/m
= 31.881kN/m
Point load 3Y, C
= 31.881kN/m x 2.9m
= 92.455kN
Point load 3W, C
= 19.567kN/m x 1.6m
= 31.307kN
Total moment YC
= 92.455kN(1.45m) + 31.307kN(3.7) - WC(4.5)
WC(4.5) = 249.896kN
Reaction force WC = 55.532kN
Reaction force YC = (92.455 + 31.307 - 55.532)
= 68.23kN
Shear force area
x/2.9 = 24.225/92.455
x = 0.76m
A = ½ (68.23kN x 2.14m)
​= 73kNm
B = ½ (24.225kN x 0.76m)
​= 9.21kNm
C = ½ (24.225kN + 55.532kN) x 1.6m
​ = 63.81
Beam Y, A’D winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
=​ ​1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
=​ ​8.55kN/m
Dead load WY, A’C
= 3.6kN/m² x 3.5m/2 x ⅔
= 4.2kN/m
Dead load YZ, A’D
= 3.6kN/m² x 1m/2
= 1.8kN/m
Total dead load Y, A’C
= (1.8+4.2+1.62+8.55)
= 16.17kN/m
Ultimate dead load Y, A’C
= 16.17kN/m x 1.4
= 22.64kN/m
Total dead load Y, CD
= (1.8+1.62+8.55)kN/m
= 11.97kN/m
Ultimate dead load Y, CD
= 11.97kN/m x 1.4
= 16.758kN/m
Live load WY, A’C
= 1.5kN/m² x 3.5m/2 x ⅔
= 1.75kN/m
Live load YZ, A’D
= 1.5kN/m² x 1m/2
= 0.75kN/m
Total ultimate load Y, A’C
= (0.75+1.75) kN/m
= 2.5kN/m
Ultimate live load Y, A’C
= 2.5kN/m x 1.6
= 4kN/m
Live load Y,CD
=1.75kN/m
Ultimate live load Y, CD
= 1.75kN/m x 1.6
= 2.8kN/m
Total ultimate load Y, A’C
= (22.638+4) kN/m
= 26.64kN/m
Total ultimate load Y, CD
= (16.758+2.8) kN/m
= 19.558kN/m
Point load at Y, A’C
= 26.638kN/m x 3.5m
= 93.24kN
Point load Y, CD
= 19.558kN/m x 1.75m
= 34.2265kN
Total moment of YD
= 34.2265kN(0.875m) + 68.23kN(1.75m) + 93.24kN(3.5m) - YA’(5.25m)
YA’(5.25) = 475.69
YA’ reaction force = 90.61kN
YD reaction force = (34.2265+68.23+93.24-90.61)
= 105.09kN
Shear force area
x/3.5 = 2.63/93.24
x = 0.0987m
A = ½ (105.09kN+70.86kN) x 1.75m
​ = 153.96kNm
B = ½ (0.0987m x 2.63kN)
= 0.13kN
C = ½ (90.61kN x 3.4m)
= 154.04kNm
Beam X-4, D winter
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load WY, CD
= 3.6kN/m x 1.75m/2
= 3.15kN/m
Total dead load Y-4, D
= (1.62+8.55)
= 10.17kN/m
Ultimate dead load Y-4, D
= 10.17kN/m x 1.4
= 14.238kN/m
Total dead load X-Y, D
= (1.62+8.55+3.15)
= 13.32kN/m
Ultimate dead load X-Y, D
= 13.32kN/m x 1.4
= 18.648kN/m
Live load WY, CD
= 1.5kN/m x 1.75m/2
= 2.625kN/m
Ultimate live load
= 2.625kN/m x 1.6
= 4.2kN/m
Total ultimate load Y-4, D
= 14.238kN/m
Total ultimate load X-Y, D
= (18.648+4.2) kN/m
= 22.848kN/m
Point load from beam Y, A’D
= 105.09kN
Point load at Y-4
= 14.238kN/m x 0.4m
= 5.695kN
Point load at X-Y
= 22.848kN/m x 3.8m
= 86.822kN
Total moment at 4,D
= 5.695kN(0.2m) + 105.09kN(0.4m) + 86.822kN(2.3m) - XD(4.2)
XD(4.2) = 242.87Kn
Reaction force at XD = 57.83kN
Reaction force at 4D
= (5.695+105.09+86.822-57.83)kN
= 139.78kN
Shear force area
x/3.8 = 29/86.83
x = 1.27m
A = ½ (139.78kN+132.09kN) x 0.4m
​ = 54.37kNm
B = ½ (29kN x 1.27m)
​ = 18.42kNm
C = ½ (2.53m x 57.83kN)
​= 73.15kNm
Beam V, C-D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load 1-V, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Dead load V-W, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Total dead load
= (1.62 + 8.55 + 2.1 + 2.1 ) kN/m
= 14.37kN/m
Ultimate dead load
= 14.37kN/m x 1.4
= 20.118kN/m
Live load 1-V, CD
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Live load V-W, CD
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Total live load
= (1.31 + 1.31 )kN/m
= 2.62kN/m
Ultimate live load
= 2.62kN/m x 1.6
= 4.19kN/m
Total ultimate load
= (20.118 + 4.19 )kN/m
= 24.31kN/m
Distributed load
= 24.31kN/m x 1.75m
= 42.54kN / 2
= 21.27kN/m
Shear force area
= ½ (0.87m x 21.27kN/m)
= 9.3kNm
Beam W, C-D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load V-W, CD
= 3.6kN/m² x 1.75/2 x ⅔
= 2.1kN/m
Dead load W-Y, CD
= 3.6kN/m² x 1.75/2
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 2.1 + 3.15 ) kN/m
=15.42kN/m
Ultimate dead load
= 15.42kN/m x 1.4
= 21.588kN/m
Live load W, C-D
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Live load W, C-D
= 1.5kN/m² x 1.75/2
= 1.31kN/m
Total live load
= (1.31 + 1.31 )kN/m
= 2.62kN/m
Ultimate live load
= 2.62kN/m x 1.6
= 4.19kN/m
Total ultimate load
= (21.59 + 4.19 )kN/m
= 25.78kN/m
Distributed load
= 25.78kN/m x 1.75m
= 45.12kN / 2
= 22.56kN/m
Shear force area
= ½ (0.87m x 22.56kN/m)
= 9.87kNm
Beam 1-X, D (First Floor Plan) Teo Chong Yih
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15 x 19kN/m
=8.55kN/m
Dead load 1-V, D
= 3.6kN/m² x 2.65/2 x ⅔
= 3.18kN/m
Dead load V-W, D
= 3.6kN/m² x 2/2 x ⅔
= 2.4kN/m
Dead load 1-X
= 3.6kN/m² x 5.3
= 19.08kN/m
Dead load W-X,D
= 3.6kN/m² x 0.875m
= 3.15kN/m
Total dead load
= (1.62 + 8.55 + 19.08 + 3.15 ) kN/m, (1.62 + 2.4 + 19.08)kN/m, (1.62 + 8.55 + 3.18 +
19.08)kN/m
= 32.4kN/m , 23.1kN/m, 32.43kN/m
Ultimate dead load
= 32.4kN/m x 1.4, 23.1kN/m x 1.4, 32.43kN/m x 1.4
= 45.36kN/m, 32.34kN/m, 45.4kN/m
Live load 1-V, D
= 1.5kN/m² x 2.65/2
= 1.99kN/m
Live load V-W, D
= 1.5kN/m² x 2/2
= 1.5kN/m
Live load W-X, D
= 1.31kN/m
Live load 1-X
= 1.5 x 5.3/2
= 3.98kN/m
Total live load
= (1.31 + 3.98 )kN/m , (1.5 + 3.98)kN/m , (1.99 + 3.98)kN/m
= 5.29kN/m , 5.48kN/m , 5.97kN/m
Ultimate live load
= (5.29kN/m x 1.6) , (5.48kN/m x 1.6) , (5.97kN/m x 1.6)
= 8.46kN/m , 8.77kN/m , 9.55kN/m
Total ultimate load
= (45.36 + 8.46)kN/m , (32.34 + 8.77 )kN/m , (45.4 + 9.55)kN/m
= 53.82kN/m, 41.11kN/m, 54.95kN/m
Distributed load
= 53.82kN/m x 0.7m , 41.11kN/m x 2m , 54.95 x 2.65m
= 37.67kN, 82.22kN, 145.62kN
Take moment at point XD,
(37.67kN x 0.35m) + (22.56kN x 0.7m) + (82.22kN x 1.7m) + (21.27 x 2.7m) + (145.62kN x
4.025m) - 5.35z = 13.18kNm + 15.79kNm + 139.77kNm + 57.43kNm + 586.12kNm - 5.35z
= 812.29Nm - 5.35z
(5.35m)z = 812.29kNm
z = 151.83kN
(145.62kN x 1.325m) + (21.27kN x 2.65m) + (82.22kN x 3.65m) + (22.56kN x 4.65) + (37.67kN x
5.025m ) = 5.35x
192.95kNm + 56.37kNm + 300.1kNm + 104.9kNm + 189.29kNm = (5.35m)x
x = 157.68kN
Shear graph area
A = ½ (157.68kN + 120.01kN) x 0.7 = 97.19kNm
B = ½ (97.45kN + 15.23kN) x 2 = 112.68kNm
C = ½ (-6.04kN - 151.66kN) x 2.65 = -208.95kNm
Beam W, A’-C (First Floor Plan) WINTER
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at W-Y, A’-C
= 3.6kN/m² x 3.5m/2 x 2/3
= 4.2kN/m
Dead load at 1-W, A’-C
= 3.6kN/m² x 1.2/2 x 2/3
= 4.2kN/m
Total dead load
= (1.62 + 8.55 + 4.2 + 4.2)kN/m
= 18.57kN/m
Ultimate dead load
= 18.57kN/m x 1.4
= 26kN/m
Live load at W-Y, A’-C
= 1.5kN/m² x 3.5m/2 x 2/3
= 1.75kN/m
Live load at 1-W, A’-C
= 1.5kN/m² x 3.5m/2 x 2/3
= 1.75kN/m
Total live load
= (1.75 + 1.75)kN/m
= 3.5kN/m
Ultimate live load
= 3.5kN/m x 1.6
= 5.6kN/m
Total ultimate load
= (26 + 5.6)kN/m
= 31.6kN/m
Distributed load
31.6kN/m x 3.5m/2
= 55.3kN
Shear graph area
= ½ x 55.3kN x 1.75m
= 48.3kNm
Beam A’, 2-Y (First Floor Plan) WINTER
Beam self weight
= 0.15m x 0.45m x 24kN/m
= 1.62kN/m
Brick wall weight
= 3m x 0.15m x 19kN/m
= 8.55kN/m
Dead load at 1-Y, A-A’
= 3.6kN/m² x 1.2m/2
= 2.16N/m
Dead load at W-Y, A’-C
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Dead load at 2-W, A’-C
= 3.6kN/m² x 3.5m/2
= 6.3kN/m
Total dead load at grid W-Y
= (1.62 + 8.55 + 2.16 + 6.3)kN/m
= 18.63kN/m
Total dead load at grid 2-W
= (1.62 + 8.55 + 2.16 + 6.3)kN/m
= 18.63kN/m
Ultimate dead load at grid W-Y
= (18.63kN/m x 1.4)
= 26.08kN/m
Ultimate dead load at grid 2-W
= (18.63kN/m x 1.4)
= 26.08kN/m
Live load at 1-Y, A-A’
= 1.5kN/m² x 1.2m/2
= 0.9kN/m
Live load at W-Y, A’-C
= 1.5kN/m² x 3.5m/2
= 2.63kN/m
Live load at 2-W, A’-C
= 1.5kN/m² x3.5m/2
= 2.63kN/m
Total live load at grid W-Y
= (0.9 + 2.63)kN/m
= 3.53kN/m
Total live load at grid 2-W
= (0.9 + 2.63)kN/m
= 3.53kN/m
Ultimate live load at grid W-Y
= (3.53kN/m x 1.6)
= 5.65kN/m
Ultimate live load at grid 2-W
= (3.53kN/m x 1.6)
= 5.65kN/m
Total ultimate load at grid W-Y
= (26.08 + 5.65)kN/m
= 31.73kN/m
Total ultimate load at grid 2-W
= (26.08 + 5.65)kN/m
= 31.73kN/m
Distributed load of gid W-Y
= 31.73kN/m x 4.5m
= 142.79kN
Distributed load of grid 2-W
= 31.73kN/m x 1m
= 31.73kN
Take moment at point YA’
(142.79kN x 2.25m) + (55.3kN x 4.5m) + (31.73kN x 5m) = (5.5m)YA’
(5.5m)YA’ = 728.78kNm
YA’ = 132.51kN
Take moment at point A’2
(31.73kN x 0.5m) + (55.3kN x 1m) + (142.79kN x 3.25m) = (5.5m)2A’
(5.5m)2A’ = 535.23kNm
2A’ = 97.32kN
Shear graph area
x/4.5 = 97.32/142.79
x = 3.07
A = ½ x 3.07m x 97.32kN = 149.24kNm
B = ½ x 1.23m x 45.47kN = 32.51kNm
C = ½ x (100.77kN + 132.5kN) x 1m = 116.64
Building structure

More Related Content

What's hot

Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculationJy Chong
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Ivy Yee
 
Dynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualDynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualSchneiderxds
 
Building Structure
Building StructureBuilding Structure
Building StructureBolin Loong
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)premkumar mk
 
7.60 ppt batfink energy
7.60 ppt batfink energy7.60 ppt batfink energy
7.60 ppt batfink energyffiala
 
B structure power point
B structure power pointB structure power point
B structure power pointAnderson Wong
 
Dynamic response of oscillators to general excitations
Dynamic response of oscillators to general excitationsDynamic response of oscillators to general excitations
Dynamic response of oscillators to general excitationsUniversity of Glasgow
 
Anderson7e sm
Anderson7e smAnderson7e sm
Anderson7e smDanggirl1
 
Latihan soal jawab fentrans
Latihan soal jawab fentransLatihan soal jawab fentrans
Latihan soal jawab fentransWidia Kurnia Adi
 

What's hot (16)

Building Structure calculation
Building Structure calculationBuilding Structure calculation
Building Structure calculation
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Beam Analysis
Beam AnalysisBeam Analysis
Beam Analysis
 
Dynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manualDynamics of structures 5th edition chopra solutions manual
Dynamics of structures 5th edition chopra solutions manual
 
Building Structure
Building StructureBuilding Structure
Building Structure
 
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
DESIGN OF ISOLATOR (LEAD RUBBER BEARING)
 
7.60 ppt batfink energy
7.60 ppt batfink energy7.60 ppt batfink energy
7.60 ppt batfink energy
 
Baja kuda kuda
Baja kuda kudaBaja kuda kuda
Baja kuda kuda
 
B structure power point
B structure power pointB structure power point
B structure power point
 
Energy methods for damped systems
Energy methods for damped systemsEnergy methods for damped systems
Energy methods for damped systems
 
Base excitation of dynamic systems
Base excitation of dynamic systemsBase excitation of dynamic systems
Base excitation of dynamic systems
 
Dynamic response of oscillators to general excitations
Dynamic response of oscillators to general excitationsDynamic response of oscillators to general excitations
Dynamic response of oscillators to general excitations
 
Physics Working Formulas
Physics Working FormulasPhysics Working Formulas
Physics Working Formulas
 
Anderson7e sm
Anderson7e smAnderson7e sm
Anderson7e sm
 
Modern2426
Modern2426Modern2426
Modern2426
 
Latihan soal jawab fentrans
Latihan soal jawab fentransLatihan soal jawab fentrans
Latihan soal jawab fentrans
 

Similar to Building structure

individual part
individual part individual part
individual part KC Wong
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures ReportJoe Onn Lim
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Ong Seng Peng Jeff
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a BungalowJing Fan Koh
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2 Ryan Kerry Jy
 
Hb structure
Hb structureHb structure
Hb structurehongbinng
 
Building structure real
Building structure realBuilding structure real
Building structure realong93
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2Wen Yee
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentJoyce Wee
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow reportChengWei Chia
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Reportdouglasloon
 
B structure
B structure B structure
B structure Andy Heng
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure reportlee yiang siang
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structureKen Wong
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structureYung Kai
 
Gb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinGb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinshensin1015
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02Winnie Ang
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Make Mannan
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculationSheau Hui Tan
 

Similar to Building structure (20)

individual part
individual part individual part
individual part
 
Building Structures Report
Building Structures ReportBuilding Structures Report
Building Structures Report
 
Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)Building Structure Project 2 (Taylor's lakeside campus)
Building Structure Project 2 (Taylor's lakeside campus)
 
Structural Analysis of a Bungalow
Structural Analysis of a BungalowStructural Analysis of a Bungalow
Structural Analysis of a Bungalow
 
Building Structure Project 2
Building Structure Project 2 Building Structure Project 2
Building Structure Project 2
 
Hb structure
Hb structureHb structure
Hb structure
 
Building structure real
Building structure realBuilding structure real
Building structure real
 
Building Structure Project 2
Building Structure Project 2Building Structure Project 2
Building Structure Project 2
 
Beam and Column Analysis | Individual Component
Beam and Column Analysis | Individual ComponentBeam and Column Analysis | Individual Component
Beam and Column Analysis | Individual Component
 
Structural analysis of a bungalow report
Structural analysis of a bungalow reportStructural analysis of a bungalow report
Structural analysis of a bungalow report
 
Structural Analysis of a Bungalow Report
Structural Analysis of a Bungalow ReportStructural Analysis of a Bungalow Report
Structural Analysis of a Bungalow Report
 
B structure
B structure B structure
B structure
 
Oscar individual b structure report
Oscar individual b structure reportOscar individual b structure report
Oscar individual b structure report
 
Dead load of structure
Dead load of structureDead load of structure
Dead load of structure
 
Yung Part, structure
Yung Part, structureYung Part, structure
Yung Part, structure
 
Gb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensinGb22, 23, 24, 20 shensin
Gb22, 23, 24, 20 shensin
 
Building Structures_Project_02
Building Structures_Project_02Building Structures_Project_02
Building Structures_Project_02
 
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
Question and Answers on Terzaghi’s Bearing Capacity Theory (usefulsearch.org)...
 
Structures
StructuresStructures
Structures
 
BStructure calculation
BStructure calculationBStructure calculation
BStructure calculation
 

More from yenweizheng

Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essayyenweizheng
 
Food & culture
Food & cultureFood & culture
Food & cultureyenweizheng
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdfyenweizheng
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation systemyenweizheng
 
Mechancal ventilatio
Mechancal ventilatioMechancal ventilatio
Mechancal ventilatioyenweizheng
 
Introduction of air conditioning system
Introduction of air conditioning systemIntroduction of air conditioning system
Introduction of air conditioning systemyenweizheng
 
Fire protection system bservice
Fire protection system bserviceFire protection system bservice
Fire protection system bserviceyenweizheng
 
Conclusion reference
Conclusion  referenceConclusion  reference
Conclusion referenceyenweizheng
 
Introduction b services
Introduction b servicesIntroduction b services
Introduction b servicesyenweizheng
 
Pj street essay.docx
Pj street essay.docxPj street essay.docx
Pj street essay.docxyenweizheng
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final reportyenweizheng
 
Business report (1)
Business report (1)Business report (1)
Business report (1)yenweizheng
 

More from yenweizheng (20)

Urban comparative essay
Urban comparative essayUrban comparative essay
Urban comparative essay
 
Wz synopsis
Wz synopsisWz synopsis
Wz synopsis
 
Food & culture
Food & cultureFood & culture
Food & culture
 
Bscience report
Bscience reportBscience report
Bscience report
 
Bsci ii (1)
Bsci ii (1)Bsci ii (1)
Bsci ii (1)
 
Bsci ii
Bsci iiBsci ii
Bsci ii
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdf
 
Transient
TransientTransient
Transient
 
Proposal
ProposalProposal
Proposal
 
Design brief
Design briefDesign brief
Design brief
 
Service report
Service reportService report
Service report
 
Vertical transportation system
Vertical transportation systemVertical transportation system
Vertical transportation system
 
Mechancal ventilatio
Mechancal ventilatioMechancal ventilatio
Mechancal ventilatio
 
Introduction of air conditioning system
Introduction of air conditioning systemIntroduction of air conditioning system
Introduction of air conditioning system
 
Fire protection system bservice
Fire protection system bserviceFire protection system bservice
Fire protection system bservice
 
Conclusion reference
Conclusion  referenceConclusion  reference
Conclusion reference
 
Introduction b services
Introduction b servicesIntroduction b services
Introduction b services
 
Pj street essay.docx
Pj street essay.docxPj street essay.docx
Pj street essay.docx
 
Team bunga raya final report
Team bunga raya final reportTeam bunga raya final report
Team bunga raya final report
 
Business report (1)
Business report (1)Business report (1)
Business report (1)
 

Recently uploaded

EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...Suhani Kapoor
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
Spark3's new memory model/management
Spark3's new memory model/managementSpark3's new memory model/management
Spark3's new memory model/managementakshesh doshi
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改atducpo
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfLars Albertsson
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystSamantha Rae Coolbeth
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...shivangimorya083
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 

Recently uploaded (20)

EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
VIP High Class Call Girls Bikaner Anushka 8250192130 Independent Escort Servi...
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
Spark3's new memory model/management
Spark3's new memory model/managementSpark3's new memory model/management
Spark3's new memory model/management
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
代办国外大学文凭《原版美国UCLA文凭证书》加州大学洛杉矶分校毕业证制作成绩单修改
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
Schema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdfSchema on read is obsolete. Welcome metaprogramming..pdf
Schema on read is obsolete. Welcome metaprogramming..pdf
 
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service AmravatiVIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
VIP Call Girls in Amravati Aarohi 8250192130 Independent Escort Service Amravati
 
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
꧁❤ Aerocity Call Girls Service Aerocity Delhi ❤꧂ 9999965857 ☎️ Hard And Sexy ...
 
Unveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data AnalystUnveiling Insights: The Role of a Data Analyst
Unveiling Insights: The Role of a Data Analyst
 
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
Full night 🥵 Call Girls Delhi New Friends Colony {9711199171} Sanya Reddy ✌️o...
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service BhilaiLow Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
Low Rate Call Girls Bhilai Anika 8250192130 Independent Escort Service Bhilai
 

Building structure

  • 1. 1. Beam 1-2,B (Ground Floor Plan) Teo Vi Vien Dead load Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load at 1-2,A-B = 3.6kN/m² x 1.875m/2 =​ ​3.375kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 =​ ​5.22kN/m Total dead load = (1.62 + 8.55 + 3.375 + 5.22)kN/m =​ ​18.765kN/m Ultimate dead load = 18.765kN/m x 1.4 =​ ​26.3kN/m Live load Live load at 1-2,A-B = 1.5kN/m² x 1.875m/2 = 1.41kN/m Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 = 2.175kN/m Total live load = (1.41 + 2.175)kN/m = 3.59kN/m Ultimate live load = 3.59kN/m x 1.6 = 5.74kN/m Total ultimate load = 26.3kN/m + 5.74kN/m = 32.04kN/m Distributed load = (32.04kN/m x 3.775m) = 120.95kN ​/2 (UDL) = 60.48kN ​(Reaction Force) 60.48kN x 1.89m x 1/2 = ​57.15kNm
  • 2. 2. Beam 2-Y,C (Ground Floor Plan) Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Dead load at 2-Y,A-C = 3.6kN/m² x 4.78m/2 = 8.6kN/m Dead load 2-Y,C-D = 3.6 kN/m² x 1.75m/2 = 3.15kN/m Total dead load = (8.6 + 3.15 + 1.62)kN/m = 13.37kN/m Ultimate dead load = 13.37kN/m x 1.4 = 18.72kN/m Live load Live load at 2-Y,A-C = 1.5kN/m² x 4.78m/2 = 3.59kN/m Live load at 2-Y,C-D = 1.5kN/m² x 1.75m/2 = 1.31kN/m Total live load = (3.59 + 1.31)kN/m = 4.9kN/m Ultimate live load = 4.9kN/m x 1.6 = 7.84kN/m Total ultimate load = 7.84kN/m + 18.72kN/m = 26.56kN/m Distributed load = (26.56kN/m x 5.2m) = 138.11kN​ /2 (UDL) = 69.06kN ​(Reaction Force) Shear force diagram 69.06kN x 2.6m x 1/2 = ​89.78kNm
  • 3. 3. Beam 2,A-D (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 2-4,A-C = 3.6kN/m² x 4.775m/2 x 2/3 = 5.73kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 x 2/3 = 3.48kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.6m/2 = 2.88kN/m Total dead load at grid A-B = (1.62 + 8.55 + 5.73)kN/m = 15.9kN/m Total dead load at grid B-C = (1.62 + 8.55 + 5.73 + 3.48)kN/m = 19.38kN/m Total dead load at grid C-D = (1.62 + 8.55 + 2.88)kN/m = 13.05kN/m Ultimate dead load of grid A-B = 15.9kN/m x 1.4 = 22.26kN/m Ultimate dead load of grid B-C = 19.38kN/m x 1.4 = 27.13kN/m Ultimate dead load of grid C-D = 13.05kN/m x 1.4 = 18.27kN/m
  • 4. Live load Live load at 2-4,A-C = 1.5kN/m² x 4.775m/2 x 2/3 = 2.39kN/m Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 x 2/3 = 1.45kN/m Live load at U-2,C-D = 1.5kN/m² x 1.6m/2 = 1.2kN/m Total live load on grid A-B = 2.39kN/m Total live load on grid B-C = (2.39 + 1.45)kN/m = 3.84kN/m Total live load on grid C-D = 1.2kN/m Ultimate live load for grid A-B = 2.39kN/m x 1.6 = 3.824kN/m Ultimate live load for grid B-C = 3.84kN/m x 1.6 = 6.144kN/m Ultimate live load for grid C-D = 1.2kN/m x 1.6 = 1.92kN/m Total ultimate load on grid A-B = (22.26 + 3.824)kN/m 26.08kN/m Total ultimate load on grid B-C = (27.13 + 6.144)kN/m = 33.28kN/m Total ultimate load on grid C-D = (18.27 + 1.92)kN/m = 20.19kN/m Take point load from 1-2,B = 60.48kN Take point load from 2-4,C and 1-2,C = 69.06kN + 73.19kN = 142.25kN
  • 5. Take moment at point A, 48.9kN/m(0.9375m) + 60.48kN/m(1.875m) + 96.51kN/m(3.325m) + 142.25kN/m(4.775m) + 35.33kN/m(5.65m) - DkN/m(6.525m) = 0 6.525D = 1358.998 D = 208.28kN Take moment at point D, 35.33kN/m(0.875m) + 142.25kN/m(1.75m) + 96.51kN/m(3.2m) + 60.48kN/m(4.65m) + 48.9kN/m(5.59m) - AkN/m(6.525m) = 0 6.525A = 1143.266 A = 175.21kN Shear area diagram A = 1/2 x (126.31 + 175.21)kN x 1.875m = 282.68kNm B = 1/2 x 65.83kN x 1.978m = 65.11kNm C = 1/2 x 30.68kN x 0.921m = 14.13kNm D = 1/2 x (172.93 + 208.26)kN x 1.75m = 333.54kNm
  • 6. 4. Beam U,C-D (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.4m/2 = 2.52kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.75m/2 x 2/3 = 2.1kN/m Total dead load = (1.62 + 8.55 + 2.52 + 2.1)kN/m = 14.79kN/m Ultimate dead load = 14.79kN/m x 1.4 = 20.71kN/m Live load Live load at 1-U,C-D = 1.5kN/m² x 1.4m/2 = 1.05kN/m Live load at U-2,C-D = 1.5kN/m² x 1.75m/2 x 2/3 = 0.875kN/m Total live load = (1.05 + 0.875)kN/m = 1.925kN/m Ultimate live load = 1.925kN/m x 1.6 = 3.08kN/m Total ultimate load = (20.71 + 3.08) kN/m = 23.79kN/m Distributed load = 23.79kN/m x 1.75m = 41.63kN​ /2 (UDL) = 20.82kN ​(Reaction Force/Point Load at 1-2,C) 20.82kN x 0.875m x 1/2 = ​9.11kNm
  • 7. 5. Beam 1-2,C (Ground Floor Plan) Teo Vi Vien Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-2,B-C = 3.6kN/m² x 2.9m/2 = 5.22kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.4m/2 x 2/3 = 1.68kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.75m/2 = 3.15kN/m Total dead load = (1.62 + 8.55 + 5.22 + 1.68 + 3.15)kN/m = 20.22kN/m Ultimate dead load = 20.22kN/m x 1.4 = 28.3kN/m Live load Live load at 1-2,B-C = 1.5kN/m² x 2.9m/2 = 2.175kN/m Live load at U-2,C-D = 1.5kN/m² x 1.4m/2 x 2/3 = 0.7kN/m Live load at 1-U,C-D = 1.5kN/m² x 1.75m/2 = 1.31kN/m Total live load = (2.175 + 0.7 + 1.31)kN/m = 4.19kN/m Ultimate live load = 4.19kN/m x 1.6 = 6.71kN
  • 8. Total ultimate load = (28.3 + 6.71)kN/m = 35.01kN/m ​x 3.775m = 132.16kN ​(UDL) Point load from ​Beam 4. U,C-D = 20.82kN Take moment at point 2C, 20.8kN(1.4m) + 132.16kN(1.8875m) - 2CkN(3.775m) = 0 Reaction force at 2C = 73.79kN Reaction force at 1C = 20.8kN + 132.16kN - 73.79kN = 79.17kN Shear graph area A = 1/2 x (30.16kN + 79.17kN) x 1.4m = ​76.53kNm x/2.375 = 9.36/83.15 x = 0.267 B = 1/2 x 9.36kN x 0.267m = ​1.25kNm C = 1/2 x 73.79kN x 2.108m = ​77.77kNm
  • 9. 6. Beam T-2,D’ Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load T-2,D-D’ = 3.6kN/m² x 1.2m/2 = 2.16kN/m Dead load T-2,D’-E = 3.6kN/m² x 1.2m/2 = 2.16kN/m Total dead load = (1.62 + 8.55 + 2.16 + 2.16)kN/m = 14.49kN/m Ultimate dead load = 14.49kN/m x 1.4 = 20.29kN/m Live load Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load at T-2,D’-E = 1.5kN/m² x 1.2m/2 = 0.9kN/m Total live load = (0.9 + 0.9)kN/m = 1.8kN/m Ultimate live load = 1.8kN/m x 1.6 = 2.88kN/m Total ultimate load = (20.29 + 2.88)kN/m = 23.17kN/m Distributed load = 23.17kN/m x 2.1m =48.66kN /2 = 24.33kN (Point load) Shear area diagram = 24.33kN x 1.05m x 1/2 = ​12.77kNm
  • 10. 7. Beam T,D-E Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at T-2,D-D’ = 3.6kN/m² x 1.2m/2 x 2/3 = 1.44kN/m Dead load at T-2,D’-E = 3.6kN/m² x 1.2/2 x 2/3 = 1.44kN/m Dead load 1-T,D-E = 3.6kN/m² x 1.5m/2 = 2.7kN/m Total dead load = (1.62 + 8.55 + 1.44 + 1.44 + 2.7)kN/m = 15.75kN/m Ultimate dead load = 15.75kN/m x 1.4 = 22.05kN/m Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 x 2/3 = 0.6kN/m Live load at T-2,D’-E = 1.5kN/m² x 1.2m/2 x 2/3 = 0.6kN/m Live load at 1-T,D-E = 1.5kN/m² x 1.5m/2 = 1.125kN/m Total live load = (0.6 + 0.6 + 1.125)kN/m = 2.325kN/m Ultimate live load = 2.325kN/m x 1.6 = 3.72kN/m
  • 11. Total ultimate load = (22.05 + 3.72)kN/m = 25.77kN/m x 2.7m = 69.58kN Point load from beam T-2,D’ = 24.33kN Take moment at point D, 69.58kN(1.35m) + 24.33kN(1.35m) - DkN(2.7m) = 0 Reaction force at ​D = 46.95kN Reaction force at E = 24.32kN + 69.58kN - 46.95kN = 46.95kN Shear area diagram = 1/2 x (46.95 + 12.16)kN x 1.35m =39.9kNm
  • 12. 8. Beam 1-2,D (Ground Floor Plan) Lim Zanyu Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at U-2,C-D = 3.6kN/m² x 1.5m/2 x 2/3 = 1.8kN/m Dead load at 1-U,C-D = 3.6kN/m² x 1.75m/2 = 3.15kN/m Dead load at T-2,D-D’ = 3.6kN/m² x 1.2m/2 = 2.16kN/m Dead load at 1-T,D-D’ = 3.6kN/m² x 1.6m/2 x 2/3 = 1.92kN/m Total dead load at grid 2-U = (1.62 + 1.8 + 2.16)kN/m = ​5.58kN/m Total dead load at grid U-T = (1.62 + 8.55 + 3.15 + 2.16)kN/m = ​15.48kN/m Total dead load at grid T-1 = (1.62 + 8.55 + 3.15 + 1.92)kN/m = ​15.24kN/m Ultimate dead load at grid U-2 = 5.58kN/m x 1.4 = 7.81kN/m Ultimate dead load at grid T-U = 15.48kN/m x 1.4 = 21.67kN/m Ultimate dead load at grid 1-T = 15.24kN/m x 1.4 = 21.34kN/m
  • 13. Live load Live load at U-2,CD = 1.5kN/m² x 1.5m/2 x 2/3 = 0.75kN/m Live load at 1-U,CD = 1.5kN/m x 1.75m/2 = 1.31kN/m Live load at T-2,D-D’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load 1-T,D-D’ = 1.5kN/m² x 1.6m/2 x 2/3 = 0.8kN/m Total live load at grid 2-U = (0.75 + 0.9)kN/m = 1.65kN/m Total live load at grid U-T = (1.31 + 0.9)kN/m = 1.21kN/m Total live load at grid T-1 = (1.31 + 0.8)kN/m = 2.11kN/m Ultimate load at grid U-2 = 1.65kN/m x 1.6 = 2.64kN/m Ultimate load at grid T-U = 1.21kN/m x 1.6 = 1.936kN/m Ultimate load at grid 1-T = 2.11kN/m x 1.6 = 3.376kN/m Total ultimate load on grid U-2 = (7.81 + 2.64)kN/m = 10.45kN/m Total ultimate load on grid T-U = (21.67 + 1.936)kN/m = 23.61kN/m Total ultimate load on grid 1-T = (21.34 + 3.376)kN/m = 24.71kN/m Point load of grid U-2
  • 14. = (7.81 + 2.64)kN/m = 10.45kN/m​ ​x 1.5m = 15.68kN Point load of grid T-U = (21.67 + 1.936)kN/m = 23.61kN/m x 0.5m = 11.8kN Point load of grid 1-T = (21.34 + 3.376)kN/m = 24.71kN/m x 1.6m = 39.54kN/m Point load from ​Beam 4. U,C-D = 20.8kN Reaction force as point load from ​Beam 7. T,D-E = 46.95kN Take moment at point A, 15.68kN/m(0.75m) + 20.8kN/m(1.5m) + 11.8kN/m(1.75m) + 46.95kN/m(2m) + 39.54kN/m(2.8m) - B(3.6m) = 0 3.6B = 268.22kN/m B = 74.51kN Take moment at point B, -39.54kN/m(0.8m) - 46.95kN/m(1.6m) - 11.8kN/m(1.85m) - 20.8kN/m(2.1m) - 15.68kN/m(2.85m) + A(3.6m) = 0 3.6A = 216.95kN/m A = 60.26kN Shear area diagram Area A = 1/2 x (44.58kN + 60.26kN) x 1.5m = 78.63kNm Area B = 1/2 x (11.98kN + 23.78kN) x 0.5m = 8.94kNm Area C = 1/2 x (34.97kN + 74.51kN) x 1.6m = 87.58kNm
  • 15. Beam 4-2, E (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 2-4, E-F = 3.6kN/m² x 5.6m/2 = 10.08kN/m Dead load 1-X, D-E = 3.6kN/m² x 2.6m/2 = 4.68kN/m Total dead load X-4, E = (1.62 + 8.55 + 10.08) kN/m = 20.25kN/m Total dead load 2-X, E = (1.62 + 8.55 + 10.08 + 4.68) kN/m = 24.93kN/m Ultimate dead load X-4, E =20.25kN/m x 1.4 = 28.35kN/m Ultimate dead load 2-X, E = 24.93kN/m x 1.4 = 34.9kN/m Live load 2-4, E-F = 1.5kN/m² x 5.6m/2 = 4.2kN/m Live load 1-X, D-E = 1.5kN/m² x 2.6m/2 =1.95kN/m Total live load at X-4, E = 4.2kN/m Total live load 2-X, E = (4.2 + 1.95) kN/m = 6.15kN/m Ultimate live load X-4, E = 4.2kN/m x 1.6 = 6.72kN/m Ultimate live load 2-X, E = 6.15kN/m x 1.6
  • 16. = 9.84kN/m Total ultimate load X-4, E = (28.35 + 6.72) kN/m = 35.07kN/m Total ultimate load 2-X, E = (34.9 + 9.84) kN/m = 44.74kN/m Point load from beam X, D-E = ​11.34kN/m Distributed load X-4, E = 35.07kN/m x 4m = 140.28kN Distribution load 2-X, E = 44.74kN/m x 1.6m = 71.58kN/m Total moment of point 4E = 140.28kN(2m) + 11.34kN(4m) + 71.58kN(4.8m) - 2E(5.6m) 2E(5.6m) = 669.5kNm 2E reaction force = 119.55kN 4E reaction force = (140.28 + 11.34 + 71.58 - 119.55) kN = 103.65kN Shear graph area x/4 = 36.63/140.28 x = 1.04m A = ½ (103.65kN x 2.96m) = 153.4kNm B = ½ (36.63kN x 1.04m) = 19.05kNm C = ½ (47.97kN+ 119.55kN) x 1.6m = 134.02kNm
  • 17. Beam X, D-E (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Dead load at 1-X, D-E = 3.6kN/m² x 2.6m/2 x ⅔ = 3.12kN/m Total dead load = (3.12 + 1.62) kN/m = 4.74kN/m Ultimate dead load = 4.74kN/m x 1.4 = 6.64kN/m Live load 1-X, D-E = 1.5kN/m² x 2.6m/2 x ⅔ = 1.3kN/m Ultimate live load 1-X, D-E = 1.3kN/m x 1.6 = 2.08kN/m Total ultimate load = 6.64kN/m + 2.08kN/m =8.72kN/m Distributed load = 8.72kN/m x 2.6m = 22.67kN/m​ /2 = 11.34kN Shear force area = ½ (11.34kN + 1.3m) = 6.32kNm
  • 18. Beam 2 E-E’ (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load 1-2, E-E’ = 3.6kN/m² x 3.4m/2 x ⅔ 4.08kN/m Dead load 2-4, E-F = 3.6kN/m² x 5.6m/2 x ⅔ = 6.72kN/m Total dead load = (1.62 + 8.55 + 4.08 + 6.72) kN/m = 20.97kN/m Ultimate dead load = 20.97kN/m x 1.4 = 29.36kN/m Live load 1-2, E-E’ = 1.5kN/m² x 3.4m/2 x ⅔ = 1.7kN/m Live load 2-4, E-F = 1.5kN/m² x 5.6m/2 x ⅔ = 2.8kN/m Total live load = (1.7 + 2.8)kN/m = 4.5kN/m Ultimate live load = 4.5kN/m x 1.6 = 7.2kN/m Total ultimate load = (29.36 + 7.2)kN/m = 36.56kN/m Distributed load = 36.56kN/m x 3.4m = 124.3kN​ / 2 = 62.15kN
  • 19. Shear force area = ½ (62.15kN x 1.7m) = 52.83kNm
  • 20. Beam T, E’-F (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load T-2, E’-F = 3.6kN/m² x 2/2 x ⅔ = 2.4kN/m Total dead load = (1.62 +8.55 + 2.4) kN/m = 12.57kN/m Ultimate dead load = 12.57kN/m x 1.4 = 17.6kN/m Live load T-2, E’-F = 1.5kN/m² x 2/2 x ⅔ = 1kN/m Ultimate live load = 1kN/m x 1.6 = 1.6kN/m Total ultimate load = (17.6 + 1.6) kN/m = 19.2kN/m Distributed load = 19.2kN/m x 2m = 38.4kN​ / 2 = 19.2kN/m Shear force area = ½ (1m x 19.2kN) = 9.6kNm
  • 21. Beam 1-2, E’ (First Floor Plan) Yen Wei Zheng Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load 1-2, E-E’ = 3.6kN/m² x 3.5m/2 = 6.3kN/m Dead load T-2, E’-F = 3.6kN/m² x 2m/2 = 3.6kN/m Total dead load T-2, E’ = (1.62 + 8.55 + 6.3 + 3.6)kN/m = 20.07kN/m Total dead load 1-T, E’ = (1.62 + 8.55 + 6.3)kN/m = 16.47kN/m Ultimate dead load T-2, E’ = 20.07kN/m x 1.4 = 28.1kN/m Ultimate dead load 1-T, E’ = 16.47kN/m x 1.4 = 23.06kN/m Live load 1-2, E-E’ = 1.5kN/m x 3.5m/2 = 2.63kN/m Live load T-2, E’-F = 1.5kN/m x 2m/2 = 1.5kN/m Total live load T-2, E’ = (2.63 + 1.5)kN/m = 4.13kN/m Ultimate live load T-2, E’ = 4.13kN/m x 1.6 = 6.61kN/m Ultimate live load 1-1’E’ = 2.63kN/m x 1.6 = 4.21kN/m
  • 22. Total ultimate load T-2, E’ = (28.1 + 6.61)kN/m = 34.71kN/m Total ultimate load 1-T, E’ = (23.06 + 4.21)kN/m = 27.27kN/m UDL (T-2, E’) to point load = 34.71kN/m x 2m = 69.42kN UDL (1-T, E’) to point load = 27.27kN/m x 1.5m = 40.9kN Point load from Beam T, E’-F = 19.2kN Total moment of point 2E’ = 69.42kN(1m) + 19.2kN(2m) + 40.9kN(2.75m) - 1E’(3.5m) 1E’(3.5m) = 220.3kN Reaction force 1E’ = 62.94kN Reaction force 2E’ = (69.42 + 19.2 + 40.9 - 62.94)kN = 66.58kN Shear force area x/2 = 2.84/69.42 x = 0.08m A = ½ (66.58kN x 1.92m) = 63.92kNm B = ½ ( 0.08m x 2.84kN) = 0.11kNm C = ½ (22.04kN + 62.94kN) x 1.5m = 63.74kNm
  • 23. Beam W-Y, C winter Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load WY, CD = 3.6kN/m² x 1.75m/2 = 3.15kN/m Dead load WY, A’C = 3.6kN/m² x 2.9m/2 = 5.22kN/m Total dead load 3Y, C = (1.62 + 8.55 + 3.15 + 5.22) kN/m = 18.54kN/m Total dead load 3W, C = (1.62 + 3.15 + 5.22) kN/m = 9.99kN/m Ultimate dead load 3Y, C = 18.54kN/m x 1.4 = 26.3kN/m Ultimate dead load 3W, C = 9.99kN/m x 1.4 = 13.986kN/m Live load WY, CD = 1.5kN/m² x 1.75m/2 = 1.313kN/m Live load WY, A’C = 1.5kN/m² x 2.9m/2 = 2.175kN/m² Total live load = (1.313 + 2.175)kN/m = 3.488kN/m Ultimate live load = 3.488kN/m x 1.6 = 5.581kN/m Total ultimate load 3Y, C = (26.3 + 5.581) kN/m = 31.881kN/m
  • 24. Point load 3Y, C = 31.881kN/m x 2.9m = 92.455kN Point load 3W, C = 19.567kN/m x 1.6m = 31.307kN Total moment YC = 92.455kN(1.45m) + 31.307kN(3.7) - WC(4.5) WC(4.5) = 249.896kN Reaction force WC = 55.532kN Reaction force YC = (92.455 + 31.307 - 55.532) = 68.23kN Shear force area x/2.9 = 24.225/92.455 x = 0.76m A = ½ (68.23kN x 2.14m) ​= 73kNm B = ½ (24.225kN x 0.76m) ​= 9.21kNm C = ½ (24.225kN + 55.532kN) x 1.6m ​ = 63.81
  • 25. Beam Y, A’D winter Beam self weight = 0.15m x 0.45m x 24kN/m =​ ​1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m =​ ​8.55kN/m Dead load WY, A’C = 3.6kN/m² x 3.5m/2 x ⅔ = 4.2kN/m Dead load YZ, A’D = 3.6kN/m² x 1m/2 = 1.8kN/m Total dead load Y, A’C = (1.8+4.2+1.62+8.55) = 16.17kN/m Ultimate dead load Y, A’C = 16.17kN/m x 1.4 = 22.64kN/m Total dead load Y, CD = (1.8+1.62+8.55)kN/m = 11.97kN/m Ultimate dead load Y, CD = 11.97kN/m x 1.4 = 16.758kN/m Live load WY, A’C = 1.5kN/m² x 3.5m/2 x ⅔ = 1.75kN/m Live load YZ, A’D = 1.5kN/m² x 1m/2 = 0.75kN/m Total ultimate load Y, A’C = (0.75+1.75) kN/m = 2.5kN/m Ultimate live load Y, A’C = 2.5kN/m x 1.6 = 4kN/m Live load Y,CD =1.75kN/m
  • 26. Ultimate live load Y, CD = 1.75kN/m x 1.6 = 2.8kN/m Total ultimate load Y, A’C = (22.638+4) kN/m = 26.64kN/m Total ultimate load Y, CD = (16.758+2.8) kN/m = 19.558kN/m Point load at Y, A’C = 26.638kN/m x 3.5m = 93.24kN Point load Y, CD = 19.558kN/m x 1.75m = 34.2265kN Total moment of YD = 34.2265kN(0.875m) + 68.23kN(1.75m) + 93.24kN(3.5m) - YA’(5.25m) YA’(5.25) = 475.69 YA’ reaction force = 90.61kN YD reaction force = (34.2265+68.23+93.24-90.61) = 105.09kN Shear force area x/3.5 = 2.63/93.24 x = 0.0987m A = ½ (105.09kN+70.86kN) x 1.75m ​ = 153.96kNm B = ½ (0.0987m x 2.63kN) = 0.13kN C = ½ (90.61kN x 3.4m) = 154.04kNm
  • 27. Beam X-4, D winter Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load WY, CD = 3.6kN/m x 1.75m/2 = 3.15kN/m Total dead load Y-4, D = (1.62+8.55) = 10.17kN/m Ultimate dead load Y-4, D = 10.17kN/m x 1.4 = 14.238kN/m Total dead load X-Y, D = (1.62+8.55+3.15) = 13.32kN/m Ultimate dead load X-Y, D = 13.32kN/m x 1.4 = 18.648kN/m Live load WY, CD = 1.5kN/m x 1.75m/2 = 2.625kN/m Ultimate live load = 2.625kN/m x 1.6 = 4.2kN/m Total ultimate load Y-4, D = 14.238kN/m Total ultimate load X-Y, D = (18.648+4.2) kN/m = 22.848kN/m Point load from beam Y, A’D = 105.09kN Point load at Y-4 = 14.238kN/m x 0.4m = 5.695kN
  • 28. Point load at X-Y = 22.848kN/m x 3.8m = 86.822kN Total moment at 4,D = 5.695kN(0.2m) + 105.09kN(0.4m) + 86.822kN(2.3m) - XD(4.2) XD(4.2) = 242.87Kn Reaction force at XD = 57.83kN Reaction force at 4D = (5.695+105.09+86.822-57.83)kN = 139.78kN Shear force area x/3.8 = 29/86.83 x = 1.27m A = ½ (139.78kN+132.09kN) x 0.4m ​ = 54.37kNm B = ½ (29kN x 1.27m) ​ = 18.42kNm C = ½ (2.53m x 57.83kN) ​= 73.15kNm
  • 29. Beam V, C-D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load 1-V, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Dead load V-W, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Total dead load = (1.62 + 8.55 + 2.1 + 2.1 ) kN/m = 14.37kN/m Ultimate dead load = 14.37kN/m x 1.4 = 20.118kN/m Live load 1-V, CD = 1.5kN/m² x 1.75/2 = 1.31kN/m Live load V-W, CD = 1.5kN/m² x 1.75/2 = 1.31kN/m Total live load = (1.31 + 1.31 )kN/m = 2.62kN/m Ultimate live load = 2.62kN/m x 1.6 = 4.19kN/m Total ultimate load = (20.118 + 4.19 )kN/m = 24.31kN/m Distributed load = 24.31kN/m x 1.75m = 42.54kN / 2 = 21.27kN/m Shear force area = ½ (0.87m x 21.27kN/m) = 9.3kNm
  • 30. Beam W, C-D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load V-W, CD = 3.6kN/m² x 1.75/2 x ⅔ = 2.1kN/m Dead load W-Y, CD = 3.6kN/m² x 1.75/2 = 3.15kN/m Total dead load = (1.62 + 8.55 + 2.1 + 3.15 ) kN/m =15.42kN/m Ultimate dead load = 15.42kN/m x 1.4 = 21.588kN/m Live load W, C-D = 1.5kN/m² x 1.75/2 = 1.31kN/m Live load W, C-D = 1.5kN/m² x 1.75/2 = 1.31kN/m Total live load = (1.31 + 1.31 )kN/m = 2.62kN/m Ultimate live load = 2.62kN/m x 1.6 = 4.19kN/m Total ultimate load = (21.59 + 4.19 )kN/m = 25.78kN/m Distributed load = 25.78kN/m x 1.75m = 45.12kN / 2 = 22.56kN/m Shear force area = ½ (0.87m x 22.56kN/m) = 9.87kNm
  • 31. Beam 1-X, D (First Floor Plan) Teo Chong Yih Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15 x 19kN/m =8.55kN/m Dead load 1-V, D = 3.6kN/m² x 2.65/2 x ⅔ = 3.18kN/m Dead load V-W, D = 3.6kN/m² x 2/2 x ⅔ = 2.4kN/m Dead load 1-X = 3.6kN/m² x 5.3 = 19.08kN/m Dead load W-X,D = 3.6kN/m² x 0.875m = 3.15kN/m Total dead load = (1.62 + 8.55 + 19.08 + 3.15 ) kN/m, (1.62 + 2.4 + 19.08)kN/m, (1.62 + 8.55 + 3.18 + 19.08)kN/m = 32.4kN/m , 23.1kN/m, 32.43kN/m Ultimate dead load = 32.4kN/m x 1.4, 23.1kN/m x 1.4, 32.43kN/m x 1.4 = 45.36kN/m, 32.34kN/m, 45.4kN/m Live load 1-V, D = 1.5kN/m² x 2.65/2 = 1.99kN/m Live load V-W, D = 1.5kN/m² x 2/2 = 1.5kN/m Live load W-X, D = 1.31kN/m Live load 1-X = 1.5 x 5.3/2 = 3.98kN/m
  • 32. Total live load = (1.31 + 3.98 )kN/m , (1.5 + 3.98)kN/m , (1.99 + 3.98)kN/m = 5.29kN/m , 5.48kN/m , 5.97kN/m Ultimate live load = (5.29kN/m x 1.6) , (5.48kN/m x 1.6) , (5.97kN/m x 1.6) = 8.46kN/m , 8.77kN/m , 9.55kN/m Total ultimate load = (45.36 + 8.46)kN/m , (32.34 + 8.77 )kN/m , (45.4 + 9.55)kN/m = 53.82kN/m, 41.11kN/m, 54.95kN/m Distributed load = 53.82kN/m x 0.7m , 41.11kN/m x 2m , 54.95 x 2.65m = 37.67kN, 82.22kN, 145.62kN Take moment at point XD, (37.67kN x 0.35m) + (22.56kN x 0.7m) + (82.22kN x 1.7m) + (21.27 x 2.7m) + (145.62kN x 4.025m) - 5.35z = 13.18kNm + 15.79kNm + 139.77kNm + 57.43kNm + 586.12kNm - 5.35z = 812.29Nm - 5.35z (5.35m)z = 812.29kNm z = 151.83kN (145.62kN x 1.325m) + (21.27kN x 2.65m) + (82.22kN x 3.65m) + (22.56kN x 4.65) + (37.67kN x 5.025m ) = 5.35x 192.95kNm + 56.37kNm + 300.1kNm + 104.9kNm + 189.29kNm = (5.35m)x x = 157.68kN Shear graph area A = ½ (157.68kN + 120.01kN) x 0.7 = 97.19kNm B = ½ (97.45kN + 15.23kN) x 2 = 112.68kNm C = ½ (-6.04kN - 151.66kN) x 2.65 = -208.95kNm
  • 33. Beam W, A’-C (First Floor Plan) WINTER Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at W-Y, A’-C = 3.6kN/m² x 3.5m/2 x 2/3 = 4.2kN/m Dead load at 1-W, A’-C = 3.6kN/m² x 1.2/2 x 2/3 = 4.2kN/m Total dead load = (1.62 + 8.55 + 4.2 + 4.2)kN/m = 18.57kN/m Ultimate dead load = 18.57kN/m x 1.4 = 26kN/m Live load at W-Y, A’-C = 1.5kN/m² x 3.5m/2 x 2/3 = 1.75kN/m Live load at 1-W, A’-C = 1.5kN/m² x 3.5m/2 x 2/3 = 1.75kN/m Total live load = (1.75 + 1.75)kN/m = 3.5kN/m Ultimate live load = 3.5kN/m x 1.6 = 5.6kN/m Total ultimate load = (26 + 5.6)kN/m = 31.6kN/m Distributed load 31.6kN/m x 3.5m/2 = 55.3kN Shear graph area = ½ x 55.3kN x 1.75m = 48.3kNm
  • 34. Beam A’, 2-Y (First Floor Plan) WINTER Beam self weight = 0.15m x 0.45m x 24kN/m = 1.62kN/m Brick wall weight = 3m x 0.15m x 19kN/m = 8.55kN/m Dead load at 1-Y, A-A’ = 3.6kN/m² x 1.2m/2 = 2.16N/m Dead load at W-Y, A’-C = 3.6kN/m² x 3.5m/2 = 6.3kN/m Dead load at 2-W, A’-C = 3.6kN/m² x 3.5m/2 = 6.3kN/m Total dead load at grid W-Y = (1.62 + 8.55 + 2.16 + 6.3)kN/m = 18.63kN/m Total dead load at grid 2-W = (1.62 + 8.55 + 2.16 + 6.3)kN/m = 18.63kN/m Ultimate dead load at grid W-Y = (18.63kN/m x 1.4) = 26.08kN/m Ultimate dead load at grid 2-W = (18.63kN/m x 1.4) = 26.08kN/m Live load at 1-Y, A-A’ = 1.5kN/m² x 1.2m/2 = 0.9kN/m Live load at W-Y, A’-C = 1.5kN/m² x 3.5m/2 = 2.63kN/m Live load at 2-W, A’-C = 1.5kN/m² x3.5m/2 = 2.63kN/m Total live load at grid W-Y = (0.9 + 2.63)kN/m = 3.53kN/m Total live load at grid 2-W
  • 35. = (0.9 + 2.63)kN/m = 3.53kN/m Ultimate live load at grid W-Y = (3.53kN/m x 1.6) = 5.65kN/m Ultimate live load at grid 2-W = (3.53kN/m x 1.6) = 5.65kN/m Total ultimate load at grid W-Y = (26.08 + 5.65)kN/m = 31.73kN/m Total ultimate load at grid 2-W = (26.08 + 5.65)kN/m = 31.73kN/m Distributed load of gid W-Y = 31.73kN/m x 4.5m = 142.79kN Distributed load of grid 2-W = 31.73kN/m x 1m = 31.73kN Take moment at point YA’ (142.79kN x 2.25m) + (55.3kN x 4.5m) + (31.73kN x 5m) = (5.5m)YA’ (5.5m)YA’ = 728.78kNm YA’ = 132.51kN Take moment at point A’2 (31.73kN x 0.5m) + (55.3kN x 1m) + (142.79kN x 3.25m) = (5.5m)2A’ (5.5m)2A’ = 535.23kNm 2A’ = 97.32kN Shear graph area x/4.5 = 97.32/142.79 x = 3.07 A = ½ x 3.07m x 97.32kN = 149.24kNm B = ½ x 1.23m x 45.47kN = 32.51kNm C = ½ x (100.77kN + 132.5kN) x 1m = 116.64